Interim Deficiency Rept Re Poor Implementation of Conduit & Cable Tray Insp Procedures.Initially Reported on 820721. Commonwealth-Lord Jv Revising Insp Procedures to Clarify Documentation Requirements.Next Rept by 821203
ML20063E341
Person / Time
Site: Marble Hill
Issue date: 08/20/1982
From: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, S82-16, SVP-0016-82, SVP-16-82, NUDOCS 8208300218
Download: ML20063E341 (2)


Text

g dA/8 S

PUBLIC SERVICE INDIANA August 20, 1982 S82-16 S. W. Shields SVP-0016-82 Senior Vice President -

Nuclear Division Mr. James G. Keppler, Docket Nos.: STN 50-546 Regional Administrator STN 50-547 U. S. Nuclear Regulatory Commission Construction Permit Nos.:

Region III CPPR - 170 799 Roosevelt Road CPPR - 171 Glen Ellyn, Illinois 60137 Marble Hill Nuclear Generating Station - Units 1 and 2

Dear Mr. Keppler:

On July 21, 1982, Mr. T. D. Geib of Public Service Company of Indiana, Inc (PSI) notified your office of a potentially reportable item as required by 10 CFR 50.55(e). Conduit and cable tray hanger inspection reports generated by the electrical erection contractor, Commonwealth-Lord JV, were determined to have a variety of deficiencies.

The deficiencies included missing inspection reports, inadequate description of items inspected, missing inspection results and conflicting notes.

Commonwealth-Lord JV is presently revising its inspection procedures to clarify documentation requirements. Conduit and cable tray hangers previously inspected will be reinspected to the revised procedures. Further corrective action, if any is determined necessary, will be based on the results of this reinspection.

This letter is intended to fulfill the requirements of an interim report as required by 10 CFR 50.55(e). A further report will be filed on or before December 3, 1982. If you have any questions on this matter, please feel free to contact me.

Sincerelyf

/ /

. 4 S. W. Shields SWS/TDG/bak Dohkoffgfjj6 ~

Q g3 PDR P. O. Box 190, New Washington, Indiana 47162 ZS7 812. 289 . 3000

V y'. to PUBUC SERVICE INDIANA Letter: J. G. Keppler August 20, 1982 S82-16 SVP-0016-82 cc: Director of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 J. E. Konklin ,

J. J. liarrison

,