ML20211Q541 | 8 September 1999 | Proposed Tech Specs Reflecting USQ Associated with Increases in Offsite Dose Consequences Reported in FSAR for SGTR & MSLB Accidents | Stroke time Anticipated operational occurrence |
ML20195C519 | 28 May 1999 | Proposed Tech Specs Sections 3.9.1,revised to Maintain CTS Requirements on Refueling Pool Boron Concentration Limits & 5.6.5,revised to Delete Item 5.6.5.a | Boric Acid Shutdown Margin |
ML20207F480 | 27 May 1999 | Proposed Improved TSs & ITS Bases | Safe Shutdown Unanalyzed Condition Boric Acid Time of Discovery Shutdown Margin Reactor Vessel Water Level High Radiation Area Ultimate heat sink Offsite Dose Calculation Manual Stroke time Anticipated operational occurrence Post Accident Monitoring Hydrostatic Operating Basis Earthquake Pressure and Temperature Limits Report Annual Radiological Environmental Operating Report Process Control Program Deep Dose Equivalent Fuel cladding Pressure Boundary Leakage Offsite Circuit Fire Protection Program Power change Unidentified leakage |
ML20206G362 | 30 April 1999 | Proposed Conversion Tech Specs Section 1.0/ITS Section 1.0 | |
ML20205S914 | 21 April 1999 | Proposed Tech Specs Sections 1.0,3.3,3.4,3.6,3.7 & 3.9, Converting to ITS | Missed surveillance |
ML20205L090 | 7 April 1999 | Proposed Tech Specs Section 3.3,3.4,3.5,3.6,3.7,3.8 & 4.0, Converting to ITS | Shutdown Margin Qualified Offsite Circuit Offsite Circuit |
ML20207L106 | 9 March 1999 | Proposed Tech Specs Re Conversion to ITSs Sections 3.3,3.4, 3.6,3.7.3 8,3.9 & 5.0 | Reactor Vessel Water Level High Radiation Area Stroke time Anticipated operational occurrence Post Accident Monitoring Offsite Circuit Grace period Power change |
ML20196G173 | 25 November 1998 | Proposed Tech Specs Section 3.3, Intstrumentation, Converting to Improved Tech Specs | |
ML20196D001 | 23 November 1998 | Proposed Tech Specs Pages Re follow-up Items Related to 970515 Request for Amend to License NPF-30 | |
ML20155B579 | 27 October 1998 | Proposed Tech Specs for Use of Electrosleeves on Two Cycle Basis | Earthquake Pressure Boundary Leakage |
ML20154S237 | 21 October 1998 | Proposed Tech Specs Sections 3.1,3.2,3.4,3.5 & 5.0 Re Reactivity Control Sys,Power Distribution Sys,Rcs,Eccs & Administrative Controls,Respectively | |
ML20154F831 | 29 September 1998 | Proposed Tech Specs Revising ESFAS Functional Unit 6.f Re Loss of Offsite power-start turbine-driven Pump | Reactor Vessel Water Level |
ML20154A290 | 24 September 1998 | Proposed Tech Specs Converting to Improved TS Re Section 3.4, RCS, Consistent w/NUREG-1431 | Boric Acid Stroke time Fuel cladding Pressure Boundary Leakage Unidentified leakage |
ML20151U103 | 27 August 1998 | Proposed Tech Specs Sections 1.0,2.0 & 3.0,converting to Improved Tech Specs | |
ML20236Y172 | 4 August 1998 | Proposed Tech Specs Re Conversion to Improved STS Sections 3.1,3.2,3.5,3.9 & 4.0 | Boric Acid Shutdown Margin Stroke time Anticipated operational occurrence Hydrostatic |
ML20198D320 | 31 July 1998 | Rev 20 to Inservice Testing Program at Callaway Nuclear Plant | Boric Acid Stroke time Cold shutdown justification |
ML20236W372 | 30 July 1998 | Proposed Tech Specs Revising Table 4.3-2 by Adding Table Notation to Clarify That Verification of Time Delays Associated W/Esfas Functional Units 8.a & 8.b Is Only Performed as Part of Channel Calibr | Offsite Circuit |
ML20236J082 | 29 June 1998 | Proposed Tech Specs 3.7.1.7,4.7.1.7.1,4.7.1.7.2 & Bases 3/4.7.1.7 Revising to Address All Four Atmospheric Steam Dump Lines | |
ML20236E965 | 26 June 1998 | Proposed Tech Specs Pages Re Conversion to Improved STS, Section 3.6 | |
ML20216F379 | 9 March 1998 | Proposed Tech Specs SR 3/4.5.2b.1 Adding Clarification in Regard to Venting ECCS Pump Casings & Accessible Discharge Piping High Points | |
ML20195B565 | 2 March 1998 | Rev 22 to QC Procedure QCP-ZZ-03003, Matl Receipt Insp | Coatings |
ML20217P816 | 23 February 1998 | Proposed Tech Specs Replacement Page B 3.8-34 Re AC Sources Shutdown | Offsite Circuit |
ML20198T352 | 16 January 1998 | Proposed Tech Specs 3/4.3,revising Ms & Feedwater Isolation Sys Slave Relay Surveillance from Quarterly Actuation Logic Test to Monthly Actuation Logic Test on Staggered Test Basis | |
ML20197D646 | 16 December 1997 | Proposed Tech Specs Table Revising Lift Setting Tolerance for Main Steam Line Safety Valves | |
ML20199B426 | 10 November 1997 | Proposed Tech Specs Re Page 5 of 8 for FW Isolation Changes | |
ML20198P336 | 31 October 1997 | Proposed Tech Specs Reducing Repeated Alarms,Rod Blocks & Partial Reactor Trips That Continue to Manifest,During Beginning of Cycle Operation Following Refueling Outages | Anticipated operational occurrence |
ML20198P414 | 31 October 1997 | Proposed Tech Specs,Revising ESFAS Functional Unit 6.f, Loss of Offsite Power-Start Turbine-Driven Pump, in Tables 3.3-3,3.3-4 & 4.3-2 | |
ML20217B326 | 22 October 1997 | Procedure MPE-ZZ-QY128, Operational Test Sequence of 4.16KV Diesel Generator NE02 Air Circuit Breaker 152NB0211 | |
ULNRC-03664, Proposed Tech Specs 3/4.4.9 Re Pressure/Temp Limits | 17 October 1997 | Proposed Tech Specs 3/4.4.9 Re Pressure/Temp Limits | |
ML20217B300 | 14 September 1997 | Procedure ETP-NF-00001, MDAFW Pump (DPAL01A) Start Inhibit Circuit Test,Lsels Relay K1102 | Offsite Dose Calculation Manual |
ML20217B308 | 4 September 1997 | Procedure ETP-BF-00002, Mdaew Pump (DPAL01B) Start Inhibit Circuit Test,Lsels Relay K4102 | |
ML20217H803 | 8 August 1997 | Proposed Tech Specs 3/4.3 Re Instrumentation | |
ML20210H215 | 8 August 1997 | Proposed TS Revising SRs 3/4.7.4, Essential Svc Water Sys by Removing Requirement to Perform SRs 4.7.4.b.1, 4.7.4.b.2 & 4.7.4.c During Shutdown | |
ML20198F391 | 8 August 1997 | Proposed Tech Specs Changes,Revising Feedwater Isolation ESFAS Functions in TS Tables 3.3-3,3.3-4 & 4.3-2 | |
ML20198F341 | 8 August 1997 | Proposed Tech Specs,Revising Table 3-7.2 to Specify That Lift Setting Tolerance for Main Steam Line Safety Valves Is +3/-1% as-found & +1% as-left.Table 2.2-1 Revised by Reducing Sensor Error for Pressurizer pressure-high Trip | Loop seal |
ML20195B526 | 20 May 1997 | Rev 6 to EDP-ZZ-03000, Containment Building Coatings | Coatings |
ML20154Q119 | 15 May 1997 | Proposed Improved TS Section 3.7, Plant Sys | Ultimate heat sink |
ML20198J730 | 15 May 1997 | Proposed Conversion to ITS Sections 1.0,3.1,3.2,3.3,3.4,3.7, 3.9 & 5.0 for Plant | Boric Acid Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Offsite Dose Calculation Manual Missed surveillance Pressure and Temperature Limits Report Process Control Program |
ML20138B742 | 24 April 1997 | Proposed Tech Specs 6.0 Revising Title Senior Vice President,Nuclear to Vice President & Chief Nuclear Officer | Offsite Dose Calculation Manual Process Control Program Fire Protection Program |
ML20141C340 | 14 April 1997 | Rev 18 to CNP IST Program | Boric Acid Stroke time Cold shutdown justification |
ML20141D933 | 14 April 1997 | Rev 18 to Inservice Testing Program for Callaway Nuclear Plant | Boric Acid Stroke time Cold shutdown justification |
ML20137N611 | 1 April 1997 | Proposed Tech Specs Table 3.3-3 Re Engineered Safety Features Actuation Sys Instrumentation | |
ML20195B558 | 11 March 1997 | Rev 12 to Matls Engineering Procedure WEP-ZZ-00015, Preparation of Procurement Documents | Safe Shutdown Nondestructive Examination Fire Protection Program |
ML20195B549 | 31 January 1997 | Rev 22 to Administrative Procedure APA-ZZ-00400, Procurement of Parts,Supplies,Matls & Svcs | Safe Shutdown Fitness for Duty Nondestructive Examination Incorporated by reference Liquid penetrant Scaffolding |
ML20135E735 | 11 December 1996 | Tests to Determine Ampacity Derating Factors for Electrical Conductors Installed in 1 & 4 Diameter Rigid Steel Conduits Encapsulated by KM1 Darmatt One H Replacement Matl | |
ML20135E743 | 11 December 1996 | Test to Determine Ampacity Derating Factor for Electrical Conductors Installed in 600mm X 101mm X 3650mm Long Cable Tray Encapsulated by KM1 Darmatt Three H Replacement Matl | Fire Barrier |
ML20135E739 | 11 December 1996 | Tests to Determine Ampacity Derating Factors for Electrical Conductors Installed in 1 & 4 Diameter Rigid Steel Conduits Encapsulated by KM1 Darmatt Three H Replacement Matl | Fire Barrier |
ML20140G233 | 31 October 1996 | Rev 6 to Callaway Plant Offsite Dose Calculation Manual | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Backfit Power change |
ML20217B295 | 3 October 1996 | Procedure ISP-SA-2413A, Diesel Generator & Sequencer Testing (Train a) | Temporary Modification Test box |
ML20117K643 | 5 September 1996 | Proposed Tech Specs,Revising TS 3/4.4 Re RCS |