JUL 2 8 0621
l
Docket No. 50-329'
Docket No. 50-330
Consumers Power Company
ATTN:
Mr. James W. Cook
Vice President
Midland Project
1945 West Parnall Road
Jackson, MI 49201
Gentlemen:
This refers to the routine safety inspection conducted by Mr. F. C. Hawkins
of this office on June 2-4, 30 and July 1, 1982, and Messrs. L. Abramson
and D. Lurie of the NRC office of Resource Management on June 30 and July 1,
1982,.of activities at Midland Nuclear Power Plant, Units 1 and 2, authorized
by NRC Construction Permits No. CPPR-81 an ' No. CPPR-82 and to the discussion
of our findings with Mr. M. L. Curland and ( thers of your staff at the
conclusion of the inspection.
'ihe enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted _of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
i
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
t
days from the date of'this letter a written application to this office
to withhold such information.
If your receipt of this letter has been
,
.)
,
. __
. g-
320720
g2
OMOO g
-
p
G
, . . ,
.
.
.
..
- - - - - - - - - .
.
-.
Consumers Power Company
2
JUL 2 8 tT2
j
delayed such that less than seven (7) days are available for your review,
l
please notify this office promptly so that a new due date may be estab-
l
limhed. Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the informaticn
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withhold shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
h
W. S. Little, Chief
Engineering Inspection Branch
Enclosure: Inspection Reports
No. 50-329/82-10(DETP) and
No. 50-330/82-10(DETP)
cc w/ enc 1:
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
The Honorabic Charles Bechhoofer, ASLB
The Honorable Jerry Harbour, ASLB
The Honorable Frederick P. Cowan, ASLB
The Honorable Ralph S. Decker, ASLB
Michael Miller
Ronald Callen, Michigan
Public Service Commission
Myron M. Cherry
Barbara Stamiris
Mary Sinclair
Wendell Marshall
Colonel Steve J. Gadler (P.E.)
JII[0
p 'II
JI
RIIIg
RIjl [#
RII
</
<
( 1l0
Williams $5/
T
Hawkg3
45
4 4
s/sv
Abramson
Lurie
boyd g
Litt e
f
7/21/82
4
.
.
.
.
_ _ _
_