Monthly Operating Rept for Dec 1982
ML20072C346
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 01/10/1983
From: Kuczynski L
PENNSYLVANIA POWER & LIGHT CO.
To:
Shared Package
ML20072C340 List:
References
NUDOCS 8303080403
Download: ML20072C346 (4)


Text

. . . -________ _ _ - _ _ _ _

[ AVERAGE DAIL. UNIT POWER LEVEL Q )

Y CO  ;... 3

  • DOCKET NO. 50-387 - - - - -

. G.T L :- J UNIT One O DATE l-10-83 Jggc SY COMPLETED BY _L.A. Kuczynski TELEPHONE (717)542-2181 MONTH nor ombnr , 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Ne'l g 377 37 438 2 199 13 457 3 _

388 39 453 4 362 20 ,,

452 5

400 g 447 6 406 22 100 7 413 23 0 8

230 24 180 9 236 25 433 10 434 26 483 465 0 -

12 448 28 89 13 449 29 515

,4 448 30 15 449 31 725 16 447 INSTRUCIlONS On this format, list the average daily unit power level in MWe-Net for each day in the reportmg month. Compute to the nearest whole megawat' (9/77) 8303090403 830114 DR ADOCK 05000387 PDR

  1. ^$ g l l

) {D D@ I \v ]

W / 1_ _ _ ,

\ Y3 L L- MdJ OPERATING DATA REPORT N PPaL 50-387 0 DOCKET NO.

ODl?f M DATE l-10-83

$Y COMPLETED BY TELEPHONE L.A. Kuczynski

(/L/)d42-2181 OPERATING STATUS Unit One

1. Unit Name.Susquehanna Steam Electric Statio 1 Notes December, 1982
2. Reportinb Period:
3. Licensed Thermal Power (MWt): 3293
4. Nameplate Rafing (Gross MWe): 1280 x 0.9 = 1052
5. Design Electiical Rating (Net MWe): 1052 - 41 = 1011
6. Maximum Dependable Capacity (Gross MWe):
  • *MDC to be determined.
7. Maximum Dependable Capacity fN;t MWe):
8. If Changes Occur in Capacity Ratings (Items N ;mber 3 Througn 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted,If Any (Net MWe):
10. Reasons For Restrictions. If Any:

This Month Yr.-to-Date Cumulative

11. Ilours In Reporting Period 744 1092.5 1092.5
12. Numhi Of Hours Reactor Was Critical 673.5 930 930
13. Reactor Reserve Shutdown Hours 33.1 64.6 64.6
14. Hours Generator On-Line 640.4 852.6 852.6
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MW!D 971,998 1,157,557 1,15_7,557 299,430 344,420 344,420 I 17. Gross Electrical Energy Generned (MMI) l 18. Net Electrical Energy Generated (MWH) 282,657 321,305 321,305
19. Unit Service Factor "/A
20. Unit Availability Factor

"^

21. Unit Capacity Factor (Using MDC Net) N/A
22. Unit Capacity Factor (Using DER Net) N/A
23. Unit Forced Outage Rate N/A
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each1:

_ None, l 25. If Shut Down At End Of Report Period. Estimated Date of Startup:

26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY 9-7-82 9-10-82 INITIA L ELECTRICITY 11-19-82 11-16-82 l COMMERCIAL OPERATION 5-15-83 (4/77i

4gANN4 a f. f' rn1 L

5 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-387 - .

UNIT N AME Susquehanna Unit 1

$+

@ DADE 1-10-8 3 December ,1982 COMPLETED BY L . A . Kuczynski

?RIC Si REPORT MONTN TELEPHONE f 717) 54 2-2181 n.

- E E No. Date g

5?

3g

}; jY3,g&

Licensee Event

,E r, gy f'.

c.

Cause & Corrective Action to H

$E 5 j ;g g Report # mO

[ '8 Prevent Recurrence a

6 821208 F 16 H 3 N/A CH INSTRU Scram occurred during the perforn *-

ance of a surveillance test. An I&C Technician opened a link on z .

feedwater control loop while it was still selected to control RPV level. He was counseled by his supervisor and successfully per-formed the remainder of the test under the direct supervision of that supervisor.

7 821222 S 49.3 B 3 N/A ZZ ZZZZZZ As part of scheduled startup testing, generator output breakers were opened, causing a reactor scram on trubine control valve fz.st closure trip.

8 821227 F 38.4 A 1 N/A HA INSTRU Leaking O-Ring on main turbine control valve EHC control' pack.

0-Ring replaced and unit returnec.

to service.

I 2 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation ai Data B Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination F-Administrative 5 G-Operational Error (Explain) Exhibit I - Same Source (9/77) Il-Other (Explain)

nn town

~

SUSQUEHANNA STEAM ELECTRIC STATION Docket Number 50-387 Date 12-9-82 Completed by:. L.A. Kuczynski Telephone (717)542-2181 I

December, 1982 4

Challanges to Main Steam Safety Relief Valves During the first 16 minutes of the running of the scheduled loss of Turbine Generator _and Offsite Power Startup Test, Main Steam Safety Relief Valve (SRV)

"B" lifted and re-seated four times. SRV's "A" and."C" were manually activated for pressure control later in-the test. The setpoint of the "B" SRV was determined to be low.

Changes to Offsite Dose Calculation Manual None.

i t

Major Changes to Radioactive Waste Treatment Systems I ..

l None.

4 i

0 4

PENNSYLVANI A POWE R & LIGHT COMPANY

- . , _ . ,_ .- _.. , - . . . _ . . -- - - - - - . - . , .