Rev 2 to A120.0021/S236, Signature/Initials LogML20066H260 |
Person / Time |
---|
Site: |
Callaway ![Ameren icon.png](/w/images/0/06/Ameren_icon.png) |
---|
Issue date: |
01/31/1991 |
---|
From: |
UNION ELECTRIC CO. |
---|
To: |
|
---|
References |
---|
A120.0021-S236, NUDOCS 9102200238 |
Download: ML20066H260 (6) |
|
|
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211Q5411999-09-0808 September 1999 Proposed Tech Specs Reflecting USQ Associated with Increases in Offsite Dose Consequences Reported in FSAR for SGTR & MSLB Accidents ML20195C5191999-05-28028 May 1999 Proposed Tech Specs Sections 3.9.1,revised to Maintain CTS Requirements on Refueling Pool Boron Concentration Limits & 5.6.5,revised to Delete Item 5.6.5.a ML20207F4801999-05-27027 May 1999 Proposed Improved TSs & ITS Bases ML20206G3621999-04-30030 April 1999 Proposed Conversion Tech Specs Section 1.0/ITS Section 1.0 ML20205S9141999-04-21021 April 1999 Proposed Tech Specs Sections 1.0,3.3,3.4,3.6,3.7 & 3.9, Converting to ITS ML20205L0901999-04-0707 April 1999 Proposed Tech Specs Section 3.3,3.4,3.5,3.6,3.7,3.8 & 4.0, Converting to ITS ML20207L1061999-03-0909 March 1999 Proposed Tech Specs Re Conversion to ITSs Sections 3.3,3.4, 3.6,3.7.3 8,3.9 & 5.0 ML20196G1731998-11-25025 November 1998 Proposed Tech Specs Section 3.3, Intstrumentation, Converting to Improved Tech Specs ML20196D0011998-11-23023 November 1998 Proposed Tech Specs Pages Re follow-up Items Related to 970515 Request for Amend to License NPF-30 ML20155B5791998-10-27027 October 1998 Proposed Tech Specs for Use of Electrosleeves on Two Cycle Basis ML20154S2371998-10-21021 October 1998 Proposed Tech Specs Sections 3.1,3.2,3.4,3.5 & 5.0 Re Reactivity Control Sys,Power Distribution Sys,Rcs,Eccs & Administrative Controls,Respectively ML20154F8311998-09-29029 September 1998 Proposed Tech Specs Revising ESFAS Functional Unit 6.f Re Loss of Offsite power-start turbine-driven Pump ML20154A2901998-09-24024 September 1998 Proposed Tech Specs Converting to Improved TS Re Section 3.4, RCS, Consistent w/NUREG-1431 ML20151U1031998-08-27027 August 1998 Proposed Tech Specs Sections 1.0,2.0 & 3.0,converting to Improved Tech Specs ML20236Y1721998-08-0404 August 1998 Proposed Tech Specs Re Conversion to Improved STS Sections 3.1,3.2,3.5,3.9 & 4.0 ML20198D3201998-07-31031 July 1998 Rev 20 to Inservice Testing Program at Callaway Nuclear Plant ML20236W3721998-07-30030 July 1998 Proposed Tech Specs Revising Table 4.3-2 by Adding Table Notation to Clarify That Verification of Time Delays Associated W/Esfas Functional Units 8.a & 8.b Is Only Performed as Part of Channel Calibr ML20236J0821998-06-29029 June 1998 Proposed Tech Specs 3.7.1.7,4.7.1.7.1,4.7.1.7.2 & Bases 3/4.7.1.7 Revising to Address All Four Atmospheric Steam Dump Lines ML20236E9651998-06-26026 June 1998 Proposed Tech Specs Pages Re Conversion to Improved STS, Section 3.6 ML20216F3791998-03-0909 March 1998 Proposed Tech Specs SR 3/4.5.2b.1 Adding Clarification in Regard to Venting ECCS Pump Casings & Accessible Discharge Piping High Points ML20195B5651998-03-0202 March 1998 Rev 22 to QC Procedure QCP-ZZ-03003, Matl Receipt Insp ML20217P8161998-02-23023 February 1998 Proposed Tech Specs Replacement Page B 3.8-34 Re AC Sources Shutdown ML20198T3521998-01-16016 January 1998 Proposed Tech Specs 3/4.3,revising Ms & Feedwater Isolation Sys Slave Relay Surveillance from Quarterly Actuation Logic Test to Monthly Actuation Logic Test on Staggered Test Basis ML20197D6461997-12-16016 December 1997 Proposed Tech Specs Table Revising Lift Setting Tolerance for Main Steam Line Safety Valves ML20199B4261997-11-10010 November 1997 Proposed Tech Specs Re Page 5 of 8 for FW Isolation Changes ML20198P3361997-10-31031 October 1997 Proposed Tech Specs Reducing Repeated Alarms,Rod Blocks & Partial Reactor Trips That Continue to Manifest,During Beginning of Cycle Operation Following Refueling Outages ML20198P4141997-10-31031 October 1997 Proposed Tech Specs,Revising ESFAS Functional Unit 6.f, Loss of Offsite Power-Start Turbine-Driven Pump, in Tables 3.3-3,3.3-4 & 4.3-2 ML20217B3261997-10-22022 October 1997 Procedure MPE-ZZ-QY128, Operational Test Sequence of 4.16KV Diesel Generator NE02 Air Circuit Breaker 152NB0211 ULNRC-03664, Proposed Tech Specs 3/4.4.9 Re Pressure/Temp Limits1997-10-17017 October 1997 Proposed Tech Specs 3/4.4.9 Re Pressure/Temp Limits ML20217B3001997-09-14014 September 1997 Procedure ETP-NF-00001, MDAFW Pump (DPAL01A) Start Inhibit Circuit Test,Lsels Relay K1102 ML20217B3081997-09-0404 September 1997 Procedure ETP-BF-00002, Mdaew Pump (DPAL01B) Start Inhibit Circuit Test,Lsels Relay K4102 ML20217H8031997-08-0808 August 1997 Proposed Tech Specs 3/4.3 Re Instrumentation ML20210H2151997-08-0808 August 1997 Proposed TS Revising SRs 3/4.7.4, Essential Svc Water Sys by Removing Requirement to Perform SRs 4.7.4.b.1, 4.7.4.b.2 & 4.7.4.c During Shutdown ML20198F3911997-08-0808 August 1997 Proposed Tech Specs Changes,Revising Feedwater Isolation ESFAS Functions in TS Tables 3.3-3,3.3-4 & 4.3-2 ML20198F3411997-08-0808 August 1997 Proposed Tech Specs,Revising Table 3-7.2 to Specify That Lift Setting Tolerance for Main Steam Line Safety Valves Is +3/-1% as-found & +1% as-left.Table 2.2-1 Revised by Reducing Sensor Error for Pressurizer pressure-high Trip ML20195B5261997-05-20020 May 1997 Rev 6 to EDP-ZZ-03000, Containment Building Coatings ML20154Q1191997-05-15015 May 1997 Proposed Improved TS Section 3.7, Plant Sys ML20198J7301997-05-15015 May 1997 Proposed Conversion to ITS Sections 1.0,3.1,3.2,3.3,3.4,3.7, 3.9 & 5.0 for Plant ML20138B7421997-04-24024 April 1997 Proposed Tech Specs 6.0 Revising Title Senior Vice President,Nuclear to Vice President & Chief Nuclear Officer ML20141C3401997-04-14014 April 1997 Rev 18 to CNP IST Program ML20141D9331997-04-14014 April 1997 Rev 18 to Inservice Testing Program for Callaway Nuclear Plant ML20137N6111997-04-0101 April 1997 Proposed Tech Specs Table 3.3-3 Re Engineered Safety Features Actuation Sys Instrumentation ML20195B5581997-03-11011 March 1997 Rev 12 to Matls Engineering Procedure WEP-ZZ-00015, Preparation of Procurement Documents ML20195B5491997-01-31031 January 1997 Rev 22 to Administrative Procedure APA-ZZ-00400, Procurement of Parts,Supplies,Matls & Svcs ML20135E7351996-12-11011 December 1996 Tests to Determine Ampacity Derating Factors for Electrical Conductors Installed in 1 & 4 Diameter Rigid Steel Conduits Encapsulated by KM1 Darmatt One H Replacement Matl ML20135E7431996-12-11011 December 1996 Test to Determine Ampacity Derating Factor for Electrical Conductors Installed in 600mm X 101mm X 3650mm Long Cable Tray Encapsulated by KM1 Darmatt Three H Replacement Matl ML20135E7391996-12-11011 December 1996 Tests to Determine Ampacity Derating Factors for Electrical Conductors Installed in 1 & 4 Diameter Rigid Steel Conduits Encapsulated by KM1 Darmatt Three H Replacement Matl ML20140G2331996-10-31031 October 1996 Rev 6 to Callaway Plant Offsite Dose Calculation Manual ML20217B2951996-10-0303 October 1996 Procedure ISP-SA-2413A, Diesel Generator & Sequencer Testing (Train a) ML20117K6431996-09-0505 September 1996 Proposed Tech Specs,Revising TS 3/4.4 Re RCS 1999-09-08
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20198D3201998-07-31031 July 1998 Rev 20 to Inservice Testing Program at Callaway Nuclear Plant ML20195B5651998-03-0202 March 1998 Rev 22 to QC Procedure QCP-ZZ-03003, Matl Receipt Insp ML20217B3261997-10-22022 October 1997 Procedure MPE-ZZ-QY128, Operational Test Sequence of 4.16KV Diesel Generator NE02 Air Circuit Breaker 152NB0211 ML20217B3001997-09-14014 September 1997 Procedure ETP-NF-00001, MDAFW Pump (DPAL01A) Start Inhibit Circuit Test,Lsels Relay K1102 ML20217B3081997-09-0404 September 1997 Procedure ETP-BF-00002, Mdaew Pump (DPAL01B) Start Inhibit Circuit Test,Lsels Relay K4102 ML20195B5261997-05-20020 May 1997 Rev 6 to EDP-ZZ-03000, Containment Building Coatings ML20141D9331997-04-14014 April 1997 Rev 18 to Inservice Testing Program for Callaway Nuclear Plant ML20141C3401997-04-14014 April 1997 Rev 18 to CNP IST Program ML20195B5581997-03-11011 March 1997 Rev 12 to Matls Engineering Procedure WEP-ZZ-00015, Preparation of Procurement Documents ML20195B5491997-01-31031 January 1997 Rev 22 to Administrative Procedure APA-ZZ-00400, Procurement of Parts,Supplies,Matls & Svcs ML20140G2331996-10-31031 October 1996 Rev 6 to Callaway Plant Offsite Dose Calculation Manual ML20217B2951996-10-0303 October 1996 Procedure ISP-SA-2413A, Diesel Generator & Sequencer Testing (Train a) ML20117P2281996-02-26026 February 1996 Rev 10 to Maint Mechanical Procedure MTM-ZZ-QV009, Westinghouse Check Valve Disassembly/Reassembly ML20108E3711996-02-16016 February 1996 Rev 5 to Administrative Procedure APA-ZZ-01003, Odcm ML20117P2371995-11-28028 November 1995 Rev 2 to Callaway Plant Bolting Manual ML20076F9881994-10-12012 October 1994 Rev 0 to Second 10-Yr Interval ISI Plan for Callaway Nuclear Power Plant ML20065N4831993-11-24024 November 1993 Temporary Change Notice 93-0955 to Rev 2 to Off-Normal Operating Procedure OTO-RK-00001, Loss of Control Room Alarms ML20101M4591992-06-26026 June 1992 Rev 1 to J-26060A, Critical Safety Function Parameters ML20069B9661992-03-31031 March 1992 Cultural Resources Mgt Plan for Residual Lands at Union Electric Co Callaway Plant,Callaway,Mo ML20094H2821992-01-28028 January 1992 Rev 2 to Administrative Procedure APA-ZZ-01011, Process Control Program Manual ML20195B5301992-01-14014 January 1992 Rev 2 to Spec A-1003(Q), Surface Preparation & Application of Field Coatings ML20079L5141991-11-0404 November 1991 Rev 13 EPIP EIP-ZZ-00241, Fmt Driver Checklist ML20024H2411991-05-24024 May 1991 Rev 12 to Pump & Valve Inservice Testing Program ML20024G9881991-05-0606 May 1991 Rev 5 to Callaway Records Info Sys General Rules for Records Indexing. ML20070W0021991-04-0101 April 1991 Rev 4 to ARIP2371, General Rules ML20066H2601991-01-31031 January 1991 Rev 2 to A120.0021/S236, Signature/Initials Log ML20067D6541991-01-30030 January 1991 Rev 7 to T210.0002/Q101, Qualification/Certification Documentation ML20066L4881991-01-29029 January 1991 Rev 3 to Callaway Records Info Sys General Rules for Records Indexing ML20067D8191991-01-29029 January 1991 Backfit Change Notice 074 to Rev 6 to T210.0002/R353 ML20066L4561991-01-28028 January 1991 Rev 2 to Callaway Records Info Sys General Rules for Records Indexing ML20081E2111990-07-23023 July 1990 Rev 6 to T210.0002/R353, Required Reading/Personnel Form 2 ML20081E2071990-07-23023 July 1990 Rev 6 to T210.0002/Q101, Qualification/Certification Documentation ML20059G5081990-05-31031 May 1990 Rev 0 to APA-ZZ-01003, Odcm ML20042F2861990-03-30030 March 1990 Rev 11 to Inservice Testing Program. ML20058N2841990-02-0606 February 1990 Rev 4 to T210.0002/D157, Delegation of Authority ML20247D8361989-07-24024 July 1989 Process Control Program Manual ML20247D8291989-07-19019 July 1989 Odcm ML20246L8221989-05-31031 May 1989 Rev 6 to Callaway Plant,Odcm ML20151R2591988-03-31031 March 1988 Rev 10 to Inservice Testing Program Class 1,2 & 3 Pumps ML20154E5101988-02-29029 February 1988 Offsite Dose Calculation Manual ML20236W7151987-11-0303 November 1987 Rev 1 to Nuclear Function Administrative Procedure APA-ZZ-00645, Simulator Configuration Mgt ML20236F7431987-07-31031 July 1987 Rev 9 to Inservice Testing Program,Callaway Nuclear Plant ML20206N4781987-04-0808 April 1987 Rev 8 to Inservice Testing Program,Callaway Nuclear Plant ML20207Q1561987-01-15015 January 1987 Rev 7 to Inservice Testing Program,Callaway Nuclear Plant ML20154J0751986-02-14014 February 1986 Rev 6 to Inservice Testing Program,Callaway Nuclear Plant ML20134D0441985-07-25025 July 1985 Rev 5 to Inservice Testing Program ML20140F5191985-06-28028 June 1985 Rev 4 to, Inservice Testing Program,Callaway Nuclear Plant ML20100E9791985-03-31031 March 1985 Procedure for Performing Task Analysis (& Verification) for Snupps Detailed Control Room Design Review ML20099J0791984-12-31031 December 1984 Corrected Rev 3 to Table, Inservice Testing Program, Inservice Insp Class 1,2 & 3 Pumps ML20093F3491984-10-31031 October 1984 Procedure for Performing Task Analysis & Verification for Detailed Control Room Design Review 1998-07-31
[Table view] |
Text
. . _ . _ . - _ . _ . . _ . __-.. .. . ._ -. _ __. _
QATE: 02/05/91 UNION ELECTRIC COMPANY PAGE: 1- i TIME: 15:24:18 , DOCUMENT CONTROL SYSTEM ARDC8811 DOCUMEN7 TRANSMITTAL TRANSMITTAL NUMBER: 175618 RETURN ACKNOWLEDGED TRANSMITTAL AND TO CONTROL NUMBER: 338U SUPERSEDED DOCUMENTS (IF APPLICABLE) TO: i TITLEt-OTHER ADMINISTRATION RECORDS DEPT: NUCLEAR REGULATORY COMM. UNION ELECTRIC COMPANY-LOCATION: MASH D.C. CALLAWAY PLANT ;
TRANSMITTAL DATE: 910205 P.O. BOX 620 FULTON, MO 65251 TRAN DOC RET ALT ALT CODE TYPE DOCUMENT NUMBER REV REV MED COPY MED COPY AFFECTED DOCUMENT -
.... .... .................... ... ... ... .... ...-.... . ................ . 1 R 1NDX Al20.0021/S236 002 001 C 1 1
4 ,
t b
I
. ACKNOWLEDGED BY: DATE:
l l
-9102200230 910131 ,
.PDR 7
.ADOCK.05000403PDR ,1 -
's'?
.I((j m..__. .,. _ . . __
_. . _ - .._ . _ . _ _ . - _. ~._ _ _ _ - . .. _. _ _ . . . __ . . _ _ - . _ ._.._.._ _ ._
t a
4 OI/31/91 UNION ELECTRIC COMPANY ARIP2361 10:09:44 CALLAWAY RECORDS INFORMATION SYSTEM PACE 1 3 SORT BY FIELD SEQUENCE NUMBER EXINC INSTRUCTION NUMBER: Al20.0021/S236 REVISION 002 v
ADMINISTRATION APPROVAL (, ' [M ' E 1 / ft / 9 /
ORIGINATORt TAMMY'LAMONS 1991/01/23 TITLEt SICNATURE IDC )
BOX STORACE APPLIEST WO j CROUP CODE OP ( OP=0PERATIONS )
i NNRMHON ONW- '
JNCOE104 1 O, FIELD SEQUENCE NUMBER / NAME j REQUIRED / ADMINISTRATION
- 06) ROLL / FRAME RRRR/FFFF REQUIRED / ADMINISTRATION
- 07) ORCANIZATION U01' REQUIRED / ADMINISTRATION f
i 08) RETENTION PERIOD Q-LP ENTER AS LP
- . . ....... .a - . . . . , . . .
REQUIRED / ADF;NISTRATION , ;
- 09) MEDIA R OR H OR F.
1 i
l l
)
1 FILE CODE: A130.0016 I
~
N' ,
l n
._Oe.*. .+- - ^# *f*- I C
' * - ' W $ T 'N""
...-..- .-....- -. . - - .- . .-_. - -- _ - . ~ . . . . . - - - . .. . - . . . . . - - . . - . . . .
!' OJ/31/91 UNION ELECTRIC COMPANY ARIP2361 10:09:44 CALLAWAY RECORDS INFORMATION SYSTEM PACE 2 SORT SY FIELD SEQUENCE NUMBER -
l
" DEXING INSTRUCTION NUMBER A170t0021/S236 . REVISION 002 l
REQUIRED / DEPARTMENT :
- 24) NAME ***** .
ENTER ALL NAMES ON RECORD IN LAST, FIRST, MIDDLE INITIAL FORMAT..
REQUIRED / DEPARTMENT.
- 25) SOCIAL SECURITY NUMBER ***** - .
-ENTER SSN WITHOUT DASHES OR SPACES. IF I;0 SSN IS AVAILABLE ON THE RECORD, CHECK PERSONNEL SYSTEM. IF NOT ON PERSONNEL SYSTEN,. BLANK' THIS FIELD.
NOTE: PRIOR TO REVISION 1 0F THIS INSTRUCTION, SOCIAL SECURITY. -
NUMBERS WERE NOT ENTERED.-
T t
I i
l' l .: ,
i FILE CODE A130.0016 ~t O
4 e
m i
l i
s .
,4 Al20.0021 S236. Rev. A fv4y$ /
Cuc id I M20.0021,1 r 1. ;
- 1. Sosial Seemrity Member 25 1, Zadividael's Fall Name (Prist) l 24 2004A lower -
l a,m m.m> taux.,
- 3. Vt/ dt ~~~
2 E. ' /8 /TD l
/ stonesare v Instais b.=
Yes are regstred to en example of yeur Signmurs and Init the way you sism desuments
! whiah will Leemme % tasereds.
- Rnkere N n4 3 RZ 1/2/06 C& W 50 ,
. . . . . - 12/35/89 t', b o0907 .
3 f
h h
l I
s
(
i l
j t
9 t
__ ___.. _ - - - - - - . . . . - - . . - . . . _ - . , . . _ , , . . . _ _ . -_ , , . . . . _ . . . . . . . ~ ~ , . - - , . - , , . - - . ~ - , - - . - . , .
i A120.0021 1 *d -!e i S236.,_Rev. A fige >
pm J ef I i s \
e
[Q A RECORD,ma,,,, y 4 20.21
{
t 1.
Page 1 of 1 1
Individuals @ Name (Print)
ArmskoWQ d.eWI.c e
(Last) V
~
first),e 44.'/b 'GM 24 2.
Example of Signature and Initists Ofiddle) -
e * ~ -
~
jg.g.g *f -
I A tare- j Ntihis ~ Date ,
- LWA 10/6/87 You are required to provide an example _of your Signature and laitials the way you sign _ doomments 3
^
- which will became Q& Records.
For Document Control Use only (Do not'put anything is these blanks). '
- CA-M50 03/20/47
- APA-ZZ-00907 r
l I
- %gej 'd s*. ),?. ' ' * * 'I * '
5'*h * , ,, f* ' I A e 'f ep f*** e s,e e , e g ,,ggge--, @Y' 8h'd***eW
. jN. N ?'Pphs,=e .ee h.% * %e,4 I
8 6+
9 8
.h e
8 d
DM M
94 i
! i.
J.
r
. . - - - ._ _. - ~. _- -. . - .
..., _ , . . . hik423 q) fD U0SCQ 85-034
~ ~' ~
July 2, 1985 A120.0021 Gog,'Ig S236, Rev. A !
flp/. .t. 3 C9' ESW4 4 i h .v I&I To "FittW' - v e Subj ect: Verification Signatures of Consultant Personnel Listed below are the true and accurate signatures sind handwritten ,
initials of Quality control consultant. personnel as of July 2,1985.
I
_NAME SIGNATURE INITIA13 24 T. L. Antweiler haI A-v M,
P. A. Bohnert . at K. H. Hudson /f T>@D.R.
k Spencer '
These signatures and initials are transmitted to the QA File for use 't in validating records completed by these individuals. ,
f :
Signatures Witnessed By: <.. &F ,- d2* ' .
'R. L. Nave T. L/ ~Shas Asst. QC Supv. QC Supervisor t In Process TIS /RLN/11 cci T. L. Shaw R. L. Nave 3 V. P. Porte11 '
L. M. Zahara QO100SCQ i C57.72
V .
,e +