Procedure ETP-BF-00002, Mdaew Pump (DPAL01B) Start Inhibit Circuit Test,Lsels Relay K4102ML20217B308 |
Person / Time |
---|
Site: |
Callaway ![Ameren icon.png](/w/images/0/06/Ameren_icon.png) |
---|
Issue date: |
09/04/1997 |
---|
From: |
Taylor UNION ELECTRIC CO. |
---|
To: |
|
---|
Shared Package |
---|
ML20217A030 |
List: |
---|
References |
---|
ETP-NF-00002, ETP-NF-2, NUDOCS 9803260026 |
Download: ML20217B308 (6) |
|
|
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211Q5411999-09-0808 September 1999 Proposed Tech Specs Reflecting USQ Associated with Increases in Offsite Dose Consequences Reported in FSAR for SGTR & MSLB Accidents ML20195C5191999-05-28028 May 1999 Proposed Tech Specs Sections 3.9.1,revised to Maintain CTS Requirements on Refueling Pool Boron Concentration Limits & 5.6.5,revised to Delete Item 5.6.5.a ML20207F4801999-05-27027 May 1999 Proposed Improved TSs & ITS Bases ML20206G3621999-04-30030 April 1999 Proposed Conversion Tech Specs Section 1.0/ITS Section 1.0 ML20205S9141999-04-21021 April 1999 Proposed Tech Specs Sections 1.0,3.3,3.4,3.6,3.7 & 3.9, Converting to ITS ML20205L0901999-04-0707 April 1999 Proposed Tech Specs Section 3.3,3.4,3.5,3.6,3.7,3.8 & 4.0, Converting to ITS ML20207L1061999-03-0909 March 1999 Proposed Tech Specs Re Conversion to ITSs Sections 3.3,3.4, 3.6,3.7.3 8,3.9 & 5.0 ML20196G1731998-11-25025 November 1998 Proposed Tech Specs Section 3.3, Intstrumentation, Converting to Improved Tech Specs ML20196D0011998-11-23023 November 1998 Proposed Tech Specs Pages Re follow-up Items Related to 970515 Request for Amend to License NPF-30 ML20155B5791998-10-27027 October 1998 Proposed Tech Specs for Use of Electrosleeves on Two Cycle Basis ML20154S2371998-10-21021 October 1998 Proposed Tech Specs Sections 3.1,3.2,3.4,3.5 & 5.0 Re Reactivity Control Sys,Power Distribution Sys,Rcs,Eccs & Administrative Controls,Respectively ML20154F8311998-09-29029 September 1998 Proposed Tech Specs Revising ESFAS Functional Unit 6.f Re Loss of Offsite power-start turbine-driven Pump ML20154A2901998-09-24024 September 1998 Proposed Tech Specs Converting to Improved TS Re Section 3.4, RCS, Consistent w/NUREG-1431 ML20151U1031998-08-27027 August 1998 Proposed Tech Specs Sections 1.0,2.0 & 3.0,converting to Improved Tech Specs ML20236Y1721998-08-0404 August 1998 Proposed Tech Specs Re Conversion to Improved STS Sections 3.1,3.2,3.5,3.9 & 4.0 ML20198D3201998-07-31031 July 1998 Rev 20 to Inservice Testing Program at Callaway Nuclear Plant ML20236W3721998-07-30030 July 1998 Proposed Tech Specs Revising Table 4.3-2 by Adding Table Notation to Clarify That Verification of Time Delays Associated W/Esfas Functional Units 8.a & 8.b Is Only Performed as Part of Channel Calibr ML20236J0821998-06-29029 June 1998 Proposed Tech Specs 3.7.1.7,4.7.1.7.1,4.7.1.7.2 & Bases 3/4.7.1.7 Revising to Address All Four Atmospheric Steam Dump Lines ML20236E9651998-06-26026 June 1998 Proposed Tech Specs Pages Re Conversion to Improved STS, Section 3.6 ML20216F3791998-03-0909 March 1998 Proposed Tech Specs SR 3/4.5.2b.1 Adding Clarification in Regard to Venting ECCS Pump Casings & Accessible Discharge Piping High Points ML20195B5651998-03-0202 March 1998 Rev 22 to QC Procedure QCP-ZZ-03003, Matl Receipt Insp ML20217P8161998-02-23023 February 1998 Proposed Tech Specs Replacement Page B 3.8-34 Re AC Sources Shutdown ML20198T3521998-01-16016 January 1998 Proposed Tech Specs 3/4.3,revising Ms & Feedwater Isolation Sys Slave Relay Surveillance from Quarterly Actuation Logic Test to Monthly Actuation Logic Test on Staggered Test Basis ML20197D6461997-12-16016 December 1997 Proposed Tech Specs Table Revising Lift Setting Tolerance for Main Steam Line Safety Valves ML20199B4261997-11-10010 November 1997 Proposed Tech Specs Re Page 5 of 8 for FW Isolation Changes ML20198P3361997-10-31031 October 1997 Proposed Tech Specs Reducing Repeated Alarms,Rod Blocks & Partial Reactor Trips That Continue to Manifest,During Beginning of Cycle Operation Following Refueling Outages ML20198P4141997-10-31031 October 1997 Proposed Tech Specs,Revising ESFAS Functional Unit 6.f, Loss of Offsite Power-Start Turbine-Driven Pump, in Tables 3.3-3,3.3-4 & 4.3-2 ML20217B3261997-10-22022 October 1997 Procedure MPE-ZZ-QY128, Operational Test Sequence of 4.16KV Diesel Generator NE02 Air Circuit Breaker 152NB0211 ULNRC-03664, Proposed Tech Specs 3/4.4.9 Re Pressure/Temp Limits1997-10-17017 October 1997 Proposed Tech Specs 3/4.4.9 Re Pressure/Temp Limits ML20217B3001997-09-14014 September 1997 Procedure ETP-NF-00001, MDAFW Pump (DPAL01A) Start Inhibit Circuit Test,Lsels Relay K1102 ML20217B3081997-09-0404 September 1997 Procedure ETP-BF-00002, Mdaew Pump (DPAL01B) Start Inhibit Circuit Test,Lsels Relay K4102 ML20217H8031997-08-0808 August 1997 Proposed Tech Specs 3/4.3 Re Instrumentation ML20210H2151997-08-0808 August 1997 Proposed TS Revising SRs 3/4.7.4, Essential Svc Water Sys by Removing Requirement to Perform SRs 4.7.4.b.1, 4.7.4.b.2 & 4.7.4.c During Shutdown ML20198F3911997-08-0808 August 1997 Proposed Tech Specs Changes,Revising Feedwater Isolation ESFAS Functions in TS Tables 3.3-3,3.3-4 & 4.3-2 ML20198F3411997-08-0808 August 1997 Proposed Tech Specs,Revising Table 3-7.2 to Specify That Lift Setting Tolerance for Main Steam Line Safety Valves Is +3/-1% as-found & +1% as-left.Table 2.2-1 Revised by Reducing Sensor Error for Pressurizer pressure-high Trip ML20195B5261997-05-20020 May 1997 Rev 6 to EDP-ZZ-03000, Containment Building Coatings ML20154Q1191997-05-15015 May 1997 Proposed Improved TS Section 3.7, Plant Sys ML20198J7301997-05-15015 May 1997 Proposed Conversion to ITS Sections 1.0,3.1,3.2,3.3,3.4,3.7, 3.9 & 5.0 for Plant ML20138B7421997-04-24024 April 1997 Proposed Tech Specs 6.0 Revising Title Senior Vice President,Nuclear to Vice President & Chief Nuclear Officer ML20141C3401997-04-14014 April 1997 Rev 18 to CNP IST Program ML20141D9331997-04-14014 April 1997 Rev 18 to Inservice Testing Program for Callaway Nuclear Plant ML20137N6111997-04-0101 April 1997 Proposed Tech Specs Table 3.3-3 Re Engineered Safety Features Actuation Sys Instrumentation ML20195B5581997-03-11011 March 1997 Rev 12 to Matls Engineering Procedure WEP-ZZ-00015, Preparation of Procurement Documents ML20195B5491997-01-31031 January 1997 Rev 22 to Administrative Procedure APA-ZZ-00400, Procurement of Parts,Supplies,Matls & Svcs ML20135E7351996-12-11011 December 1996 Tests to Determine Ampacity Derating Factors for Electrical Conductors Installed in 1 & 4 Diameter Rigid Steel Conduits Encapsulated by KM1 Darmatt One H Replacement Matl ML20135E7431996-12-11011 December 1996 Test to Determine Ampacity Derating Factor for Electrical Conductors Installed in 600mm X 101mm X 3650mm Long Cable Tray Encapsulated by KM1 Darmatt Three H Replacement Matl ML20135E7391996-12-11011 December 1996 Tests to Determine Ampacity Derating Factors for Electrical Conductors Installed in 1 & 4 Diameter Rigid Steel Conduits Encapsulated by KM1 Darmatt Three H Replacement Matl ML20140G2331996-10-31031 October 1996 Rev 6 to Callaway Plant Offsite Dose Calculation Manual ML20217B2951996-10-0303 October 1996 Procedure ISP-SA-2413A, Diesel Generator & Sequencer Testing (Train a) ML20117K6431996-09-0505 September 1996 Proposed Tech Specs,Revising TS 3/4.4 Re RCS 1999-09-08
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20198D3201998-07-31031 July 1998 Rev 20 to Inservice Testing Program at Callaway Nuclear Plant ML20195B5651998-03-0202 March 1998 Rev 22 to QC Procedure QCP-ZZ-03003, Matl Receipt Insp ML20217B3261997-10-22022 October 1997 Procedure MPE-ZZ-QY128, Operational Test Sequence of 4.16KV Diesel Generator NE02 Air Circuit Breaker 152NB0211 ML20217B3001997-09-14014 September 1997 Procedure ETP-NF-00001, MDAFW Pump (DPAL01A) Start Inhibit Circuit Test,Lsels Relay K1102 ML20217B3081997-09-0404 September 1997 Procedure ETP-BF-00002, Mdaew Pump (DPAL01B) Start Inhibit Circuit Test,Lsels Relay K4102 ML20195B5261997-05-20020 May 1997 Rev 6 to EDP-ZZ-03000, Containment Building Coatings ML20141D9331997-04-14014 April 1997 Rev 18 to Inservice Testing Program for Callaway Nuclear Plant ML20141C3401997-04-14014 April 1997 Rev 18 to CNP IST Program ML20195B5581997-03-11011 March 1997 Rev 12 to Matls Engineering Procedure WEP-ZZ-00015, Preparation of Procurement Documents ML20195B5491997-01-31031 January 1997 Rev 22 to Administrative Procedure APA-ZZ-00400, Procurement of Parts,Supplies,Matls & Svcs ML20140G2331996-10-31031 October 1996 Rev 6 to Callaway Plant Offsite Dose Calculation Manual ML20217B2951996-10-0303 October 1996 Procedure ISP-SA-2413A, Diesel Generator & Sequencer Testing (Train a) ML20117P2281996-02-26026 February 1996 Rev 10 to Maint Mechanical Procedure MTM-ZZ-QV009, Westinghouse Check Valve Disassembly/Reassembly ML20108E3711996-02-16016 February 1996 Rev 5 to Administrative Procedure APA-ZZ-01003, Odcm ML20117P2371995-11-28028 November 1995 Rev 2 to Callaway Plant Bolting Manual ML20076F9881994-10-12012 October 1994 Rev 0 to Second 10-Yr Interval ISI Plan for Callaway Nuclear Power Plant ML20065N4831993-11-24024 November 1993 Temporary Change Notice 93-0955 to Rev 2 to Off-Normal Operating Procedure OTO-RK-00001, Loss of Control Room Alarms ML20101M4591992-06-26026 June 1992 Rev 1 to J-26060A, Critical Safety Function Parameters ML20069B9661992-03-31031 March 1992 Cultural Resources Mgt Plan for Residual Lands at Union Electric Co Callaway Plant,Callaway,Mo ML20094H2821992-01-28028 January 1992 Rev 2 to Administrative Procedure APA-ZZ-01011, Process Control Program Manual ML20195B5301992-01-14014 January 1992 Rev 2 to Spec A-1003(Q), Surface Preparation & Application of Field Coatings ML20079L5141991-11-0404 November 1991 Rev 13 EPIP EIP-ZZ-00241, Fmt Driver Checklist ML20024H2411991-05-24024 May 1991 Rev 12 to Pump & Valve Inservice Testing Program ML20024G9881991-05-0606 May 1991 Rev 5 to Callaway Records Info Sys General Rules for Records Indexing. ML20070W0021991-04-0101 April 1991 Rev 4 to ARIP2371, General Rules ML20066H2601991-01-31031 January 1991 Rev 2 to A120.0021/S236, Signature/Initials Log ML20067D6541991-01-30030 January 1991 Rev 7 to T210.0002/Q101, Qualification/Certification Documentation ML20066L4881991-01-29029 January 1991 Rev 3 to Callaway Records Info Sys General Rules for Records Indexing ML20067D8191991-01-29029 January 1991 Backfit Change Notice 074 to Rev 6 to T210.0002/R353 ML20066L4561991-01-28028 January 1991 Rev 2 to Callaway Records Info Sys General Rules for Records Indexing ML20081E2111990-07-23023 July 1990 Rev 6 to T210.0002/R353, Required Reading/Personnel Form 2 ML20081E2071990-07-23023 July 1990 Rev 6 to T210.0002/Q101, Qualification/Certification Documentation ML20059G5081990-05-31031 May 1990 Rev 0 to APA-ZZ-01003, Odcm ML20042F2861990-03-30030 March 1990 Rev 11 to Inservice Testing Program. ML20058N2841990-02-0606 February 1990 Rev 4 to T210.0002/D157, Delegation of Authority ML20247D8361989-07-24024 July 1989 Process Control Program Manual ML20247D8291989-07-19019 July 1989 Odcm ML20246L8221989-05-31031 May 1989 Rev 6 to Callaway Plant,Odcm ML20151R2591988-03-31031 March 1988 Rev 10 to Inservice Testing Program Class 1,2 & 3 Pumps ML20154E5101988-02-29029 February 1988 Offsite Dose Calculation Manual ML20236W7151987-11-0303 November 1987 Rev 1 to Nuclear Function Administrative Procedure APA-ZZ-00645, Simulator Configuration Mgt ML20236F7431987-07-31031 July 1987 Rev 9 to Inservice Testing Program,Callaway Nuclear Plant ML20206N4781987-04-0808 April 1987 Rev 8 to Inservice Testing Program,Callaway Nuclear Plant ML20207Q1561987-01-15015 January 1987 Rev 7 to Inservice Testing Program,Callaway Nuclear Plant ML20154J0751986-02-14014 February 1986 Rev 6 to Inservice Testing Program,Callaway Nuclear Plant ML20134D0441985-07-25025 July 1985 Rev 5 to Inservice Testing Program ML20140F5191985-06-28028 June 1985 Rev 4 to, Inservice Testing Program,Callaway Nuclear Plant ML20100E9791985-03-31031 March 1985 Procedure for Performing Task Analysis (& Verification) for Snupps Detailed Control Room Design Review ML20099J0791984-12-31031 December 1984 Corrected Rev 3 to Table, Inservice Testing Program, Inservice Insp Class 1,2 & 3 Pumps ML20093F3491984-10-31031 October 1984 Procedure for Performing Task Analysis & Verification for Detailed Control Room Design Review 1998-07-31
[Table view] |
Text
- ETP-NF-00002 r Revision 0 September 4,1997 CALLAWAY PLANT l ENGINEERING TEST PROCEDURE l
ETP-NF-00002 i
MDAFW PUMP (DPALO1B) START INHIBIT CIRCUlT TEST, LSELS RELAY l K4102 1
RESPONSIBLE DEPARTMENT h 4f o4 efmg -
WRITTEN BY f.2 [fc/jI
- r v c PREPARED BY j [p, gg 6
APPROVED BY )cu/)
Y l
l DATEISSUED 9-bk7 This procedure contains the following:
Pages 1 through 4 l
Attachments through Tables through Figures through ;
l Appendices through CheckoffLists through ;
This procedure has checkoff list (s) maintained in the mainframe computer.
- INFORMATION ONLY *** 01/23/98 0 09:20:23 HRS 9003260026 980318 PDR ADOCK 05000483 P PDR .
g
ETP-NF-00002 R ev. O g
i i
TABLE OF CONTENTS Section Pane Number 1.0 PURPOSE AND SCOPE.. . . . ... . . . . . . . . . . . . . . . . . . . . . . . . . .. 1 2.0 ACCEPTANCE CRITERIA . . .... . .......... . ..... .... . . . . . . . . .. I l t 3.0 NOTES AND PRECAUTIONS ... ..... . .. . .. ... ... . . ...... .... ... .1 l
........1 l
4.0 - PREREQUISITES..... . . . . . . . . . . . . . . . . . . . . . . . .........
1 1
5.0 TEST EQUIPMENT . ...... .. .... ...... ... ... . . . . . . . . . . . . .... ...2 l
6.0 PROCEDURE .. . . . ...... .... . . . . . . . . . . . . . . . . . . ... ............2 7.0 RESTORATION.. . . . . . . . . - . . . . . . . . . . . . . . . . . . . . . . . ..3 i
l l
l l
l i
i l
l i
l i
i <
- INFORMATION ONLY *** 01/23/98 0 09:20:23 HRS
f ETP-NF-00002 Rev. O g
MDAFW PUMP (DPALO1B) START INHIBIT CIRCUIT TEST. LSELS RELAY K4102
- 1. PURPOSE AND SCOPE l
To verify the proper operation of the Motor Driven Aux Feedwater l
Pump start inhibit circuitry on a simulated loss of vital A/C bus voltage (NB02). This test will verify that the LSELS circuitry will initiate a 50 second time delay (Relay No. AL62RP331TDDAL2) that inhibits the I
MDAFP (DPALOlB) from starting on an Aux Feedwater Actuation l
i Signal (AFAS).
1
- 2. ACCEPTANCE CRITERIA l
- All required relay contact conditions are met as described in this i procedure.
l
- Time delay relay AL62RP331TDDAL2 actuates in 5012.5 seconds. I l
- 3. NOTES AND PRECAUTIONS
- ESW Pump DPEF01B will receive a trip signal, and SHALL be declared inoperable.
e The "B" MDAFP (DPALolB) SHALL be declared inoperable during the performance of this procedure due to this test defeating the auto start function on an AFAS.
. The Alternate Feeder Breaker for NB02 (NB0212) will receive a trip signal.
- 4. PREREOUISITES
- A Control Room brief, including compensatory action has been conducted prior to the start of this procedure.
i e Compensatory Actions
- 1. Remove power supply from K4102, and reland lead to ,
terminal 6.
- The ShiA Supervisor has given permission to conduct this test procedure.
l
- NB02 Bus normal Feeder Breaker (NB0209) clomi.
- An IAC brief WILL be conducted by the Test Engineer. i
- QC termination verification required.
l l
1
- INFORMATION ONLY *** 01/23/98 8 09:20:23 HRS l l
l
I i
! ETP-NF-00002 l
Rev. O lg
- 5. TEST EQUIPMENT
- Portable 48-vdc isolating power supply, capable of carrying a 1-amp loed.
- Digital Muhlmeter, Keithley 197A or equivalent. {
- Test leads for meters and power supply. -
- 6. PROCEDURE 6.1 At NF039C, Lift vendor wire from relay K4102 terminal 6 and tape. This disables autohntic load shed capability of the "B" ESW Pump and the AFAS inhibit for the "B" MDAFP.
Performer: / / Initial / Dcte / Time Ind. Verfication: / / Initial / Date /11me QC Verification : / / Initial / Date / Time 6.2 Connect the DEENERGIZED portable 48-volt de power supply to relay K4102. The positive lead goes to pin 6 and the negative lead goes to pin 7.
I Performer: / Initial / Date Ind. Verfication: / Initial / Date 6.3 At SA036B, Connect a Digital Multimeter (NOTE: Set on the 200vde ,
1 range) between terminals 8 and 9 on TB 2. This will monitor the 50 second AFAS inhibit circuit from time delay relay ;
AL62RP331TDDAL2, Performer: / laitial/ Date
! Ind. Verfication: / Initial / Date l
l l
2
- INFORMATION ONLY *** 01/23/98 0 09:20:23 HRS i
ETP.NF-00002 Rev. 0
_(
NOTE The next Step will generate a TRIP signal to the"B" ESW Pump if running.
6.4 Energize LSELS relay K4102 with 48 vde hm the temporary power supply and verify proper operation of relay K4102 and relay AL62RP331TDDAL2 by observing the DMM installed at SA036B for the followi'ng change in indication:
i e Prior to energizing K4102 the DMM should indicate the presence of 125 vdc.
e AAer K4102 is energized the 125 vde indication should go to o vdc and stay.
I Performer: / Initial / Date Ind. Verfication: / Initial / Date i
Deenergize relay K4102 and verify proper time delay function of relay l 6.5 '
l AL62RP331TDDAL2 by the following change in indication.
e 50 seconds i 2.5 seconds aAer K4102 is deewgized the DMM installed at SA036B should indicate the presence of 125 vdc.
! Performer: / Initial / Date Ind. Verfication: / Initial / Date 6.6 Notify the IAC Supervisor or I&C Engineer if any step failed to meet it's l required test result.
- 7. RESTORATION 7.1 Remove test equipment installed at NF039C and S A036B.
i '
I Performer / Initial / Date Ind. Verfication. / Initial / Date f
7.2 Reland vendor wire at Relay K4102 terminal 6.
I Performer: / Initial / Date Ind. Verfication: / Initial / Date QC Verification: / Initial / Date 3
- INFORMATION ONLY *** 01/23/98 0 09:20:23 HRS d.
I
- a O ETP-NF-00002 Rev. 0 31 7.3 Verify proper circuit continuity for relay K4102 by connecting a Simpson 260 (set on the 2.50 ydc range or lower) positive lead at relay l K4102 terminal 6 and the negative lead at terminal 7. A small meter l defection WILL occur when a ATI test pulse is present. The ATI test l i
steps that are applicable to relay K4102 are 2,4,45,50,55 and 60. Only one step / meter deflection is necessary to verify continuity.
Performer: / / Initial / Date / Time Ind. Verfication: / / Initial / Date / Time 7.4 Ensure all test equipment is removed from NF039C.
Performer: _ / Initial / Date Ind. Verfication: / Initial / Date 7.5 Notify the I&C Supervisor or IAC Engineer if any Restoration step failed to meetits required result.
7.6 Notify the SS that the test is complete and the Technical Specification actions of this test may be exited.
l l
1 l
l I
i
- INFORMATION ONLY *** 01/23/98 6 09:20:23 HRS l
[