Deletion of Reactor Trip on Turbine Trip Below 70% Power. Max Dose Release Analysis Encl
ML20058H288
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 03/31/1982
From:
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To:
Shared Package
ML20058H254 List:
References
1890Q:1, NUDOCS 8208030532
Download: ML20058H288 (39)


Text

.-. . . - -__ . . .- . - .

8 i CATAWBA DELETION OF REACTOR. TRIP ON TURBINE TRIP BELOW 70 PERCENT POWER M' arc h, 1982 t

1 i

i Westinghouse Electric Corporation.

Nuclear Energy Systems P. O. Box 355 Pittsburgh, Pennsylvania 15230 -

l l

l l

9 l

i 8208030532 820726 PDR ADOCK 05000413 A ppR i

l

! 1890Q:1

TABLE OF CONTENTS

- Sec ti o n Ti tl e 1.0 Identification of Causet and Accident Description 2.0 Analysis of Effects and Consequences 3.0 Results .

4.0 Co nclusion -

4 P

18900: 1

L8ST OF TABLES i

Table Titl e 1

1 1- Initial Conditions i

2 Time Sequence of Events for a Turbine Trip With l 4

Pressure Control

3 Time Sequence of Events for a Turbine Trip Without l, Pressure Control.

9

.i i

i 4

i 4

4 i

i 1

r i

i i

i 1

i i

t 1890Q:1

1.0 IDENTIFICATION OF CAUSES AND ACCICENT DESCRIPTION A major load loss on thh plant can msult from loss of external elec- '

trical load due to some electrical system disturbance. Offsite AC power remains available to operate plant components such as the reactor coolant pumps. Following the loss of generator load, an immediate fast .

closure of the turbine control valves will occur. This will cause a - +

sudden reduction in steam flow, resulting in an increase in pressure and temperature in the' steam generator shell. As a result, the heat tran-sfer rate in the stear! generator is reduced, causing the reactor coolant temperature to rise, which in turn causes coolant expansion, pressurizer insurge, and RCS pressure rise.

For a loss of external electrical load without subsequent turbine trip, no direct reactor trip signal would be generated. The plant would be expected to trip from the Reactor Protection System. In the event that a safety limit is approached, protection would be provided by the high pressurizer pressure and overtemperature AT trips.

In the event the steam dump valves fail to open following a loss of load or turbine trip, the steam generator safety valves may lift and the reactor may b_Ne tripped by the high-pressurizer pressure signal, the high pressurizer water level signal, or the'overtemperature aT signal. The

~

steam generator shell side pmssure and mactor coolant temperatures will increase rapidly. The pressurizer safety valves and steam genera-tor safety valves are, however, sized to protect the Reactor Coolant System (RCS) and steam generator against overpressure for all load

(

l losses wi thout assuming the operation of the steam dump system, pres-suri zer spray, pressuri zer power-operated relief valves, automatic rod cluster control assembly control or direct reactor trip on turbine trip.

The steam generator saf ety valve capacity is sized to remove the steam '

flow at the Engineered Safety Features Rating (105 perant of steam flow

! at rated power) from the steam generator without exceeding 110 percent of the steam system design pressure. The pressurizer safety valve capacity is sized based on a complete loss of heat sink with tne piant i

18900:1

initially operating at the maximum calculated turbina load along with operation of the steem generator safety valves. The pressurizer safety valves are then able to relieve suf ficient steam to maintain the RCS pressure wi thin 110 percent of the RCS design pressure.

The primary-side transient is caused by a decrease in heat transfer capability from primary to secondary due to a rapid termination of steam flow to the turbine, accompanied by an automatic reduction sof feedwater fl ow. Should feed flow not be reduced, a larger heat sink would be available and the transient would be less severe. Termination of steam flow to the turbine following a loss of external load occurs due to automatic fast closure of the turbine control valves in approximately .3 seconds. Following a turbine trip event, termination of steam flow occurs via turbine stop valve closure, which occurs in approximately .1 seconds. Therefore, the transient in primary pressure, temperature, and water volume will not be dependent on the mode of steam flow termina-tion; therefore, a detailed transient analysis is only presented for the turbine trip event.

3 For a turbine trip event, the reactor would be tripped directly (unless below approximately 70 percent power) from a signal derived from the turbine auto stop emergency trip fluid pressure and turbine stop val ve s. The turbine stop valves close rapidly on loss of trip-fluid pressure actuated by one of a number of possible turbine trip signals.

Turbine-trip initiation signals include:

1. Generator trip
2. Low Condenser Vacuum
3. Loss of Lubricating Oil
4. Turbine Thrust Bearing Failure
5. Turbine Overspeed
6. Manual Trip -
3. ,

18900: 1

tfpon initiation of stcp valva closure, steam flow to the turbine stops ab rup tly . Sensors on the stop valves detect the turbine trip and ini-tiate steam dump and, if above 70 percent power, a reactor trip. The loss of steam flow results in an almost immediate rise in secondary system temperature and pressure with a resultant primary system transient.

The automatic steam dump system would nonnally accomodate the excess steam generation. Reactor coolant temperatures and pressure do not signficantly increase if the steam dump system and pressuri;:er pressure control system are functioning properly (i.e. the better estimate case) . If the turbine condenser was not available, the excess steam generation would be dumped to the atmosphere and main feedwater flow would be lost. For this situation feedwater flow would be maintained by the Auxiliary Feedwater System to insure adequate residual and decay heat removal capability. Should the steam dump system f ail to operate, the steam generator safety valves may lif t to provide pressure control, as discussed previously.

Normal power for the reactor coolant pumps is supplied through busses from a transforTner connected to the generator. When a generator trip occurs, the busses are automatically transferred to a transfomer sup-plied from external power lines, and the pumps will continue to supply coolant flow to the core. Following any turbine trip where there are no electrical' faults which require tripping the generator from the network, the generator remains connected to the network for approximately 30 seconds. The mactor coolant pumps remain connected to the generator, thus ensuring flow for 30 seconds before any transfer is made.

Should the network bus transfer fail at or before 30 seconds, a complete loss of forced reactor coolant flow would result. The imediate ef fect of loss of coolant flow is a rapid increase in the coolant temperature in addition to the increased coolant temperature as a result of the turbine trip. This increase could msult in DNB with subsecuent fuel damage if the reactor were not tripped pecmptly.

l

[

1890Q:1

.' The folicwir.g signals provid2 the nscessary protection against a ccmplete loss of flow accident:

1. Reactor coolant pump power supply undervoltage.
2. Low reactor coolant loop flow.

~

4 The reactor trip on reactor coolant pump undervoltage is provided to protect against conditions which can cause a loss of voltage to all reactor coolant pumps, i.e. , station blackout. This function is blocked .

below approximately 10 percent power (Permissive 7).

The reactor trip on low primary coolant loop flow'is provided to protect against loss of flow conditions which affect only one reactor coolant loop. This function is generated by two out of three low flow signals per reactor coolant loop. Between approximately 10 percent power (Permissive 7) and the power level corresponding to Permissive 8, low flow in any two loops will actuate a reactor trip.

d 18900: 1

l

. l 2.0 ANALYSIS OF EFFECTS AND CONSEQUENCES l

Method of Analysis In this analysis, the behavior of the unit is evaluated for a complete loss of steam load from 70 percent of full power without direct reactor trip. This shows the adequacy of the pressure relieving devices and also demonstrates the core protection margins; that is, the turbine is assumed to trip without actuating all the sensors for reactor trip until conditions in the RCS result in a trip due to other signals. Thus, the analysis assumed a worst transient. In addition, no credit is taken for steam dump. Main feedwater flow is terminated at the time of turbine trip, with no credit taken for auxiliary feedwater to mitigate the con-sequences of the transient.

Following the loss of steam load but before a reactor trip, a fast bus transfer is attempted. The transfer to an external power source is assumed to fail at the time producing the most limiting DNR resulting in a complete loss of flow transient initiated from the loss of load con-ditions.

The loss of flow transient coincident with turbine trip transients are analyzed by employing the detailed digital computer code LOFTRANkI I .

The LOFTRAN Code calculates the loop and core flows following the initial loss of load. The LOFTRAN Code simulates the neutron kinetics, RCS, pressurizer, pressurizer relief and safety valves, pressurizer spray, steam generator, and steam generator safety valves. The program computes pertinent plant variables including temperatures, pressures, power level, and EDNB margin.

Major assumptions are summarized below:

1. Initial Operating Conditions - the initial reactor power, RCS tea-peratures, and RCS pressure are assumed to be consistent with the steady state 70 percent operation.

I (1) Burnett, T. W. T. , et al. , "LOFTRAN Code Description", WCAP-7907, l June, 1972.

2354Q
1 l

LZST OF FZGURES Fi gure Titl e 1 Turbine Trip with Pressure Control - Minimum Feedback -

Nuclear Power and Reactor Coolant Average Temperature 2 Turbine Trip with Pressure Control - Minimum Feedback -

Pressurizer Pressure and Water Volume 3 Turbine Trip with Pressure Control - Minimum Feedback -

Core Flow and DNBR 4 Turbine Trip with Pressure Control - Maximum Feedback -

Nuclear Power and Reactor Coolant Average Temperature 5 Turbine Trip with Pressure Control - Maximum Feedback -

Pressurizer Pressure and Water Volume 6 Turbine Trip with Pressure Control - Maximum Feedback -

Core Flow and DNBR 7 Turbine Trip without Pressure Control - Minimum Feedback -

Nuclear Power and Reactor Coolant Average Temperature

8 Turbine Trip without Pressure Control - Minimum Feedback -

Pressurizer Pressure and Water Volume 9 Turbine Trip without Pressure Control - Minimum Feedback -

Core Flow and DNBR 10 Turbine Trip without Presspre Control - Maximum Feedback -

Nuclear Power and Reactor Coolant Average Temperature 11 Turbine Trip without Pressure Control - Maximum Feedback Pressurizer Pressure and Water Volume 18900:1

LXST OF FIGURES (Continu;d)

Figure Title 12 Turbine Trip without Pressure Control - Maximum Feedback -

Core Flow and DNBR 13 Turbine Trip with Pressure Control - Minimum Feedback -

)- Steam Dump - Control Rod Insertion - No Loss of RCS Flow -

Nuclear Power and Reactor Coolant Average Temperature 14 Turbine , Trip with Pressure Control - Minimum Feedback -

Steam Dump - Control Rod Insertion - No Loss of RCS Flow -

Pressurizer Pressure and Water Volume 9

l l

l l

l i

I f 18900: 1 - _ - .

The initial RCS pressure is assum:d at a minimum value consistent with the steady state 70 pen:ent power cperation including allow-ances for calibration and instrument errors. The initial RCS flow is assumed to be consistent for four loop operation. This results in the maximum pcwer difference for the load loss and the minimum margin to core protection limi+.s at the intiation of the accident.

Table 1 summarizes the initial conditions assumed.

2. Moderator and Doppler Coefficients of Reactivity - the turbine trip is analyzed with both a least negative moderator temperature coef-ficient and a large negative moderator temperature coefficient.

Doppler power coefficients are adjusted to provide consistent minimum and maximum mactivity feedback cases.

3. Reactor control - from the standpoint of the maximum pressures attained, it is conservative to assume that the reactor is.in manual control. If the reactor were in autcmatic control, the control rod banks would insert prior to trip and reduce the severity of the transient.
4. Steam Release - no credit is taken for the operation of the steam dump system or steam generator power-operated relief valves. The steam generator pressure rises to the safety valve setpoint where steam release through safety valves limits secondary steam pressure at the setpoint value.
5. Pressurizer Spray and Power-0perated Relief Valves - two cases for both the minimum and maximum reactivity feedback cases are analyzed:
a. Full credit is taken for the effect of pressurizer spray and t

power-operated relief valves in reducing or limiting the coolant pre ssure. Safety valves are also available.

b. No cmdit is taken for the effect of pressurizer spray and power-operated relief valves in reducing cr limiting the coolant press u re. Safety valves are operable.

l 16900: 1

6. Feedwater Flow - main fe:dwat:r flow to the steam g:nerators is assumed to be lost at the time of turbine trip. No credit is taken for auxiliary feedwater flow since a stabilized plant condition will be mached before auxiliary feedwater initiation is nonnally assumed to occur; however, the auxiliary feedwater pumps would be expected to start on a trip of the main feedwater pumps. The auxiliary feedwater flow would remove core decay heat following plant stabilization.
7. Reactor trip is actuated by the first Reactor Protection System trip setpoint mached with no cmdit taken for the direct reactor trip on the turbine trip. Trip signals are expected due to high pressurizer pressure, overtemperature AT, high pmssurizer water level, low ,

reactor coolant loop flow, and reactor coolant pump power supply undervoltage.

Except as discussed above, nonnal reactor control systems and Engineered Safety Systems are not required to function. The Reactor Protection System may be required to function following a turbine trip. Pressur-

~

izer safety valves and/or steam generator safety valves may be required to open to maintain system pressures below allowable limits. No single active failure will prevent operation of any system required to function.

Recently the NRC has expressed concerns regarding the potential increase in probability of a stuck-open pressurizer PORY following the implemen-tation of the WRAP item " Deletion of Reactor Trip on Turbine Trip below 70 percent power." The NRC current position is addressed in NUREG-0660, Vol.1, Requirement 10, Table C-3 and NUREG-0611, Paragraph 3.2.4.6:

the anticipatory reactor trip function should not be deleted "until it i has been shown on a plant-by-plant bases that the small break LOCA probability msulting from a stuck-open PORY is little affected by the modification" The Westinghouse design criterion is that load rejections up to 100 percent should not require a reactor trip if all other functions operate properly. The power mismatch is taken up by the 70 pertent steam dump and automatic md insertion (10 pertent). The PORV's are provided to owew

- r' educe th likelihood of tripping the reactor on the high pressurizer pressure signal and opening the pressurizer safety valves, which cannot be isolated.

So in addition to the limiting transients described above, a better estimate transient was simulated assuming operation of the control sys-tems that normally would be available. This is done in order to simu-late a better estimate of the transient that would normally occur following a loss of load without subsequent reactor trip to show that the pressurizer PORV's would normally not open. Using the same initial operating conditions, the better estimate case assumed correct operation of the network buss transfer, steam dump, feedwater control system, and pressurizer pressure control system. Also for the better estimate case, automatic rod control and beginning of life reactivity feedback condi-tions were assumed. The same protection systems were available but not used for the better estimate transient.

8 l

l i

r l

16900: 1

3.0 RESULTS s

The transient reponses for a turbine trip from 70 percent of full power operaticn are shown for five cases: two cases for minimum reactivity .

feedback, two cases for maximum reactivity feedback and one better esti-mate case (Figures 1 through 15). The calculated sequence of events for the transients is shown in Tables 2 and 3.

Figures 1 through 3 show the transient response,s for the total loss of steam load with a least negative moderator temperature coefficient as;uming full credit for the pressurizer spray and pressurizer power-operated relief valves. No credit is taken for steam dump. The buss transfer failure at 30 seconds results in an undervol~tage trip of the reactor and the initiation of the loss of flow transient. The minimum DNBR remains well above the limit value. The pressurizer relief valves are actuated and maintain primary system pmssure below 110 percent of the design value. The steam generator safety valves limit the secondary steam conditions to saturation at the safety valve setpoint.

Figures 4 through 6 show the responses for the total loss of steam load with a large negative moderator temperature ccefficient. All other plant parameters are the same as above. The buss transfer failure at 30 seconds results in an undervoltage trip of the reactor and the initiation of the loss of flow transient. The minimum DNBR remains well above the limit value throughout the transient. Pressurizer relief valves and steam generator safety valves prevent overpressurization in primary and secondary systems, respectively. .

The turbine trip accident was also studied assuming the plant to be initially operating at 70 pertent of full power with no credit taken for the pressurizer spray, pressurizer power-operated relief valves, or i

steam dump. The reactor is tripped on high pmssurizer pressure sig-nal. The fast bus transfer for this case is assumed to fail 1.2 seconds i

before md drop time to produce the transient most limiting with respect i

i l

l l

1890Q: 1 __ _

4 to DNB and to a ssume the rod drop time from the high pressurizer pres-sure signal i s coincident with the time from the undervoltage signal .

Figures 7 tnrough 9 show the transients with a l east negative moderator coefficient. The neutron flux remains essentially constant at 70 per-cent of f ull power until the reactor is tripped. The DNBR remains above the limit value throughout the transient. In this case the pressurizer safety valves are actuated and maintain system pressure below 110 percent of the design value.

Figures 10 through 12 are the transients with maximum reactivity feedback with the other assumptions being the same as in the preceeding case. The reactor is tripped on the high pressurizer pressure signal and the fast buss transfer to offsite power is assumed to fail 1.2 seconds before rod drop. Again, the minimum DNBR remains above the limit value throughout the transient and the pressurizer safety valves are actuated to limit primary pressure.

A better estimate turbine trip accident was also simulated assuming the plant to be i nitially operating at 70 percent of f ull power with credit

~

taken for pressurizer spray, steam dump, successful buss transfer, feed-water control system operational, automatic rod control, and beginning of life reactivity feedback conditions in mitigating the transient.

The control rods are inserted and the steam dump quickly actuated following the turbine trip event; primary side pressure increases very little, there is no reactor trip and the plant is smoothly and quickly brought to hot shutdown condition. DNBR remains well above the limit

! value. Following the turbine trip the maximum primary pressure is 2334 psia, and the steam pressure peaks at 1195 psia. Nei the r th e prima ry or secondary side pressure reaches the point where the pressure PORV's or the steam generator safety valves are actuated.

i l

13900: 1 . _ . _ . - _ _ _ _ _. ___

4.0 CONCLUSION

S Results of the analyses'show that the plant design is such that a turbine trip without a direct or immediate reactor trip presents no hazard to the integrity of the RCS or the main steam system. P ressure relieving devices incorporated in the two systems are adequate to limit the maximum pressures to within the design limits. The analysis also demonstrates that for a complete loss of forced reactor coolant flow initiated from the most adverse preconditions of a turbine trip, the DNBR does not decrease below the limit value at any time during the transi ent . Thus, no fuel or clad damage is predicted, and all applicable acceptance criteria are met.

For normal plant operation with all normal control systems assumed operational, pressurizer pressure does not reach the point of pressur-izer PORY activation. Therefore the Deletion of reactor trip on turbine trip below 70 percent power is not expected to significantly increase the probability of a small break LOCA due to a stuck-open PORV.

i i

1 d

1890Q: 1

TABLE 1 INITIAL CONDITIONS No. of Active Loops 4 Core Power, Mwt 2388 Thermal Design Flow (TOTAL) GPM 387600 Reactor Coolant Average Temperature, OF 580.7 Reactor Coolant System Pressure, psia 2250

TABLE 2 TIME SEQUENCE OF EVENTS FOR A TURBINE TRIP WITH PRESSURIZER PRESSURE CONTROL Event Time (sec.)

1. Minimum Feedaack (BOL)

Tu rbine trip 0 Peak pressurizer pressure occurs 9.5 Initiation of steam release from steam generator safety valves 9.5 Fast bus transfer failure, flow coastdown begins, and undervol tage -

trip occurs 30 Rods begin to fall 31.2 Minimum DNBR occurs 33.5

2. Maximum Feedback (E0L)

Turbine Trip 0 Minimum DNBR occurs 0 Peak pressurizer pressure occurs 7.5 Initiation of steam release from steam geneator safety valves 9.5 Fast bus transfer failure, flow coastdown begins, and undervoltage trip occurs 30 Rods begin to fall 31.2 18900:1

TABLE 3 I

TIME SEQUENCE OF EVENTS FOR A TURBINE i TRIP WITHOUT PRESSURIZER PRESSURE CONTROL Event Time (sec.)

i 1

1. Mi nimum l Feedback (B0L)

! Turbine Trip 0 Fast bus transfer fa'ilure, _ flow coastdown begins, and undervoltage trip occurs 6.36 r

Rods begin to f all, high pressur-izer pressure trip occurs 7.56 Initiation of steam release from steam generator safety valves 9.5 -

Minimum DNBR cccurs 10.0 Peak pressurizer pressure occurs

' (2547 psia) 10.0

2. Fbximum i Feedback (E0L)
Turbine Trip 0 i.

Minimum DNBR occurs 0 l

Fast bus transfer f ailure, flow l- coastdown begins and undervoltage i trip occurs 6.47.

! Rods begin to fall and high pres-  ;

- surizer pressure trip occurs 7.67 Peak pressudzer pressure occurs (2531 psia) 9.5-l

i i

i 18900:1 _ _ . _ _ _ _ _ . - - - _ . _ - , ,

0.8  ;

0.7 2 0.6 3J 0.5

- 0.4 >.,

=

==

y e-

  • 0*O

=a

  • g 0.2 ,

D 0.1 0.0 0 10 20 30 40 50 60 70 Time (sec) 700 675 l

_ 650 w

0 w

m 625 e

>=

600 575 0 10 20 30 40 50 60 70 Time (sac)

=igure 1 Tur:ine Tri:: si~n Pmssure Centro 1 - *M4nimum =eecback -

.1uclear ?cwer anc .Reac:cr Cccian: .verage Temeera ure

2600 2500 5 2400 -

o A

3 .2300 -

n u

2200 L8 ::0 3 2100 m

u l- 2000 1900 0 10 20 30 40 50 60 70 Time (sac) i 1400 1300 s

u 1200 -

\~

a 3Fa 1100 b%

1000

-u u=

= 5

  • C 900 us 800 700 0 10 20 30 40 50 00 70
  • Time (sac)

Ficure 2

~

Turcine Tric wit.1 Fressure Centrcl - Minimum Feecback -

Pressurizer Pressure and 'datar 'Iolume

2.00- '

L. .sa E

1.50 30 1*,5

_o. -

2. *s: 1.00
o. =

,3 ..o. 0.75 -

u U

g 0.50 -

V 0.75 0.00 0 10 20 30 40 50 60 70 Time (Sec) 3.]

l 7.0 -

6.0 -

~ .

t 3 a.0 i

l 4.0 -

l l

~

l a,0 s 2.0 0 5 10 15 20 25 30 35 40 r

{

! Time (Sec) l 1

Figure 3 Turbine Trip with Pressure Centrol -

.Niinimum Feel ack - Cor: .9:w r.d DNER l

l

O.3 0.7 0.6 dE 0.5 \ <

e .: N L~- t 0.4

=

3 5 0.3 3 ._-

m: a 0 . .,.

5 60.1 {

0.0 0 10 20 30 40 50 60 70 Time (sac) 1 610 .i 600 -

u.

o

- 590 e

9

>=

l 580 t

570

! 0 10 20 30 40 50 60- 70 i

' Time (sec) l ricure 1 Tdreine Tria uitn drassure Centrol .'daximum .reecbacx -

'tuclear 2cwer me :eac::r Ceciant .'verage Tam:ers ure i

I 1

[

'. 2600 2500 E 2400 3,

E_ 2300 5e 2200 d-O o

2100 A

E 2000 1900 0 10 20 30 40 50 60 70 Time (sec) 1200 1100 -

u u

a e-

mm a

1000 .

b%

u~

N IE==

900

, en oe u>

$~ 800 700 0 10 20 30 40 50 60 70 Time (sec) r ricure 5 Turcine Tria wi:.1 ?nssure C:ntr:1 "aximum eectacx -

~

Pressurizer Pressure ana '4ater Volume

o .

, ^

. . .J O 1 . ~, -r + -

_-. ,i

.- . :,: r

_. , ,- I

.. a .

2' I

, ,, n

..vu .

= l

.x - i \

0.,a- t x -

2

.Y 0.30 f C 'N o

J . ., J- [ e 0.00 0 10 20 30 10 50 60 ~ 'r tura (Sec) t 4 . :' .

_ .0 6.0 - e i

=.

3.U ,

.s.

a.0 b 1

3.O I

..r, m i

o 3 ,0 1 la- 20 5 20 2
4 i

Tira (Sec)

, m..,

.s.

.. .n. , ,, , . t . i,. n. . . ,-c. at.,, m.

..e ., c~,...

. .i .

i "a::i:a::a Feedback - Core 1 10w and D2il

)

i I

I

, 0.5 0.7

^

q 0.6 .

._._=

Ei E 0.5 35 7_ _ 0.4 -

25 u ._

0.3 .

a ium 0.2 w

- 0.1 0.0 0 10 20 30 40 50 60 70 Time (sec) 610 600 . '

w o

590 e

a 580 570 0 10 20 30 40 50 60 70 Time (sac) r ricure 7 t urca ne i r4 .c ..j d .s.cut Prassure wo,n,e..o1 . Minimum Feecback -

c

,u.u..i..a

. - r : we r and n,eac,.or .cl an Temce r3 tur.e

2600 2500 -

E 2400 '

u 4- -

2300 ux >,

s - 00

~

2100 m

.U f 2000 1900 0 10 20 30 40 50 60 .70 Time (sec) 1200 1100 .

u a . -.

-72., 1000 km w u

~ v 73 900 -

=-

4 O

=>

?. 800 700 0 10 20 30 40 50 60 70

Time (sec)

I r

'icur ' S Tur :ine Tric '4itncut 3ressure Cgn:mi '41nimum .:eedback -

l  ?~.s:uri:er Pressura and 'datar lo t ume i

i i

I

2.00  ;

1.75 -

f

- I

.5 1.50 f 1.25

5 o

1.00 6.3w 0.75

, U t

E 0.50 -

6 0.25 0.00 0 10 20 30 40 50 60 70 Time (Sec) 8.0 i.

I 7.0 +

t 6.0 '

5.0 is E

4.0

+

3.0 -

i i

I 2.0 i

0 3 10 15 20 25 30 35 40 i

  • Time (Sec) i 8

i i

Figure 9 - Turbine Trip Withcut Pressure Centrol -

.\linimum Feedback - Core Flow and DNBR i

0.3 0.7 5 0.6 .

-2 i

.3 0.5

--=,, 0.4 - .

n u=

IIJE

=

0.3 zv g 0.2 -

0.1 0 . 0.

0 10 20 30 40 50 60 70 Time (sac) 610 600 w

- 590 m

4 580 -

570 0 10 20 30 40 50 60 70 Time (sec) '

-"aSa_,dr,. ,. n,.. o 1 - Maximum Feectacx -

.: icure 10

' uro1ne i 7. 3 gj.*cu*"

~

Nuclear ?cwer and .,seac.'ar . C oiant Aver 19e *CO ' F2 2'J I'

.-' ' 2600 2500

=, 2400 E- 2300 D F_ 2200

~~

5 2100 o .

m a

g 2000 1900 0 10 20 30 40 50 60 70 Time (sac)

. 1200 1100 - .

u a

w 3m a 1000 b%

u~ '

N

-y -

6 900

.s.

w-me i um I 5 800 l

l 700 l -

0 10 20 30 40 50 60 70

, Time (sec) l I Ficura 11

~

Turoine Trio Withou: :res;ure On:rci - bi=:n eecback -

PNssurizer Pressure inc iater Iciume

.e ,

2.00 .

4 I

1. /3 f r_ -

. 1. a_0 a

3= 1.75 o- .

c 1.00

-v

-=

d .3 a 0.75 - -

O 0.50 -

v

. 0.25 0.00 0 10 20 30 JO 50 -60 70 .

Time (Sec) 1

! 3.0 .

i  :

I  !

7.0 - I i

6.0 -

i -

b a

, E -

5.0 ,

Sur i 4

4.0

, l'

c- ~

t r

! 3. 0 /

i

t. ,-

L 2.0

  • J

! O 5 10 15 :D 25 30 35 10 '

i .

ume (Sec1 1  ;.

l i.

l Fitmre 12 - Turbine Tric /Jiicut ?ressure :cntrol

) "

! Maximum Feedback '- Core Ficw ad :'GR v

1 4

4

1

\ .

W j

i 4 ,.

{

A 4

i

?.2 . , ,

1 ,

v t

- s

s. s .

.. . o s .

  • i i 5 '
2. .

. - , . .~

~ -

... . . s

= ,

u :=

_.  : s v- s

- i.

, = a, '

u

- s . t 0 . .,. ,

1

~ - - ... .-- . ~

J g Te,, i

. \ i

! 0.0

.I sw

. 0' 50 100 150 00 1

  • 4. .. e s aep, .

i v

i t

t

  • il 4

i

  • 600 580 < ~

1 560

w m i

s' 540 y

=

1, -

, s ...

t -> \

5Q0.

i, s

500 i

0 50 100 150 200 i

  • J. e t u ;.3

. ? ,s r '

a , .~=r 1

5

- i

.w....,.

  • t..--,.

esp I a* t.* e*

  • * **3* ** t*

=

. e*m g " a . . , , ' 4.*..e .se. . e 4. C. '.* *a*.- P C . . . . *

.. 1 =, ..

[

. . a.

a.. *w

. ...,,e..w *

. . ,, o w e. = =< <, , . m.e. .g e*..w.

  • M. . .,,*

w .. * * ,=-

i . 4" 3

== ,,

.,.J

. *..e , G* .

,~1

..e. .. +- - *

  • 3 v.a **. *g

~- e: P { f. C

=*

'O2**".*+w ==

  • * . *** "* * * 3**...*

=== 5

'* *I'

, = ; ,n u .

. :.mp a

. .e q**. . .f Y*O.

~


w--.-.--- ...y.--- - ~ _ - - - - , - , , - -

, - . , , ~ .m.,,. ,,-.--,,.---...--,,,,,,y -

- . , , , 3-,.. _ . r.,, .

9.-- -

4

. O' 9

+

I 1

2400 2300 o

u -

=n -

,,00

.. . s uA N &

= = = \_ \

^

u 2100 i 2000 0 50 100 150 200 Time (:ec';

1100 1

l b

u c- 900 3."*

1- -

b e.

MM N

l i == U

= 700

. '_ _i Am A 2 1s 2 3e b

0 20 1.00 ' .0

.. .v"0

    • l' 3h 7.._,,...,

2 .

g g a. l .m. o. ".a*=-y.-. .. ) *o. .c .- .- e.* ...a...*..

- . *14-..,....

. . ..,_f

-I j eg.

y

  • o.

. 14 *

  • a , ',' mw ' ..

. 4. a %. e. ] t, ."

. .[ *., ,W =

  • ****e= I
7. A.w e . e. c. g.ve* . 4. w g E #.3. 2fp* * . 7* * 'a w ....iw.

4

  • ep == '**

'....i..g o ., G . 0. ye .

2 ve o, c..*s *w*

  • O *

,==.v" ) v c. .* .* *.+ .e=

' ' ^ ~ - --

.e s c.

w

  • I - - _ - , , . . _ , , , , , ,

I ATTACfNENT 2 i

I l

1 1890Q:1 --,

- '---e

e .

MAXIMUM DOSE RELEASE ANALYSIS An analysis of the worst case steam releases was performed using the following basic assumptions:

1. Plant is in manual control mode
2. Pressurizer pressure control (spray and PORV relief)
3. BOL conditions (minimum moderator feedback)
4. No steam dump
5. Successful bus transfer to offsite power
6. Feedwater control system operational
7. No operator action for 30 minutes A considerable amount of steam may be released during this transient through the Steam Generator Safety Valves to the environment. This is assumed to occur for 30 minutes due to operator action delay. liowever, the pressurizer PORVs and SG safety valves do not lift until 9.5 seconds into the transient (following primary to secondary pressure and temperature increases due to turbine trip).

By 30 seconds the pressurizer PORVs and spray and SG safety valves and the plant conditions stabilize at approximately 68 percent power, a high DNBR, and 68.64 percent nominal steam flow out of the steam generator safety valves. It is the steam flow we are concerned with. Graphs of pertinent parameters are on the following pages.

Total flow through SG safety valves = 68.84 percent nominal flow

(.6864)(4206.69 lbm/S)(1800 sec - 9.5 sec) = 5,170,018.65 lbm)

Since a Reactor Trip is not obtained and the plant stabilizes at a high power level and steam flow, this case is very conservative with respect to steam release for all cases presented in the main body of this report. Therefore, this release (5,170,018.65 lbm) is conservative and may be used to verify the i acceptability of all transients with respect to radiological dose releases.

Normal operation steam activity concentrations are assumed for the entire steam

release with the appropriate dispersion factors applied for doses to the Exclusion
Area Boundary and Low Population Zone Boundary. The normal operating assumption applied to the worst case steam release for this event yields doses to the site boundaries that are in compliance with 10 CFR 50 Appendix I objectives.

Annual doses from a number of such events will also be within the Appendix I objectives and will contribute insignificant 1y to anticipated operational annual releases for the Catawba Nuclear Station.

,e .. .

U.S ,

'r_

. 2 0.6 -

, =

Li

,, w e=

u 0.4

-= * -

U O

=-

as 4 0.2 u.

w 0.0 0 500 1000 1500 1800 Time (sec) -

620 610 -

600 4 u.

o

- 590 m

=

- 530 570 -

560 0 500 1000 1500 1800 Time (sac)

..se rs a- ui-5 :-n:ure C:ntr:I 'iinimum Feecback -

, :, ~~ u r ,. .

Nuclear 2 0wer inc CJr9 Aver 3Ca .dC:Cer300F9 l

l l

i l

I

~

2400 __

2300

., 2200 A

s n

e. 2100

- m u =.

Nw

-- 2000

-=

U 1900 -

1800 0 500 1000 1500 1800 Time (sec) 1400 1300 1200 v

.w e e 1100

=w%.

m

~

1000 MU

=

-: 900

=-

A C

'A > o u v00 t

l 700 r

I 600 i

0 500 ' 1000 1500 1800 Time (sec) l :5:ur, 2 r uccine cia i:., :ressure C:n:r:1 - mimum =eeeack -

r i

-essur :er =ressure snc wa a r vc.u=e e

i l

l

.e* .

0.5

_. 0.4 N -

= -

=

z

0.3 -

2%

=

w=

=

0.2 .

a-ma 7 uu

< a W b v . .,

w 0.0 0 500 1000 1500 1800 i ime sac 0.O .

- 04 -

m=

==

4= 0.3 2e c

-= 0 . .,.

wc -

as cU r

u< 0,1 a u A6 w

0.0 .

0 500 1000 1500 1300 ilme sac q, ,r .2

, u p*, 4. ..,2....4.,4 ... .w. . e~u.. ~- ~~F n~- ci tiinimum Feecback -

3 tasm El 0W , '0CCS 2 3DC 3

.... 4

. , b. e 8.0 7.0 6.0 -

55.0 E

4.0 3.0 1 4

2.0 0 500 1000 1500 1800 Ti.me (sec) l l

l r

Ficure a Turcine Trio with Pressure Centrol - tiinimum .:eecback -

ONBR l

I l

- _ _ _ _ _ _ - _ _