See also: IR 05000329/1982003
Text
.
,
-
.
JUL
2 G82'
Docket No. 50-329
Docket No. 50-330
Consumers Power Company
ATTN:
Mr. James W. Cook
Vice President
Midland Project
1945 West Parnall Road
Jackson, MI 49201
Gentlemen:
This refers to the routine safety inspections conducted by Mr. R. B. Landsman
of this office on April 12-14, and Messrs. R. B. Landsman and R. N. Gardner
of this office on April 21-23, 1982, of activities at Midland Plant, Units 1
and 2, authorized by NRC Construction Permits No. CPPR-81 and No. CPPR-82
and to the discussion of our findings with Mr. J. A. Mooney and others at
the conclusion of the inspection. This report also refers to two meetings
in Midland on April 12-13, 1982 and ACRS Subcommittee meeting in Washington
on April 29, 1982.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
torviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as specified in the enclosed Appendix.
A written response is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and your response to this letter will be placed
in the NRC's Public Document Room.
If this_ report contains any information-
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
-to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office to
withhold such information.
If your receipt of this letter has been
l
delayed such that less than seven (7) days are available for your review,
8207200284 820702
PDR ADOCK 05000329
-A
U
G
4
-
.-
-. .-
.
.. .
'
.
,
Consumers Power Company
2
s
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that.the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter, the enclosures,
and your response to this letter will be placed in the Public Document
Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
[$f
[Ll
N6
f
C. E. Norelius, Director
Division of Engineering and
Technical Programs
Enclosures:
1.
Appendix, Notice
of Violation
2.
Inspection Reports
No. 50-329/82-03(DETP)
and No. 50-330/82-03(DETP)
cc w/cncls:
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
The Honorable Charles Bechhoefer, ASLB
The Honorable Jerry Harbour, ASLB
The Honorable Frederick P. Cowan, ASLB
~
The Honorable Ralph S. Decker. ASLB
'
Michael Miller
Ronald Callen, Michigan
Public Service Commission
Myron M. Cherry
Barbara Stamiris
Mary Sinclair
Wendell Marshall
Colonel Steve J. Gadler (P.E.)
R
RIII
RIII
R
RIII
RPPr"
a a
bitti.
..rd - /,p
., d .
,o, y
,r.11..
6/8/82
,;
&
QS