Responds to FOIA Request for ACRS Documents Re Facility. Forwards App B Documents.App a & B Documents Available in PDR
ML20140G820
Person / Time
Site: Dresden, Indian Point, Midland, 05000000
Issue date: 09/30/1985
From: Felton J
NRC OFFICE OF ADMINISTRATION (ADM)
To: Brunner J
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML19255C661 List: ... further results
References
FOIA-85-602 NUDOCS 8510080023
Download: ML20140G820 (11)


Text

r q

0 ~0h

=

a ur 8

[q UNITED STATES

[

g NUCLEAR REGULATORY COMMISSION g

p WASHINGTON, D. C. 20555

...../

.g to 1816 Mr. James E. Brunner Consumers Power Company 212 West Michigan Avenue IN RESPONSE REFER Jackson, MI 49201 TO F0!A-85-602

Dear Mr. Brunner:

This is in response to your letter dated August 23, 1985, in which you requested, pursuant to the Freedom of Information Act (F0IA), all documents in possession of the Advisory Committee on Reactor Safeguards regarding the Midland nuclear power plant.

The documents identified on the enclosed Appendix A are subject to your request end are already available for public inspection and copying at the NRC Public Document Room (PDR).

The documents identified on the enclosed Appendix B are being made available for public inspection and copying at the PDR in file F01A-85-602 under your narne.

Enclosed also is a copy of a notice which explains the procedures and charges for obtaining records from the PDR.

Sincerely, L

v J. M. Felton, Director Division of Rules and Records Office of Administration

Enclosures:

As stated 8510080023 850930 PDR FOIA BRUNNER85-602 PDR l

1 l

Re: F0IA-85-602 APPENDIX A DOCUMENTS SUBJECT TO F0IA-85-602 ALREADY IN THE PDR ACRS Numbers NRC DCS Minutes Transcript Accessions Numbers (Minutes / Transcript)

Subcommittee Meetings January 22, 1969 ACRS-0518 NA*

t February 4,1969 ACRS-0521 t

March 24, 1970 ACRS-0638 t

April 24,1970 ACRS-0645 t

June 10, 1970 ACRS-0668 t

September 14, 1970 ACRS-0697 t

April 29,1982 ACRS-1981 ACRST-1084 8208010071/8205030548 May 20-21, 1982 ACRS-1991 ACRST-1094 8210270433/8205270374 8205270103 June 2, 1982 ACRS-1997 ACRST-1100A 8210270417/8206040021 Full Committee Meetings 103rd Mtg 1031-110268 ACRS-0503 NA*

t 106th Mtg 0206-0869 ACRS-0523 t

120th Mtg 0409-1170 ACRS-0644 t

121st Mtg 0507-0970 ACRS-0654 t

122nd Mtg 0611-1370 ACRS-0670 t

125th Mtg 0917-1970 ACRS-0703 t

127th Mtg 1112-1470 ACRS-0720 t

133rd Mtg 0506-0871 ACRS-0782 t

164th Mtg 1206-0873 ACRS-1082 ACRST-0049/0050 t

196th Mtg 0812-1476 ACRS-1365 ACRST-0357 t

199th Mtg 1111-1376 ACRS-1387 ACRST-0390/0391 t

202nd Mtg 0210-1277 ACRS-1411 ACRST-0423/0424 t

203rd Mtg 0310-1277 ACRS-1415 ACRST-0428/0429 t

205th Mtg 0505-0777 ACRS-1429 ACRST-0446/0447 t

215th Mtg 0309-1178 ACRS-1524A ACRST-0557 t

265th Mtg 0506-0882 ACRS-1987 ACRST-1089 8212010502/8205110113 266th Mtg 0603-0582 ACRS-1998 ACRST-1102 8210280034/8206070072 8206090003 274th Mtg 0210-1283 ACRS-2075

.ACRST-116e 8308150026/8212130040 8212150043

Re:

F01A-85-602 i

APPENDIX A TContinued)

ACRS Mumber NRC DCS Accessions Number, Letter Reports June 18,1970 ACRSR-0429 8002070538 (CP Review)

Septembe r 23, 1970 ACRSR-0437 8002110694 (Suppl. Rpt, CP Review)

November 18, 1976 ACRSR-0725 8002070532 (ASLB Request /Sup. Rpt)

March 16,1977 ACRSR-0746 8007170709 (Addl Request - ASLB)

June 8, 1982 ACRSR-0979 8206140166 (Interim Rpt/0L Review)

Consultants' Reports January 4,1969 CT-0066 t

March 16,1970 CT-0439 t

April 26,1982 (Davis)

CT-1448 8205270040 April 28,1982 (Pomeroy)

CT-1449 8205280193 April 29,1982 (Foster)

CT-1450 8205280222 May 27, 1982 (Zudans)

CT-1458 8206270100

  • No transcripts for meetings prior to March 1973.

t Material placed in the PDR prior to 9/78 may or may not be available through DCS; therefore, no accession number is available for those indicated.

Re: F0IA-85-602 APPENDIX A (Continued)

Correspondence 03/30/77 Letter to Stephen H. Howell, Consumers Power Company, from R.F. Heishman, Region III, with enclosed IE Inspection Report No. 050-330/77-03. Accession No. 8102060217 ADOCK/50-3300 10/22/81 Letter to J.W. Cook, Consumers Power Company, from Robert L.

Tedesco, NRR, transmitting preliminary draft of SER Sections 3.6.1 and 10.4.9 for Midland 1 and 2.

Accession No. 8111130745 AD0CK/50-329E.

11/12/81 Letter to Harold R. Denton, NRR, from Janes W. Cook, Consumers Power Company, transmitting input to preliminary draft of SER Sections 3.6.1 and 10.4.9.

Accession No. 8111160065 AD0CK/50-329E.

12/81 NUREG/CR-2368, " Midland Plant Auxiliary Feedwater System Reliability Analysis Evaluation." Accession No. 8201210157 AD0CK/59-329A.

Re:

F01A-85-602 APPENDIX B Documents In PDR File F01A-85-602 1.

10/31/68 103rd ACRS Meeting, Excerpt from Meeting Sumary (1 page).

2.

01/29/69 Memo to Dan Muller from J. E. Hard, ACRS, entitled " Agenda and Schedule for Midland Subcommittee Meeting, February 4,1969" (1 page).

3.

02/03/69 Project Status Report for Midland by J. E. Hard, ACRS (1 page).

4.

02/05/69 Project Status Report for Midland by J. E. Hard, ACRS (1 page).

5.

02/06/69 106th ACRS Meeting, Excerpt from meeting summary (2 pages).

6.

02/14/69 Memo to file with excerpt from meeting sumary of the 106th ACRS meeting (1 page).

7.

02/12/70 Memo to ACRS members from J. C. McKinley, ACRS, entitled

" Agenda for February 24, 1970, Subcommittee Meeting on the Midland Plant" (1 page).

8.

03/16/70 Letter to J. C. McKinley, ACRS, from James T. Wilson regarding salt mining at Midland site (1 page).

9.

03/18/70 Memo to ACRS members from J. C. McKinley, ACRS, entitled

" Agenda for March 24, 1970, Subcommittee Meeting on the Midland Plant" (1 pages).

10. 03/19/70 Memo to L. Squires, Chairman, ACRS Subcomittee on Midland Plant, from J. C. McKinley, entitled " Midland plant, DRL Meeting on the Subsidence Question" (1 page) with attached minutes of the DRL meeting on Midland plant held in Bethesda, Maryland on March 12, 1970 (7 pages).
11. 04/06/70 Project Status Report for Midland by J. C. McKinley, ACRS (2pages).
12. 04/09/70 120th ACRS Meeting, Excerpt from meeting sumary (I page),
13. 04/15/70 Memo to ACRS members from J. C. McKinley, ACRS, entitled

" Agenda for April 24, 1970, Subcomittee Meeting on the Midland Plant" (2 pages).

14. 04/23/70 Memo to L. Squires, Chairman, ACRS Subcomittee on Midland Plant, from J. C. McKinley, ACRS, entitled "DRL Meeting with Consumers Power Company Regarding the Process Steam Exported to DOW"(2pages).

Re: F01A-85-602 APPENDIX B Documents In PDR File F01A-85-602

15. 04/23/70 120th ACRS Meeting, Excerpt from meeting sumary (3 pages).
16. 04/28/70 Memo to ACRS Members from R. F. Fraley, ACRS, forwarding copy of 10 CFR (1 page).
17. 05/01/70 Memo to file from R. F. Fraley, ACRS, entitled " Meeting to Discuss AEC Requirements / Plans to License the Use of Midland Plant steam by the Dow Chemical Company (2 pages)
18. 05/05/70 Project Status Report for Midland Plant, by J. C. McKinley, ACRS (2 pages).
19. 05/07/70 121st ACRS Meeting, Excerpt from meeting sumary (2 pages).
20. 05/14/70 Memo to ACRS members from J. C. McKinley, ACRS, entitled

" Agenda for June 10, 1970, Subcomittee Meeting on the Midland Plant" (1 page).

21. 05/20/70 Memo to L. Squires, Chairman, ACRS Subcomittee on Midland Plant, from J. C. McKinley, entitled " Category B Reports -

Midland - DRL Letter Dated April 24,1970"(2pages).

22. 06/09/70 Project Status Report for Midland Plant, by J. C. McKinley, ACRS (2 pages).
23. 06/11/70 122nd ACRS Meeting, Excerpt from meeting sumary (5 pages).
24. 06/17/70 Memo to Peter A. Morris, DRL, from R. F. Fraley, ACRS, entitled

" Resolution of Items Discussed During the 122nd ACRS Meeting" (2pages).

25. 07/13/70 Memo to L. Squires, ACRS Midland Subcomittee, and S. H. Bush, ACRS, from J. C. McKinley, ACRS entitled " Category B Reports -

Midland - Consumers Power Company Letter Dated June 2, 1970 -

Amendment No. 13" (2 pages).

26. 08/28/70 Memo to ACRS members from J. C. McKinley, ACRS, entitled

" Agenda for September 14, 1970, Subcommittee Meeting on the Midland Plant" (1 page).

27. 09/16/70 Project Status Report for Midland Plant by J. C. McKinley, ACRS (1page).
28. 09/17/70 125th ACRS Meeting, Excerpt from meeting sumary (1 page).

29, 11/12/70 127th ACRS Meeting, Excerpt from meeting sumary (1 page).

1 Re: F01A-85-602 APPENDIX B Documents In PDR File F0!A-85-602

30. 11/18/70 Memo to H. L. Price, DR, from R. F. Fraley, ACRS entitled

" Resolution of Items Discussed During the 127th ACRS Meeting" (1 page).

31. 05/06/71 133rd ACRS Meeting, Excerpt from meeting sumary (1 page).
32. 05/24/76 Memo to ACRS and ACRS Technical Staff from Ragnwald Muller, ACRS, entitled " Meeting on Midland I and 2 Proposed High Energy Line Break Analysis" (6 pages).
33. 08/06/76 Memo to ACRS from M. W. Libarkin, ACRS Assistant Executive Director for Project Review, entitled " Midland ' Catch-All' Paragraph" (36 pages).
34. 08/12/76 196th Meeting, Excerpt of meeting sumary (1 page).
35. 10/06/76 Letter to Chase R. Stephens, SECY, from Myron M. Cherry, Counsel for Intervenors at Midland, regarding revision of ACRS letters (1 page).

36.

11/10/76 Memo to ACRS members from M. W. Libarkin, ACRS, (1 page) transmitting 11/08/76 letter to R. F. Fraley from Michael A.

Bauser, Esquire, (3 pages) with attachments.

37.

11/11/76 199th ACRS Meeting, Excerpt from meeting sumary (1 page).

38. 01/28/77 Letter to Myer Bender, ACRS, from Frederick J. Coufal, ASLB, regarding ASLB review of ACRS reports on Midland (4 pages).
39. 02/04/77 Memo to ACRS from M. W. Libarkin, ACRS, (2 pages) enclosing 01/28/77 letter to Myer Bender, ACRS, from Frederic J. Coufal, ASLB (4 pages), and all material attached to ACRS Supplemental Report on the Midland plant (27 pages).

1

40. 02/10/77 202nd ACRS Meeting, Excerpt from meeting sumary (1 page).
41. 03/11/77 Midland (3 pages)g, Drawing of bulge in containment liner at 203rd ACRS Meetin
42. 03/10/77 203rd ACRS Meeting, Excerpt from meeting sumary (1 page).
43. 03/15/77 Letter to Stephen H. Howell, Consumers Power Company, from R. F. Heishman, Region III, regarding special inspection of Midland Unit 2 Containment Liner Plant Bulge on 02/28-03/01/77 by Mr. I. T. Yin, Region III, with enclosed IE Inspection Report No. 505-330/77-02 (8 pages).

Re: F01A-85-602 I

APPENDIX B Documents In PDR File F01A-85-602

44. 05/06/77 205th ACRS Meeting, Presentation by Shumaker, NRC, regarding alignment of tendons around main steam penetration (drawings)

(2 pages).

45. 05/06/77 205th Meeting, Presentation by Shumaker, NRC, regarding failure mode on bulged liner plate at Midland (drawings) (3 pages).
46. 05/05/77 205th ACRS Meeting, Excerpt from meeting sumary (1 page).

47.

12/08/77 212th ACRS Meeting, Excerpt from meeting sumary (1 page).

48. 03/09/78 215th ACRS Meeting, Excerpt from meeting sumary (1 page).
49. 03/10/78 NRC Staff Presentation in Midland on Process Steam Radiation Monitoring (4 pages).
50. 10/80 Report entitled " Midland Plant Auxiliary Feedwater System Reliability Analysis" by Dennis C. Bley, Carroll L. Cate, Daniel W. Stillwell, B. John Garrick; Pickard, Lowe and Garrick, Inc., prepared for Consumers Power Company (207 pages).
51. 04/07/82 Memo to John C. Hoyle, SECY, from David Fischer, ACRS, entitled

" Meeting of the ACRS Subcommittee on Midland Plant Units 1 and 2, April 29,1982" (1 page) with attached draft Federal Register notice (2 pages).

52. 04/09/82 Memorandum to Paul Pomeroy and Mihailo Trifunac, ACRS Consultants, from D. C. Fischer, ACRS Engineer, entitled

" Midland Plant Seismic Site-Specific Response Spectra" (2 pages) with attached documents (est. 700 pages)

53. 04/09/82 To David Fischer, ACRS, from William LaFave, NRR, draft SER Section 10 on Auxiliary Feedwater System (29 pages).
54. 04/14/82 Memo to Chester Siess, ACRS Subcomittee on Midland Plant, from David Fischer, ACRS, entitled " Tentative Schedule for the ACRS Subcomittee Meeting on Midland Plant Units I and 2 - April 29, 1982 - Washington, DC" (4 pages).
55. 04/21/82 Memo to Chester Siess, ACRS Subcomittee on Midland Plant, from David Fischer, ACRS, entitled " Project Status Report for the ACRS Subcomittee Meeting on Midland Plant Units 1 and 2 -

April 29, 1982 - Washington, DC" (33 pages)

L

Re:

F01A-85-602 APPENDIX B Documents In PDR File F01A-85-602

56. 04/26/82 Memo to Chester Siess, ACRS Subcommittee on Midland Plant, from David Fischer, ACRS, entitled " Revised Tentative Schedule for the ACRS Subcommittee Meeting on Midland Plant Units 1 and 2 -

April 29, 1982 - Washington, DC" (4 pages).

57. 04/26/82 Letter to Chester Siess, ACRS Subcommittee on Midland Plant form Mary Sinclair, participant in licensing hearings, regarding soil settlement issue at Midland (7 pages).
58. 04/27/82 Memo to John C. Hoyle, SECY, from David Fischer, ACRS, entitled

" Meeting of the ACRS Subcommittee on Midland Plant Units 1 and 2, May 20 and 21, 1982, Midland, MI" (1 page) with attached draft Federal Register notice (2 pages).

59. 05/02/82 "NRC Staff Responses to Questions By the ACRS Subcommittee Subcommittee During Meeting of May 20-21, 1982, on Midland Plant, Units 1 and 2" (26 pages).
60. 05/04/82 Memo to Harold R. Denton, et at. from David Fischer, ACRS, 4

entitled " Transmittal of WrTtten Statement Received from the Public by the ACRS" (8 pages).

61. 05/06/82 Memo to Chester Siess from David Fischer, ACRS, entitled "Ad Hoc Subcommittee on Midland Plant Units 1 and 2 April 29, 1982" (7 pages).
62. 05/07/82 Letter to David Okrent, ACRS, from Jack W. Hickman, Sandia National Laboratories, regarding review of studies on Midland Auxiliary Feedwater System (3 pages).
63. 05/12/82 Memo to David Okrent, ACRS Subcommittee on Midland Plant Units 1 and 2, from David Fischer, ACRS, entitled " Tentative Schedule for the ACRS Subcommittee Meeting on Midland Plant Units 1 and 2 - May 20-21, 1982, Washington, DC" (8 pages).
64. 05/14/82 Memo to William J. Dircks, E00, from R. F. Fraley, ACRS, entitled " Foundation Problems and Related Remedial Actions at the Midland Plant Site" (1 page).
65. 05/17/82 Memo to David Okrent, ACRS, from David Fischer, ACRS, entitled

" Project Status Report for the ACRS Subcommittee Meeting on Midland Plant Units 1 and 2 - May 20-21, 1982, Midland, Michigan" (est. 80 pages)

66. 05/17/82 Memo to ACRS members from David C. Fischer, ACRS, entitled

" Midland Plant Safety Review Groups" (45 pages)

I

Re: F0!A-85-602 APPENDIX B Documents In PDR File F01A-85-602

67. 05/20/82 Memo to David Okrent, ACRS Subcommittee on Midland Plant Units 1 and 2, from David Fischer, ACRS, entitled " Subcommittee on Midland Plant Units 1 and 2 - May 20 and 21, 1982 - Midland, Michigan" (10 pages).
68. 05/25/82 Memo to ACRS Members from David Fischer, ACRS, entitled

" Transmittal of Written Statements Received from the Public by ACRS" with attached statements (11 pages).

69. 05/25/82 Memo to David Okrent, ACRS Subcommittee on Midland Units 1 and 2, from David C. Fischer, ACRS, entitled " Tentative Schedule for the ACRS Subcommittee Meeting on Midland Plant Units 1 & 2 -

June 2, 1982, Washington, DC" (3 pages).

70. 05/28/82 Memo to David Okrent, ACRS Subcommittee on Midland Plant Units 1 and 2, from David C. Fisher, ACRS, entitled " Project Status Report for the ACRS Subcommittee Meeting on Midland Plant Units 1 A 2 - June 2, 1982, Washington, DC" (est. 150 pages).
71. 05/28/82 Letter to Paul G. Shewmon, ACRS, from Mary Sinclair, Midland Intervenor, requesting time to make statements at June 4, 1982, ACRS meeting regarding soil settlement issue at Midland, with attachments (7 pages).
72. 05/30/82 Letter to David C. Fisher, ACRS, from Barbara Stameris, Midland i

Intervenor, transmitting letter to David Okrent regarding his statements made at the May 20-21, 1982, Subcommittee Meeting in Midland, Michigan (8 pages).

73. 06/03/82 266th ACRS Meeting, Excerpt from Meeting Sunnary (10 pages).
74. 06/04/82 266th ACRS meeting, Agenda and Handouts for presentation by B. W. Marguglio, ;onsumers Power Company, entitled " Midland Project Quality Assurance" (15 pages).
75. 06/04/82 Draft prepared statement by Mary Sinclair, Midland Intervenor, before ACRS hearing (15 pages).
76. 06/04/82 266th ACRS meeting, Presentation by W. Little, Region III (2 pages).

i

77. 06/04/82 MidlandACRSMeeting-IntroductionbyNRCStaff(4pages).
78. 06/05/82 Letter to Mihailo D. Trifunac, ACRS, from David Okrent, ACRS, regarding Trifunac's statement on earth site (1 page) with attached testimony (quakes at the Midland 23 pages).

e i

Re: F01A-85-602 APPENDIX B Documents In PDR File F0IA-85-602

79. 06/21/82 Letter to Jeff Kimball, NRR, from Mihailo D. Trifunac, ACRS, regarding Trifunac's testimony at Midland hearing on earthquake probability (2 pages).
80. 06/28/82 Memo to Ron Hernan, NRR, from David C. Fisher, ACRS, entitled

" Steam Generator Overfill Protection" (7 pages).

81. 07/28/82 Letter to Robert L. Tedesco, NRR, from Barbara Stamiris, Midland Intervenor, urging that competitor to Consumers Power Company's contractor be used to perfom a design and construction audit at Midland (1 page).
82. 08/11/82 Memo to David Okrent, ACRS Subcomittee on Midland Plant Units 1 and 2, from David Fischer, entitled "ACRS Subcommittee on Midland Units 1 & 2 - June 2, 1982 - Washington, DC" (5 pages).
83. 12/09/82 Memo to ACRS members from David C. Fisher, ACRS, entitled

" Region III Report on Midland Design and Construction Problems, Their Disposition, and Overall Effectiveness of the Effort to Assure Appropriate Quality (4 pages).

84.

12/14/82 Letter to David Okrent, ACRS, from Mary Sinclair, Midland Intervenor, regarding recent events at Midland (6 pages).

85. 01/11/83 Letter to Chester Siess, ACRS Subcommittee on Midland Plant Units 1 and 2, from Billie Pirner Garde, Government Accountability Project, regarding construction problems at Midland (8 pages).
86. 01/30/83 Prepared statement entitled "1983 Midland Plant Overview" by BarbaraStamiris,MidlandIntervenor(5pages)withattachments (13 pages).
87. 01/30/83 Letter to ACRS, from Barbara Stamiris, Midland Intervenor (3 pages) with attachments (4 pages).
88. 02/07/83 Memo to ACRS members from David C. Fisher, ACRS staff, entitled

" Midland QA/QC" (6 pages).

i

89. 03/03/83 Memo to ACRS members from David C. Fischer, ACRS, entitled

" Midland's Independent Design Verification" (1 page) with attached " Midland Plant Units 1 and 2 Quality Assurance / Quality Control Project Status Report, 274th ACRS Meeting, February 10, 1983" (5 pages) with three attachments (11 pages).