ML20248L498

From kanterella
Jump to navigation Jump to search
Quarterly Self-Monitoring Results for Jan 1998, for Perry Nuclear Power Plant
ML20248L498
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 01/31/1998
From: Myers L
CENTERIOR ENERGY
To:
Shared Package
ML20248L291 List:
References
NUDOCS 9803230127
Download: ML20248L498 (1)


Text

.

INDUSTRIAL RETREATMENT QUARTERLY SELF-MONITORING RESULTS l

Perry Nuclear Power Plant Permit No.: 1004911

{

- 10 Center Rd.

Report Date: 1/13/98 i

Perry, Ohio 44081 Laboratory: Electro Analytical '

l Date of Sample: 1/5 to 1/6/98 Time of sample: 1030 e,

Sample Location: Sewage Pump Station Name ofSampler:Beckler i

Laboratory Address: 7118 Industnal Park Blvd.

Mentor, Ohio 44060-5314 Date of Analysis: 1/6 to 1/12/98 Flow: 33,000 gpd PARAMETER SAMPLE EPA ANALYSIS DISCHARGE ANALYSIS TYPE METHOD DATE LIMIT RESULT i

COD Composite 410.4 1/6S8 n/a 150 mg/l -

l BOD Composite 405.1 1/12/98 n/a 50 mg/l TSS Composite 160.2 In/98 n/a 44 mg/l Silver Composite 272.1 1/9/98 n/a

<.050 mg/l Mercury.

Composite 245.1-1/12/98 2 ug/l

<.50 ug/l pH Composite 150.1 1/7/98 5.5 to 12 s.u.

8.4s.u.

Oil /Gmase Grab 413.1 1/6/98 50 mg/l 18 mg/l l

I I certify under penalty oflaw that I have personally examined and I am familiar with the information in this report and that, based on my ino,elry of those persons immediately responsible for obtaining the information contained in this report, I believe that the information is true, accurate, and complete. I am aware that there are significant penalties for submitting false information including the possibility of fme and imprisonment.

a Q (Yu m 3[9IS'l Vice President -Nuclear ignature O

Date Title i

I i

f 9903230127 990312 PDR ADOCK 05000440 R

PDR

-- - -- J