Proposed Tech Specs Revising Table 4.3-2 by Adding Table Notation to Clarify That Verification of Time Delays Associated W/Esfas Functional Units 8.a & 8.b Is Only Performed as Part of Channel CalibrML20236W372 |
Person / Time |
---|
Site: |
Callaway ![Ameren icon.png](/w/images/0/06/Ameren_icon.png) |
---|
Issue date: |
07/30/1998 |
---|
From: |
UNION ELECTRIC CO. |
---|
To: |
|
---|
Shared Package |
---|
ML20236W365 |
List: |
---|
References |
---|
NUDOCS 9808050239 |
Download: ML20236W372 (12) |
|
|
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20211Q5411999-09-0808 September 1999 Proposed Tech Specs Reflecting USQ Associated with Increases in Offsite Dose Consequences Reported in FSAR for SGTR & MSLB Accidents ML20195C5191999-05-28028 May 1999 Proposed Tech Specs Sections 3.9.1,revised to Maintain CTS Requirements on Refueling Pool Boron Concentration Limits & 5.6.5,revised to Delete Item 5.6.5.a ML20207F4801999-05-27027 May 1999 Proposed Improved TSs & ITS Bases ML20206G3621999-04-30030 April 1999 Proposed Conversion Tech Specs Section 1.0/ITS Section 1.0 ML20205S9141999-04-21021 April 1999 Proposed Tech Specs Sections 1.0,3.3,3.4,3.6,3.7 & 3.9, Converting to ITS ML20205L0901999-04-0707 April 1999 Proposed Tech Specs Section 3.3,3.4,3.5,3.6,3.7,3.8 & 4.0, Converting to ITS ML20207L1061999-03-0909 March 1999 Proposed Tech Specs Re Conversion to ITSs Sections 3.3,3.4, 3.6,3.7.3 8,3.9 & 5.0 ML20196G1731998-11-25025 November 1998 Proposed Tech Specs Section 3.3, Intstrumentation, Converting to Improved Tech Specs ML20196D0011998-11-23023 November 1998 Proposed Tech Specs Pages Re follow-up Items Related to 970515 Request for Amend to License NPF-30 ML20155B5791998-10-27027 October 1998 Proposed Tech Specs for Use of Electrosleeves on Two Cycle Basis ML20154S2371998-10-21021 October 1998 Proposed Tech Specs Sections 3.1,3.2,3.4,3.5 & 5.0 Re Reactivity Control Sys,Power Distribution Sys,Rcs,Eccs & Administrative Controls,Respectively ML20154F8311998-09-29029 September 1998 Proposed Tech Specs Revising ESFAS Functional Unit 6.f Re Loss of Offsite power-start turbine-driven Pump ML20154A2901998-09-24024 September 1998 Proposed Tech Specs Converting to Improved TS Re Section 3.4, RCS, Consistent w/NUREG-1431 ML20151U1031998-08-27027 August 1998 Proposed Tech Specs Sections 1.0,2.0 & 3.0,converting to Improved Tech Specs ML20236Y1721998-08-0404 August 1998 Proposed Tech Specs Re Conversion to Improved STS Sections 3.1,3.2,3.5,3.9 & 4.0 ML20236W3721998-07-30030 July 1998 Proposed Tech Specs Revising Table 4.3-2 by Adding Table Notation to Clarify That Verification of Time Delays Associated W/Esfas Functional Units 8.a & 8.b Is Only Performed as Part of Channel Calibr ML20236J0821998-06-29029 June 1998 Proposed Tech Specs 3.7.1.7,4.7.1.7.1,4.7.1.7.2 & Bases 3/4.7.1.7 Revising to Address All Four Atmospheric Steam Dump Lines ML20236E9651998-06-26026 June 1998 Proposed Tech Specs Pages Re Conversion to Improved STS, Section 3.6 ML20216F3791998-03-0909 March 1998 Proposed Tech Specs SR 3/4.5.2b.1 Adding Clarification in Regard to Venting ECCS Pump Casings & Accessible Discharge Piping High Points ML20217P8161998-02-23023 February 1998 Proposed Tech Specs Replacement Page B 3.8-34 Re AC Sources Shutdown ML20198T3521998-01-16016 January 1998 Proposed Tech Specs 3/4.3,revising Ms & Feedwater Isolation Sys Slave Relay Surveillance from Quarterly Actuation Logic Test to Monthly Actuation Logic Test on Staggered Test Basis ML20197D6461997-12-16016 December 1997 Proposed Tech Specs Table Revising Lift Setting Tolerance for Main Steam Line Safety Valves ML20199B4261997-11-10010 November 1997 Proposed Tech Specs Re Page 5 of 8 for FW Isolation Changes ML20198P3361997-10-31031 October 1997 Proposed Tech Specs Reducing Repeated Alarms,Rod Blocks & Partial Reactor Trips That Continue to Manifest,During Beginning of Cycle Operation Following Refueling Outages ML20198P4141997-10-31031 October 1997 Proposed Tech Specs,Revising ESFAS Functional Unit 6.f, Loss of Offsite Power-Start Turbine-Driven Pump, in Tables 3.3-3,3.3-4 & 4.3-2 ULNRC-03664, Proposed Tech Specs 3/4.4.9 Re Pressure/Temp Limits1997-10-17017 October 1997 Proposed Tech Specs 3/4.4.9 Re Pressure/Temp Limits ML20217H8031997-08-0808 August 1997 Proposed Tech Specs 3/4.3 Re Instrumentation ML20198F3411997-08-0808 August 1997 Proposed Tech Specs,Revising Table 3-7.2 to Specify That Lift Setting Tolerance for Main Steam Line Safety Valves Is +3/-1% as-found & +1% as-left.Table 2.2-1 Revised by Reducing Sensor Error for Pressurizer pressure-high Trip ML20198F3911997-08-0808 August 1997 Proposed Tech Specs Changes,Revising Feedwater Isolation ESFAS Functions in TS Tables 3.3-3,3.3-4 & 4.3-2 ML20210H2151997-08-0808 August 1997 Proposed TS Revising SRs 3/4.7.4, Essential Svc Water Sys by Removing Requirement to Perform SRs 4.7.4.b.1, 4.7.4.b.2 & 4.7.4.c During Shutdown ML20198J7301997-05-15015 May 1997 Proposed Conversion to ITS Sections 1.0,3.1,3.2,3.3,3.4,3.7, 3.9 & 5.0 for Plant ML20154Q1191997-05-15015 May 1997 Proposed Improved TS Section 3.7, Plant Sys ML20138B7421997-04-24024 April 1997 Proposed Tech Specs 6.0 Revising Title Senior Vice President,Nuclear to Vice President & Chief Nuclear Officer ML20137N6111997-04-0101 April 1997 Proposed Tech Specs Table 3.3-3 Re Engineered Safety Features Actuation Sys Instrumentation ML20117K6431996-09-0505 September 1996 Proposed Tech Specs,Revising TS 3/4.4 Re RCS ML20115J0181996-07-18018 July 1996 Proposed Tech Specs 3/4.7.7,3/4.9.13 & Corresponding Bases Re Charcoal Test Methodology for Emergency Exhaust Sys ML20107H3931996-04-17017 April 1996 Proposed Tech Specs 3/4.3 Re Adding Ms & FW Isolation Sys Actuation Logic & Relays to Functional Units 4.b & 5.a of Tables 3.3-3,3.3-4 & 4.3-2 & Revising Table 3.3-3 by Adding Action Statements 27a & 34a ML20107E3251996-04-12012 April 1996 Proposed Tech Specs 3/4.4.5, SGs & 3.4.6.2, Operational Leakage & Associated Bases,Addressing Installation of Laser Welded Tube Sleeves in Plant SGs ML20107F0791996-04-12012 April 1996 Proposed Tech Specs 3/4.4 Re Changing TS, RCS & Associated Bases to Address Installation of Electrosleeves in Callaway Plant SGs ML20101R4211996-04-0909 April 1996 Revised TS Pages That Adhere to Testing Methods of ASTM Std D2276-78,Method a for Diesel Fuel Oil Particulate Concentration ML20101J0381996-03-22022 March 1996 Proposed Tech Specs,Implementing Containment Integrated Leakage Rate Program That Would Allow Ilrt,Presently Scheduled for Refuel 8,to Be Rescheduled ML20106G4351996-02-28028 February 1996 Proposed TS 3/4.8.1,ac Sources ML20106G4131996-02-23023 February 1996 Proposed Tech Specs Paragraph 1.A. Re Operating License Change to Reflect Union Electric as wholly-owned Subsidiary of Ameren Corp ML20097D5801996-02-0909 February 1996 Proposed Tech Specs Allowing Use of Alternate Zirconium Based Fuel Cladding Material ML20097D6151996-02-0909 February 1996 Proposed Tech Specs & Bases Re Containment Systems ML20097D6341996-02-0909 February 1996 Proposed Tech Specs Re AFW Sys ML20097F8991996-02-0404 February 1996 Proposed Tech Specs 4.6.1.2.a Re Containment Sys ML20097C2791996-02-0202 February 1996 Proposed Tech Spec 3/4.6.3, Containment Isolation Valves ML20096B1891996-01-0202 January 1996 Proposed Tech Specs 3.9.4, Containment Bldg Penetrations & Associated Bases Section to Allow Containment Personnel Airlock Doors to Be Open During Core Alterations ML20094A1721995-10-23023 October 1995 Proposed Tech Specs,Relocating Audit Frequencies in Former TS 6.5.2.9 to Operational QA Manual 1999-09-08
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211Q5411999-09-0808 September 1999 Proposed Tech Specs Reflecting USQ Associated with Increases in Offsite Dose Consequences Reported in FSAR for SGTR & MSLB Accidents ML20195C5191999-05-28028 May 1999 Proposed Tech Specs Sections 3.9.1,revised to Maintain CTS Requirements on Refueling Pool Boron Concentration Limits & 5.6.5,revised to Delete Item 5.6.5.a ML20207F4801999-05-27027 May 1999 Proposed Improved TSs & ITS Bases ML20206G3621999-04-30030 April 1999 Proposed Conversion Tech Specs Section 1.0/ITS Section 1.0 ML20205S9141999-04-21021 April 1999 Proposed Tech Specs Sections 1.0,3.3,3.4,3.6,3.7 & 3.9, Converting to ITS ML20205L0901999-04-0707 April 1999 Proposed Tech Specs Section 3.3,3.4,3.5,3.6,3.7,3.8 & 4.0, Converting to ITS ML20207L1061999-03-0909 March 1999 Proposed Tech Specs Re Conversion to ITSs Sections 3.3,3.4, 3.6,3.7.3 8,3.9 & 5.0 ML20196G1731998-11-25025 November 1998 Proposed Tech Specs Section 3.3, Intstrumentation, Converting to Improved Tech Specs ML20196D0011998-11-23023 November 1998 Proposed Tech Specs Pages Re follow-up Items Related to 970515 Request for Amend to License NPF-30 ML20155B5791998-10-27027 October 1998 Proposed Tech Specs for Use of Electrosleeves on Two Cycle Basis ML20154S2371998-10-21021 October 1998 Proposed Tech Specs Sections 3.1,3.2,3.4,3.5 & 5.0 Re Reactivity Control Sys,Power Distribution Sys,Rcs,Eccs & Administrative Controls,Respectively ML20154F8311998-09-29029 September 1998 Proposed Tech Specs Revising ESFAS Functional Unit 6.f Re Loss of Offsite power-start turbine-driven Pump ML20154A2901998-09-24024 September 1998 Proposed Tech Specs Converting to Improved TS Re Section 3.4, RCS, Consistent w/NUREG-1431 ML20151U1031998-08-27027 August 1998 Proposed Tech Specs Sections 1.0,2.0 & 3.0,converting to Improved Tech Specs ML20236Y1721998-08-0404 August 1998 Proposed Tech Specs Re Conversion to Improved STS Sections 3.1,3.2,3.5,3.9 & 4.0 ML20198D3201998-07-31031 July 1998 Rev 20 to Inservice Testing Program at Callaway Nuclear Plant ML20236W3721998-07-30030 July 1998 Proposed Tech Specs Revising Table 4.3-2 by Adding Table Notation to Clarify That Verification of Time Delays Associated W/Esfas Functional Units 8.a & 8.b Is Only Performed as Part of Channel Calibr ML20236J0821998-06-29029 June 1998 Proposed Tech Specs 3.7.1.7,4.7.1.7.1,4.7.1.7.2 & Bases 3/4.7.1.7 Revising to Address All Four Atmospheric Steam Dump Lines ML20236E9651998-06-26026 June 1998 Proposed Tech Specs Pages Re Conversion to Improved STS, Section 3.6 ML20216F3791998-03-0909 March 1998 Proposed Tech Specs SR 3/4.5.2b.1 Adding Clarification in Regard to Venting ECCS Pump Casings & Accessible Discharge Piping High Points ML20195B5651998-03-0202 March 1998 Rev 22 to QC Procedure QCP-ZZ-03003, Matl Receipt Insp ML20217P8161998-02-23023 February 1998 Proposed Tech Specs Replacement Page B 3.8-34 Re AC Sources Shutdown ML20198T3521998-01-16016 January 1998 Proposed Tech Specs 3/4.3,revising Ms & Feedwater Isolation Sys Slave Relay Surveillance from Quarterly Actuation Logic Test to Monthly Actuation Logic Test on Staggered Test Basis ML20197D6461997-12-16016 December 1997 Proposed Tech Specs Table Revising Lift Setting Tolerance for Main Steam Line Safety Valves ML20199B4261997-11-10010 November 1997 Proposed Tech Specs Re Page 5 of 8 for FW Isolation Changes ML20198P3361997-10-31031 October 1997 Proposed Tech Specs Reducing Repeated Alarms,Rod Blocks & Partial Reactor Trips That Continue to Manifest,During Beginning of Cycle Operation Following Refueling Outages ML20198P4141997-10-31031 October 1997 Proposed Tech Specs,Revising ESFAS Functional Unit 6.f, Loss of Offsite Power-Start Turbine-Driven Pump, in Tables 3.3-3,3.3-4 & 4.3-2 ML20217B3261997-10-22022 October 1997 Procedure MPE-ZZ-QY128, Operational Test Sequence of 4.16KV Diesel Generator NE02 Air Circuit Breaker 152NB0211 ULNRC-03664, Proposed Tech Specs 3/4.4.9 Re Pressure/Temp Limits1997-10-17017 October 1997 Proposed Tech Specs 3/4.4.9 Re Pressure/Temp Limits ML20217B3001997-09-14014 September 1997 Procedure ETP-NF-00001, MDAFW Pump (DPAL01A) Start Inhibit Circuit Test,Lsels Relay K1102 ML20217B3081997-09-0404 September 1997 Procedure ETP-BF-00002, Mdaew Pump (DPAL01B) Start Inhibit Circuit Test,Lsels Relay K4102 ML20217H8031997-08-0808 August 1997 Proposed Tech Specs 3/4.3 Re Instrumentation ML20210H2151997-08-0808 August 1997 Proposed TS Revising SRs 3/4.7.4, Essential Svc Water Sys by Removing Requirement to Perform SRs 4.7.4.b.1, 4.7.4.b.2 & 4.7.4.c During Shutdown ML20198F3911997-08-0808 August 1997 Proposed Tech Specs Changes,Revising Feedwater Isolation ESFAS Functions in TS Tables 3.3-3,3.3-4 & 4.3-2 ML20198F3411997-08-0808 August 1997 Proposed Tech Specs,Revising Table 3-7.2 to Specify That Lift Setting Tolerance for Main Steam Line Safety Valves Is +3/-1% as-found & +1% as-left.Table 2.2-1 Revised by Reducing Sensor Error for Pressurizer pressure-high Trip ML20195B5261997-05-20020 May 1997 Rev 6 to EDP-ZZ-03000, Containment Building Coatings ML20154Q1191997-05-15015 May 1997 Proposed Improved TS Section 3.7, Plant Sys ML20198J7301997-05-15015 May 1997 Proposed Conversion to ITS Sections 1.0,3.1,3.2,3.3,3.4,3.7, 3.9 & 5.0 for Plant ML20138B7421997-04-24024 April 1997 Proposed Tech Specs 6.0 Revising Title Senior Vice President,Nuclear to Vice President & Chief Nuclear Officer ML20141C3401997-04-14014 April 1997 Rev 18 to CNP IST Program ML20141D9331997-04-14014 April 1997 Rev 18 to Inservice Testing Program for Callaway Nuclear Plant ML20137N6111997-04-0101 April 1997 Proposed Tech Specs Table 3.3-3 Re Engineered Safety Features Actuation Sys Instrumentation ML20195B5581997-03-11011 March 1997 Rev 12 to Matls Engineering Procedure WEP-ZZ-00015, Preparation of Procurement Documents ML20195B5491997-01-31031 January 1997 Rev 22 to Administrative Procedure APA-ZZ-00400, Procurement of Parts,Supplies,Matls & Svcs ML20135E7351996-12-11011 December 1996 Tests to Determine Ampacity Derating Factors for Electrical Conductors Installed in 1 & 4 Diameter Rigid Steel Conduits Encapsulated by KM1 Darmatt One H Replacement Matl ML20135E7431996-12-11011 December 1996 Test to Determine Ampacity Derating Factor for Electrical Conductors Installed in 600mm X 101mm X 3650mm Long Cable Tray Encapsulated by KM1 Darmatt Three H Replacement Matl ML20135E7391996-12-11011 December 1996 Tests to Determine Ampacity Derating Factors for Electrical Conductors Installed in 1 & 4 Diameter Rigid Steel Conduits Encapsulated by KM1 Darmatt Three H Replacement Matl ML20140G2331996-10-31031 October 1996 Rev 6 to Callaway Plant Offsite Dose Calculation Manual ML20217B2951996-10-0303 October 1996 Procedure ISP-SA-2413A, Diesel Generator & Sequencer Testing (Train a) ML20117K6431996-09-0505 September 1996 Proposed Tech Specs,Revising TS 3/4.4 Re RCS 1999-09-08
[Table view] |
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
ULNRC- 03873 i
ATTACHMENT TIIREE PROPOSED TECHNICAL SPECIFICATION REVISIONS i
1 t
l-9900050239 990730 "
PDR ADOCK 05000483 P PM g
r c w !
UO Xw w .* +
w l 55"
m .
.= .=
-- d. o3 m m m W3ww a m , m .
W >m N
. . . + +
N N N . .
CEE N O O D to = =
w ,.
w>
> <t >- . . .
aC J @ m .
m Jww et. eC. *C. m se
. . i mEP, Z Z Z w en. C a:c. aC.
i cr Z c) Z G Z Cd c w >-
m . L 4 .
et. aC. -
> - at >- aC. w m -J m Z Z Z aC. 3 et. at.
j Z! arww Z Z cr Z Z l X.' m & ej -
.O. p l cc
+- ZM a; 1
i
>- =>.- . C Z 6-m m w at u eC. at.
Z aC. .C.
- ag D D- Z Z Z - .C.
C t- c Z Z =
Z Z
>- UC c) ve *C - J >
L
.Z. J p 1 sg m e Z l w
Z Z O C A O 1 yqq y<
- - t-- m.
&- w >-
= o 4 l<
"O m Z at u < Z
...J Ca >- w Q. ::;3 - cc t- cc c .
= m aC. U Z Z Z = e-- > w M .
aC. c3 C w c: U w C. w Z Z Z m
- 2 Cc e- e:; C O p- C
=a -
C .O - 3 J o +-- o <C v at w Z .h a w D cc C c; V- J- w N U w O w t-- . . m I
I <C U 2
C 2" *: Z m . .
- m. J Z ct 6- eC. aC. cr w
s.h < == <C w to Z Z aC. - cC. aC.
I,.J w Z = CL w =
CC aJ EX V O V- w Z Z LJ D *==
J e- w Z %
t C2 < > O o
< w cc w n<
i
+= W D >= a .
m, q 4 !
>* J st b.J CE 2 C)
> R V \
+-- CC. % C W Z CQ edC. o Cg Cg w Z- Z .c cf J Z m
w J E w I w
CC Z hf .esJ w Zu . .
CC L.J . .=%
Z Z= m *C. EC. m CJ Uu V CC. *C.
T o C)
Z Z m Z CJ 4.r.
Z 3 Z 3 kJ C. t
- J L Gl C C) L C3 o 3 63 o CC 5 m U o &M ** o o re I
l
%=. L J C
oJ m =.o
=- e f I =J
= GI se sa G) e L G1 L CJ -M 3L CJ 3 C Cn Cn o '
tw fu o .C o Gb ed 99 C. *o C,, > 33 sa =
m of re >
ed m
M ZE c) o +e *d *
.,,.J
-.-*J ee Cn en 3 CJ C .C o. UUM e- to e- *o 3 h - C. 6o U E at eC C i3U o es oU t 6 - - c) >- > 'o GJ O et L h ed
- J ::3 m - *a *m L o L se j
GI l Gb L U
- - V) U 'O M CJ C L U> UL 1 W W u % se 3 === C % * > GI C == CJ 'O tw 3 m ed 'o Cn
- o o se -m C sa tw m M Q1 % 3 C% C $1 i Z h 8 3 - U CJ J- A o 3o DO
.3 L m C."o - c. -E EUh o - es V *J C re m -
xE3 >- C Cs > M > 'O
- d i - 6. CJ, c = mo ,e - m-6 4*- 4m # **-
.c - a *-6 =X cu , E.
oe r o re o o u Z -
o J
=c oc ce v m .c J ee l'
.C x es C M D . . . M e- C w en 3 o . . o .
u .C Cc v = .c m
Z J ,o .o
! m .
i w e ~
m CALLAWAY - UNIT 1 3/4 3-36a Amendment tio.43,9," 91
}
8 _ _ _ - - _ _ . _ - _ _ - _ - _ - - _ - - - _ _ - - - - - - - - - - - - - - - - - - - - - __ - _ _ . - - - - - - - - - - - - - -- J
j1l)1iIlljjlllil !l! ; ! i 4 ,l 1
- l E -
CD s l
NE 4 h i AR +
CLI .
6 t
n o o i.
l LU 3 3 3 3 oe t n l
i IQ .
mh t
f s o
SWEE .
ro n
4 . .
t d E VR 2 25 2 2 8 o n DRR a
l l
OOUS l . l 1 n is o
~ MFSI A 1 A 14 1
. . i rn po p
t 1 rh s EY s et pi w
ds ei i e r
r s1 VAT . ) .
t . . .
e mv o t ALS A. 3( n A. ro A. cd c A LEE e A. A. ne or SRT N 0 N mN e
N N ot s
fp h r c c
r R i te st ee ph i
h c EY TAT )
u q
a en T w e v
SLS 1 e A.
s A. A. e 6 u
l AEE ( R A. A. e i
MRT N M N N N N e tb a
et d s N T c
n dv e
cs nr ai n
a x O
I NS OE IT )
l a
)
ea th l f l
5 s.
T T 2 l
s is s A i 2 ey er e T
N E
M AC UI TG C) f A.
. )
1
(
(
)
1
(
e v
r u
(
)
1
( A.
A.
S I
S b
t e et h
vu rc uc so d
M o .
W U
R Ai N M M S M N N B
A l s s
er i n
6 d
S*
T n l e he n S L o T al t v E a I
N
~
. G N
A N
O i
t a
S E
T hn su dheB eccA e .L 5
f
)
d e Y M
E T
S S
T N
I
. TET
. ACA PUIRT ITVES
. I '
l i
o s
D E
RTho ESwh
.iu hs cr dinR ihaE vwlP o lO d
s o
e g p
M E A. A. r .i u S M RCEPE " A. A. GE . p6 e e n E TADOT R N N A N N R S GT 4 n 8vb n i N R " A 12 e19r N i t O I L e O TC4 p 1 uo C
n o
I T
A U
Q E
A N
s a
I T
A SI7g aO GKn i
oe dc1 sd l .st b
s u ~
( U R O h T Ldd ey ie E=
LI P n ne 2
T C E GET O N oNae iCehr f nti E
L -
3L
- A S
C N
A ONA LNRT AAES l
l a
. E sI O
yT 0 e
.cx iru roJf q A ef oe u B R
f 4 E L Nl PE i A. A. A. A. A. LB aA4 v r r E ACOT 17 R L N N N r N Q N dU7N doe P E U o A TKW ee cs I
f T O L T E N 2C
.O bveni n B A V O e 6A D i ga d o A E R v 0T l aamr e is I
1 F U ye3V l wt re t S
LA T o rh6i l a uoc .a Y b etKS heof nri T ER a v sb reoc r.
E NB NI . . . . .
emo4L .D 6 yn pqa s geut o y
F .
A AL A. A. a tr2O ers S
l iA A. . A. A. sf6C 1 ai 2ml msea l
CC N N N R e D
3 N N a ed K
.h G yueor en e r d 0
E m l e c Ncff nGo R L E
e d2a ne o f e
E t t u2e 2ert l E NK I al6 5u ef ed N
1 C . . . . . cK g qt s o s e Wl e A.
I G
N I l CC E
A. A.
N N A.
N e
S N N A. A.
N dx t
ee 0r
.i n dese nrrrnii afi oDuy er . H~
E s se2u f ei ql sk eb6d 6h rt yen n
nn oo nn oo) o y n
ec ro e ul r'
. t ea y
K
.d n 1t 1 nh 0 ot2 pe yn earcro%c on t r u bm2a Gm g0 n r n gl oS o n i i iiS i c ae s 4 0 .N i i o tt ttA t n et s - lk6 g s 8n .weot .
t i aa aaF a e Fn e P l c K n y21i 4 o m a a t uu uuS l g I r ae i a5 w dEsl i l a tt) ttE o r y P .
hhsld dont o o i ccS cc s e t m p scye sel ouE s to s ti AAP AAP m ee r a u 0 r il i h L yi d.
I i I S O Er ft e r n yl f 9 ef otsBt n cdS cdB " e as z T i t ee kif a Air mI in( i n( A rc Syi aiRrsac ceRl e e T o ta ta " en S r r ru ueetihEit I
N ol a R a mcy s a mcy edu s de d en s u
t o t nt i p nib s ai g o r p r f t P Oaw b a S<t U u oia oia s eq ro s1 c hteiv t cy rd <
n t gl t gl a he ei e1 a L
l o a uoe uoeh SS et r - e cncreeesel eee e A r M ALR ALR P na PP R EaC o E dxpT u rih e pn h p e V T rSOtOf N t dd iu O n aa gt I
T o
C a b c
d LL
. oo nc .
EA a b C
N . . ))) ) )
U .
0 1 123 4 F 9 1 1 ((( (# +
u (a D hgE* 55l -
' uA w S f 9olecete e degreded
'; cit:ge ci;.;l if tl,e weitew n 610 epproxi;;tely 00! for ;-
10 9 tin. .2'N.fEg7 /f 5',7-/f/
(continued)
CALLAWAY PLANT ITS BASES B 3.3 151 5/15/97
t
- INSERT B 3.3-151 Once the bistable has actuated, a timer in the LSELS circuitry provides an 8 second time delay to avoid false actuation on large motor starts other than an RCP. There are four of these 8-second '
timers per bus, one for each degraded voltage channel. The b! stable outt uts are then combined in a two out-of-four logic to generate a degraded voltage signal if the voltage is below approximately 90% Orice the two-out-of-four logic is satisfied, contacts in the bus feeder breaker trip circuits close to arm the tripping circuitry. If a safety injection signal (SIS) were to occur concurrently with or after the arming of the trippiag circuitry, the bus feeder breaker would open j immediately, a bus undervoltage would be sensed, and a LOP signal would be generated. Should i the degraded voltage condition occur in a non-accident condition (no SIS present), an additional )
i l I second time delay is provided. These time delays are specific to the feeder breakers (2 per l bus). If the degraded voltage condition i:: not alleviated in the overall 119 seconds (nominal ;
delay), ne bus feeder breaker is tripped. l I
s l
l
e . . (
< : j LOP DG Start Instrumentation B 3.3.5 s'y l BASES ACTIONS DJ (continued) cre/titions from full power conditions in an orderly manner and without challenging plant systems.
Ed Condition E applies to each of the LOP DG start Functions when the Required Actions and associated Completion Times for Condition A. B, or C are not met when the associated DG is required to be OPERABLE per LC0 3.8.2.
In these circumstances the Conditions specified in LC0 3.8.2. "AC Sources-Shutdown" for the DG and offsite circuit made inoperable by failure of the LOP DG start instrumentation are required to be entered immediately. The actions of that LCO provide for adequate compensatory actions to assure unit safety.
SURVEILLANCE SR 3.3.5J REQUIREMENTS Tie breakers 52NG0116 and 52NG0216 shall be verified open once every 7 days. This frequency is based cn Reference 4.
x :- ~
lou of vsIh a ed da n/ad vs/%<
SR 3.3.5.2 Infd 'h +1,eylTELS i o,y c c i,cul-hr.
SR 3.3.5.2 is the performance of a TAD 0T. This test is pe formed every 31 days. The test checks trip devices that provide v ctu; tier, ;ign2 directly, bypaccing th :n&g precert contrel- l cquip ,; rit. For these tests, the relay Trip Setpoints are verified and adjusted as necessary. The Frequency is based on !
the known reliability of the relays and controls and the ;
multichannel redundancy available, and has been shown to be ;
acceptable through operating experience.
2~A4rG21' 8 2.3-/S7 l SR 3.15.3 l
SR 3.3.5.3 is the performance of a CHANNEL CALT9R^. TION. l l
l l
(continued)
CALLAWAY PLANT ITS BASES B 3.3-157 5/15/97 1
E l INSERT B 3.3-157 The SR is modified by a Note that excludes verification of time delays from the TADOT.
Verification of the time delays for the loss of voltage and degraded voltage functions is only performed as part of the CHANNEL CALIBRATION (SR 3.3.5.3,.
i t
r ;
LOP DG Start l' instrumentation B 3.3.5 BASES -
SURVEILLANCE SR 3.3.5.3 (continued)
REQUIREMENTS The setpoints as well as the response to a loss of voltage and a degraded voltage test, shall include a single point verification that the trip occurs within the required time delay.3 Zh/.fE#7- 8 7. 7-/U A CHANNEL CALIBRATION is performed every 18 months, or approximately at every refueling. CHANNEL CALIBRATION is a complete check of the instrument loop, including the sensor. The test verifies that the channel responds to a measured parameter within the necessary range and accuracy.
The Frequency of 18 months is based on operating experience and consistency with the typical industry refueling cycle and is justified by the assumption of an 18 month calibration interval in the determination of the magnitude of equipment drift in the setpoint analysis.
SR 3.3.5.4 SR 3.3.5.4 is the performance of the required response time verification (see al.to SR 3.3.2.10) every 18 months on a STAGGERED TEST BASIS on those functicns with time lime provided in Reference 5. Each verification shall inclur.'a at le:m one train such that both trains are verified at least once per 36 months.
REFERENCES 1. FSAR, Section 8.3.1.1.3.
- 2. FSAR. Chapter 15.
- 3. Calculations NB 05 Rev. O Addendum 2. NB 05 Rav. O, and E B 21 Rev. O.
- 4. Callaway OL Amendment No. 99 dated April 18, 1935.
- 5. FSAR Table 16.3 2.
- - 6. - NRC Branch Technical Position PSB 1.
[ l I CALLAWAY PLANI ITS - BASES B 3.3 158 5/15/97 L
I
a ,u ;
e ,a INSERT B 3.3-158 Verification of the time delays for undervoltage relays (1 second nominal) in the loss of voltage function (NB01011271DG, NB01131272DG, NB01161274DG, NB01171273DG, NB02011274DG, NB02101271DG, NB02161272DG, and NB02171273DG), for LSELS timers ,
(8 seconds nominal) in the degraded voltage function (NFKS5000A&B, NFKS5001 A&B, i NFKS5002A&B, and 'NFKS5003A&B), and for time delay relays (11I seconds nominal) in the l degraded voltage function (NB62RP332TDENB01, NB62RP332TDENB02, NB62RP333TDENB03, and NB62RP333TDENB04)is performed during the CHANNEL l CALIBRATION.