Text

s DISTRIBUTION Docket Nos. 50-329/330,OM,OL NRC PDR M 30 g Local PDR LB #4 r/f EAdensam DHood Docket Nos.: 50-:329/330 051, OL MDuncan RHernan RTedesco TIC /NSIC/ TERA OI&E fir. J. W. Cook ACRS (16)

Vice President JKane Consumers Power Company . FRinaldi

~[ 1945 West Parnall Road RLandsman, RIII Jackson, ttichinan 49201 JGilray RCook, RIII

Dear Mr. Cook:

Attorney, OELD

Subject:

Feedwater Isolation Valve Pit rroof Test Your letter of t'ay 10, 1982, defining renedial soils work that you considered to be previously approved by the f1RC, included a "FIVP proof load test."

Our reply of May 25, 1982 noted the absence of any explanation of this tem, and therefore, withheld confirmation of approval.

Your subsequent letter of June 18, 1982 provides clarification of the tem

" proof load test" and relates it to previous discussions with the NRC staff.

The tem is explained in reference to your plan to verify load transfer of the total calculated weight of the feedwater isolation valve pits to their overhead, tenporary support structures prior to excavation beneath these pits.

Your June 18, 1982 letter also explains rodifications to provide additional nargins of safety for the support structures.

In earlier reviews and audits on " phase 2" underpinning, the staff recognized verification of the FIVP overhead support structure to be an essential and inherent part of the renedial action to be achieved prior to excavation beneath the FlVP. Our approval of " phase 2" by letter of May 25, 1982 encompassed t this activity. The nodifications to provide increased safety margins are recognized as a design enhancenent and are also acceptable. Your romitments.

to conduct this load verification as a Q-activity under quality procedure MPQP-1 and to obtain prior concurrence fron Region III regarding the as-built condition of the structure are consistent with the conditions for phase 2

approval specified by Enclosure 3 of our ' fay 25, 1982 letter.

Sincerely, Robert L. Tedesco, Assistant Director 8207190047 820630 for Licensing PDR ADOCK 05000329 Division of Licensing A PDR JDL cc: See next pace _

Q:fih , q DL:LB#4 LA:DL:LB# DblB#4/ AD/CSOf" OELD . O^O ,

suamo .'65'."o"di'ith((

o MDuncand' E' *dInTaT""" "#T5 Wiifb '

~

is fs

. . . . . . f"..". .

6 6 .6 ./..g.../ 82 .....g...........

6 /82 em, ..../ 7 .')../....82.....6../...Q... .../.82 .6/.R.. . . . . . .

3 h. ./.82 . . . . . .

..../..g< .../82 NRC FORM 318 (1040) NRCM 024 OFFICIAL RECORD COPY usom mi-m.m

~ >

MIDLAND Mr. J. W. Cook Vice President ,

Consumers Power Conpany 1945 West Parnall Road Jackson, Michigan 49201 cc: Michael I. Miller, Esq. Mr. Don van Farrowe, Chief Ronald G. Zamarin, Esq. Division of Radiological Health Alan S. Farnell, Esq. Department of Public Health Isham, Lincoln & Beale P.O. Box 33035 Suite 4200 Lansing, Michigan 48909 1 First National Plaza Chicago, Illinois 60603 William J. Scanlon, Esq.

2034 Pauline Boulevard James E. Brunner, Esq. Ann Arbor, Michigan 48103 Consumers Power Company 212 West Michigan Avenue U.S. Nuclear Regulatory Commission Jackson, Michigan 49201 Resident Inspectors Office Route 7 Ms. Mary Sinclair Midland, Michigan 48640 5711 Summerset Drive Midland, Michigan 48640 Ms. Barbara Stamiris 5795 N. River Stewart H. Freeman Freeland, Michigan 48623 Assistant Attorney General State of Michigan Environmental Mr. Paul A. Perry, Secretary Protection Division Consumers Power Company 720 Law Building 212 W. Michigan Avenue Lansing, Michigan 48913 Jackson, Michigan 49201 Mr. Wendell Marshall Mr. Walt Apley Route 10 c/o Mr. Max Clausen Midland, Michigan 48640 Battelle Pacific North West Labs (PNWL)

Battelle Blvd.

Mr. Roger W. Huston SIGMA IV Building Suite 220 Richland, Washington 99352 7910 Woodmont Avenue Bethesda, Maryland 20814 Mr. I. Charak, Manager i NRC Assistance Project Mr. R. B. Borsum Argonne National Laboratory Nuclear Power Generation Division 9700 South Cass Avenue Babcock & Wilcox Argonne, Illinois 60439 7910 Woodmont Avenue, Suite 220 Bethesda, Maryland 20814 James G. Keppler, Regional Administrator U.S. Nuclear Regulatory Commission, Cherry & Flynn Region III l Suite 3700 799 Roosevelt Road Three First National Plaza Glen Ellyn, Illinois 60137 Chicago, Illinois 60602 Mr. Steve Gadler 2120 Carter Avenue St. Paul, Minnesota 55108

i s Mr. J. W. Cook .

cc: Commander, Naval Surface Weapons Center ATTN: P. C. Huang White Oak Silver Spring, Maryland 20910 Mr. L. J. Auge, Manager Facility Design Engineering Energy Technology Engineering Center P.O. Box 1449 Canoga Park, California 91304 Mr. Neil Gehring U.S. Corps of Engineers NCEED - T 7th Floor 477 Michigan Avenue Detroit, Michigan 48226 Charles Bechhoefer, Esq.

Atomic Safety & Licensing Board U.S. Nuclear Regulatory Commission Washington, D. C. 20555 Mr. Ralph S. Decker Atomic Safety & Licensing Board U.S. Nuclear Regulatory Commission Washington, D. C. 20555 Dr. Frederick P. Cowan Apt. B-125 6125 N. Verde Trail Boca Raton, Florida 33433

! Jerry Harbour, Esq.

Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, D. C. 20555 l

l Geotechnical Engineers, Inc.

l ATTN: Dr. Steve J. Poulos

! 1017 Main Street f Winchester, Massachusetts 01890 i

_-