  • ETP-NF-00002 r Revision 0 September 4,1997 CALLAWAY PLANT l ENGINEERING TEST PROCEDURE l

ETP-NF-00002 i

MDAFW PUMP (DPALO1B) START INHIBIT CIRCUlT TEST, LSELS RELAY l K4102 1

RESPONSIBLE DEPARTMENT h 4f o4 efmg -

WRITTEN BY f.2 [fc/jI

- r v c PREPARED BY j [p, gg 6

APPROVED BY )cu/)

Y l

l DATEISSUED 9-bk7 This procedure contains the following:

Pages 1 through 4 l

Attachments through Tables through Figures through  ;

l Appendices through CheckoffLists through  ;

This procedure has checkoff list (s) maintained in the mainframe computer.

      • INFORMATION ONLY *** 01/23/98 0 09:20:23 HRS 9003260026 980318 PDR ADOCK 05000483 P PDR .

g

ETP-NF-00002 R ev. O g

i i

TABLE OF CONTENTS Section Pane Number 1.0 PURPOSE AND SCOPE.. . . . ... . . . . . . . . . . . . . . . . . . . . . . . . . .. 1 2.0 ACCEPTANCE CRITERIA . . .... . .......... . ..... .... . . . . . . . . .. I l t 3.0 NOTES AND PRECAUTIONS ... ..... . .. . .. ... ... . . ...... .... ... .1 l

........1 l

4.0 - PREREQUISITES..... . . . . . . . . . . . . . . . . . . . . . . . .........

1 1

5.0 TEST EQUIPMENT . ...... .. .... ...... ... ... . . . . . . . . . . . . .... ...2 l

6.0 PROCEDURE .. . . . ...... .... . . . . . . . . . . . . . . . . . . ... ............2 7.0 RESTORATION.. . . . . . . . . - . . . . . . . . . . . . . . . . . . . . . . . ..3 i

l l

l l

l i

i l

l i

l i

i <

      • INFORMATION ONLY *** 01/23/98 0 09:20:23 HRS

f ETP-NF-00002 Rev. O g

MDAFW PUMP (DPALO1B) START INHIBIT CIRCUIT TEST. LSELS RELAY K4102

1. PURPOSE AND SCOPE l

To verify the proper operation of the Motor Driven Aux Feedwater l

Pump start inhibit circuitry on a simulated loss of vital A/C bus voltage (NB02). This test will verify that the LSELS circuitry will initiate a 50 second time delay (Relay No. AL62RP331TDDAL2) that inhibits the I

MDAFP (DPALOlB) from starting on an Aux Feedwater Actuation l

i Signal (AFAS).

1

2. ACCEPTANCE CRITERIA l
  • All required relay contact conditions are met as described in this i procedure.

l

  • Time delay relay AL62RP331TDDAL2 actuates in 5012.5 seconds. I l
3. NOTES AND PRECAUTIONS
  • ESW Pump DPEF01B will receive a trip signal, and SHALL be declared inoperable.

e The "B" MDAFP (DPALolB) SHALL be declared inoperable during the performance of this procedure due to this test defeating the auto start function on an AFAS.

. The Alternate Feeder Breaker for NB02 (NB0212) will receive a trip signal.

4. PREREOUISITES
  • A Control Room brief, including compensatory action has been conducted prior to the start of this procedure.

i e Compensatory Actions

1. Remove power supply from K4102, and reland lead to ,

terminal 6.

  • The ShiA Supervisor has given permission to conduct this test procedure.

l

  • NB02 Bus normal Feeder Breaker (NB0209) clomi.
  • An IAC brief WILL be conducted by the Test Engineer. i
  • QC termination verification required.

l l

1

      • INFORMATION ONLY *** 01/23/98 8 09:20:23 HRS l l

l

I i

! ETP-NF-00002 l

Rev. O lg

5. TEST EQUIPMENT
  • Portable 48-vdc isolating power supply, capable of carrying a 1-amp loed.
  • Simpson 260 Voltmeter
  • Digital Muhlmeter, Keithley 197A or equivalent. {
  • Stopwatch, calibrated.
  • Test leads for meters and power supply. -
6. PROCEDURE 6.1 At NF039C, Lift vendor wire from relay K4102 terminal 6 and tape. This disables autohntic load shed capability of the "B" ESW Pump and the AFAS inhibit for the "B" MDAFP.

Performer: / / Initial / Dcte / Time Ind. Verfication: / / Initial / Date /11me QC Verification : / / Initial / Date / Time 6.2 Connect the DEENERGIZED portable 48-volt de power supply to relay K4102. The positive lead goes to pin 6 and the negative lead goes to pin 7.

I Performer: / Initial / Date Ind. Verfication: / Initial / Date 6.3 At SA036B, Connect a Digital Multimeter (NOTE: Set on the 200vde ,

1 range) between terminals 8 and 9 on TB 2. This will monitor the 50 second AFAS inhibit circuit from time delay relay  ;

AL62RP331TDDAL2, Performer: / laitial/ Date

! Ind. Verfication: / Initial / Date l

l l

2

      • INFORMATION ONLY *** 01/23/98 0 09:20:23 HRS i

ETP.NF-00002 Rev. 0

_(

NOTE The next Step will generate a TRIP signal to the"B" ESW Pump if running.

6.4 Energize LSELS relay K4102 with 48 vde hm the temporary power supply and verify proper operation of relay K4102 and relay AL62RP331TDDAL2 by observing the DMM installed at SA036B for the followi'ng change in indication:

i e Prior to energizing K4102 the DMM should indicate the presence of 125 vdc.

e AAer K4102 is energized the 125 vde indication should go to o vdc and stay.

I Performer: / Initial / Date Ind. Verfication: / Initial / Date i

Deenergize relay K4102 and verify proper time delay function of relay l 6.5 '

l AL62RP331TDDAL2 by the following change in indication.

e 50 seconds i 2.5 seconds aAer K4102 is deewgized the DMM installed at SA036B should indicate the presence of 125 vdc.

! Performer: / Initial / Date Ind. Verfication: / Initial / Date 6.6 Notify the IAC Supervisor or I&C Engineer if any step failed to meet it's l required test result.

7. RESTORATION 7.1 Remove test equipment installed at NF039C and S A036B.

i '

I Performer / Initial / Date Ind. Verfication. / Initial / Date f

7.2 Reland vendor wire at Relay K4102 terminal 6.

I Performer: / Initial / Date Ind. Verfication: / Initial / Date QC Verification: / Initial / Date 3

      • INFORMATION ONLY *** 01/23/98 0 09:20:23 HRS d.

I

  • a O ETP-NF-00002 Rev. 0 31 7.3 Verify proper circuit continuity for relay K4102 by connecting a Simpson 260 (set on the 2.50 ydc range or lower) positive lead at relay l K4102 terminal 6 and the negative lead at terminal 7. A small meter l defection WILL occur when a ATI test pulse is present. The ATI test l i

steps that are applicable to relay K4102 are 2,4,45,50,55 and 60. Only one step / meter deflection is necessary to verify continuity.

Performer: / / Initial / Date / Time Ind. Verfication: / / Initial / Date / Time 7.4 Ensure all test equipment is removed from NF039C.

Performer: _ / Initial / Date Ind. Verfication: / Initial / Date 7.5 Notify the I&C Supervisor or IAC Engineer if any Restoration step failed to meetits required result.

7.6 Notify the SS that the test is complete and the Technical Specification actions of this test may be exited.

l l

1 l

l I

i