Industrial Pretreatment Quarterly Self-Monitoring Results, for Sept 1997
ML20203H314
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 09/30/1997
From: Myers L
CENTERIOR ENERGY
To:
Shared Package
ML20203H306 List:
References
NUDOCS 9712180380
Download: ML20203H314 (1)


Text

,

Q 1

1

, , INDUST RI AL PRETREA1 MENT QU AR11 RLY SI:ll410Ni1ORING RESULTS Poi) Nut:<a l'ower 1%nt Permit No.: 100401I 10 Center Rd Report Date: 9/12/97 7 Pctry, Ohio 44081 Laboratory: Electro Analytical Date of Sample: 9/4 to 9'5/97 Time of sample: 1645 Sample Location: Seware Pump Station Name of Sampler: A. Beckler Laboratory Address: 7118 Industrial Park filvd.

Mentor, Ohio 44060 5314

!) ate of Analysiv 9/5 to 9/11/97 I low: 33,000 ppd PARAMETliR SAMPLE EPA ANALYSIS DIScilARGE ANALYSIS TYPl! METil0D DATE LIMIT RESULT COD Composite 410.4 9/8/97 n'a 230 mg/l

~

110D ' Composite 405.1 9/10/97 n/a 140 mg/l TSS Composite 160.2 9/lI/97 n/a 240 mg/l Silver Composite 272,1 9/10/97 n/a < 050 g/l Mercury Composite 245.1 9/10.97 2 ug/l (0.50 ug/l pil Composite 150.1 9/5/97 5.5 tol2 s.u. 7.8 s.u.

Oil'Orcase Grab 413.1 9/10/97 50 mg/l 15 mg/l I certify under penalty of law that I have personally examined and I am familiar with the infonnation in this report and that, based on my inquiry of those persons immediately responsible for obtaining the infonnation contained in ti.a report, I belies e that the infotmation is true, accurate, and cornplete, I am aware that there are significant penalties for submhting false information including the possibility of fine and imprisonment.

Ag/)/ggp / ./M97 ,ylce President . Nuclear Signature 0 tate Title 9712180300 971210 PDR ADOCK 05000440 N PDR

- .