ML20203H339

From kanterella
Jump to navigation Jump to search
Industrial Pretreatment Quarterly Self-Monitoring Results, for Nov 1997
ML20203H339
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 11/30/1997
From: Myers L
CENTERIOR ENERGY
To:
Shared Package
ML20203H306 List:
References
NUDOCS 9712180385
Download: ML20203H339 (3)


Text

.

INDUSTRI AL PRETREATMENT QUAR 1LRLY SELF MONITORING RESUL1S Perry Nuclear Power Plant Permit No.: 1004911 10 Center Rd.

Report Date: 11/20/97 Perry, Ohio 44081 Laboratory: Electro Analytical Date of Sample: 11/6 to 11/7/97 Time of sample: 14:15 Sample Location: Sewage Pump Station Name of Sampler: Deckler/Landis Laboratory Address: 7118 Industrial Park Illvd.

Mentor, Ohio 44060 5314 D :te of Analysis: 11/10 to 11/17/97 Flow: 33,000 gpd PARAMETER SAMPLE EPA ANALYSIS DISCil ARGE ANALYSIS TYPE METIIOD DATE LIMIT RESULT COD Composite 410.4 11/17/97 n/a 370 mg/l llOD Composite 405.1 11/12/97 n/a 140 mg/l TSS Composite 160.2 11/11/97 n/a 100 mg/l Silver Composite 272.1 11/10/97 n'a

<.050 mg/l Mercury Composite 245.1 11/12/97 2 ug/l

< 50 ug/l plI Composite 159.1 11/14/97 5.5 to 12 s.u.

7.7 s.u.

l Oil / Grease Grab 413.1 11/t I/97 50 mg/l 4.3 mg/l I certify under penalty oflaw that I have personally examined and I am familiar with the information in this report and that, based on my inquiry of those persons immediately responsible for obtaining the infonnation contained in this report, I believe that the information is true, accurate, and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment.

M [27

/f//d7 Vice President - Nuclear Signature

'Date Title 9712180385 971210 PDR ADOCK 05000440 R

PDR

<. s Parry Auclocr Pow 0r PICnt 1-DEC-1997 10:01:

S mple title

SEWAGE SAMPLE S mple time
1-DEC-1997 10:01:

Sample Reason: PE Laot energy cal

's 30-Nov-1997 21:49 Sample quantity

1.00000E+03 ML D;t cter name
Detector 1 Detector geometry: 1LLM0 Elcpsed live time 4000.0 teconds Elapsed real time: 4000.5 seconds S:nsitivity
5 System deadtime
0.0%

Analyzed by

JDM Decayed to 0 days 0.00 hoors Collccted by
JDM Saved Filename 9712011017 Post-NID Peak Search Report It Energy Area Bkgnd FWilM Channel Left Pw % Err Fit Nuclides 1

92.61 87 22 1.02 184.86 178 16 14.8 2.62E+00 1

95.57 31 14 1.03 190.79 178 16 27.0 0

186.40 53 53 0.98 372.43 367 11 30.5 0

295.92 22 25 0.71 591.43 585 9 45.6 0

351.75 52 46 4.18 703.08 695 20 34.4 0

511.88 37 11 2.59 1023,33 1017 15 27.7 0

583.05 14 2

0.85 1165.67 1162 7 30.6 0

609.52 68 3

1.18 1218.60 1212 14 13.5 A.

N t

REPORT NAME QA CHECK (V9.1)

PAGE 1 OF l

  • REPORT DATE :

10DEC-1997 11:08 REQUESTOR-JDM THE ILLUMINATING COMPANY PERRY NUCLEAR POWER PLANT POST NID QA ANALYSIS TITLE : SEWAGE SAMPLE SAMPLE No.

9712011017 OPERATOR NAME
JDM SAMPLE TYPE : ENVIRONMENTAL SAMPLE GEOMETRY : 1LLM COUNT TIME
1-DEC-1997 10:01:29.

SAMPLE QUANTITY : 1.00000E+03 SAMPLE TIME : 1-DEC-1997 10:01:29.

DETECTOR Detector 1 LIBRARY

. GENERAL PEAK ENERGY DECAY CORR ISOTOPE ENERGY DIF? (KEV) uCi/ML COMMENTS UNIDENTIFIED / REJECTED PEAKS GAMMAsSEC POTENTIAL ENERGY NET AREA FWHM GAMMA /SEC /ML

% EPROR FLAG ID ACTIVITY 92.61 87.

1.02 5.734E-01 5.734E-04 14.8 R

BR-82 2.176E-06 BA.D1 9

TD X-RAY T.425E-06 U_

.550E-08 m!T21-3M. 2 32 E-0 5 Ib AC-228 4.712E-07 95.57 31, 1.03 2.001E-01 2.001E-04 27.0

)

J SE-75 1.586E-07 186.40 53.

0.98 3.853E-01 3.853E-04 30.5 - un--226, 3.175E-07 R

U-235 1.92BE-08 295.92 22.

0.71 2.194E-01 2.194E-04 45.6 R

BR-82 3.997E-06 R

RU lDL 2.383E-06 (U ~ pB-21A>

6.483E-08 351.75 52, 4.18 5.900E-01 5.900E-04 34.4

'u NH;96 1.474E-06 R

BA-131 1.565E-05 R. I-1-3 4.793E-06 PB-214 8.995E-08

ANN;RD,)

511.88 37.

2.59 5.708E-01 5.708E-04 27.7 1.543E-08 583.05 14.

0.85 2.476E-01 2.476E-04 30.6 U

AC-228 5.087E-06 609.52 68.

1.18 1.222E+00 1.222E-03 13.5 R ~~NI-65 2.718E-05 R

RU-103 5.899E-07 R

TC-104 3.409E-06

- BA-141 3.491E-05 BI 2%

1.836E-07 U

s Total Unidentified / Rejected Peaks =

8

% Unidentified / Rejected Peaks = 100.00 Flags: U - Unknown Line R - Rejected During Analysis P - Positively Identified (line not in analysis library)

No nuclides found QA Analysis Terminated I

-