ML20248L491

From kanterella
Jump to navigation Jump to search
Quarterly Self-Monitoring Results for Dec 1997, for Perry Nuclear Power Plant
ML20248L491
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 12/31/1997
From: Myers L
CENTERIOR ENERGY
To:
Shared Package
ML20248L291 List:
References
NUDOCS 9803230120
Download: ML20248L491 (1)


Text

-

=

F I .  : j f

INDUSTRIAL RETREATMENT

, ., . QUARTERLY SELF-MONITORING RESULTS Perry Nuclear Power Plant Permit No.: 1004911 10 Center Rd. Report Date: 12/18/97 Perry, Ohio 44081 Laboratory: Electro Analytical Date of Sample: 12/8 to 12/9/97 Time of sample: 1115 r, Sample Location: Sewage Pump Station Name of Sampler: Beckler

- Laboratory Address
7118 Industrial Park Blvd.

Mentor, Ohio 44060-5314 Date of Analysis: 12/9 to 12/16/97 Flow: 33,000 gpd

)

I PARAMETER SAMPLE EPA ANALYSIS DISCHARGE ANALYSIS TYPE METHOD DATE LIMIT RESULT COD Composite 410.4 12/15/97 n/a 450 mg/l BOD Composite 405.1 12/15/97 n/a 260 mg/l j i

TSS Composite 160.2 12/12/97 n/a 53 mg/l Silver Composite 272.1 12/10/97 n/a <.050 mg/l l l

Mercury Composite -245.1 12/12/97 2 ug/l <0.50 ug/l

, pH Composite 150.1 12/9/97 5.5 tol2 s.u. 8.6s.u.

Oil / Grease Grab 413.1 12/16/97 50 mg/l 3.0 mg/l l l

l I certify under penahy oflaw that I have personally examined and I am familiar with the information in this report r and that, based on my inquiry of those persons immediately responsible for obtaining the information conta~med in this repat, I believe that the information is true, accurate, and complete. I am aware that there are signifuant penalties for submitting false information including the possibility of fine and impnsonment. .

O - N uh -. _ MZdP Vice President - Nuclear Sb U' ' ~liate Title 9903230120 980312 PDR ADOCK 05000440 R PDR; L-__--_-__=-_--_---.---------------_--__---------_---------- - - - - - - - _ - - - - - - - - - - - - - _ - - - - - . - - - - -