ML20062J744

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-329/81-23 & 50-330/81-23 on 811201-820630.No Noncompliance Noted
ML20062J744
Person / Time
Site: Midland
Issue date: 07/26/1982
From: Knop R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jackie Cook
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML20062J746 List:
References
NUDOCS 8208160453
Download: ML20062J744 (2)


See also: IR 05000329/1981023

Text

_

'

.

yut 2 61982

Docket No. 50-329

Docket No. 50-330

Consumers Power Company

ATTN: Mr. James W. Cook

Vice President

Midland Project

1945 West Parnall Road

Jackson, MI 49201

Gentlemen:

This refers to the routine safety inspection conducted by Mr. R. J. Cook

of this office on December 1, 1981 through June 30, 1982, of activities

at the Midland Plant, Units 1 and 2, authorized by NRC Construction

Permits No. CPPR-81 and No. CPPR-82 and to the discussion of our findings

with you and Messrs. D. Turnbull and M. Curland at the conclusion of the

inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room. If this report contains any information that you (or

your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within ten (10)

days from the date of this letter of your intention to file a request for

withholding; and (b) submit within twenty-five (25) days from the date of

this letter a written application to this office to withhold such informa-

tion. If your receipt of this letter has been delayed such that less than

seven (7) days are available for your review, please notify this office

B O p

G

.TEo(

.

Consumers Power Company 2

promptly so that a new due date may be established. Consistent with

Section 2.790(b)(1), any such application must be accompanied by an

affidavit executed by the owner of the information which identifies the

document or part sought to be withheld, and which contains a full state-

ment of the reasons which are the bases for the claim that the information

should be withheld from public disclosure. This section further requires

the statement to address with specificity the considerations listed in

10 CFR 2.790(b)(4). The information sought to be withheld shall be

incorporated as far as possible into a separate part of the affidavit. If

we do not hear from you in this regard within the specified periods noted

above, a copy of this letter and the enclosed inspection report will be

placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

.) J

R. C. Knop, Chie

, Projects Branch 1

Enclosure: Inspection Reports

No. 50-329/81-23(DPRP) and

No. 50-330/81-23(DPRP)

'

cc w/ enc 1:

DS!B/Documerit Control Desk (RIDS)

Resident Inspector, RIII

The Honorable Charles Bechhoefer, ASLB

The Honorable Jerry Harbour, ASLB

The Honorable Frederick P. Cowan, ASLB

The Honorable Ralph S. Decker, ASLB

i t!ichael ?! iller

! Ronald Callen, t!ichigan

l Public Service Commission

l  ?!yron ?!. Cherry

(- Barbara Stamiris

j flary Sinclair

l Wendell $!arshall

l Colonel Steve J. Gadler (P.E.)

Bo d/sv Knop

7/22/82 / Sk

,

4

!

I

i