o . I l

ULNRC-3069 i i

l

{

l ATTACHMENT ONE TECHNICAL SPECIFICATION CHANGES (MARKED-UP) f I

9409200340 940912 PDR ADOCK 05000483 F PDR

o w TABLkJ12-1 REACTOR TRIP SYSTEM INSTRUMENTATION TRIP SETPOINTS

  • n

?" TOTAL SENSOR ERROR

{4 FUNCTIONAL UNIT

1. Manual Reactor Trip ALLOWANCE (TA)

N.A.

Z_ M. TRIP SETPOINT ALLOWABLE VALUE N.A. H.A. N.A. N.A.

2. Power Range, Neutron Flux y a. liigh Setpoint 7. 5 4.56 0 <109% of RTP* <112.3% of RTP*

] b. Low Setpoint 8.3 4.56 0 <25% of RTP* <28.3% of RTP*

3. Power Range, Neutron Flux, 2.4 0.5 0 <4% of RTP* with <6.3% of RTP* with -

High Positive Rate a time constant a time constant

>2 seconds >2 seconds

4. Deleted
5. Intermediate Range, 17.0 8.41 0 <25% of RTP* <35.3% of RTP*

7 Neutron Flux

^

6. Source Range, Neutron Flux 17.0 10.01 0 1105 cps <l.6 x 105 cps
7. Overtemperature AT 9.3 6.47 1.83 See Note 1 See Note 2

+1.24***

8. Overpower AT 5.7 1.90 1.65 See Note 3 See Note 4
9. Pressurizer Pressure-Low 5.0 2.21 2.0 >1885 psig >1874 psig g 10. Pressurizer Pressure-High .

12385 psig 12:00 psig

@ 11. Pressurizer Water Level- 8.0 2.18 .

-<92% of instrument 3.8% of instrument liigh span span o

[ 12. Reactor Coolant Flow-Low 2.5 1.38 06 >90% of loop _88.8% of loop o

minimum measured minimum measured y f1ow** f1ow**

Y 3./2 f 0. 7/ 2. 0 g *RTP = RATED THERMAL POWER 6 23U 3 ** Minimum Measured Flow = 95,660 gpm P ***Two Allowances (temperature and pressure, respectively)

O L.___-_-_---________--_-_.--_-__. - _ _ -__

~ 'G .. v TABLE 3.3-2 .

^

~=

i n

??

REACTOR TRIP SYSTEM INSTRUMENTATION RESPONSE TIMES f-2 1 i~; .

RESPONSE TIME

~<'

FUNCTIONAL UNIT Manual Reactor Trip N.A.

Si 1.

23

., 2. Power Range, Neutron Flux i 0.5 second*

3. Power Range, Neutron Flux, N.A.

High Positive Rate

4. Deleted i

Intermediate Range, Neutron Flux N.A.

u> 5.

1 N.A.

us 6. Source Range, Neutron Flux

'a

7. Overtemperature AT $ 6.0 seconds *

< 6.0 seconds"

8. .0verpower AT i -

Pressurizer Pressure-Low 5 2.0 seconds 7, 7 S.

-5 . seconq(

Fl 10. . Pressurizer Pressure-High.

@ .N.A.

11. Pressurizer Water level-High Et E

- ' Response time of the neutron flux signal portion if

  • Neutron; detectors are exempt from response time testing.of the channel shall be measure t, ,

cn i

^

i

- . REVISIOy .3

- TABLE 3.7-1 e

MAXIMUM ALLOWABLE POWER RANGE NEUTRON FLUX HIG THOPERABLE STEAM LlHE SAFETY VALVES OUR1HG FO MAXIM'JM ALLOWABLE POWER RANGE MAXIMUM HUMBER OF IHOPERABLE HEUTRON FLUX HIGH SETPOINT SAFETY VALVES ON ANY (PERCENT OF RATED THERMAL POWER)

OPERATING STEAM GENERATOR _

1 eSf@d#

' -6'.r 3 9 2

44 22-3 O

e i

Y. NI$ C^h *ke- O)

  • S &N 10 M SGVC InOler;eLlc, +lt s.

maximw< a//swalle power rwye n edron f/a fgh seff anf iny Le vi perr.e,+ of rded +/ tens] power, &

es pt cat,eid ,.c repared if a es,em of sa Os .

n1 STY i.r. InsprsWc. on svsore -Hiarn ene desm peranf:v ..

4 l .

8

_)

3/4 7-2 CALLAWAY - UNIT 1

) I l

1

- - - - " ~ ~ ~ - * - ' -

-- -~ -

._ .T . . . .... . . . . . . . . .

. ..s .

j

- t NWIStoy I ,_

TABLE 3.7-$

Cn ,?' ' SIEAM LINE SAFETY VALVES PER LOOP _ .

=.'..

VALVE NUMBER LIFT SETTING .443!Q' ORIFICE SIZE Loop 1 Loop 2 Loop 3 Loop 4 '

V055 V065 V075 .V045 1185 psig ,

, 16.0 sq. in.

V066 V076 V046 1197 psig 16.0 sq.'in. ..

V056 ,

V057 V067 V077 V047 1210 psig 16.0 s'4. in.

1222 psig 16.0 sq. in.

V058 V068 V078 V048 1234 psig 16.0 sq. in.

V059 V069 V079 .V049 t

~ .

  • The lift setting pressure shall correspond to ambient conditions of the valve at nominal operating temperature and pressure.

7~Ae a r- E u d h R re d ng do/erance i .,

+3/-l2 of  ;

Ha nmiu/ safpinf. We a.r-faf+ hf+ sadnj Ner'n'e 'r .t /% s-f /Ae wwm / s$sid.

l l

l

\

-J . ,

CALLAWAY - UNIT 1 3/4 7-3 i

1 .

o - -.- . --

~- .

REV18/Qg - j

') 3/4.7 PLANT S SIEMS

\

~ .

l$t ., BASES \

c \

\

3/4.7.1 TURBINE CYCLE .

3/4.7.1.1 SAFETY val.VES The OPERABILITY of the main steam line Code safety valves ensures that110% (132 the Secondary Coolant System pre'ssure will be limited to within of its design pressure of 1200 psia during the most severe anticipated system operational transient.. The maximum relieving capacity is associated with a ,

Turbine trip from 102% RATED THERMAL POWER coincident with an assumed los '

condenser heat sink (i.e., no steam bypass to the condenser). 11 3 %

/f.035~ capacities are in The specified valve ift settings and relievin he ASME Boiler and Pressure accordance with the req frements of Section III of for all valves on all of he total relieving capaci Code, (1971 Edition). of the total secondary x 108 ) lbs/h which is A minimum of .

the steam lines is x( 10 . 5 lbs/h.:t 105 TATCO T,::rJ".L P0'. 00.

steam flow of two OPERABLE saf ty valves per steam generator ensur Table 3.7-1.

/. C %

STARTUP and/or POWER OPERATION is allowable with safetyi valves inoperab within the limitations of the ACTION requirements The Reactor on the b

- Reactor Trip Settings of the Power Range Neutron Flux channels.

'- Trip Setpoint reductions are derived on the following bases:

I r f: r is;p :per:t h

--57 -Q

..(103) ,

"h .C.

OI - CduCCd 0000t07 I. ey OitP0iIt iii PsiCC i OI SIbb Ibbb5M. bbMEb

. s n-- :t:;.7. i i r.: , l y - u s -_.- -._. v.e. a <nnn.enw1. e=r.+v univ.e l 411~8.7~ N 1

1 i

f B 3/4 7-1 CALLAWAY - UNIT 1

i l

INSERT A To insure overpressurization of secondary system does not occur, the maximum allowed power for operation would be conservatively set equal to the heat removing capability of the operable MSSVs. Thus, the power range neutron flux high setpoint (SP), in percent of rated thermal power, is given by SP = (100 / Q) [Ws x brg x NJ / K where Q = the rated NSSS power, which is equal to 3579 MWt for Callaway Plant, Ws = minimum total stetun flow rate capability of the operable MSSVs on any one steam generator at the highest MSSV opening pressure including tolerance and accumulation, as appropriate, in Blu/sec, hrg = heat of vaporization for steam at the highest MSSV opening pressure including tolerance and accumulation in Btu /lbm.,

N = Number of loops, and K = Conversion factor,947.82 (Blu/sec)/Mwt-For reactor protection, the setpoint calculated is adjusted lower, accounting for the instrument and channel uneenainty.  ;

i l

l i

l I

ll

~

o..__,.., _. _ _ _ .

. ,_.. _ ,, ]

l REV!Sq j '

PLANT SYSTEMS D

. ' I i BASES l

l SAFETY VALVES (Continued) .

'109 -

..- Rengs NeJtren Tia-"igh Trip ktpeint f;r f;;r 1;;p eperati;n, X = Tetel relieving cep;;ity Of :11 ::fety v:17: p:r :t:= - -

lins in ibs/heur, :nd Y - Muimum ..le-ing ;epe;ity ;f :ny en: ::f:ty e:17:

L /h;;r. .

3/4.7.1.2 AUXILIARY FEEDWATER SYSTEM The A"NABILITY of the Auxiliary Feedwater System ensures that the Reactor Coolar. System can be cooled down to less than 350'F from normal operating cop #tions in the event of a total loss-of-offsite power.

[ orifice recirculation flow and ensuring a discharge pressure of greater thanTestin j

/ or equal to 1535 psig verifies the capability of each pump to deliver a total f feedwater flow of 575 gpm at a pressure of 1221 psig to the entrance of the

/ steam generators. The steam-driven auxiliary feedwater pump is capable of delivering a total feedwater flow of 1145 gpm at a pressure of 1221 psig to .. ,

the entrance of the steam generators. This papacity is sufficient to ensure .

}

that adequate feedwater flow is available to remove decay heat and reduce the ~/~ ,

Re'attor Coolant System temperature to less than 350 F when the RHR System may be placed into operation.

3/4.7.1.3 CONDENSATE STORAGE TANK e i

The OPERABILITY of the condensate storage tank with the minimum water. -

volume ensures that sufficient water is available to maintain the RCS at HOT STANDBY conditions for 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> with steam discharge to the atmosphere

- concurrent with total loss-of-offsite power and then a cooldown to 350*F at  ;

50*F per hour. The contained water volume limit includes an allowance for o l water not usable because of tank discharge ling location or other physical -

characteristics.

3 /4. 7.1. 4 SPECIFIC ACTIVITY The limitations on Secondary Coolant System specific activity ensure that -

the resultant offsite radiation ' dose will be limited to a small fraction of '

10 CFR Part .100 dose guideline values in the event of a steam line rupture. '

Ihis dose also includes the effects of a coincident 1 gpm reactor to secondary tube leak in the steam genefator of the affected steam line. These values are consistent with the assumptions used in the safety analyses.

a- O

,s. /

CALLAWAY - UNIT 1 B 3/4 7-2

)

)

~

l c .

ULNRC-3069 ATTACHMENT TWO TECHNICAL SPECIFICATION CHANGES (RE-TYPED) l i

l 1

o TABLE 2.2-1 REACTOR TRIP SYSTEM INSTRUMENTATION TRIP SETPOINTS TOTAL SENSOR ERROR FUNCTIONAL UNIT ALLOWANCE (T.A_1 2- S TRIP SETPOINT ALLOWABLE VALUE

1. Manual Reactor Trip N.A. N.A. N.A. N.A. N.A.
2. Power Range, Neutron Flux
a. High Setpoint 7.5 4.56 0 s 109% of RTP* s112.3% of RTP'
b. Low Setpoint 8.3 4.56 0 s25% of RTP* s28.3% of RTP*
3. Power Range, Neutron Flux, 54% of RTP* with a time s6.3% of RTP* with a High Positive Rate 2.4 0.5 0 constant 2 2 seconds time constant 22 seconds
4. Deleted
5. Intermediate Range, Neutron Flux 17.0 8.41 0 525% of RTP* s35.3% of RTP*
6. Source Range, Neutron Flux 17.0 10.01 0 ggos cps s1.6 x 105 cps
7. Overtemperature AT 9.3 6.47 1.83 See Note 1 See Note 2

+ 1.24 " *

8. Overpower AT 5.7 1.90 1.65 See Note 3 See Note 4
9. Pressurizer Pressure-Low 5.0 2.21 2.0 21885 psig 21874 psig
10. Pressurizer Pressure-High 3.125 0.71 2.0 s2385 psig s2393 psig
11. Pressurizer Water Level-High 8.0 2.18 2.0 s92% of instrument span s93% of instrument span
12. Reactor Coolant Flow-Low 2.5 1.38 0.6 290% of loop minimum 288.8% of loop minimum measured flow ** measured flow * *
  • RTP = RATED THERMAL POWER

" Minimum Measured Flow = 95,660 opm

  • "Two Allowances (temperature and pressure, respectively)
e-TABLE 3.3-2 REACTOR TRIP SYSTEM INSTRUMENTATION RESPONSE TIMES FUNCTIONAL UNIT RESPONSE TIME
1. Manual Reactor Trip N.A.
2. Power Range, Neutron Flux s 0.5 second *
3. Power Range, Neutron Flux, High Positive Rate N.A.
4. Deleted
5. Intermediate Range, Neutron Flux N.A.
6. Source Range, Neutron Flux N.A.
7. Overtemperature AT s 6.0 seconds *
8. Overpower AT s 6.0 seconds *
9. Pressurizer Pressure-Low s 2.0 seconds
10. Pressurizer Pressure-High 51.0 second
11. Pressurizer Water Level-High N.A.
  • Neutron detectors are exempt from response time testing. Response time of the neutron flux signal portian of the channel shall be measured from detector output or input to first electronic component in channel.

o .

TABLE 3,7-1 MAXIMUM ALLOWABLE POWER RANGE NEUTRON FLUX HIGH SETPOINT WITH INOPERABLE STEAM LINE SAFETY VALVES DURING FOUR LOOP OPERATION MAXIMUM NUMBER OF INOPERABLE MAXIMUM ALLOWABLE POWER RANGE SAFETY VALVES ON ANY NEUTRON FLUX HIGH SETPO!NT OPERATING STEAM GENERATOR (PERCENT OF RATED THERMAL POWER) 1 56 (71)*

2 39 3 22 With only one (1) of the 20 MSSVs inoperable, the maximum allowable power range neutron flux high setpoint may be 71 percent of rated thermal power. The 56 percent setpoint is required if a maximum of one (1) MSSV is inoperable on more than one steam generator.

)

R E

CALLAWAY - UNIT 1 3/4 7-2

-o .

TABLE 3.7-2 STEAM LINE SAFETY VALVES PER LOOP VALVE NUMBEB LIFT SETTING

  • ORIFICE SIZE Loon 1 Loop 2 Loon 3 Loon 4 V055 V065 V075 V045 1185 psig 16.0 sq. in.  !

V056 V066 V076 V046 1197 psig 16.0 sq. in.

V057 V067 V077 V047 1210 psig 16.0 sq. in.

V058 V068 V078 VO48 1222 psig 16.0 sq. in.

V059 V069 V079 V049 1234 psig 16.0 sq. in.

l I

The lift setting pressure shall correspond to ambient conditions of the valve at nominal operating temperaturo and pressure. The as-found lift setting tolerance is +3/-1% of the nominal setpoint. The as-left lift setting tolerance is 1% of the nominal setpoint.

CALLAWAY - UNIT 1 3/4 7-3

l-

c. e 3/4.7 PLANT SYSTEMS

.P..A S ES 3/4.7.1 TURBINE CYCLE 3/4.7.1.1 SAFETY VALVES The OPERABILITY of the main steam line Code safety valves ensures that the Secondary Coolant System pressure will be limited to within 110 % (1320 psia) of its design pressure of 1200 psia during the most severe anticipated system operational transient. The maximum relieving capacity is associated with a Turbine trip from 102%

RATED THERMAL POWER coincident with an assumed loss of condenser heat sink (i.e.,

no steam bypass to the condenser).

The specified valve lift settings and relieving capacities are in accordance with the requirements of Section III of the ASME Boiler and Pressure Code, (1971 Edition). The total relieving capacity for all valves on all of the steam lines is (18.035 x 108) Ibs/h which is 113% of the total secondary steam flow of 15.96 x 108 lbs/h. A minimum of two OPERABLE safety valves per steam generator ensures that sufficient relieving capacity is available for the allowable THERMAL POWER restriction in Table 3.7-1.

STARTUP and/or POWER OPERATION is allowable with safety valves inoperable within the limitations of the ACTION requirements on the basis of the reduction in Secondary Coolant System steam flow and THERMAL POWER required by the reduced Reactor Trip Settings of the Power Range Neutron Flux channels. The Reactor Trip Setpoint reductions are derived on the following bases:

To insure overpressurization of secondary system does not occur, the maximum allowed power for operation would be conservatively set equal to the heat removing capability of the operable MSSVs. Thus, the power range neutron flux high setpoint (SP), in percent of rated thermal power, is given by:

SP =(100/Q) W, x h,, x N /K where O = the rated NSSS power, which is equal to 3579 MWt for Callaway Plant, W, = minimum total steam flow rate capability of the operable MSSVs on any one steam generator at the highest MSSV opening pressure including tolerance and accurnulation, as appropriate, in Btu /sec, h,g = heat of vaporization for steam at the highest MSSV opening pressure including tolerance and accumulation in Btu /lbm.,

N = Number of loops, and K = Conversion factor,947.82 (Btu /sec)/MW t-For reactor protection, the setpoint calculated is adjusted lower, accounting for the instrument and channel uncertainty.

CALLAWAY - UNIT 1 B 3/4 7-1

.o. e.

' PLANT SYSTEMS I BASES 3/4.7.1.2 AUXILIARY FEEDWATER SYSTEM The OPERABILITY of the Auxiliary Feedwater System ensures that the Reactor -

Coolant System can be cooled down to less than 350 F from normal operating >

conditions in the event of a totalloss-of-offsite power. .

Testing of each electric motor-driven auxiliary feedwater pump on a fixed orifice recirculation flow and ensuring a discharge pressure of greater than or equal to 1535  ;

psig verifies the capability of each pump to deliver a total feedwater flow of 575 gpm at a pressure of 1221 psig to the entrance of the steam generators. The steam-driven auxiliary feedwater pump is capable of delivering a total feedwater flow of 1145 gpm at .

a pressure of 1221 psig to the entrance of the steam generators. This capacity is sufficient to ensure that adequate feedwater flow is available to remove decay heat and reduce the Reactor Coolant System temperature to less than 350 F when the RHR Systems may be placed into operation.

3/4.7.1.3 CONDENSATE STORAGE TANK The OPERABILITY of the condensate storage tank with the minimum water volume ensures that sufficient water is available to maintain the RCS at HOT STANDBY conditions for 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> with steam discharge to the atmosphere concurrent with total loss-of-offsite power and then a cooldown to 350 F at 50 F per hour. The contained .

water volume limit includes an allowance for water not usable because of tank  ?

discharge line location or other physical characteristics.

3/4.7.1.4 SPECIFIC ACTIVITY c

The limitations on Secondary Coolant System specific activity ensure that the resultant offsite radiation dose will be limited to a small fraction of 10 CFR Part 100 .

dose guideline values in the event of a steam line rupture. This dose also includes the  ;

effects of a coincident 1 gpm reactor to secondary tube leak in the steam generator of.

the affected steam line. These values are consistent with the assumptions used in the safety analyses.

b i

-i CALLAWAY.- UNIT 1 B 3/4 7-2

, h- '. . ,y., ~, - - -

.A.

  • ULNRC-3069 ATTACHMENT THREE SAFETY EVALUATION

S AFETY EVALUATION This amendment application requests a revision to Technical specification (TS) 3.7.1.1

. (Tables 3.7-1 and 3.7--2), 2.2 (Table 2.2-1), 3/4.3 (Table 3.3-2), and Bases 3/4.7.

These specifications are revised to increase the lift setting tolerance for the main steam safety valves from 11 % to +3/-l %, lower the maximum allowable power levels with inoperable main steam safety valves, and to incorporate the revised methodology for calculating maximum power levels with inoperable main steam safety valves into the Bases.

Backcround The function of the main steam line safety valves is to provide overpressure protection, ensuring that the secondary system pressure will be limited to within 110% (1320 psia) of its design pressure (1200 psia) during the most severe anticipated system operational transient. The total relieving capacity for all valves on all steam lines is 113% of the total secondary steam flow.

Revision of the lift setting tolerance to +3/-l % as-found and I % as-left will have no ,

effect on the relieving capacity of the safety valves. The change in lift setting tolerance !

will provide reasonable acceptance criteria taking into account the component service 1 conditions and conservative criteria for the as-left condition of the safety valves. The test equipment tolemnce (+2/-l %) will not be accounted for in the TS tolerance  !

because this equipment tolerance is specifically addressed by the ASME Code. l Therefore, as long as the testing equipment and methodology meet the +2/-l % l tolemnce requirements of OM-1, there is no need to account for testing tolerances in the TS or the safety analyses. (This position is also applicable for the primary safety valves.)

Previous safety analyses conservatively included accumulation in the modelling.

Accumulation is no longer modeled for spring loaded MSSVs. This approach is acceptable because the valve setpoint is determined by stem motion and setting the valves on steam. This procedure insures the valves will " pop open" at the TS setpoint.

Earlier analyses used accumulation to account for valve chatter prior to opening. This conservatism is no longer required with present testing methods.

The existing tolerance ofil % specified in Technical Specification 3/4.7.1 for steam line safety valve lift settings is based on the design requirements for safety valves specified in ASME Section III, Subsection NC-7614.2. The il % tolerance is appropriate for design criteria, but is not appropriate for testing acceptance criteria for the following reasons: a) The il % lift setting tolerance currently specified does not take into considention the service conditions of the safety valves. For safety valves subjected to a constant load for extended periods of time without being cycled, it is common for the valve springs to take a set resulting in a slight increase in the spring mte, until broken loose during the initial test stroke of the valve. ASME Section XI

.t.

e o test criteria requires the perfonnance of 2 successive lifts with no adjustments to the valve lift setting. Due to the valve spring taking a set as described above, the first test lift is commonly found to be slightly out of tolerance and the second and third lifts within tolerance, b) ASME Section XI, Subsection IWV requires safety valves to be tested using OM-1. (Union Electric will adopt the 1989 version of the ASME Code for the next 10 year IST inteival, which will begin December 20,1994. This version of the Code indirectly imposes the 1987 version of OM-1.)

The ASME Section XI schedule used previously for testing additional valves will continue to be used, except that the criteria for testing additional valves will be

+3/-l % of the setpoint instead ofil %. However, all valves that are tested and found outside the 11 % band will be reset to within il %.

Industry operating experience has also demonstrated that a setpoint tolerance for the main steam safety valves of only il % results in safety valves frequently failing surveillance tests. Infonnation Notice 86-56, " Reliability of Main Steam Safety Valves," tabulated a number of problems with setpoint drift a ; reported in various LERs. This infonnation notice discussed the various safety concerns that may be encountered with setpoint drift. Union Electric has considered these concerns in the proposed relaxed tolerance limits. Other plants, such as Trojan, Palisades, Yankee Rowe, Calvert Cliffs, LaSalle, Diablo Canyon, and Wolf Creek have been granted setpoint tolerance relaxations.

As shown below, the proposed tolerance relaxation meets overpressure protection requirements and all ASME code requirements. In addition, evaluation of the FSAR accident analyses affected by the change has demonstrated that the conclusions for these analyses as stated in the FSAR remain valid, and results in no additional operational concerns.

All safety analyses done to support the MSSV tolerance change were perfonned using WCAP-12910 Rev.1-A, " Primary Safety Valve Surge Line Loop Clearance Models."

Specifically, primary safety valves utilize a TS setpoint of 2500 psia, a il % tolerance and + 1 % setpoint shift. Union Electric calculated a loop seal purge time of 1.15 seconds (using the methodology of WCAP-12910) which was implemented in the analysis as a time delay.

A sensitivity study was perfonned, to assess the effect on DNBR, in which the pressurizer safety valves were modeled as opening at 2475 psia (-l % tolerance) and the loop seal clearing time was neglected. This modeling confinnation results in minimum pressurizer pressure, which is conservative for DNBR evaluations. The Westinghouse DNBR evaluation of this sensitivity shows negligible impact on DNBR.

Non-LOCA Accident Evaluation Many of the non-LOCA accidents are not affected by the assumption of maximum tolemnce on the main steam line safety valves. This is because the pressures reached in the transient never approach the values for the lift setpoints. The pressure in a given tmnsient would have to reach 1236 psia on the secondary side for the transient to begin to be affected by the increased tolerance, where the 1236 psia secondary setpoint reflects the Westinghouse transient methodology of modeling all main steam line safety valves as lifting at the same setpoint. All FSAR Chapter 15 non-LOCA transients have been evaluated and most are not significantly affected by the main steam line safety valve increased setpoint tolerance. The following accidents could possibly be impacted either because of Depanure from Nucleate Boiling Ratio (DNBR) concerns or other licensing-basis acceptance criteria:

a Loss of External Load / Turbine Trip RETRAN was used to reanalyze the loss of external load / turbine trip for DNBR. See Appendix A for a description of the RETRAN computer code and the Callaway model.

This is the same model used by Union Electric to analyze the tube rupture accident presented in the Callaway FSAR. To assure the adequacy of this model for analyzing the turbine trip event, Union Electric benchmarked the RETRAN model to the existing Callaway FSAR turbine trip analysis which was done using LOFTRAN The results of this benchmark are contained in Appendix B.

The benchmarked RETRAN model was used to reanalyze the turbine trip accident to  ;

assure the DNB design limits were not exceeded. In addition to modeling +3/-l % l MSSV tolerances, changes wem made to the benchmarked RETRAN model to account for the presence of a pressurizer loop seal and to expressly model five MSSVs per steam generator. The msults of this revised DNBR analysis are contained in Appendix C. This analysis shows that the DNB design limits are not exceeded.

Westinghouse used LOFTRAN to reanalyze the loss of external load / turbine trip to assure design pressure was not exceeded (see Appendix D). This analysis shows that the design pressure was not exceeded with an expanded main steam line safety valve setpoint tolerance band, provided that the high pressurizer pressure safety analysis trip setpoint was reduced to 2425 psia and the trip response time for that trip function was reduced to I second.

  • Rod Withdrawal at Power l The Westinghouse review of the rod withdrawal at power transients shows that the minimum reported DNBR occurs before MSSV actuation for most analyzed cases.  ;

Note that this transient is not very sensitive to secondary side changes, and the FSAR l analyses conclusions remain valid.

l I

l 1

1

e RCP Locked Rotor / Shaft Break Westinghouse reviewed the locked rotor / shaft break accident and it was found that the MSSV tolemnce increase to +3/-l % has little impact on the tmnsient. However, as shown in WCAP-12910, the peak primary pressure will not remain below the 110%

design limit when the primary safety valve loop seal is modeled. WCAP-12910 states that a Service Level C limit is more appropriate for this transient. RCS peak pn:ssure will remain below the Service Level C values.

. Loss of Nonnal Feedwater/ Station Blackout Feedwater Line Break Panial less of Forced Reactor Coolant Flow Complete Loss of Forced Reactor Coolant Flow Westinghouse detennined that the impacted non-.LOCA accidents would have slightly higher DNBR values if the main steam safety valves lift at higher initial pressures. The DNBR transient is not changed significantly for the relaxation in setpoint tolemnce and the conclusions reached for the DNBR accidents in the FSAR analyses remain valid.

  • Inadvenent ECCS Actuation at Power Westinghouse determined that the inadvenent ECCS actuation at power event would be impacted by an increased MSSV tolerance. However, the current analysis conservatively models a +3% tolerance.

Non-DNB Tmnsients Westinghouse detennined that the locked rotor and rod ejection events will not be affected by the setpoint tolerance as it relates to the peak heat flux calculation. These analyses assume a conservative pressure which is less than the steady state RCS pressure. This pressure is maintained at a constant value throughout the transient so as to maximize the peak heat flux. Therefore, the FSAR analyses conclusions remain valid.

Westinghouse and Union Electric reviewed the quantity of steam mass released from the main steam line safety valves and detennined that doses will not be significantly affected by the revised tolerance values. The primary effect of the increase in the safety valve tolerance on the impacted accidents is to alter the time at which the valves would open during the pressure increase transient. Even though the initial steam flow through the safety valves will increase due to a higher back pressure, the integmted mass release relieved from the secondary side is not expected to be significantly increased.

. .t .

Westinghouse reviewed the effect of the setpoint tolerance change on long-tenn heat removal for both the loss of nonnal feedwater and station blackout events. The competing effects of increased / decreased heat removal capability on the secondary side and higher / lower average coolant temperatures on the primary side result in no signincant impact on the heat removal capability of the secondary system. There is significant margin in these events to filling the pressurizer and the conclusions presented in the FSAR analyses remain valid.

Union Electric reviewed the applicable AFW calculations and it has been determined that the potentially higher discharge pressure against which the AFW must flow due to the increase in the MSSV tolerance will have no appreciable affect on Auxiliary Feedwater flow.

Union Electric determined that the ANSI /ASME piping system analysis equations have elements pertaining to internal pressure. This pressure stress is typically small with respect to the moments generated due to occasional and sustained loads. The additional 36 pai related to the +2% increase in MSSV set pressure will have no appreciable affect on secondary side pipe stresses.

LOCA Accident Evaluation A safety evaluation for a safety valve setpoint tolerance relaxation to +3/-l percent on the Chapter 15 FSAR LOCA accidents was perfonned in order to justify relaxation of the current il percent tolerance on the main steam line safety valves.

The current large break LOCA analysis fonning the licensing basis for Callaway Plant (break size greater than or equal to 1.0 sq. ft.) results in a very rapid (approximately 30 seconds) depressurization of the RCS from the operating pressure to a pressure slightly above that of the containment. Because of the rapid primary depressurization, the secondary side of the steam generators quickly becomes a heat source rather than a heat sink such that the main steam safety valves are not challenged. The pressurizer safety valves are also not challenged because of the RCS depressurization. Therefore, the proposed safety valve tolerance relaxation will have no effect on the large break LOCA analysis.

The current small break LOCA analysis fonning the licensing basis for Callaway Plant causes the system to depressurize to a pressure slightly above that of the steam generator secondary side pressure relief. The main steam safety valves provide a signincant path for RCS energy release until steam venting through the break occurs.

The primary pressure and the duration of time that the RCS primary remains above the secondary side pressure is governed by the rate of decay energy removal through the break and the amount of heat transferred to the steam generator secondary side. A slight increase in RCS pressure is computed to occur during this portion of the transient due to the higher secondary pressure as a result of the relaxed tolerances. Analysis has shown that increasing the secondary pressure, and as a result, the RCS pmssure, results 5

O- O in higher peak cladding temperatures (PCT). The PCT increase is 120 F, which when added to existing penalties, results in a PCT of 1985 F. The current Callaway small break analysis assumes nominal main steam line safety valve setpoints. An evaluation of the relaxed tolerance on PCT shows there is still a significant margin to the 2200 F regulatory limit. Further, since the small break LOCA is a depressurization transient, the pressurizer safety valves are not challenged. Therefore, the relaxed main steam line safety valve tolerance is acceptable with respect to the small break LOCA analysis.

The increase in PCT for small break LOCA will be reported consistent with the requirements of 10 CFR 50.46.

Post-LOCA hot leg recirculation switchover time is determined for inclusion in ,

emergency procedures to ensure long tenn core cooling by precluding boron precipitation in the reactor vessel following boiling in the core. This time is dependent on power level as well as the RCS, refueling water storage tank, and accumulator water masses and boron concentrations. Changes in the steam generator secondary pressure influence the RCS pressure and masses assumed in the switchover analysis.' The effect of the proposed main steam line safety valve tolerance relaxation has been evaluated and is insignificant. Further, operation of the pressurizer safety valves will not affect the analysis since calculations are based on total mass inventories.

The LOCA hydraulic forcing functions acting upon the vessel, intemals, and loop are a function of the primary system geometry and primary operating conditions. The peak forces are generated within the first seconds after break initiation. For this reason, the forces model does not consider the effects of the secondary side. As such, the relaxation in main steam line safety valve lift set tolerances to +3 percent will have no effect on the magnitude or frequency of the LOCA hydraulic forcing functions provided in the Callaway FSAR.

Post-LOCA long-term core cooling will not be affected by an increase in main steam I line safety valves setpoint tolerances because no change in the sump boron concentration would occur. Sump baron concentration is detennined by the accumulation of all potential water sources in the containment, based on each respective source boron concentmtion. A scenario has not been envisioned whereby changes in safety valve operation would result in spilling additional non-borated water, reduce the inventory of borated water, or limit component boron concentration as used in the mass l average calculation used in the evaluation. It is concluded that there would be no change to the long-tenu cooling capability of the emergency core cooling system as a result of increased valve tolerances. l l

Steam Generator Tube Rupture Accident Evaluation I The FSAR Steam Generator Tube Rupture (SGTR) analysis is perfonned to evaluate  ;

the radiological consequences of an SGTR accident. The major factors that affect the n:sultant offsite doses are the amount of mdioactivity in the reactor coolant, the total

-6

I amount of primary coolant transferred to the secondary side of the ruptured steam generator through the mptured tube, and the steam released from the ruptured steam generator to the atmosphere. The amount of radioactivity in the reactor coolant assumed in the FSAR SGTR analysis is not affected by the changes in the main steam line safety valve setpoint tolerances. An increase in the setpoint tolerance in the positive direction will reduce the calculated break flow and offsite doses.

Conclusion The non-LOCA safety evaluation supports the conclusion that the proposed tolerance

+3 percent for the main steam line safety valves is acceptable. This conclusion is reached based on the assessment that the non-LOCA acceptance criteria are met for th increase in opening setpoints for all the non-LOCA accidents. It is concluded that the tolerances on the main steam line safety valves as given in the Technical Specificatio for Callaway Plant may be changed to specify +3/-l percent.

The LOCA safety evaluation supports the conclusion that the effects ofincreasing steam line safety valve tolerances to +3 percent at Callaway Plant do not result in exceeding any design or regulatory limit. Therefore, it is concluded that the propose technical specification valve tolerance relaxation is acceptable.

The increase in safety valve setpoint tolerance from il percent to +3/-l percent has been evaluated with respect to both LOCA and non-LOCA events for impact on the radiological consequences of accidents. There is no impact on the radiological consequences of any accident.

Table 3.3-2 is changed to revise the pressurizer pressure-high response time from l

2 seconds setpoint totoI +3/-l tolerance second.

%. This provides margin to expand the main steam safety va i

l l

l The revisions to Table 2.2-1 are made to assess the impact of reducing the high j pressurizer pressure safety analysis limit (SAL) from the current value of 2445 psig t 2410 psig. This SAL reduction is needed to ensure acceptable accident aralysis re

{ are obtained to accommodate a relaxation of the main steam safety valve setpoint tolemnce to i3/-l %. These changes recognize that older genemtion Barton transmitters, subject to excessive negative drift, are no longer used in this application This negative drift accounted for 4.25% of the 4.96% of span Z tenn. Deletion of this drift tenn requires that the S tenn be increased by 1 % of span to account for a typ drift allowance. Thus, Z and S are revised to 0.71 % span and 2.0% span ,

respectively. The reduced SAL directly results in a reduced total allowance (TA), i e ..

since it reflects the difference between the SAL and the nominal trip setpoint I

2410 - 2385 psig~

sS00 psig /100% span = 3.125% spanj .

, o i

The decreased TA in conjunction with the increased S term results in a reduced allowable value of 2393 psig.

The revision to Table 3.7-1 (and Bases 3/4.7), utilized the methodology as described in Westinghouse Nuclear Service Advisory Letter 94-001 and Infonnation Notice 94-60,

" Potential Overpressurization of Main Steam System." These documents notified utilities of a calculational error in detennining the maximum power level for inoperable main steam safety valves. Using the new methodology results in lower allowed power levels with inoperable MSSVs. As such, these changes are conservative and do not ,

impact any accident analysis or involve an unreviewed safety question. l The revision to Bases 3/4.7 reflects changes necessitated by the use of V5 fuel and the .

plant uprating. These changes supersede the changes submitted in ULNRC-2450 (dated l July 30,1991). This Bases section is also revised to incorporate a change in the methodology used to detennine the maximum power level for inoperable main steam '

safety valves. These changes are conservative in nature and therefore do not impact any accident analysis or involve an unreviewed safety question.

Evaluation The proposed change to Technical Specifications does not involve an unreviewed safety question because operation of the Callaway Plant with this change would not:

1. Increase the probability of occurrence or the consequences of an accident or malfunction of equipment important to safety previously evaluated in the safety analysis report. There is no increase in the probability of occurrence or the consequences of an accident. The main steam line safety valves are designed to mitigate tmnsients by preventing overpressurization of the main steam system.

The proposed change does not alter this design basis. The revised analysis shows that the probability or consequences of all previously analyzed accidents are not changed by increasing the setpoint tolerance of the safety valves. Therefore, there is no increase in the probability of occurrence or the consequences of any accident.

2. Create a possibility for an accident or malfunction of a different type than any previously evaluated in the safety analysis report. There is no new type of accident or malfunction created and the method and manner of plant operation will not change nor is there a change in the method in which any safety related system perfonns its function. Any main steam safety valve lifting at the extremes of the proposed tolerance will not resuh in a low lift setpoint that is less than the normal j no load system pressure or a high lif, ftpoint that allows main steam system '

overpressurization.

3. Reduce the margin of safety as defined in the basis for any technical specification.

This is based on the fact that no plant design changes are involved and the method

.x.

I D

e e and manner of plant operation remains the same. With the exception oflocked rotor, all safety analysis which model the MSSV increased setpoint tolerances demonstrate that the main steam safety valves will still prevent pressure from ,

exceeding 110 percent of design pressure in accordance with the ASME code. For locked rotor, the impact of changing the tolerance to +3/-l % has.little impact on peak pressure and the Service level C acceptance limit is satisfied. All FSAR '

accident analysis conclusions remain valid and unaffected by this change. +

Given the above discussions as well as those presented in the Significant Hazards Evaluation, the proposed change does not adversely affect or endanger the health or safety of the general public or involve a significant safety hazard.

i 6

9

r-e e I

r i

P SAFETY EVALUATION j

'l Appendix A:

Description of RETRAN MODEL ,.

I e

P r

s i

l i

j l

l

e e

.A_ppendix A 1.0 RETRAN COMPUTER CODE The RETRAN-02 (Mod 5.1) code is a one-dimensional, best-estimate, thermal-hydraulic, tnmsient analysis computer code developed from RELAP-4/003 (Reference A-1). The NRC issued a Safety Evaluation Report (References A-2, A-3) which concluded that RETRAN-02 is an " acceptable computer program for use in licensing applications for calculating the transients described in Chapter 15 of NUREG-0800, and other transients and events as appropriate and necessary for nuclear power plant operation."

RETRAN-02 is a variable nodalization code and, therefore, requires a user to input a control volume / flow path network / heat slab model of both primary and secondary system elements similar in type to those utilized in the RELAP series of codes. The control volume / flow path equilibrium thennal hydraulics have three slip options:

homogeneous, drift flux, and a four equation set. Point kinetics or one-dimensional space-time kinetics can be used for the neutronics.

Polynomial fits are used for the thennodynamic properties of water. Air is approximated by an ideal gas. There is an extensive list of forced and natural convection heat tnmsfer correlations covering the entire boiling curve plus a number of condensing heat transfer correlations. A modified Bennett flow regime map can be l used to select friction factors. Critical flow options available use the Moody, )

isoenthalpic and the extended Henry-Fauske models. Special purpose models include a i subcooled void fit, bubble rise, trips and a wide ranging control system which gives the l user flexibility to program user-specific modifications, transport delay, auxiliary DNBR, enthalpy transport, and local condition heat transfer. Component models include a two region nonequilibrium pressurizer, centrifugal and jet pumps, valves, non-conducting heat exchangers. steam separators, and turbine. An automatic steady state initialization procedure is also available.

2.0 GENERAL DESCRIPTION The Callaway turbine trip noding diagram employed in the RETRAN analysis is shown schematically in Figure A-1. The RETRAN model utilizes two loops; one represents a single loop of the plant while the second loop combines the remaining three plant loops into one. Noding of this manner allows analysis of asymmetric transients such as a turbine trip.

I 4

The pressurizer is positioned on the lumped loop. This placement is typical of that for other IETRAN models for similar plants.

A-1

o .

The reactor vessel is modeled with eight control volumes as shown in Figure A-1; one volume for the downcomer region, one volume for the core bypass region, three volumes for the active core region, one volume each for the upper plenum and the lower plenum and the upper head.

The primary coolant piping and steam generators are modeled in some detail so that area changes and elevation differences would be included in the model. The hot leg, .

pump suction leg, pump, and cold leg were represented by one volume each. Six volumes are used to model each steam generator; one each for the inlet and outlet plenums and four in the U-tube region. The pressurizer, pressurizer surge line, and l pressurizer spray line are each represented by a single volume.

Heat conductors are modeled only for the steam genemtor tubes and the active length of the reactor core. The active length of steam generator tubes has four heat conductors (one for each fluid volume) and the reactor core has three axial core conductors (one for each fluid volume) to describe the active core. r The turbine trip model consists of 37 fluid volumes,64 junctions and 11 heat conductors. The nodalization was selected so as to identify important hydraulic features of the system and provide sufficient detail to attain accumcy in solution. A summary of the volume description is given in Table A-1.

3.0 COMPONENT DESCRIPTIONS Steam Generators Nodalization The primary portion of the steam generator is divided into four nodes. These four nodes represent the 5626 U-tubes associated with the Model F. According to Figure A-1, the single loop nodes are identified by Volumes 402,412 through 462 and 492 ,

and the lumped loop nodes are identified by Volumes 401,411 through 461 and 491.

The secondary side of the steam generators is represented as a single saturated volume.

This noding is a significant simplification for the actual plant geometry but is consistent with the modeling technique employed for the turbine trip transient in the FSAR.

Initialization Since the secondary side is modeled by a single volume and does not account for recirculation flow in the tube bundle region, the flow area in the tube bundle has been reduced by the recirculation ratio to obtain a retdistic value of velocity for the heat tmnsfer calculations.

A-2 >

e 1

7 In addition to initializing with the proper heat transfer characteristics, steam and liquid mass inventories must be initially correct. The initial steam genemtor liquid mass i depends on the input initial conditions and was adjusted by varying the initial mixture quality while maintaining a fixed mixture level height.

Heat Conductors r

The steam genemtor tubes are divided into four equal conductors, one conductor for  ;

each SG tube volume, in order to provide one to one correspondence for heat transfer. i Thus, the inside and outside surface areas and volume of metal for each conductor are one-fourth of the value of these parameters calculated for all the SG tubes. The eight heat conductors for the two steam generators are shown in Figure A-1.

Feedwater Main Feedwater The main feedwater is represented as a fill junction and is identified as junction 701 for the lumped loop and Junction 702 for the single loop.

Auxiliary Feedwater The auxiliary feedwater is also represented as a fill junction and is identified as Junction 71i for the lumped loop and Junction 712 for the single loop. Although Figure A-1 shows the auxiliary feedwaterjunction elevation above that of the main feedwater junction, the model input has the auxiliary feedwater jtmetion correctly .i positioned as in the plant. l f

l Main Steam Line .

i l

The main steam line from the steam generator outlet nozzle inclusive to the main steam 'l isolation valve is modeled as a single volume. According to Figure A-1, the single i loop steam line is identified as Volume 602 whereas the lumped loop is identified as Volume 601.

Safety and Relief Valves In the event of steam generator secondary over-pressurization, five safety valves and one atmospheric relief valve can open to relieve pressure. The actuation of the valves i is controlled by trip functions that monitor pressure of the secondary side. l l

l l

A-3

.* o 11essuri7er The pressurizer, Volume 310 on Figure A-1, is modeled as a single non-equilibrium fluid volume with phase separation. This option uses the equations for mass and energy balances in RETRAN to permit the pressurizer volume to have different temperatures in the liquid and vapor regions of the pressurizer during a transient.

Safety, Relief and Spray Valves The model includes the pressurizer relief and safety valves, pressurizer spray, but does not include pressurizer heaters. The pressurizer relief and safety valves are activated -

by trip functions which are set to open and reset on pressurizer pressure. The pressurizer spray is controlled by a control system acting upon a pressurizer pressure error signal. The relief and safety valves discharge to the pressurizer relief tank, Volume 330.

Reactor Vessel Imwer Plenum The lower plenum, Volume 100, includes the lower head and the volume inside the lower internals assembly below the core.

Upper Plenum The region above the core consists of an upper plenum (Volume 120) and upper head volumes (Volume 130) as illustmted in Figure A-1. The flow paths in this region represent both the main flow path from the core to the hot leg piping and the downcomer to upper head leakage of approximately 1.5 % of total flow.

Downcomer The downcomer, Volume 140, is the annular volume between the reactor vessel and the outer surface of the lower barrel assembly. The volume extends from the upper flange of the lower barrel assembly to the bottom of the lower barrel assembly.

Core The core is divided into three axial nodes. The length of each of these fluid volumes is one-third the avemge active length of a fuel assembly. The total flow area in the core is composed of the difference between the area within the core baffle and the total cross section area of the fuel rods, instmmentation tubes and RCCA thimbles.

A-4

. o RETRAN detennines the core power genemtion by employing the kinetics model with one prompt neutron group, six delayed neutron groups, and eleven delayed gamma emitters plus U-239 and Np-239.

Core IIeat Conductors There are three core heat conductors numbered I through 3. These provide a one for one correspondence with each core fluid volume numbered I through 3. All volume heat conductors have a length equal to their corresponding fluid volumes. The conductivity of the gas in the gap between the fuel and the clad gives an average fuel tempemture corresponding to full power.

Core Bypass The core bypass, Volume 110, consists of the space between the core barrel and the core baffle, the incore instrument tube assembly, and the RCCA thimbles.

Reactor _ coolant Pumps The reactor coolant pumps are represented by the design Westinghouse model 93A pump homologous perfonnance chamcteristic curves. For the model, the thermal energy generated by the pumps is added to the reactor coolant system in the pump control volumes, Volumes 221 and 222 as shown in Figure A-1.

Reactor Coolant Pinine The remaining volumes represent the reactor coolant piping. These nodes are identified as Volumes 201,211,231,202,212 and 232 on Figure A-I.

Safety Injection Safety injection to the cold legs of the reactor coolant piping is modeled as fill

. junctions. Upon reaching the low pressurizer pressure setpoint, the fill junction trips on and emergency core cooling is provided. Safety Injection is not employed in analyzing the Turbine Trip transient.

Charging and Ixtdown The Chemical and Volume Control System functions of nonnal charging and letdown are not included in this model.

4.0 MODELING TECHNIOUES Reactor Trins A-5

e .

l Overtemperature and Overpower Delta T Both the OTAT and OPAT equations are programmed into RETRAN via linear centrol systems which trip the reactor if either setpoint is reached.

Pressurizer pressure -

Both extremes of pressurizer pressure are monitored for reactor trip purposes. In addition to reactor trip, safety injection occurs when the low pressurizer pressure setpoint is reached.

5.0 MODELING OPTIONS Enthalpv Transport The standard enthalpy transport option is used on all the heated or heat exchanging conductors. This involves the three core conductors and the four steam generator conductors in each loop. This option provides a value forjunction enthalpy based on known enthalpy at the center of the associated volume. j Pressuri7er Model 1

The non-equilibrium model is used to determine the pressurizer response. This model ]

is a necessity for operational transients because the surge into the pressurizer causes a )

significant non-equilibrium effect which is not accounted for by the standard l equilibrium state solution. This model keeps track of the mass and energy in both  !

liquid and vapor regions allowing different thermodynamic states in each region. The model includes a " flashing" model for movement of vapor from the liquid region to the vapor region and a minout model for movement of liquid from the vapor region to the liquid region.

The limitations of the non-equilibrium pressurizer model as identified in the SER are recognized and it is noted that at no point in the turbine trip transient analyses does the i pressurizer completely empty or become water solid.

Temoerature Transoon Dela.v The temperature transport delay model is employed to model the movement of l temperature fronts through the piping volumes. As identified in the SER, the transport /

delay option is only used in piping exhibiting a dominant flow direction.

\

A-6  ;

i

e o Momentum Equation Of the options available to calculate momentum effects, the complete compressible momentum equation is employed for all junctions in the model. At junctions like the surge line entmnce from the hot leg piping it is assumed that there is no momentum flux exchanged since tllis is a "T" junction with a much smaller line entering the reactor coolant piping and the angle is biased 90 to remove the momentum flux. ,

Homogeneous Eauilibrium Model ,

All volumes employed in the model with the exception of the pressurizer and the steam generator secondary are homogeneous equilibrium model volumes.

Bubble Rise Model The steam generator secondary side employs the standard equilibrium mixture bubble rise model in order to account for separation of phases. i

6.0 REFERENCES

c A-1 McFadden, J.H., et al, RETRAN A Program for Transient Thermal-Hydmulic Analysis of Complex Fluid Flow Systems, EPRI NP-1850-CCM-A, Rev. 5,1992 A 2 Safety Evaluation Report on RETRAN-01 MOD 003 and RETRAN-02 MOD 002, September 4,1984, Page 3. -

A-3 Letter from A. C. Thadoni (NRC) to W. J. Boatwright (TU), November 1,1991,

Subject:

" Acceptance for Use of RETRAN02 MOD 005.0."

A-7 ,

TABLE A-1. CONTROL VOLUME DESCRIPTIONS Control Volume No. Description 201 (202) Hot leg pipe - includes RV outlet r7zzle and steam generator inlet nozzle i 401 (402) Steam generator primary inlet volume and tubesheet volume 411, 412 (412, 422) Steam generator tubes vertical upuow section 431 (432) Steam generator tubes upflow includes half of U bend 441 (442) Steam generator tubes downflow includes half of U bend 451, 461, (452, 462) Steam generator tubes vertical downDow section 491 (492) Steam generator primary outlet tubesheet and outlet plenum 211 (212) Crossover pipe - steam generator outlet nozzle to RC pump 221 (222) RC pump 231 (232) Cold leg pipe - RC pump to RV inlet nozzle 310 Pressurizer 300 Pressurizer surge line

]

i 320 Pressurizer spray line 140 Reactor vessel downcomer annulus 100 Reactor vessel lower plenum 1 Lower third of core active length  !

2 Middle third of core active length 3 Upper third of core active length A-8 .

I

-e .

Control Volume No. Description ,

120 Core outlet plenum 130 Reactor vessel upper head i10 Core bypass Steam generator secondary i 501 (502) 330 Pressurizer Relief Tank (Time Dependent Volume)  ;

999 Atmosphere (Infinitely Large Volume) i 601 (602) Main steam line inclusive to the MSIVs  !

?

Control volume numbers in parenthesis are associated with loop representing the single steam generator and the other control volume numbers are for the lumped loop.

P 1

4 A-9 l

e MS!v Ott

)[ 042 SVI-5 eSI-cos

" skal m 611 675 Svt-S D l1 .b H- m AJty 905 00 W 0?O Afty 38' fury --

r ,

h tl Q r 502 m:; t J r. 3 9  ;;"^

r m @

a

'91 h 1 31 til 435 E' db FEED t 37

,12 .

.3agg 13 12t , -- -

TEED

'S' 12

(  ;

422 n22

$ FEED 40s til h d "I IN c S ',? @k , 112 95

$ h 91 ..293 i t) .- SQ 'i,> %: '

h 291 g +

_g 12 t g

1

- 2 122, g 292 h 992 7

i,i. ,

8 e m 7 a @u m"'

. 2,,  : w -

w -

E53

=
  • e >r 1RRE 2dl 2 ll h# !I

. y:  :  ::

\232 LW SAFETY SEETT k 312 252 SINGLE LOLF accra euc::= g I

DUEC110N INECIl0N d' g _, "'

Im

- ocrm n.

a comerms h-

~

Figure A-1. Callaway Base Deck Nodalization Diagram

]

'l 7

1 f

r SAFETY EVALUATION I

Appendix B:

Benchmark of the Callaway Plant RETRAN-02 Base Deck to the LOFTRAN Results Presented in FSAR Section 15.2.3 6

Appendix B

1.0 INTRODUCTION

The purpose of this report is to document a turbine trip event analysis perfonned with RETRAN-02 MOD 005.1 and compare that analysis to similar analyses presented in the Callaway FSAR. There are four turbine trip analyses presented in the FSAR and those analyses are duplicated and presented here in this report.

These analyses were perfonned to demonstrate that the RETRAN-02 input model of the Callaway Plant could adequately replicate the FSAR results when using similar assumptions, initial conditions and values of key parameters. The results of the RETRAN-02 analyses are compared to the FSAR analyses in Section 5.0, where it is shown that the results agree very.

well. This benchmark serves as a demonstration that the Callaway input model and the RETRAN-02 computer code can be used to evaluate turbine trip events.

This report documents the assumptions and key parameters in Section 2.0, the initial conditions in Section 3.0, the modifications to the base deck in Section 4.0 and the RETRAN-02 analysis results are compared to the FSAR analysis results in Section 5.0.

2.0 Assumptions and Key Parameters The RETRAN-02 analysis was perfonned to duplicate the LOFTRAN turbine trip analysis presented in the FSAR. Where possible, the same values of initial conditions, key parameters, and assumptions were used in the RETRAN-02 analysis as in the LOFTRAN analysis.

However, there are some basic differences between the computer code models that cannot be addressed through input; or they may require the key parameters to be supplied in a different fonn.

Assumptions The major assumptions used for this analysis are:

(1) No credit is taken for the direct reactor trip upon turbine trip. The reactor trip occurs on the first reactor protection trip setpoint reached after the turbine trip.

(2) The reactor is in manual control (no credit is taken for automatic response to the event).

(3) No credit is taken for steam release through the steam dump system or the steam generator power-operated relief valves. Consequently, the steam generator pressure is limited only by the steam generator safety valves.

B-1

(4) Main feedwater flow is assumed to be lost at the time of reactor trip and no credit is taken for the auxiliary feedwater system.

(5) Two sets of reactivity assumptions were used. One assumes minimum reactivity feedback and the other assumes maximum reactivity feedback as follows:

(a) Minimum Reactivity Feedback A least negative moderator temperature coefficient and a least negative Doppler temperature coefficient were assumed (BOL conditions). In addition, it is conservatively assumed that a 5 pcm/ F PMTC exists at 100% power.

(b) Maximum Reactivity Feedback A conservatively large negative moderator temperature coefficient and a most negative Doppler temperature coefficient were assumed (EOL conditions).

(6) Two cases were analyzed for each set of reactivity assumptions. These cases were analyzed with full credit for RCS pressure control, and without credit for RCS pressure control. These cases are described as follows:

(a) With Pressure control Full credit was taken for the effect of pressurizer spray and pressurizer power-operated relief valves (PORVs) in reducing or limiting the primary pressure. Pressurizer safety valves were also assumed operable.

(b) Without Pressure Control No credit was taken for the effect of pressurizer spray and pressurizer PORVs in reducing or limiting the coolant pressure.

The pressurizer safety valves were assumed operable.

(7) The limiting single failure assumed is the loss of one protection train.

Four turbine trip transient analyses were performed with the RETRAN-02 MOD 005.1 code and compared to the FSAR analyses. These cases are:

(1) Maximum Reactivity assumptions with no credit taken for the pressurizer PORVs or spray, B-2

(2) Maximum Reactivity assumptions with credit taken for the pressurizer PORVs and spray, (3) Minimum Reactivity assumptions with no credit taken for the pressurizer PORVs or spmy, and  :

(4) Minimum Reactivity assumptions with credit taken for the pressurizer PORVs and spray.

3.0 Initial Conditions The initial conditions of the RETRAN-02 analyses were selected to match the FSAR analysis as closely as possible and are compared in Table 3-1. All four transients analyzed were initiated from these initial conditions.

The RCS flow used in the RETRAN-02 analyses is slightly less than that used in the FSAR analysis. The FSAR analyses used minimum measured flow (141.9E6 lbm/hr). However, when this flow rate was used to initialize the RETRAN-02 cases it produced a vessel AT of 60.95*F instead of the desired value of 62.16 F. Therefore,, the RCS flow was adjusted down until the desired vessel AT was obtained.

4.0 Modifications to the Base Model The base model for the Callaway Plant was modified for these transient analyses. The modifications are designed to be placed at the end of the base deck so as to replace the original data cards. A nodalization diagmm for the RETRAN-02 Callaway model is shown in Figum 4-1. The modifications were made to represent the transient scenario and assumptions, to represent initial conditions, and to emulate the analysis methods used by the LOFTRAN code.

Generally, these modifications included:

a) changes to the pmssurizer safety valve and steam generator safety valve models, b) transient initiation by closing the MSIVs and terminating main feedwater (where MSIV closure approximates closure of the turbine stop valves),

i c) keeping the reactor coolant pumps nmning throughout the transient,  ;

d) deactivating the SG relief valves, c) deactivating the pressurizer heaters, f) and, preventing the auxiliary feedwater system from actuating.

I H-3  ;

i l

Other modifications were made on a case by case basis to model the transient conditions of pressure control and reactivity feedback.

5.0 Turbine Trio Transient Analysis Results The turbine trip transient is characterized by degraded primary-to-secondary heat transfer due to an increase in secondary pressure from the turbine trip. Because of the degraded SG heat transfer, the primary fluid temperature increases thereby causing the fluid to expand into the pressurizer and increase the RCS pressure. After the turbine trip, the secondary pressure continues to rise until the SG SVs open. The primary fluid also continues to expand until the reactor is tripped. The peak RCS pressure reached depends on the power response, the degraded SG heat transfer, and the actions of the primary pressure control systems.

Four turbine trip transient analyses were perfonned with the RETRAN-02 MOD 005.1 code.

These cases are:

(1) Maximum Reactivity with no credit taken for the pressurizer PORVs or spray, (2) Maximum Reactivity with credit taken for the pressurizer PORVs and spray, (3) Minimum Reactivity with no credit taken for the pressurizer PORVs or spray, and (4) Minimum Reactivity with credit taken for the pressurizer PORVs and spray.

These four transient analyses are compared with the same analyses from the FSAR. The initial conditions and assumptions used for these analyses are the same as those used in the FSAR.

However, because the RETRAN-02 code uses different solution methods and different mathematical models for plant systems and physical phenomena than the LOFTRAN code, the FSAR analysis results cannot be matched exactly. If code model differences are believed to cause differing results for certain parameters, they are discussed in the subsections presenting the specific analyses.

The results of these RETRAN-02 analyses match the FSAR results well in all four cases. In the next subsections, the results of the four RETRAN-02 analyses are compared to the FSAR results and include graphical comparisons and timing of key events.

5.1 Maximum Reactivity with No Primary Pressure Control This case uses the most negative Doppler and moderator temperature reactivity functions and assumes the pressurizer spray and PORV are inoperable. Comparison with the FSAR data for this case are shown in Figures 5-1 through 5-5. The sequence of events are compared in Table 5-1.

B-4

8 O The primary system pressure shown in Figure 5-1 increases immediately in response to the turbine trip and resulting degmded SG heat transfer. The pressure increase is slowed by opening of the pressurizer safety valves at 5.8 seconds and then reversed by the reactor trip at 6.8 seconds. After the reactor trip, the pressure decreases sharply and in the longer term gradually decreases in parallel with the RCS tempemtures.

The nonnalized system power is shown in Figure 5-2. The power increases slightly prior to reactor trip which occurs on high system pressure at 6.8 seconds. This power increase is caused by the increased moderator density as a result of the primary pressurization. Even though the moderator temperature increases, the primary pressurization causes a net increase in core density. It should be noted that this is a shon-lived effect; that is, the pressurization is induced by heat transfer degmdation in the steam generators, and the relatively hot fluid that consequently exits the steam generators must traverse the cold legs prior to being "seen" as a reactivity effect in the core. This in turn results in an initial positive reactivity addition and a minor power increase prior to the reactor trip. After the reactor trip, the power decreases rapidly to decay heat levels.

The core average temperature and the core inlet temperature are shown in Figures 5-3 and 5-4, respectively. Both of these parameters respond to the degraded SG heat tmnsfer and increased core power by an immediate increase until the reactor trip. After the reactor trip, the primary tempemtures drop rapidly, then gradually decrease as the decay heat decreases.

The pressurizer liquid volume is shown in Figure 5-5. The pressurizer liquid volume matches the FSAR result well through the Erst 20 seconds of the transient. After that time the two analyses show differences. The change in liquid volume of the pressurizer is directly related to the primary fluid temperature. As the primary temperature increases, the increased coolant volume is displaced into the pressurizer. As can be seen in Figures 5-3 and 5-4, the primary temperature response for the two analyses match very well. In addition, the pressurizer pressure also matches well (Figure 5-1). Therefore, the discrepancy in the pressurizer liquid volume response can only be attributed to a difference in the pressurizer modeling methods in the two codes. In all four analyses, the pressurizer liquid volume comparison between the two analyses display differences.

5.2 Maximum Reactivity with Primary Pressure Control This case uses the most negative Doppler and moderator tempemture reactivity functions and assumes the pressurizer spray and PORV are operable. Comparison with the FSAR data for this case are shown in Figures 5-6 through 5-10. The sequence of events are compared in Table 5-2.

The primary system pressure shown in Figure 5-6 begins to immediately increase in response to the turbine trip and resulting degraded SG heat transfer. The expansion of the primary fluid into the pressurizer is rapid enough that the pressurizer spray and PORVs are unable to stop the pressure from increasing. The pressure increase is slowed by opening of the pressurizer PORVs at 3.8 seconds and then reversed by a decrease in power resulting from the increased B-5

e o temperature (decreased density) of the primary coolant. At 13.4 seconds the PORVs close, stopping (at least temporarily) the decline in RCS pressure. The small changes in RCS pressure that immediately follow reflect the minor fluctuations in SG pressure shortly after the SG SVs open. The reactor trips at 14.6 seconds as a result of the OTAT protection logic.

After the reactor trip, the pressure decreases sharply and then gradually decreases in parallel with the RCS tempemtures.

The nonnalized system power is shown in Figure 5-7. The power increases slightly for the first 4 seconds, predominantly caused by the increased moderator density as a result of the primary pressurization. However, the moderator temperature increase from the degmded SG heat transfer eventually causes a net expansion of the moderator in the core and consequent decrease in power. The power continues to decrease until it reaches a momentary plateau at 12 seconds. The power begins to level out at this time because the SG secondary has reached an equilibrium pressure (see Figure 5-16) causing the primary system to reach a quasi-equilibrium state. However, shortly after that, at 14.6 seconds the reactor is tripped on an OTAT reactor trip and the power decreases to a decay heat level.

The core average temperature and the core inlet tempemture are shown in Figures 5-8 and 5-9, respectively. Both core inlet temperature and core average temperature respond to the degaded SG heat transfer and changes in core power by an immediate increase after the turbine trip. At approximately 12 seconds the temperature rise is slowed after the steam generator pressure reaches the SV setpoint. After the reactor trip at 14.6 seconds, the primary temperatures drop rapidly, then gradually decrease as the decay heat decreases.

The pressurizer liquid volume is shown in Figure 5-10. The pressurizer liquid volume matches the FSAR result well until the pressurizer PORV opens at 3.8 seconds. After that time, the two analyses begin to show differences. The change in liquid volume of the pressurizer is directly related to the primary fluid temperature. As the primary temperature increases, the increased coolant volume is displaced into the pressurizer. As can be seen in Figures 5-8 and 5-9, the primary temperature response for the two analyses match very well, which is also true of the pressurizer pressure. Consequently, the difference in the pressurizer liquid volume response can only be attributed to a difference in the pressurizer modeling methods in the two codes. In all four analyses, the pressurizer liquid volume comparison between the two analyses display differences.

5.3 Minimum Reactivity With No Primary Pmssure Control This case uses the least negative Doppler and moderator temperature reactivity functions and assumes the pressurizer spray and PORV are inoperable. Comparison with the FSAR data are shown in Figures 5-11 through 5-15. The sequence of events are compared in Table 5-3.

The primary system pressure shown in Figure 5-11 begins to immediately increase in response to the turbine trip and resulting degraded SG heat transfer. The pressure increase is slowed by opening of the pressurizer safety valves at 6.0 seconds and then reversed by the reactor trip at B-6

6.9 seconds. The primary pressure reaches a slightly higher peak than the maximum reactivity case described in Section 5.1 because of the higher power obtained prior to the reactor trip (consistent with the least negative reactivity feedback). After the reactor trip, the pressure decreases sharply and gradually decreases in parallel with the RCS temperatures.

The nonnalized system power is shown in Figure 5-12. The power increases prior to the reactor trip which occurs on high system pressure at 6.9 seconds. This power increase is caused by the positive moderator temperature coefficient and the increasing temperature prior to reactor trip. In the first two cases that use maximum reactivity input, the power increased early due to the increase in modemtor density from primary pressurization prior to the time the changes in fluid temperature was tmnsponed to the core. In this case, there is no apparent change in power during that similar early period. This is due to the fact that the modemtor reactivity feedback is supplied in tenns of a temperature coefficient rather than a density coefficient, therefore, the initial change in core fluid density is not accounted for. This method of inputting the moderator feedback coefficients is consistent with the way the values  ;

are documented in the FSAR. In addition, it appears to be consistent with the method of input used in the LOFTRAN code since the turbine trip results in the FSAR displayed the same behavior (a slight initial power increase for the cases with maximum reactivity and a lack of any initial power change in the cases with minimum reactivity). Also note that had the reactivity effects from the initial density increase been modeled for the minimum reactivity cases, the power would have decreased initially which would be less conservative.

After the reactor trip, the power decreases rapidly to decay heat levels. As can be seen from the figure, the power increases more prior to the reactor trip in the RETRAN-02 analysis. As best as can be detennined, the assumptions regarding the reactivity functions are similar in the two analyses. However, the method that the RETRAN-02 and LOFTRAN codes use to model the Doppler reactivity feedback are significantly different. In the LOFTRAN code, the Doppler reactivity feedback is predominantly a function of system power while in the RETRAN-02 code the Doppler feedback is a direct function of average fuel temperature. It is possible that the differences in the Doppler feedback models are responsible for differences in power prior to the reactor trip.

The core average temperature and the core inlet temperature an: shown in Figures 5-13 and 5-14, respectively. Both parameters respond to the degraded SG heat transfer and increased core power by an immediate increase until the reactor trip. After the reactor trip, the primary temperatures drop rapidly, then gradually decrease as the decay heat decreases. The peak temperatures reached in both figures are slightly higher in the RETRAN-02 analyses because of the higher power prior to the reactor trip.

The pressurizer liquid volume is shown in Figure 5-15. The pressurizer liquid volume matches the FSAR result well through the first 10 seconds of the transient. After that time the two analyses show significant differences. The change in liquid volume of the pressurizer is directly related to the primary fluid temperature. As the primary temperature increases, the increased coolant volume is displaced into the pressurizer. As can be seen in Figures 5-11,5-13 and 5-14 the primary pressure and the primary tempemture response for the two analyses B-7

match very well. Consequently, the difference in the pressurizer liquid volume response can only be attributed to a difference in the pressurizer modeling methods in the two codes.

5.4 Minimum Reactivity with Primary Pressure Control This case uses the least negative Doppler and moderator temperature reactivity functions and assumes the pressurizer spmy and PORV are opemble. Comparison with the FSAR data is shown in Figures 5-16 through 5-20. The sequence of events are compamd in Table 5-4.

The primary system pressure shown in Figure 5-16 begins to immediately increase in response to the turbine trip and resulting degraded SG heat transfer. The pressure increase is slowed by opening of the pressurizer PORVs at 3.9 seconds, then reversed by the pressurizer SVs opening at 8.9 seconds followed shortly by a reactor trip at 9.5 seconds. After the reactor trip, the pressure decreases sharply and then gradually decreases in parallel with the RCS temperatures.

The nonnalized system power is shown in Figure 5-17. The power increases prior to the reactor trip which occurs on high system pressure at 9.5 seconds. This power increase is caused by the positive moderator temperature coefficient and the increasing temperature prior to reactor trip. In the first two cases that use maximum reactivity input, the power increased early due to the increase in modemtor density from primary pressurization prior to the time the changes in fluid temperature was transported to the core. In this case, there is no apparent change in power during that similar early period. This is due to the fact that the moderator reactivity feedback is supplied in tenns of a temperature coefficient rather than a density coefficient, therefore, the initial change in core fluid density is not accounted for. This method of inputting the moderator feedback coefficients is consistent with the way the values are documented in the FSAR. In addition, it appears to be consistent with the method of input used in the LOFTRAN code since the turbine trip results in the FSAR displaying the same behavior (a slight initial power increase for the cases with maximum reactivity and a lack of any initial power change in the cases with minimum mactivity). Also note that had the reactivity effects from the initial density increase been modeled for the minimum reactivity cases, the power would have decreased initially which would be less conservative.

After the reactor trip, the power decreases rapidly to decay heat levels. As can be seen from the figure, the power increases more prior to the reactor trip in the RETRAN-02 analysis. As best as can be detennined, the assumptions regarding the reactivity functions are similar in the two analyses. However, the method that the RETRAN-02 and LOFTRAN codes use to model the Doppler reactivity functions are significantly different. In the LOFTRAN code, the Doppler reactivity feedback is predominantly a function of system power while in the RETRAN-02 code the Doppler feedback is a direct function of fuel temperature. It is possible .

that the differences in the Doppler feedback models are responsible for the differences in power prior to the reactor trip. -

The core average temperature and the core inlet temperature are shown in Figures 5-18 and 5-19, respectively. Both parameters respond to the degraded SG heat transfer and increased core B-8

l power by an immediate increase until the reactor trip. After the reactor trip, the primary temperatures drop rapidly, then gradually decrease as the decay heat decreases. The peak temperatures reached in both figures are slightly higher in the RETRAN-02 analyses because of the higher power prior to the reactor trip.

The pressurizer liquid volume is shown in Figure 5-20. The pressurizer liquid volume matches the FSAR result well through the first 20 seconds of the transient. After that time the two analyses show significant differences. The change in liquid volume of the pressurizer is directly related to the primary Huid temperature. As the primary temperature increases, the increased coolant volume is displaced into the pressurizer. As can be seen in Figures 5-18 and 5-19 the primaiy temperature response for the two analyses match very well, as do the pressures. Consequently, the difference in the pressurizer liquid volume response can only be attributed to a difference in the pressurizer modeling methods in the two codes.

l l

l l

l l

lb9 i

e ,o TABLE 3-1

SUMMARY

OF INITIAL CONDITIONS PARAMETER FSAR RETRAN-02 Power (MWth)

Total 3579.0 3579.0 Pump 20.0 20.0 Core 3559.0 3559.0 Pressurizer Pressure (psia) 2250.0 2250.0 Vessel AT( F) 62.16 62.16 Vessel Tavg ( F) 590.9 590.9 Cold Leg Temperature ( F) 559.9 559.9 liot Leg Temperature ( F) 622.0 622.0 Feedwater Temperature ( F) 446.0 449.0 Total Core Flow (lbm/hr) 141.9x106 138.9x106 Average Core Density (Ibm /ft3 ) 43.59 43.53 Average Fuel Temperature ( F) 1345.0 1345.0 Steam Generator Pressure (psia) 960.2 960.2 Ste:un Generator Mass (Ibm) 93360 93369 B-10

TABLE 5-1 SEQUENCE OF EVENTS FOR MAXIMUM REACTIVITY WITHOUT PRESSURE CONTROL FSAR RETRAN-02 Event (seconds) (seconds)

Turbine Trip, Loss of Main Feedwater Flow 0.0 0.001 Ifigh Pressurizer Pressun:

Reactor Trip Setpoint  :

Reached 4.7 4.8 Pressurizer SVs Open ---

5.8 Rods Begin to Drop 6.7 6.8 ,

SG SVs Open 8.0 7.7 Peak Pressurizer Pressure 8.0 8.0 Pressurizer SVs Close --

12.6 B-Il

I TABLE 5-2 SEQUENCE OF EVENTS FOR MAXIMUM REACTIVITY ,

WITH PRESSURE CONTROL FSAR RETRAN-02 Event Lseconds) (seconds)

Turbine Trip, Loss of Main Feedwater Flow 0.0 0.001 Pressurizer PORVs Open ---

3.8 SG SVs Open 8.0 7.7 Peak Pressurizer Pressure 9.0 9.2 OTAT Reactor Trip Setpoint Reached 12.6 12.6 Pressurizer PORVs Close --

13.4 -

Rods Begin to Drop 14.6 14.6 13- 1 2

l TABLE 5-3 SEQUENCE OF EVENTS FOR MINIMUM REACTIVITY WITHOUT PRESSURE CONTROL FSAR RETRAN-02 Event (seconds) (seconds)

Turbine Trip, Loss of Main Feedwater Flow 0.0 0.001 High Pressurizer Pressure Reactor Trip Setpoint Reached 4.8 4.9 Pressurizer SVs Open ---

6.0 Rods Begin to Drop 6.8 6.9 SG SVs Open 8.0 7.7 Peak Pressurizer Pressure 8.5 8.6 Pressurizer SVs Close ---

12.8 l

l l

l l

l l

4 B-13 J

e o TABLE 5-4 SEQUENCE OF EVENTS FOR MINIMUM REACTIVITY WITH PRESSURE CONTROL FSAR RETRAN-02 Event (seconds) (seconds)

Turbine Trip, Loss of Main Feedwater Flow 0.0 0.001 Pressurizer PORVs Open ---

3.9 High Pressurizer Pressure Reactor Trip Setpoint Reached 7.4 7.5 SG SVs Open 8.0 7.7 Pressurizer SVs Open ---

8.9 Rods Begin to Drop 9.4 9.5 Peak Pressurizer Pressure 10.5 11.0 Pressurizer SVs Close ---

13.8 Pressurizer PORVs Close ---

13.9 s

B-14 i

'e p I

Plh f IjIb y P" [ =g r- - 1-

// L/N/ 1VNI ill

) $ h 5 h $~"

1g s.

5

_g a @

1" 3 -a ser ogi a ewuwa re.

  • I I e 11 LJ ~

./

g

__-.ni$ e e

V h ,,, g *I.

c O

st m

te e =

n. ., ., . ..i s

. =

D , e e e e 4o .

e u-u-s -

t lil

... <r .Ej Z M

a t

Q Pn e

E O

, i G-- g I@ "LM -

  • el B i r----

@ '! a e- i! ee

-e+--

$2 es

-g II

@ l . .g[ 4 i

E' hl o i ID e

g l

  • I I ,UI // t/N/ e// Q' s._/ h b i

@5-}-f @).-! i. ~pO g.'qQ_@ _

w I @

I, s up r +0 5 + G u!watwotw 1g.

J L. _

E!) f II l (E) 1 i

t i

1 E-15

k_

8-N

? 6, san o a

I -

E 4

R-N 5

- - 2 .- -- _..

H-D 20 40 60 80 100 Time (secord)

Figure 5-1. Pressurizer Pressure for the Turbine Trip Transient with Maximum Reactivity and No Pressure Control.

--e a rm =.

g ,

I a

1 E,a-N _

M, .

- -m _ ,

  • 6 I I i ,

0 20 40 60 80 100 Time (seconds) 1 Figure 5-2. Normalized Power for the Turbine Trip Transient with Maximum Reactivity and No Pressure Control.

i B-16

i S.

V E a run =

5  :

h E~-b

[$2 b

m: - _

' i 6 i i 0 20 40 60 80 100 h (M)

Figure 5-3. Average Core Temperature for the Turbine Trip Transient with Maximum Reactivity and No Pressure Control. ,

i 3

i

!! a rrum G a

$ *::  % = = =  ; )

g _

4 4-  !

I i 3 Ri- l

]

?-

3' i 40 i

60 i

80 i

100 0 20 m .t..=n*>  ;

Figure 5-4. Core Inlet Temperature for the Turbine Trip Transient with i Maximum Reactivity and No Pressure Control.

B-17

o e l

l 1

l l

i E

8 3 & FSAR Data E H-8 g:  %  :- m 5

W*+

E' ,i i i i 0 20 40 00 60 100 Time (seconds)

Figure 5-5. Pressurizer Liquid Volume for the Turbine Trip Transient with Maximum Reactivity and No Pressure Control.

8

~.

g, arsia o

?

a k ,.

R

= s 2 8-

~

E l '

5 y: = -u .

a.

1 1 4 5 0 20 40 00 80 W Tine (seconds)

Figure 5-6. Pressurizer Pressure for the Turbine Trip Transient with Maximum Reactivity and Pressure Control.

B-18

e o

~:

a raAn om.

2 .

]:

.i  :

g: - -

Y -

= - -

  • , , u 0 20 40 80 80 100 Time (seconds)

Figure 5-7. Normalized Power for the Turbine Trip Transient with Maximum Reactivity and Pressure Ccontrol.

E

^ A FSAR ossa g

5 ,

[ g .. .

i

{ R- -

= =

~

b

@. i o

i I 4 l 0 20 40 80 80 100 Time (seconds)

Figure 5-8. Average Core Temperature for the Turbine Trip Transient with Maximum Reactivity and Pressure Control.

B-19

)

E g_ a rmn E g_

1  :

e_

s a

3 E-g_ _ ..

3 i i i i a 2o 40 Bo Bo 1Do Time (seconds)

Figure 5-9. Core Inlet Temperature for the Turbine Trip Transient with Maximum Reactivity and Pressure Control.

E g} armo E !! ,

I

$El  %

5.

Ei o lo lo a do soo r.. <.-o Figure 5-10. Pressurizer Liquid Volume for the Turbine Trip Transient with Maximum Reactivity and Pressure Control.

l 1

)

B-20 l

I

A F6AR DeLa 8-

_ n_

S s

I -

E !!-

e. ~

I E

l-E' e i 4 i 1 0 20 40 60 80 100 Tkne (secords)

Figure 5-11. Pressurizer Pressure for the Turbine Trip Transient with Minimum '

Reactivity and No Pressure Control.

0 "5 a rro w

.. a I

}"i e_ . _

i l I i 0 40 60 80 100 20 Time (secores)

Figure 5- 12 Normalized Power for the Turbine Trip Transient with Minimum Reactivity and No Pressure Control.

B-21

l 1

I l l

A FSAR Data C. l f-E- _

b .

g- . -

O" E 4 { l I o 20 4o so ao too Time (somnds)

Figure 5-13. Average Core Temperature for the Turbine Trip Transient with Minimum  :

Reactivity and No Pressure Control.

h & FSAR Dem E. 2 .

E ~

- = . .  :

. s-I 3 a:

2-i 6 I 6 o 20. 4o 60 So 100 Time (seconds)

Figure 5-14. Core Inlet Temperature for the Turbine Trip Transient with Minimum Reactivity and No Pressure Control.

B-22

8 h a rua Data N

EM.-

k!i H-E. i i i i 100 0 20 40 60 80 Time (seconds)

Figure 5- 15 Pressurizer Liquid Volume for the Turbine Trip Transient with Minimum Reactivity and No Pressure Control.

a rsAR Das g_

,~.

b i

i Pressurtzer PORV Opens 8'

s s i n a 0 20 40 60 80 100 Trne (seconds)

Figure 5- 16 Pressuizer Pressure for the Turbine Trip Transient with Minimum Reactivity and Pressure Control.

i B-23 1

0

)

A F& Aft Data f

j :-

33-5 4 I

U-

.l

~ .- . .. .

= , , i i 0 20 4 M M M me (seconds)

Figure 5- 17. Normalized Power for the Turbine Trip Transient with Minimum Reactivity and Pressure Control.

3.

g_ a rre o.

E _

1

[ g-

" s- L L L ,^

3 R-o 2o Io M 0 100 Time (seconds)

Figure 5-18. Average Core Temperature for the Turbine Trip Transient with Minimum Reactivity and Pressure Control.

B-24 i

.i

o > , .

l I

!- a rm o f Si e-I j a:

5: - -

O

  • b l' l 4 1 0 20 40 60 80 100 Time (seconds)

Figure 5-19. Core Inlet Temperature for the Turbine Trip Transient with Minimum Reactivity and Pressure Control.

g~ arm o Eg -

i h !-

t E-

$~ i .

.i i i 0 20 40 60 80 100 Tyne (seconds)

Figure 5- 2a Pressurizer Liquid Volume for the Turbine Trip Transient with Minimum Reactivity and Pressure Control.

B-25

l SAFETY EVALUATION Appendix C:

Turbine Trip DNBR Analysis t

. w Appendix C  ;

1.0 IDENTIFICATION OF CAUSES AND ACCIDENT DESCRIPTION For a turbine trip event, the mactor would be tripped directly (unless below approximately 50-percent power) from a signal derived fror, the turbine emergency trip fluid pressure transmitters and turbine stop valve limit switches. Tue turbine stop valves close rapidly (typically 0.19 second) on loss of trip fluid pressure actuated by one of a number of possible turbine trip signals. Turbine trip initiation signals include:

a. Generator trip -
b. Low condenser vacuum
c. Loss of lubricating oil
d. Turbine thmst bearing failure
e. Turbine overspeed
f. Manual trip Upon initiation of stop valve closure, steam flow to the turbine stops abmptly. Limit switches on the stop valves detect the turbine trip and initiate steam dump, and, if above 50-percent power, a reactor trip. The loss of steam flow results in an almost immediate rise in secondary system temperature and pressure. As a result, the heat transfer rate in the snam generator is reduced, causing the reactor coolant temperature to rise, which in turn causes waiant expansion, pressurizer insurge, and RCS pressure rise. Reactor coolant temperatures'and pressure do no significantly increase if the steam dump system and pressurizer pressure control system are functioning properly. The more rapid loss of steam flow caused by the more mpid valve closure makes turbine trip a more severe transient than a loss of external electrical load.

If the condenser were not available, the excess steam would be relieved to the atmosphere.

Additionally, main feedwater flow would be lost if the condenser were not available. For this situation, feedwater flow would be maintained by the auxiliary feedwater system.

The automatic steam dump system would normally accommodate the excess steam generation. .

Reactor coolant tempemtures and pressure do not significantly increase if the steam dump system and pressurizer pressure control system are functioning properly. If the turbine condenser was not available, the excess steam genemtion would be dumped to the atmosphere and main feedwater flow would be lost. For this situation, feedwater flow would be maintained by the auxiliary feedwater system to ensure adequate residual and decay heat removal capability. Should the steam dump system fail to operate, the steam generator safety valves may lift to provide pressure control.

C-1

I l

l i

In the event that a safety limit is approached, protection would be provided by the high pressurizer pressure, high pressurizer water level, and overtemperature AT trips. Voltage and  ;

frequency relays associated with the reactor coolant pump provide no additional safety function for this event. In the event that the steam dump valves and steam generator /PORVs fail to open following a large loss of load, the steam generator safety valves may lift, and the reactor may be tripped by the high pressurizer pressure signal, the high pressurizer water level signal, or the overtemperature AT. A turbine trip is classified as an ANS Condition II event, fault of moderate frequency.

A turbine trip event is more limiting than loss of external load, loss of condenser vacuum, and other turbine trip related events. As such, this event has been analyzed for DNBR in detail.

2.0 ANALYSIS OF EFFECTS AND CONSEOUENCES A. Method of Analysis In this analysis, the behavior of the plant is evaluated for a complete loss of steam load from full power without direct reactor trip. This is done to show the adequacy of the pressure relieving devices, and also to demonstrate core protection margins. The reactor is not tripped until conditions in the RCS result in a trip. The turbine is assumed to trip without actuating all the turbine stop valve limit switches. The assumption delays reactor trip until conditions in the RCS result in a trip due to other signals. Thus, the analysis assumes a worst-case transient. In addition, no credit is taken for steam dump. Main feedwater flow is tenninated at the time of turbine trip, with no credit taken for auxiliary feedwater (except for long-term recovery) to mitigate the consequences of the transient.

The turbine trip transients are analyzed by employing the detailed digital computer code RETRAN. RETRAN simulates the neutron kinetics, RCS, pressurizer, pressurizer relief and safety valves, pressurizer spray, steam generators, and steam generator safety valves. It also computes pertinent plant variables, including tempemtures, pressures, and power level. Westinghouse performed the actual DNB evaluation using the WRB-2 correlation and the RETRAN results.

This accident is analyzed with the ITDP. Plant characteristics and initial conditions are discussed in Table 1. Uncertainties in initial conditions are included in the limit DNBR as described in WCAP 8567, " Improved Thermal Design Procedure," July _1975.

Major assumptions are summarized below:

a. Moderator and Doppler Coefficients of Reactivity c-2

The turbine trip is analyzed with both maximum and minimum reactivity feedback. The maximum feedback cases assume a large negative moderator temperature coefficient and the most negative Doppler power coefficient. The minimum feedback cases assume a minimum moderator temperature coefficient and the least negative Doppler coefficient.

b. Reactor control From the standpoint of the maximum pressures attained, it is conservative to assume that the reactor is in manual control. If the reactor were in automatic control, the control rod banks would move prior to trip and mduce the severity of the transient.
c. Steam release No credit is taken for the operation of the steam dump system or steam generator power-opemted relief valves. The steam generator pressure rises to the point where steam release through safety valves occurs thus limiting the secondary steam pressure increase. Because these valves are set on steam in a manner that accounts for accumulation, no accumulation is modeled. Each steam generator has five valves. The setpoint for each valve is set at the technical specification setpoint plus 3 percent for setpoint tolerance.
d. Pressurizer spray and power-operated relief valves Two cases for both the minimum and maximum reactivity feedback cases are analyzed: l i'
1. Full credit is taken for the effect of pressurizer spray and power-operated relief valves in reducing or limiting the coolant pressure. The pressurizer l safety valves are also available.
2. No credit is taken for the effect of pressurizer spray and power-operated relief valves in reducing or limiting the coolant pressure. The pressurizer safety valves are operable.
e. Feedwater flow Main feedwater flow to the steam generators is' assumed to be lost at the time of turbine trip. No credit is taken for auxiliary feedwater flow since a stabilized plant condition will be reached before auxiliary feedwater initiation is normally ,

assumed to occur; however, the auxiliary feedwater pumps would be expected to i start on a trip of the main feedwater pumps. The auxiliary feedwater flow would remove core decay heat following plant stabilization.

l C-3

f. Reactor trip is actuated by the first reactor protection system trip setpoint reached, with no credit taken for the direct reactor trip on the turbine trip. Trip signals are expected due to high pressurizer pressure, overtemperature AT, high pressurizer water level, and low-low steam generator water level.
g. The pressurizer safety valves explicitly model the impact of loop seal purge delay.

The setpoint for the safety valve is modeled to lift at the technical specification setpoint (2500 psia) plus 2% (1 % tolerance and 1 % setpoint shift). Opening of the safety valves is then delayed by the loop seal purge delay time (1.15 seconds).-

Except as discussed above, nomial reactor control systems and engineered safety features are not required to function. Cases are presented in which pressurizer spray and power-operated relief valves are assumed, but the more limiting cases where those functions are not assumed are also presented. Pressurizer safety valves and/or steam genemtor safety valves may be required to open to maintain system pressures below allowable limits. No single active failure will prevent operation of any system required to function.

B. Results The transient responses for a turbine trip from full power opemtion are shown for four -

cases: two cases for minimum reactivity feedback and two cases for maximum reactivity feedback (Figures I through 20). The calculated sequence of events for the accident is shown in Table 2.

Figures 1 through 5 show the transient responses for the total loss of steam load with minimum reactivity feedback, assuming full credit for the pressurizer spray and pressurizer power-opemted relief valves. No credit is taken for the steam dump. The reactor is tripped by high pressurizer pressure trip channels. Westinghouse found that the minimum DNBR remains well above the safety analysis limit values. The pressurizer safety valves are not actuated for this case and, therefore, maintain system pressure below 110 percent of the design value. The steam generator safety valves open and limit the secondary steam pressure increase.

Figures 6 through 10 show the response for the total loss of steam load with maximum reactivity feedback. All other plant parameters are the same as the above. The reactor is tripped on the over1emperature AT signal. The- DNBR increases throughout the transient and never drops below its initial value. Pressurizer relief valves and steam genemtor safety valves prevent overpressurization in primary and secondary systems, respectively. The pressurizer safety valves are not actuated for this case.

The turbine trip accident was also uudied assuming the plant to be initially operating at full power with no credit taken for the pressurizer spray, pressurizer power-operated relief valves, or steam dump. The reactor is tripped on the high pressurizer pressure c4

signal. Figures 11 through 15 show the transients with minimum reactivity feedback.

The neutron flux remains essentially constant at full power, until the reactor is tripped.

The DNBR never goes below the initial value throughout the transient. In this case, the pressurizer safety valves are actuated, and maintain system pressure below 110 percent of the design value.

Figures 16 through 20 show the transients with maximum reactivity feedback, with the other assumptions being the same as in the preceding case. Again, the DNBR increases throughout the transient and the pressurizer safety valves are actuated to limit primary pressure.

CONCLUSIONS Results of the analyses show that the plant design is such that a turbine trip without a direct or immediate reactor trip presents no hazard. The integrity of the core is maintained by operation of the reactor protection system, i.e., the DNBR will be maintained above the safety analysis limit values.

i l

1 l

C-5

. .j

O Appendix C TABLE 1:

SUMMARY

OF INITIAL CONDITIONS Loss of Electrical Load Turbine Trip Glaximum:ReastivitV3 afinimum Reactivity 5 iMaxim6ni Reactivits FMinimum'ReactivitF g;jp p ;; g g g g gyggggggggggg g;jgggggggggg g g .g ;;g g gg g i PORVs No No Yes Yes Spray No No Yes Yes Moderator Density 0.43 Note 2 0.43 Note 2 Coefficient (AK/K/gm/cc)(1)

Doppler (I) Iower Curve Upper Curve Lower Curve of Upper Curve of Figure 15.0-2 of Figure 15.0-2 Figure 15.0-2 of Figure 15.0-2 Fuel Temperature (l) EOL BOL EOL BOL DNB Correlation WRB-2 WRB-2 WRB-2 WRB-2 ITDP Yes Yes Yes Yes Initial Core 3565 3565 3565 3565 Thermal Power (MWt)

Reactor Coolant 14 14 14 14 Pump IIeat (MWt)

Reactor Vessel 382,630 382,630 382,630 382,630 Coolant Flow (gpm)

Page 1 of 2

Appendix C TABLE 1:

SUMMARY

OF INITIAL CONDITIONS (cont'd.)

Loss of Electrical Load Turbine Trip

' " lMssimusniReactivits? JMiniumni-Reactivitni 4MaximnniRsastivityj ':iMinimsm Resctivit6 Q/ECdnt'rol $diemE N/didsdirdiSysteNA NNidohirol$NstEndl YwittfDAhid5ystNs's Vessel T-Avg ( F) 590.9 590.9 590.9 590.9 Pressurizer Pressure (psia) 2250 2250 2250 2250 Pressurizer Water 1080 1080 1080 1080 Volumn (Ft3)

Note 3 Feedwater Temperature F 446 446 446 446 S/G Tube Plugging Level 15 % 15 % 15 % 15 %

Notes: (1) Reactivity Coefficients (2) A density coefficient corresponding to +5 pcm/ F is added to 0.0 AK/K/gm/cc.

(3) Does not include surge line volume of 57.4 ft3 Page 2 of 2 l

- - - - - - - - _ - - - - . - - - -- .-~ . . . , - - - - , . -- - - = - = "

.a .,

Appendix C TABLE 2 TIME SEQUENCE OF EVENTS FOR INCIDENTS WIIICII RESULT IN A DECREASE IN IIEAT REMOVAL BY TIIE SECONDARY SYSTEM Time Accident Event (sec)

Turbine Trip

1. With pressurizer control Turbine trip; loss of main feedwater 0.0 (minimum reactivity feedback) flow High pressurizer pressure reactor trip 8.6 setpoint reached Initiation of steam release from steam 8.7 .

generator safety valves Rods begin to drop 10.6 Peak pressurizer pressure occurs 11.2 Minimum DNBR occurs

2. With pressurizer control Turbine trip; loss of main feedwater 0.0 (maximum reactivity feedback) flow Initiation of steam release from steam 8.7 generator safety valves Peak pressurizer pressure occurs 10.0 Overtemperature AT reactor trip 12.8 setpoint reached Rods begin to drop 14.8

. Minimum DNBR occurs Page 1 of 2

l Appendix C - I TABLE 2 (continued)

Time Accident Event (sect

3. Without pressurizer control Turbine trip; loss of main feedwater 0.0 (minimum reactivity feedback) flow High pressurizer pressure reactor trip 5.1 setpoint reached Rods begin to drop 6.1 Peak pressurizer pressure occurs 7.9 Initiation of steam release from steam 8.6 generator safety valves Minimum DNBR occurs
4. Without pressurizer control Turbine trip; loss of main feedwater 0.0 -

(maximum reactivity feedback) flow High pressurizer pressure reactor trip 5.5 setpoint reached.

Rods begin to drop 7.5 Peak pressurizer pressure occurs 7.9 Initiation of steam release from steam 8.6 generator safety valves Minimum DNBR occurs

  • Previously reported DNBR results are unaffecte<l by increased MSSV tolerance.

i Page 2 of 2

APPENDIX C: FIGURE' 1 ~

TURBINE TRIP EVENT VrITH PRESSURIZER SPRAY AND PORVS, MINIMUM REACTIVITY FEEDBACK 1.2 n

d 1.0 -

Z.

8

$ 0.8i b

E

$ 0.6i 6

m O 0.4 -

k B

g 0.24 0.0 ...

.i.... ....i..

i ...i. i >> i i i -

0 10 20 30 40 50 60 70 80. 90 100 TIME (SEC)

NUCLEAR POWER

A 4-0-

APPENDIX C: FIGURE 2. ' '

TURBINE TRIP EVENT WITH PRESSURIZER SPRAY AND PORVS, MINIMUM REACTIVITY FEEDBACK 2800 2600-

$m 2400- q.

O -

ca b

=

g 2200-2000-1800 . . .. .... .... ....i.....i.... .... ....i.... ....

0 10 20 30 40 50 60 70 80 90 100

'JIME (SEC)

PRESSURIZER PRESSURE

APPENDIX C: FIGURE 3-

~~

TURBINE TRIP EVENT WITH PRESSURIZER-SPRAY AND PORVS, MINIMUM REACTIVITY FEEDBACK 1800 14002 n

12002 O

h 8

1000 2 8

800-600 . . .,,....i.... ....,... , .

0 10 20 30 40 50 60 70 80- 90 100 TIME (SEC)

PRESSURIZER WATER VOLUME

_ . - - . _ . . - _ - _ . - .. . . . _ _ . . _ . _ . . . _ _ . _ . _ _ _ _ - . . ~ . _ . .;___ _ .__ _ _ ___. . _ . _ . . - . _ _ - - - _ . - - - . . _ . _ . . _ _ - _ . . .._

-APPENDIX C FIGURE 4

  • TURBINE TRIP EVENT WITH PRESSURIZER SPRAY AND PORVS, MINIMUM REACTIVITY FEEDBACK 640 620-C g 600-S!

2

,580 p

560-l 540 ... ,,.... ....,...., ...,... ,,,.. .... .... ....

0 10 20 30 40 50 60 70 80 90 100 ,

TIME (SEC)

CORE AVERAGE TEMPERATURE

APPENDIX C: FIGURE 5 '

TURBINE TRIP EVENT WITH PRESSURIZER e SPRAY AND PORVS, MINIMUM REACTIVITY FEEDBACK -

600 590-580-O e

Id .

570-560-550- ,

540 . . .. ....i....i..... ....,..... ....

....i....i....

0 10 20 30 40 50 60 70 80 90 100 TIME (SEC)

CORE INLET TEMPERATURE

O APPENDIX C: FIGURE 6 ~

TURBINE TRIP EVENT WITH PRESSURIZER SPRAY AND PORVS, MAXIMUM REACTIVITY FEEDBACK 1.2 1.D i 5i

$ 0.Bi E

y 0.6i b

x 0 0.4 -

1 0.2 -

C 0.0 . . ..,... ,....,...., ..,,,...,....,...., ...,,...

0 10 20 30 40 50 60 70 80 90 100 TIME (SEC)

NUCLEAR POWER S 9 9

APPENDIX C: FIGURE 7 TURBINE TRIP EVENT WITH PRESSURIZER

  • SPRAY AND PORVS, MAXIMUM REACTIVITY FEEDBACK 2800 2600-rn 2400-6 ca

=

g 2200-2000-1800 . . .. . . ..,....i....i....i....i....i....i....i....

0 10 20 30 40 50 60 70 80 90 100 TIME (SEC)

PRESSURIZER PRESSURE O O O

O APPENDIX C: FIGURE 8 '

TURBINE TRIP EVENT WITH PRESSURIZER SPRAY AND PORVS, MAXIMUM REACTIVITY FEEDBACK 1600 1400-n 1200-O M

D 8

ra g1000-8 800- _

600 .- <. .... .... ....,....,.... .... .... .... ....

0 10 20 30 40 50 60 70 80 90 100 TIME (SEC)

PRESSURIZER WATER VOLUME O O O

APPENDIX C: FIGURE 9 ~

TURBINE TRIP EVENT WITH PRESSURIZER SPRAY AND PORVS, MAXIMUM REACTIVITY FEEDBACK 640 620-C O

g 800-S!

i3 g 580-m 560-540 .. .. .... ....i....i....i....i.... .... .... ....

! 0 10 20 30 40 50 60 70 80 90 100 TIME (SEC) l CORE AVERAGE TEMPERATURE

APPENDIX C: FIGURE 10 '

TURBINE TRIP EVENT WITH PRESSURIZER SPRAY AND PORVS, MAXIMUM REACTIVITY FEEDBACK 600 590-580i m

8 M

p 570-N 5

m M

E-560i 550-540 . .

..i.... ....i... , ..,,....i.. ,, ... ... ,....

0 10 20 30 40 50 60 70 80 90 100 TIME (SEC)

CORE INLET TEMPERATURE l e o .

e

APPENDIX C: FIGURE 11- -

TURBINE TRIP EVENT WITHOUT PRESSURIZER

. SPRAY AND.PORVS, MINIMUM REACTIVITY FEEDBACK 1.2 L

. 1.0 i x

$ 0.Bi E

g 0.si 6

m: .

{ 0.4 -

k 5

g 0.24 0.0 , , ,,,,,,,,,,.,i,,,,,,,,,,,,,,.,,,,,,,,,,,,,,,,,,,.,

0 10 20 30. 40 50 60 70 80 90 100 TIME (SEC)

L NUCLEAR POWER ,

4-..~ .---- - -.-~,. -.r. ...--e,- , - - ----~~----.--m~ - - , - - ,.,-e. , - .~ , - . , , .---,--~..------~m- + . - - - , . - - - . - , - - - - . . . . - , - - - - - - . + . - - - . - - -

APPENDIX C: FIGURE 12 '

-TURBINE TRIP EVENT WITHOUT PRESSURIZER SPRAY AND PORVS, MINIMUM REACTIVITY FEEDBACK 2800 ,

2600-  :

02 2400-6 ra

=

g 2200-m 2000-1800 . .

..i.... ....i.... ....i....i.... ....i....i ...

0 10 20 30 40 50 80 70 80 90 100 TIME (SEC)

PRESSURIZER PRESSURE

. APPENDIX C: FIGURE 13

  • TURBINE TRIP EVENT WITHOUT PRESSURIZER SPRAY AND PORVS, MINIMUM REACTIVITY FEEDBACK

~'

1400 t

1200-C ds O

N

@ 1000-M e

800-600 ,...

....i. ...,,,..,.,, ,,... ...,,,,..,, ,,, ..

0 10 20 30 40 50 60 70 80 90 100 TIME (SEC)

PRESSURIZER WATER VOLUME

. APPENDIX C: FIGURE 14 '

TURBINE TRIP EVENT WITHOUT PRESSURIZER SPRAY AND PORVS, MINIMUM REACTIVITY FEEDBACK 640 -

620- .

g 600-M i2 2

g 580-21 w

560-540 . .. . .,... ,.._.. ,....,..

0 10 20 30 40 50 60 70 80 90 100 ,

TIME (SEC)

CORE AVERAGE TEMPERATURE l

l

.- .. .. . . - . - . . .- . . . = - . =. -- .- - . - . _-

APPENDIX C: . FIGURE 15 '

TURBINE TRIP EVENT WITHOUT PRESSURIZER' SPRAY AND PORVS, MINIMUM REACTIVITY FEEDBACK 800 5902 580i m

b li!

p 570-

=

560i 550-540 . .... .. . .

0 10 20 30 40 50 80 70 80 90 100 TIME (SEC)

CORE INLET TEMPERATURE

- - -' w m____ _ _ _ . __ _ _A _m-_.____a__ _wsi- r w" w'-AP P-+^wa -4 a lir T'T . = + = ef 4- r4mww * 'mh__ "-

.m C./---m_A_ _ ' _ _ _ _ __ _. _ _ _ _ _ _ . _ _ _ _ _ _ _ _ . -

o APPENDIX C: FIGURE 16 '

TURBINE TRIP EVENT WITHOUT PRESSURIZER SPRAY AND PORVS, MAXIMUM REACTIVITY FEEDBACK 1.2 kT2; 1.0 -

3

$ 0.8i b

E

% 0.6 -

6 c:

N O 0.4 -

1 o

0.2 -

0.0 . . .,, ... ... ,,,..i.... .... .... ....i....i....,

0 10 20 30 40 50 60 70 80 90 100 TIME (SEC)

NUCLEAR POWER 9 9 9

O APPENDIX C: FIGURE 17 TURBINE TRIP EVENT WITHOUT PRESSURIZER SPRAY AND PORVS, MAXIMUM REACTIVITY FEEDBACK 2800 2600-1 3

cn 2400-6 m

a ,

g 2200- l I

~

l 2000-1800 .. . ,.... .... .. ,,... ,... ,.... ... ,....i....

0 10 20 30 40 50 60 -70 80 90 100 TIME (SEC)  ;

PRESSURIZER PRESSURE O O O

APPENDIX C: FIGURE 18 TURBINE TRIP EVENT WITHOUT PRESSURIZER SPRAY AND PORVS, MAXIMUM REACTIVITY FEEDBACK 1400 1200-C s

f1000 2

8 800-600 . . .. ....i....i....i....i.... .... ....i.... ....

0 10 20 30 40 50 60 70 80 90 100 TIME (SEC)

PRESSURIZER WATER VOLUME 9- - -

9 i e

APPENDIX C: FIGURE 19 TURBINE TRIP EVENT WITHOUT PRESSURIZER SPRAY AND PORVS, MAXIMUM REACTIVITY FEEDBACK 640 620-C 8

g 600-l$ 580- \

?

560-540 . .

..i....i....i.... .... ....i ...i....i....i ...

0 10 20 30 40 50 60 70 60 90 100 TIME (SEC)

CORE AVERAGE TEMPERATURE

O APPENDIX C: FIGURE 20 TURBINE TRIP EVENT WITHOUT PRESSURIZER SPRAY AND PORVS, MAXIMUM REACTIVITY FEEDBACK 600 590-580-m 8

M g 570-5 h 560-e 550-540 . . .. ... ,....i... ,.... .... .... .... .... ....

0 10 20 30 40 50 60 70 80 90 100 TIME (SEC)

CORE INLET TEMPERATURE 9 O O

i .o- 1 l

I l

l l

SAFETY EVALUATION Appendix D:

Overpressure Protection Report ,

Annendix D I

1 1.0 Eunmse of Renon  !

This repon documents the overpressure protection provided for the Reactor Coolant System (RCS) in accordance with the ASME Boiler and Pressure Vessel Code,Section III, Articles NB-7000 and NC-7000. This report documents the overpressure protection provided in the Westinghouse NSSS scope.

2.0 Description of Overnressure Protection 2.1 Overpressure protection is provided for the RCS and its components to prevent a rise in pressure of more than 10% above the system design pressure of 2485 psig, in accordance with NB-7411. This protection is afforded for the following events which envelope those credible events which could lead to overpressure of the RCS if adequate overpressure protection was not provided. i

1. Loss of External Electrical Load and/or Turbine Trip
2. Uncontrolled Rod Cluster Control Assembly Bank Withdrawal at Power
3. Loss of Forced Reactor Coolant Flow
4. Loss of Nonnal Feedwater Flow
5. Loss of Offsite Power to the Station Auxiliaries 2.2 The extent of the RCS is as defined in 10 CFR, Part 50, and includes:
1. the reactor vessel including control rod drive mechanism housings;
2. the reactor coolant side of the steam generators;
3. reactor coolant pumps;
4. a pressurizer attached to one of the reactor coolant loops;
5. safety and relief valves;
6. the interconnecting piping, valves and fittings between the principal components listed above; and
7. the piping, fittings and valves leading to connecting auxiliary or suppon systems up to and including the second isolation valve (from the high pressure side) on each line.

D-1

i .

l 2.3 The pressurizer provides volume surge capacity and is designed to mitigate pressure  !

increases (as well as decreases) caused by load transients. A pressurizer spray system )

condenses steam at a rate sufficient to prevent the pressurizer pressure from reaching 1 the setpoint of the y>wer-operated relief valves during a step reduction in power level  !

equivalent to ten percent of full rated load.

The spray nozzle is located in the top head of the pressurizer. Spray is initiated when the pressum-controlled spray demand signal is above a given setpoint. The spray rate increases proponionally with increasing compensated error signal until it reaches a maximum value. The compensated error signal is the output of a proportional plus integml controller, the input to which is an error signal based on the difference between actual pressure and a reference pressure.

The pressurizer is equipped with 2 power-operated relief valves which limit system pressure for a large power mismatch to avoid actuation of the fixed high pressure .

reactor trip. The relief valves are operated automatically or by remote manual control.

The operation of these valves also limits the frequency of opening of the spring-loaded safety valves. Remotely operated stop valves are provided to isolate the power-operated relief valve if excessive leakage occurs. The relief valves are designed to limit the pressurizer pressure to a value below the high pressure trip setpoint for all design transients up to and including the design percentage step load decrease with steam dump but without reactor trip.

Isolated output signals from the pressurizer pressure protection channels are used for ,

pressure control. These are used to control pressurizer spray and power-operated relief valves in the event of increase in RCS pressure.

In the event of unavailability of the pressurizer spray or power-operated relief valves, and a complete loss of steam flow to the turbine, protection of the RCS against overpressurization is afforded by the pressurizer safety valves in conjunction with the steam generator safety valves and a reactor trip initiated by the Reactor Protection ,

System.

There are 3 safety valves with a minimum required capacity of 420,000 lb/hr for each valve at 2575 psia. The pressurizer safety valves are totally enclosed pop-type, spring-loaded, self-activated valves with backpressure compensation. The set pressure of the safety valves will be no greater than system design pressure of 2485 psig in accordance i with Section NB-7511. The pressurizer safety valves and power-operated relief valves discharge to the pressurizer relief tank (PRT). Rupture disks are installed on the pressurizer relief tank to prevent PRT overpmssurization. The safety valve Dow rates quoted are based on a developed backpressure of 500 psi which is equivalent to 20% of the safety valve design setpoint.

Figure 1 shows a schematic arrangement of the primary system pressure-relieving devices.

2.4 ' Overpressure protection for the main steam system is provided by the steam generator safety valves to prevent a rise in pressure of more than 10% above the steam generator ,

D-2

l l

i shell-side design pressure in accordance with NC-7411. The main steam system safety valve capacity is based on providing enough relief to remove 105% of the Engineered Safeguards Design steam Dow. This protection is afforded for the same events as listed l in Section 2.1 which envelope those credible events which could lead to system  !

overpressurization if adequate overpressure protection were not provided.  ;

The set pressure of the lowest set main steam safety valve is selected to be the steam-genemtor shell design pressure of 1185 psig. The set pressure of the highest set main ,

steam safety valve is selected to be 1234 psig which ensures that all five main steam safety valves in each steam line are fully open below the maximum pressure limit of 1303.5 psig which is 10% above the design pressure. The three intermediate main steam safety valves are set to open at different, staggered pressures between the minimum and maximum set pressures on each steam line.

3.0 Sizine of Pressurizer Safety Valves 3.1 The sizing of the pressurizer safety valves is based on analysis of a complete loss of steam flow to the turbine with the reactor operating at 102% of Engineered Safeguards Design Power. In this analysis, feedwater flow is isolated at the start of the transient and no credit is taken for operation of pressurizer power-operated relief valves, pressurizer level control system, pressurizer spray system, rod control system, steam dump system or steam line power-operated relief valves. The reactor is maintained at full power (no credit for reactor trip), and steam relief through the steam generator safety valves is considered. The total pressurizer safety valve capacity is required to be at least as large as the maximum surge rate into the pressurizer during this transient.

This sizing precedure results in a safety valve capacity well in excess of the capacity required to prevent exceeding 110% of system design pressure for the events listed in Section 2.1. An analysis demonstrating the conservative nature of this sizing procedure is presented in the following section.

3.2 Each of the overpressure transients listed in Section 2.1 has been analyzed and reponed in the Callaway Plant Final Safety Analysis Report. The analysis methods, computer codes, plant initial conditions and relevant assumptions are also discussed in the FSAR for each transient.

Review of these transients shows that the loss of load / turbine trip event results in the maximum system pressure and the maximum safety valve relief requirements. In order to suppon an increase in setpoint tolemnce on the main steam safety valves (MSSVs),

this pressure-limiting tmnsient was reanalyzed to ensure that all applicable acceptance criteria continue to be met. This transient is presented in detail below.

For a loss of load / turbine trip event, the reactor would be tripped directly (unless below

  • approximately 50 percent power) from a signal derived from the turbine stop emergency trip Guid pressure and turbine stop valves. The turbine stop valves close rapidly (typically 0.19 second) on loss of trip fluid pressure actuated by one of a number of possible turbine trip signals. This will cause a sudden reduction in steam How, resulting in an increase in pressure and temperature in the steam generator shell.

D-3

o ..

As a result, the heat transfer rate in the steam generators is reduced, causing the reactor coolant temperature to rise, which in turn causes coolant expansion, pressurizer insurge, and RCS pressure rise.

The automatic steam dump system would nonnally accommodate the excess steam -

generation. Reactor coolant temperature and pressure do no significantly increase if the steam dump system and pressurizer pressure control system are functioning properly.

If the turbine condenser was not available, the excess steam generation would be dumped to the atmosphere and main feedwater flow would be lost. For this situation, feedwater flow would be maintained by the Auxiliary Feedwater System to ensure adequate residual and decay heat removal capability. Should the steam dump system fail to operate, the steam generator safety valves may lift to provide pressure control.

In this analysis, the behavior of the unit is evaluated for a complete loss of steam load from the nominal full power level plus a two percent calorimetric error without direct reactor trip; that is, the turbine is assumed to trip without actuating all the sensors for reactor trip on the turbine stop valves. This assumption delays reactor trip until conditions in the RCS result in a trip due to other signals. Thus, the analysis assumes a worst transient. In addition, no credit is taken for steam dump. Main feedwater flow -

is tenninated at the time of the turbine trip, with no credit taken for auxiliary feedwater to mitigate the consequences of the tmnsient.

The loss of load / turbine trip transient is analyzed by employing the detailed digital computer program LOFTRAN. The pmgram simulates the neutmn kinetics, RCS, pressurizer, pressurizer relief and safety valves, pressurizer spray, steam generators, and steam generator safety valves. The program computes peninent plant variables including temperatures, pressures, and power level.

Major assumptions are summarized below.

a. Initial operating conditions The initial reactor power is assumed to be at nominal full power plus a calorimetric error; the initial pressure is assumed to be nominal minus an appmpriate pressure uncenainty to allow for errors in the pressurizer pressure measurement and control channels. The average RCS temperature is assumed to be at the nominal full power value. This results in the maximum possible increase in coolant pressure for the loss of load / turbine trip event.
b. Moderator and Doppler coefficients of reactivity The analysis assumes a zero moderator temperature coefficient and a least negative Doppler power defect. Pan-power cases analyzed assuming a positive moderator tempemture coefficient, consistent with BOL conditions, were shown to be less limiting with respect to peak RCS pressure.

D-4

  • a
c. Reactor control From the standpoint of the maximum pressures attained, it is conservative to assume that the reactor is in manual control. If the reactor were in automatic control, the control rod banks would move prior to trip and reduce the severity of the transient.
d. Steam release No credit is taken for the opemtion of the steam dump system or steam generator power-operated relief valves.

A staggered main steam safety valve model is used such the each valve can be properly modeled to lift and be fully open at 3 % above its setpoint. The 3%

setpoint uncertainty accounts for safety valve setpoint tolerance. Using this model, the steam generator pressure rises until four of the five main steam safety valve setpoints are reached. Steam release through four of the five main steam safety valves on each steam line limits secondary steam pressure to levels well below the 110% of shell design pressure.

e. Pressurizer spray and power-operated relief valves No credit is taken for the effect of pressurizer spray and power-operated relief valves in reducing or limiting the coolant pressure. Safety valves are operable.

The modeling of the three pressurizer safety valves uses approved methodology (Refen:nce 10) to accolmt for the effects of the pressurizer safety valve loop seals.

A pressurizer safety valve setpoint uncertainty of +2% and 1.15-second loop seal purge time are assumed in the analysis. The 2% setpoint uncertainty includes a 1 % set pressure shift and 1 % set pressure tolerance. No steam flow is assumed until the valve loop seals are purged.

f. Feedwater flow hiain feedwater flow to the steam generators is assumed to be lost at the time of turbine trip. No credit is taken for auxiliary feedwater flow since a stabilized plant condition will be reached before auxiliary feedwater initiation is normally assumed to occur; however, the auxiliary feedwater pumps would be expected to start on a trip of the main feedwater pumps. The auxiliary feedwater flow would remove core decay heat following plant stabilization.
g. Reactor trip Reactor trip is actuated by the first Reactor Protection System trip setpoint reached with no credit taken for the direct reactor trip on the turbine trip. Trip signals are expected due to high pressurizer pressure, ovenemperature AT, high pressurizer water level, and low-low steam generator water level.

D-5

The results of the loss of load / turbine trip transient are shown on Figures 2,3 and 4.

The reactor is tripped on a high pressurizer pressure signal. Figure 2 shows the nuclear power and the reactor coolant loop hot leg and cold leg temperatures for this transient.

Figure 3 shows pressurizer pressure and reactor coolant pump discharge pressure, which is the point of highest pressure in the RCS. It also shows the pressurizer safety valve relief rate which remains below the minimum required capability assumed in the analysis: 350 lbm/sec. Figure 4 shows the steam generator shell side pressure and main steam safety valve relief rate per steam generator. This last figure indicates that fou of the five valves on each steam line are actuated during the loss ofload/ turbine trip accident.

The results of these analyses show that the overpressure protection provided is sufficient to maintain peak RCS pressure and the main steam system pressure below the code limit of 110% of the respective system design pressures. The plot of pressurizer safety valve relief rate shows that adequate overpressure protection for this limiting event could be provided by about 88% of the installed safety valve capacity.

4.0 References

1. ASME Boiler and Pressure Vessel Code,Section III, Articles NB-7000,1971 and 1974 Iklitions
2. " Topical Report - Overpressure Protection for Westinghouse Pressurized Water Reactors," WCAP-7769, Rev.1 June 1972
3. "LOFTRAN Code Description," WCAP-7907-P-A (Proprietary), WCAP-7907-A (Nonproprietary), April 1984
4. Callaway Ce:tified Safety Valve Capacity, purchase order number 250052, quality ,

release number 40915 (valve serial number N60446-00-0006) and quality release number 40937 (valve serial numbers N60446-00-0004 and N60446-00-0005)

5. Callaway OPPR Loss of Imad/ Turbine Trip Analysis for increased MSSV Tolerance, Calculation No. CN-TA-94-126, August 1994 (Proprietary)
6. Callaway Rod Withdrawal at Power Analysis, Calculation No. CN-TA-87-002, January 1987 (Proprietary)
7. Callaway Loss of Reactor Coolant Flow Analysis, Calculation No. CN-TA i 223, February 1987 (Proprietary)
8. Callaway Imss of Normal Feedwater/ Station Blackout Analysis, Calculation No.

CN-TA-86-251, January 1987 (Proprietary)

9. SNUPPS Deletion of Reactor Trip on Turbine Trip Below 50% Power Analysis, Calculation No. CN-RPA-79-12. January 1979 (Proprietary) i D-6 i

o- ,

10. " Pressurizer Safety Valve Set Pressure Shift," WCAP-12910 Rev.1-A (Proprietary), May 1993 6

D-7

e o a

t l

tR Nt t H

l L I t AN Lt tR UA i t t 5I 5

N MOf OSRi tF Rt TI N1 Pi A AN Mt 5 t r .

t , :8s TRO 0i

,st - Nl C Ac No ,

1 R __ Ett g

,v C MRRIRs _

Lt P UUu / t

. g A gR5st gT $st A

. gv a

pS tiy T iN RRt I.

P pI PPL tCT

. 2 5 _ PF( -

_ __- O o-g o

R 0 - s t

A 1 e y* u g A i

c

? MR s j 0 Ag fN A E tN e

v v

t

~

~

- it ft D l

5o R1 IC gT g A - 9^ ~ -

- 2 0N 1 A2 ON 3 TA3 n

V- ,l4 P CLP i

v P CLP y ,I O AOM O AOM i e

t t otOU OtOU l e

t MCP L RCP t

A R s ~ e r

- j u y s 2-f ' R e s

{ O r t

l RR T C t P E t $ f AS E L L R N t

e E EE o 1

mR RV ouRO 50 t

n l,

5 IL

- - Rs e s I Y

h& N E g

t ROR R A m e

PC P _ g P

t_

S n h a t

r r

t Y A A i c

R t P 4 a S

" M m 0 e 1 h 1 A c M MM S T O A i N T t N 1 E A RT iE M R ON SG MT e E

1 TA1 ON r IN N P CLP 0 TA4 P CLP u

EA E O AOM AOM ig OI G* O( OU NEOU F

$t N " L RCP l MCP N

I C O T t I

{

i I I g N t i

t t M i*

EN M O IA "

t sI f N s UO OC t *

,l v

,A

,V

  • E

,V

  • N I

,T S

,E R

,F U

,5 A Y

T 0

1 4

m

O e 1.2 1

O.8 0.6 -

s 0.4 -

C i i t t 0 20 40 60 80 100 T & G (sec) 640 C

t i

e

%600 m

a g sw -

h Cold Leg 560 -

u 540 O 20 40 60 80 100 TIME (soc)

Figure 2 D-9

c o 2,800

- *-- RCP Outlet 2,600

- Pressurizer

~

2 O

23 sm 2,400 -

m u

2,200 0 20 40 60 80 100 TIME (m) 350 7

300 -

/

g 2se -

e l 2m

  1. 150 -

1w -

h 50 -

' ' ' i 0

0 20 40 60 SO 100 TIhE (sec) l Figure 3 D-10 I

O e 1,300 6 1 d ,200 a

!0 c.,

1,100 -

1

@ l,000 t;

y , ,

0 20 40 60 80 100 TIME (sec) 800 A

y. -

E.

? '

1 8 400 -

b e

h

$ 200 -

0 O 20 40 60 80 100 TIhm (xc)

Figure 4 D-11

    • TOTAL PAGE.012 **

c .

S_lGNIFICANT HAZARDS EVAULATION This amendment application requests a revision to Technical specification (TS) 3.7.1.1 (Tables 3.7-1 and 3.7-2), 2.2 (Table 2 2-1),3/4.3 (Table 3.3-2), and Bases 3/4.7.

These specifications are revised to increase the lift setting tolerance for the main steam safety valves from il % to +3/-l %, lower the maximum allowable power levels with inoperable main steam safety valves, and to incorporate the revised methodology for calculating maximum power levels with inoperable main steam safety valves into the Bases.

Etekground The function of the main steam line safety valves is to provide overpressure protection, ensuring that the secondary system pressure will be limited to within 110% (1320 psia) of its design pressure (1200 psia) during the most severe anticipated system operational transient. The total relieving capacity for all valves on all steam lines is 113 % of the total secondary steam flow.

Revision of the lift setting tolerance to +3/-l % as-found and il % as-left will have no effect on the relieving capacity of the safety valves. The change in lift setting tolerance will provide reasonable acceptance criteria taking into account the component service conditions and conservative criteria for the as-left condition of the safety valves. It is Union Electric's position that the test equipment tolerance (+2/-l %) will not be accounted for in the TS tolemnce because this equipment tolerance is specifically addressed by the ASME Code. Therefore, as long as the testing equipment and methodology meet the +2/-l % tolerance requirements of OM-1, there is no need to account for testing tolemnces in the TS or the safety analyses.

Previous safety analyses conservatively included accumulation in the modelling.

Accumulation is no longer modeled for spring loaded MSSVs. This approach is acceptable because the valve setpoint is detennined by stem motion and setting the valves on steam. This procedure insures the valves will " pop open" at the TS setpoint.

Earlier analyses used accumulation to account for valve chatter prior to opening. This conservatism is no longer required with present testing methods.

The existing tolerance ofil % specified in Technical Specification 3/4.7.1 for steam line safety valve lift settings is based on the design requirements for safety valves specified in ASME Section III, Subsection NC-7614.2. The il % tolerance is appropriate for design criteria, but is not appropriate for testing acceptance criteria for the following reasons: a) The 11 % lift setting tolerance currently specified does not take into considemtion the service conditions of the safety valves. For safety valves subjected to a constant load for extended periods of time without being cycled, it is common for the valve springs to take a set resulting in a slight increase in the spring mte, until broken loose during the initial test stroke of the valve. ASME Section XI test criteria requires the perfonnance of 2 successive lifts with no adjustments to the

.t.

+. 4.,

valve lift setting. Due to the valve spring taking a set as described above, the first test lift is commonly found to be slightly out of tolerance and the second and third lifts within tolenmce. b) ASME Section XI, Subsection IWV requires safety valves to be tested using OM-1. (Union Electric will adopt the 1989 version of the ASME Code for the next 10 year IST interval, which will begin December 20,1994. This version of the Code indirectly imposes the 1987 version of OM-1.) OM-1 requires that the testing methodology utilized to test safety valves be accurate to +2/-l %. The +3/-l %

tolerance specified by this TS change does not include the testing accuracy.

The ASME Section XI schedule used previously for testing additional valves will continue to be used, except that the criteria for testing additional valves will be

+3/-l % of the setpoint instead ofil %. However, all valves that are tested and found outside the il % band will be reset to within 11 %.

Industry operating experience has also demonstrated that a setpoint tolenmce for the main steam safety valves of only 11 % results in safety valves frequently failing surveillance tests. Infonnation Notice 86-56, " Reliability of Main Steam Safety Valves." tabulated a number of problems with setpoint drift as reported in various LERs. This infonnation notice discussed the various safety concerns that may be encountered with setpoint drift. Union Electiic has considered these concerns in the proposed relaxed tolerance limits. Other plants, such as Trojan, Palisades, Yankee Rowe, Calvert Cliffs, LaSalle, Diablo Canyon, and Wolf Creek have been granted setpoint tolerance relaxations.

As shown below, the proposed tolerance relaxation meets overpressure protection requirements and all ASME code requirements. In addition, evaluation of the FSAR accident analyses affected by the change has demonstrated that the conclusions for these analyses as stated in the FSAR remain valid, and results in no additional operational concems.

All safety analyses done to support the MSSV tolerance change were perfonned using WCAP-12910 Rev.1-A, " Primary Safety Valve Surge Line Loop Cleanmce Models."

Specifically, primary safety valves utilize a TS setpoint of 2500 psia, a 11 % tolerance and +1 % setpoint shift. Union Electric calculated a loop seal purge time of 1.15 seconds (using the methodology of WCAP-12910) which was implemented in the analysis as a time delay. It is Union Electric's position that the test equipment tolerance (+2/-l %) will not be accounted for in the TS tolerance because this equipment tolerance is specifically addressed by the ASME Code. Therefore, as long as the testing equipment and methodology meet the +2/-l % tolerance requirements of OM-1, there is no need to account for testing tolerances in the TS or the safety analysis.

I

l c .

with inoperable MSSVs. As such, these changes are conservative and do not impact any accident analysis or involve an unreviewed safety question.

The revision to Bases 3/4.7 reflects changes necessitated by the use of V5 fuel and the plant uprating. These changes supersede the changes submitted in ULNRC-2450 (dated July 30,1991). This Bases section is also revised to incorporate a change in the methodology used to determine the maximum power level for inoperable main steam safety valves. These changes are conservative in nature and therefore do not impact any accident analysis or involve an unreviewed safety question.

Evaluation The proposed change to Technical Specifications does not involve a significant hazards consideration because operation of the Callaway Plant with this change would not:

1. Involve a significant increase in the probability of occurrence or the consequences of an accident or malfunction of equipment important to safety previously evaluated in the safety analysis report. The main steam line safety valves are designed to mitigate transients by preventing overpressurization of the main steam system. The proposed change does not alter this design basis. The revised analysis shows that the probability or consequences of all previously analyzed accidents are not changed by increasing the setpoint tolerance of the safety valves.

Therefore, there is no increase in the probability of occurrence or the consequences of any accident.

2. Create the possibility of a new or different kind of accident from any previously evaluated in the safety analysis report. There is no new type of accident or malfunction created, the method and manner of plant operation will not change nor is there a change in the method in which any safety related system performs its function. Any main steam safety valve lifting at the extremes of the proposed tolerance will not result in a low lift setpoint that is less than the nonnal no load system pressure or a high lift setpoint that allows main steam system overpressurization.
3. Involve a significant reduction in a margin of safety. This is based on the fact that no plant design changes are involved and the method and manner of plant operation remains the same. With the increased setpoint tolerance, the main steam safety valves will still prevent pressure from exceeding i10 percent of design pressure in accordance with the ASME code. All FSAR accident analysis conclusions remain valid and unaffected by this change.

Given the above discussions as well as those presented in the Safety Evaluation, the proposed change does not adversely affect or endanger the health or safety of the general public or involve a significant safety hazard.

. .t .

l

,_ l

4 W ULNRC-3069 ATTACHMENT FOUR SIGNIFICANT HAZARDS EVALUATION s

SIGNIFICANT HAZARDS EVAULATION This amendment application reque.sts a revision to Technical specification (TS) 3.7.1.1 (Tables 3.7-1 and 3.7-2),2.2 (Table 2.2-1),3/4.3 (Table 3.3-2), and Bases 3/4.7.

These specifications are revised to increase the lift setting tolerance for the main steam

- safety valves from il % to +3/-l %, lower the maximum allowable power levels with inoperable main steam safety valves, and to incorporate the revised methodology for calculating maximum power levels with inopemble main steam safety valves into the Bases.

Background

The function of the main steam line safety valves is to provide overpressure protection, ensuring that the secondary system pressure will be limited to within 110% (1320 psia) of its design pressure (1200 psia) during the most severe anticipated system operational transient. The total relieving capacity for all valves on all steam lines is 113% of the total secondary steam flow.

Revision of the lift setting tolerance to +3/-l % as-found and il % as-left will have no effect on the relieving capacity of the safety valves. The change in lift setting tolerance will provide reasonable acceptance criteria taking into account the component service conditions and conservative criteria for the as-left condition of the safety valves. The test equipment tolerance (+2/-l %) will not be accounted for in the TS tolerance because this equipment tolerance is specifically addressed by the ASME Code.

Therefore, as long as the testing equipment and methodology meet the +2/-l %

tolerance requirements of OM-1, there is no need to account for testing tolerances in the TS or the safety analyses. (This position is also applicable for the primary safety valves.)

Previous safety analyses conservatively included accumulation in the modelling.

Accumulation is no longer modeled for spring loaded MSSVs. This approach is acceptable because the valve setpoint is determined by stem motion and setting the valves on steam. This procedure insures the valves will " pop open" at the TS setpoint. .

Earlier analyses used accumulation to account for valve chatter prior to opening. This conservatism is no longer required with present testing methods.

The existing tolerance ofil % specified in Technical Specification 3/4.7.1 for steam line safety valve lift settings is based on the design requirements for safety valves specified in ASME Section III, Subsection NC-7614.2. The il % tolerance is appropriate for design criteria, but is not appropriate for testing acceptance criteria for the following reasons: a) The il % lift setting tolerance cunently specified does not take into consideration the service conditions of the safety valves. For safety valves subjected to a constant load for extended periods of time without being cycled, it is common for the valve springs to take a set resulting in a slight increase in the spring mte, until broken k>ose during the initial test stroke of the valve. ASME Section XI

.i.

a .

l test criteria requires the perfonnance of 2 successive lifts with no adjustments to the valve lift setting. Due to the valve spring taking a set as described above, the first test l lift is commonly found to be .'ightly out of tolerance and the second and third lifts J within tolerance, b) ash 1E Section XI, Subsection IWV requires safety valves to be j tested using OM-1. (Union Electric will adopt the 1989 version of the ASME Code for '

the next 10 year IST interval, which will begin December 20,1994. This version of the Code indirectly imposes the 1987 version of OM-1.)

l The ASME Section XI schedule used previously for testing additional valves will continue to be used, except that the criteria for testing additional valves will be

+3/-l % of the setpoint instead ofil L However, all valves that are tested and found outside the il % band will be reset to within il L Industry operating experience has also demonstrated that a setpoint tolerance for the main steam safety valves of only il % results in safety valves frequently failing surveillance tests. Infonnation Notice 86-56, " Reliability of Main Steam Safety Valves," tabulated a number of problems with setpoint drift as reponed in various LERs. This infonnation notice discussed the various safety concerns that may be encountered with setpoint drift. Union Electric has considered these concerns in the proposed relaxed tolerance limits. Other plants, such 1, Trojan, Palisades, Yankee Rowe, Calven Cliffs, LaSalle, Diablo Canyon, and Wolf Creek have been granted setpoint tolerance relaxations.

As shown below, the proposed tolerance relaxation meets overpressure protection requirements and all ASME code requirements. In addition, evaluation of the FSAR accident analyses affected by the change has demonstrated that the conclusions for these analyses as stated in the FSAR remain valid, and results in no additional opemtional concems.

All safety analyses done to support the MSSV tolerance change were performed using WCAP-12910 Rev.1-A, " Primary Safety Valve Surge Line loop Clearance Models."

Specifically, primary safety valves utilize a TS setpoint of 2500 psia, a il % tolerance and + 1 % setpoint shift. Union Electric calculated a loop seal purge time of 1.15 seconds (using the methodology of WCAP-12910) which was implemented in the analysis as a time delay.

As discussed in the Safety Evaluation, the non-LOCA safety evaluation suppons the conclusion that the proposed tolemnce of +3 percent for the main steam line safety valves is acceptable. This conclusion is reached based on the assessment that tce non-LOCA acceptance criteria are met for this increase in opening setpoints for all the non-LOCA accidents. It is concluded that the tolerances on the main steam line safety valves as given in the Technical Specifications for Callaway Plant may be changed to specify +3/-l percent.

2-

e -

The LOCA safety evaluation supports the conclusion that the effects ofincreasing main steam line safety valve tolerances to +3 percent at Callaway Plant do not result in exceeding any design or regulatory limit. Therefore, it is concluded that the proposed technical specification valve tolerance relaxation is acceptable.

The increase in safety valve setpoint tolerance from il percent to +3/-l percent has been evaluated with respect to both LOCA and non-LOCA events for impact on the radiological consequences of accidents. There is no impact on the radiological consequences of any accident.

Table 3.3-2 is changed to revise the pressurizer pressure-high response time from 2 seconds to I second. This provides margin to expand the main steam safety valve setpoint tolerance to +3/-l %.

The revisions to Table 2.2-1 are made to assess the impact of reducing the high pressurizer pressure safety analysis limit (SAL) from the current value of 2445 psig to 2410 psig. This SAL reduction is needed to ensure acceptable accident analysis results are obtained to accommodate a relaxation of the main steam safety valve setpoint tolemnce to 3/-l %. These changes recognize that older generation Banon tmnsmitters, subject to excessive negative drift, are no longer used in this application.

This negative drift accounted for 4.25 % of the 4.96% of span Z term. Deletion of this drift tenn requires that the S tenn be increased by 1 % of span to account for a typical drift allowance. Thus, Z and S are revised to 0.71 % span and 2.0% span, respectively. The reduced SAL directly results in a reduced total allowance (TA), i.e.

since it reDects the difference between the SAL and the nominal trip setpoint 2410-2385 psig

= 3.125% span sS00 psig /100% span j The decreased TA in conjunction with the increased S tenn results in a reduced i allowable value of 2393 psig.

The revision to Table 3.7-1 (and Bases 3/4.7), utilized the methodology as described in Westinghouse Nuclear Service Advisory Letter 94-001 and Infonnation Notice 94-60,

" Potential Overpressurization of Main Steam System." These documents notified i utilities of a calculational error in detennining the maximum power level for inoperable main steam safety valves. Using the new methodology results in lower allowed power levels with inoperable MSSVs. As such, these changes are conservative and do not impact any accident analysis or involve an unreviewed safety question.

The mvision to Bases 3/4.7 reDects changes necessitated by the use of V5 fuel and the plant uprating. These changes supersede the changes submitted in ULNRC-2450 (dated July 30,1991). This Bases section is also revised to incorporate a change in the methodology used to determine the maximum power level for inoperable main steam

% ~

j l

safety valves. These changes are conservative in nature and therefore do not impact any accident analysis or involve an unreviewed safety question.

i Evaluation i A

The proposed change to Technical Specifications does not involve a signincant hazards consideration because operation of the Callaway Plant with this change would not:

1. Involve a significant increase in the probability of occurrence or the consequences of an accident or malfunction of equipment important to safety previously evaluated in the safety analysis repon. The main steam line safety valves are designed to mitigate transients by preventing overpressurization of the main steam system. The proposed change does not alter this design basis. The revised analysis shows that the probability or consequences of all previously analyzed i accidents are not changed by increasing the setpoint tolerance of the safety valves.

Therefore, there is no increase in the probability of occurrence or the consequences I of any accident.

2. Create the possibility of a new or different kind of accident from any previously >

evaluated in the safety analysis repon. There is no new type of accident or malfunction created, the method and manner of plant operation will not change nor is there a change in the method in which any safety related system performs its function. Any main steam safety valve lifting at the extremes of the proposed >

tolemnce will not result in a low lift setpoint that is less than the normal no load system pressure or a high lift setpoint that allows main steam system overpressurization. '

3. Involve a significant reduction in a margin of safety. This is based on the fact that no plant design changes are involved and the method and manner of plant operation remains the same. With the increased setpoint tolerance, the main steam safety valves will still prevent pressure from exceeding 110 percent of design l pressure in accordance with the ASME code. All FSAR accident analysis conclusions remain valid and unaffected by this change.

t Given the above discussions as well as those presented in the Safety Evaluation, the proposed change does not adversely affect or endanger the health or safety of the  ;

general public or involve a signincant safety hazard.  ;

i l

l l

\

d .-

ULNRC-3069 ATTACHMENT FIVE ENVIRONMENTAL CONSIDERATION

q 3 t/

ENVIRONMENTAL CONSIDERATION This amendment application requests a revision to Technical Specification (TS) 3.7.1.1 (Tables 3.7-1 and 3.7-2) 2.2 (Table 2.2-1), 3/4.3 (Table 3.3-2), and Bases 3/4.7.

These specifications are revised to increase the lift setting tolerance for the main steam safety valves, lower the maximum allowable power levels with inoperable main steam safety valves, and to incorporate the methodology of calculating maximum power levels with inoperable main steam safety valves into the Bases.

The proposed amendment involves changes with respect to the use of facility components located within the restricted area as defined in 10 CFR Part 20, and changes a surveillance requirement. Union Electric has determined that the proposed amendment does not involve.

1, A significant hazard consideration, as discussed in the Significant Hazards ,

Evaluation of this amendment application; P

2. A significant change in the types or significant increase in the amounts of any effluents that may be released offsite;
3. A significant increase in individual or cumulative occupational radiation exposure.

Accordingly, the proposed amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of this amendment.

i t

e