Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20211Q5418 September 1999Proposed Tech Specs Reflecting USQ Associated with Increases in Offsite Dose Consequences Reported in FSAR for SGTR & MSLB AccidentsStroke time
Anticipated operational occurrence
ML20195C51928 May 1999Proposed Tech Specs Sections 3.9.1,revised to Maintain CTS Requirements on Refueling Pool Boron Concentration Limits & 5.6.5,revised to Delete Item 5.6.5.aBoric Acid
Shutdown Margin
ML20207F48027 May 1999Proposed Improved TSs & ITS BasesSafe Shutdown
Unanalyzed Condition
Boric Acid
Time of Discovery
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Offsite Dose Calculation Manual
Stroke time
Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
Operating Basis Earthquake
Pressure and Temperature Limits Report
Annual Radiological Environmental Operating Report
Process Control Program
Deep Dose Equivalent
Fuel cladding
Pressure Boundary Leakage
Offsite Circuit
Fire Protection Program
Power change
Unidentified leakage
ML20206G36230 April 1999Proposed Conversion Tech Specs Section 1.0/ITS Section 1.0
ML20205S91421 April 1999Proposed Tech Specs Sections 1.0,3.3,3.4,3.6,3.7 & 3.9, Converting to ITSMissed surveillance
ML20205L0907 April 1999Proposed Tech Specs Section 3.3,3.4,3.5,3.6,3.7,3.8 & 4.0, Converting to ITSShutdown Margin
Qualified Offsite Circuit
Offsite Circuit
ML20207L1069 March 1999Proposed Tech Specs Re Conversion to ITSs Sections 3.3,3.4, 3.6,3.7.3 8,3.9 & 5.0Reactor Vessel Water Level
High Radiation Area
Stroke time
Anticipated operational occurrence
Post Accident Monitoring
Offsite Circuit
Grace period
Power change
ML20196G17325 November 1998Proposed Tech Specs Section 3.3, Intstrumentation, Converting to Improved Tech Specs
ML20196D00123 November 1998Proposed Tech Specs Pages Re follow-up Items Related to 970515 Request for Amend to License NPF-30
ML20155B57927 October 1998Proposed Tech Specs for Use of Electrosleeves on Two Cycle BasisEarthquake
Pressure Boundary Leakage
ML20154S23721 October 1998Proposed Tech Specs Sections 3.1,3.2,3.4,3.5 & 5.0 Re Reactivity Control Sys,Power Distribution Sys,Rcs,Eccs & Administrative Controls,Respectively
ML20154F83129 September 1998Proposed Tech Specs Revising ESFAS Functional Unit 6.f Re Loss of Offsite power-start turbine-driven PumpReactor Vessel Water Level
ML20154A29024 September 1998Proposed Tech Specs Converting to Improved TS Re Section 3.4, RCS, Consistent w/NUREG-1431Boric Acid
Stroke time
Fuel cladding
Pressure Boundary Leakage
Unidentified leakage
ML20151U10327 August 1998Proposed Tech Specs Sections 1.0,2.0 & 3.0,converting to Improved Tech Specs
ML20236Y1724 August 1998Proposed Tech Specs Re Conversion to Improved STS Sections 3.1,3.2,3.5,3.9 & 4.0Boric Acid
Shutdown Margin
Stroke time
Anticipated operational occurrence
Hydrostatic
ML20198D32031 July 1998Rev 20 to Inservice Testing Program at Callaway Nuclear PlantBoric Acid
Stroke time
Cold shutdown justification
ML20236W37230 July 1998Proposed Tech Specs Revising Table 4.3-2 by Adding Table Notation to Clarify That Verification of Time Delays Associated W/Esfas Functional Units 8.a & 8.b Is Only Performed as Part of Channel CalibrOffsite Circuit
ML20236J08229 June 1998Proposed Tech Specs 3.7.1.7,4.7.1.7.1,4.7.1.7.2 & Bases 3/4.7.1.7 Revising to Address All Four Atmospheric Steam Dump Lines
ML20236E96526 June 1998Proposed Tech Specs Pages Re Conversion to Improved STS, Section 3.6
ML20216F3799 March 1998Proposed Tech Specs SR 3/4.5.2b.1 Adding Clarification in Regard to Venting ECCS Pump Casings & Accessible Discharge Piping High Points
ML20195B5652 March 1998Rev 22 to QC Procedure QCP-ZZ-03003, Matl Receipt InspCoatings
ML20217P81623 February 1998Proposed Tech Specs Replacement Page B 3.8-34 Re AC Sources ShutdownOffsite Circuit
ML20198T35216 January 1998Proposed Tech Specs 3/4.3,revising Ms & Feedwater Isolation Sys Slave Relay Surveillance from Quarterly Actuation Logic Test to Monthly Actuation Logic Test on Staggered Test Basis
ML20197D64616 December 1997Proposed Tech Specs Table Revising Lift Setting Tolerance for Main Steam Line Safety Valves
ML20199B42610 November 1997Proposed Tech Specs Re Page 5 of 8 for FW Isolation Changes
ML20198P33631 October 1997Proposed Tech Specs Reducing Repeated Alarms,Rod Blocks & Partial Reactor Trips That Continue to Manifest,During Beginning of Cycle Operation Following Refueling OutagesAnticipated operational occurrence
ML20198P41431 October 1997Proposed Tech Specs,Revising ESFAS Functional Unit 6.f, Loss of Offsite Power-Start Turbine-Driven Pump, in Tables 3.3-3,3.3-4 & 4.3-2
ML20217B32622 October 1997Procedure MPE-ZZ-QY128, Operational Test Sequence of 4.16KV Diesel Generator NE02 Air Circuit Breaker 152NB0211
ULNRC-03664, Proposed Tech Specs 3/4.4.9 Re Pressure/Temp Limits17 October 1997Proposed Tech Specs 3/4.4.9 Re Pressure/Temp Limits
ML20217B30014 September 1997Procedure ETP-NF-00001, MDAFW Pump (DPAL01A) Start Inhibit Circuit Test,Lsels Relay K1102Offsite Dose Calculation Manual
ML20217B3084 September 1997Procedure ETP-BF-00002, Mdaew Pump (DPAL01B) Start Inhibit Circuit Test,Lsels Relay K4102
ML20217H8038 August 1997Proposed Tech Specs 3/4.3 Re Instrumentation
ML20210H2158 August 1997Proposed TS Revising SRs 3/4.7.4, Essential Svc Water Sys by Removing Requirement to Perform SRs 4.7.4.b.1, 4.7.4.b.2 & 4.7.4.c During Shutdown
ML20198F3918 August 1997Proposed Tech Specs Changes,Revising Feedwater Isolation ESFAS Functions in TS Tables 3.3-3,3.3-4 & 4.3-2
ML20198F3418 August 1997Proposed Tech Specs,Revising Table 3-7.2 to Specify That Lift Setting Tolerance for Main Steam Line Safety Valves Is +3/-1% as-found & +1% as-left.Table 2.2-1 Revised by Reducing Sensor Error for Pressurizer pressure-high TripLoop seal
ML20195B52620 May 1997Rev 6 to EDP-ZZ-03000, Containment Building CoatingsCoatings
ML20154Q11915 May 1997Proposed Improved TS Section 3.7, Plant SysUltimate heat sink
ML20198J73015 May 1997Proposed Conversion to ITS Sections 1.0,3.1,3.2,3.3,3.4,3.7, 3.9 & 5.0 for PlantBoric Acid
Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Missed surveillance
Pressure and Temperature Limits Report
Process Control Program
ML20138B74224 April 1997Proposed Tech Specs 6.0 Revising Title Senior Vice President,Nuclear to Vice President & Chief Nuclear OfficerOffsite Dose Calculation Manual
Process Control Program
Fire Protection Program
ML20141C34014 April 1997Rev 18 to CNP IST ProgramBoric Acid
Stroke time
Cold shutdown justification
ML20141D93314 April 1997Rev 18 to Inservice Testing Program for Callaway Nuclear PlantBoric Acid
Stroke time
Cold shutdown justification
ML20137N6111 April 1997Proposed Tech Specs Table 3.3-3 Re Engineered Safety Features Actuation Sys Instrumentation
ML20195B55811 March 1997Rev 12 to Matls Engineering Procedure WEP-ZZ-00015, Preparation of Procurement DocumentsSafe Shutdown
Nondestructive Examination
Fire Protection Program
ML20195B54931 January 1997Rev 22 to Administrative Procedure APA-ZZ-00400, Procurement of Parts,Supplies,Matls & SvcsSafe Shutdown
Fitness for Duty
Nondestructive Examination
Incorporated by reference
Liquid penetrant
Scaffolding
ML20135E73511 December 1996Tests to Determine Ampacity Derating Factors for Electrical Conductors Installed in 1 & 4 Diameter Rigid Steel Conduits Encapsulated by KM1 Darmatt One H Replacement Matl
ML20135E74311 December 1996Test to Determine Ampacity Derating Factor for Electrical Conductors Installed in 600mm X 101mm X 3650mm Long Cable Tray Encapsulated by KM1 Darmatt Three H Replacement MatlFire Barrier
ML20135E73911 December 1996Tests to Determine Ampacity Derating Factors for Electrical Conductors Installed in 1 & 4 Diameter Rigid Steel Conduits Encapsulated by KM1 Darmatt Three H Replacement MatlFire Barrier
ML20140G23331 October 1996Rev 6 to Callaway Plant Offsite Dose Calculation ManualGrab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Backfit
Power change
ML20217B2953 October 1996Procedure ISP-SA-2413A, Diesel Generator & Sequencer Testing (Train a)Temporary Modification
Test box
ML20117K6435 September 1996Proposed Tech Specs,Revising TS 3/4.4 Re RCS