Category:INSPECTION REPORT
MONTHYEARIR 05000298/19990121999-10-22022 October 1999 Insp Rept 50-298/99-12 on 990927-30.No Violations Noted. Major Areas Inspected:Licensee Emergency Preparedness Program & Included Review of Emergency Preparedness Performance Indicators IR 05000298/19990101999-10-14014 October 1999 Insp Rept 50-298/99-10 on 990920-24.No Violations Noted. Major Areas Inspected:Radiological Environ & Meteorological Monitoring Programs & Program for Unrestricted Release of Matl from Radiological Controlled Area IR 05000298/19990031999-10-0808 October 1999 Insp Rept 50-298/99-03 on 990823-27 & 990907-10.No Violations Noted.Major Areas Inspected:Methods Used for Identification,Cause Investigation & Correction of Quality Related Problems IR 05000298/19990071999-09-27027 September 1999 Insp Rept 50-298/99-07 on 990718-0828.No Violations Noted. Major Areas Inspected:Implementation of Reactor Safety & Emergency Preparedness Programs IR 05000298/19990091999-09-22022 September 1999 Insp Rept 50-298/99-09 on 990823-26.No Violations Noted. Major Areas Inspected:Radioactive Matl Processing & Shipping Programs & Occupational Radiation Safety Performance Indicator IR 05000298/19990081999-09-14014 September 1999 Insp Rept 50-298/99-08 on 990816-20.No Violations Noted. Major Areas Inspected:Access Authorization/Fitness-for-Duty (Behavior Observation) Program,Access Control of Personnel, Packages & Vehicles Into Protected & Vital Areas & PIs IR 05000298/19990061999-08-0909 August 1999 Insp Rept 50-298/99-06 on 990530-0717.No Violations Noted. Major Areas Inspected:Inspectors Performed Partial Walkdown of high-pressure Coolant Injection Sys,Including Components Located in Sys Pump Room IR 05000298/19990021999-07-21021 July 1999 Insp Rept 50-298/99-02 on 990628-0702.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program to Determine Whether Program Incorporated Appropriate Requirements for Evaluation Operator IR 05000298/19990051999-06-16016 June 1999 Insp Rept 50-298/99-05 on 990502-29.Noncited Violations Identified.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000298/19990041999-05-19019 May 1999 Insp Rept 50-298/99-04 on 990321-0501.Non-cited Violations Identified.Major Areas Inspected:Operations,Maint & Plant Status.Emergency Procedures Failed to Instruct Operators When to Reduce Core Spray Pump Flow Following DBA IR 05000298/19990011999-05-0505 May 1999 Insp Rept 50-298/99-01 on 990207-0320.Non-cited Violations Noted.Major Areas Inspected:Operations & Maint ML20204D9811999-03-18018 March 1999 Insp Rept 50-298/98-09 on 981227-990206.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000298/19980081999-01-22022 January 1999 Insp Rept 50-298/98-08 on 980115-1226.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20199E1691999-01-0707 January 1999 Insp Rept 50-298/98-22 on 981116-1208.Violations Noted.Major Areas Inspected:Licensee Performance in Completing Engineering Strategy Action Item 3.2.e IR 05000298/19980151998-12-17017 December 1998 Insp Rept 50-298/98-15 on 980504-22 & 980608-26.Violations Noted.Major Areas Inspected:Safety Sys Engineering Insp Performed for Dgs,Vital Ac Eds & CR Emergency Filtration Sys IR 05000298/19980071998-12-11011 December 1998 Insp Rept 50-298/98-07 on 981004-1114.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980211998-10-29029 October 1998 Insp Rept 50-298/98-21 on 981005-09.No Violations Noted. Major Areas Inspected:Third 10-yr Interval Inservice Insp Program,Including GE Reactor Insp Sys Automated Ultrasonic Exams of Reactor Vessel Circumferential Weld IR 05000298/19980061998-10-21021 October 1998 Insp Rept 50-298/98-06 on 980823-1003.No Violations Noted. Major Areas Inspected:Operations,Maintenance & Plant Support IR 05000298/19980201998-09-21021 September 1998 Insp Rept 50-298/98-20 on 980831-0904.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000298/19980051998-09-18018 September 1998 Insp Rept 50-298/98-05 on 980712-0822.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000298/19980041998-08-19019 August 1998 Errata to Insp Rept 50-298/98-04.Page 10 of Rept Was Inadvertently Omitted ML20237A6221998-08-10010 August 1998 Insp Rept 50-298/98-04 on 980531-0711.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980181998-06-30030 June 1998 Insp Rept 50-298/98-18 on 980518-21 & 0608-11.No Violations Noted.Major Areas Inspected:Reviewed Radiation Protection Activities Including Exposure Controls,Controls of Radioactive Matls & Contamination IR 05000298/19980031998-06-23023 June 1998 Insp Rept 50-298/98-03 on 980419-0530.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980161998-06-22022 June 1998 Insp Rept 50-298/98-16 on 980608-11.Weakness Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale Biennial Exercise of Emergency Plan & Implementing Procedures IR 05000298/19980191998-06-17017 June 1998 Cancelled Insp Rept 50-298/98-19.Open Items Insp That Was Assigned NRC Insp Rept 50-298/98-19 Will Be Combined W/ Engineering Insp Documented in NRC Insp Rept 50-298/98-15 IR 05000298/19980021998-06-11011 June 1998 Errata to Insp Rept 50-298/98-02,dtd 980515.Changes Have Been Made to Fourth Paragraph IR 05000298/19980171998-05-26026 May 1998 Insp Rept 50-298/98-17 on 980504-08.Violations Noted.Major Areas Inspected:Plant Support ML20247L2721998-05-15015 May 1998 Insp Rept 50-298/98-02 on 980308-0418.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980131998-04-17017 April 1998 Insp Rept 50-298/98-13 on 980406-09.No Violations Noted. Major Areas Inspected:Training & Qualifications,Quality Assurance Oversight,Facilities & Equipment,Procedural Guidance & Annual Repts IR 05000298/19980141998-04-17017 April 1998 Insp Rept 50-298/98-14 on 980406-09.No Violations Noted. Major Areas Inspected:Organization & Mgt Controls, Radioactive Effluent Monitoring & safety-related Air Cleaning Sys ML20216F8721998-04-14014 April 1998 Insp Rept 50-298/98-12 on 980316-19.No Violations Noted. Major Areas Inspected:Emergency Plan & Implementing Procedures,Emergency Facilities & Equipment,Organization & Mgt Control,Training & Audits IR 05000298/19980111998-04-0909 April 1998 Cancelled Insp Rept 50-298/98-11.No Rept Will Be Issued W/Subj Number IR 05000298/19980011998-03-31031 March 1998 Insp Rept 50-298/98-01 on 980125-0307.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980101998-03-19019 March 1998 Insp Rept 50-298/98-10 on 980302-06.Violations Noted.Major Areas Inspected:Review of Access Authorization,Vehicle Access Control,Assessment Aids,Safeguards Event Logs,Plans & Procedures & Audit & self-assessment Programs IR 05000298/19970111998-02-23023 February 1998 Insp Rept 50-298/97-11 on 971214-980124.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19972011998-02-0505 February 1998 Insp Repts 50-298/97-201 on 971027-1121 & 1201-04.No Violations Noted.Major Areas Inspected:Rhr Sys & REC Sys ML20198L0471998-01-12012 January 1998 Insp Rept 50-298/97-10 on 971102-1213.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19970091997-12-19019 December 1997 Insp Rept 50-298/97-09 on 970921-1101.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19970191997-12-17017 December 1997 Insp Rept 50-298/97-19 on 971117-20.No Violations Noted. Major Areas Inspected:Implementation of Radiological Environ Monitoring & Meteorological Monitoring,Training & Qualifications,Qa Oversight,Facilities & Equipment IR 05000298/19970181997-12-17017 December 1997 Insp Rept 50-298/97-18 on 971020-1117.No Violations Noted. Major Areas Inspected:Maint & Engineering IR 05000298/19970171997-12-10010 December 1997 Insp Rept 50-298/97-17 on 971117-20.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program Evaluation IR 05000298/19970081997-10-20020 October 1997 Insp Rept 50-298/97-08 on 970810-0920.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000298/19970161997-10-0909 October 1997 Insp Rept 50-298/97-16 on 970915-24.Violations Noted.Major Areas Inspected:Follow Up on Licensee Planned & Implemented Activities Associated W/Erosion/Corrosion Monitoring Program & Open NRC Items IR 05000298/19970121997-10-0303 October 1997 Insp Rept 50-298/97-12 on 970708-0905.Violations Being Considered for Escalated Ea.Major Areas Inspected:Evaluation of Licensee Performance Re Recognizing Documenting & Correcting Conditions Adverse to Quality ML20154F2061997-09-19019 September 1997 Partially Withheld Insp Rept 50-298/97-15 on 970818-22 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Licensee Vehicle Barrier Sys Utilizing Technical Instruction 2515-132,dtd 960118 IR 05000298/19970131997-09-12012 September 1997 Insp Rept 50-298/97-13 on 970728-0814.Violation Noted.Major Areas Inspected:Surveillance Procedure IR 05000298/19970071997-09-0404 September 1997 Insp Rept 50-298/97-07 on 970629-0809.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000298/19970141997-08-27027 August 1997 Insp Rept 50-298/97-14 on 970804-08.No Violations Noted. Major Areas Inspected:Licensee FFD Program Utilizing IP 81502, FFD Program, ML20149K8881997-07-25025 July 1997 Insp Rept 50-298/97-06 on 970518-0628.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support 1999-09-27
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000298/19990121999-10-22022 October 1999 Insp Rept 50-298/99-12 on 990927-30.No Violations Noted. Major Areas Inspected:Licensee Emergency Preparedness Program & Included Review of Emergency Preparedness Performance Indicators IR 05000298/19990101999-10-14014 October 1999 Insp Rept 50-298/99-10 on 990920-24.No Violations Noted. Major Areas Inspected:Radiological Environ & Meteorological Monitoring Programs & Program for Unrestricted Release of Matl from Radiological Controlled Area IR 05000298/19990031999-10-0808 October 1999 Insp Rept 50-298/99-03 on 990823-27 & 990907-10.No Violations Noted.Major Areas Inspected:Methods Used for Identification,Cause Investigation & Correction of Quality Related Problems IR 05000298/19990071999-09-27027 September 1999 Insp Rept 50-298/99-07 on 990718-0828.No Violations Noted. Major Areas Inspected:Implementation of Reactor Safety & Emergency Preparedness Programs IR 05000298/19990091999-09-22022 September 1999 Insp Rept 50-298/99-09 on 990823-26.No Violations Noted. Major Areas Inspected:Radioactive Matl Processing & Shipping Programs & Occupational Radiation Safety Performance Indicator IR 05000298/19990081999-09-14014 September 1999 Insp Rept 50-298/99-08 on 990816-20.No Violations Noted. Major Areas Inspected:Access Authorization/Fitness-for-Duty (Behavior Observation) Program,Access Control of Personnel, Packages & Vehicles Into Protected & Vital Areas & PIs IR 05000298/19990061999-08-0909 August 1999 Insp Rept 50-298/99-06 on 990530-0717.No Violations Noted. Major Areas Inspected:Inspectors Performed Partial Walkdown of high-pressure Coolant Injection Sys,Including Components Located in Sys Pump Room IR 05000298/19990021999-07-21021 July 1999 Insp Rept 50-298/99-02 on 990628-0702.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program to Determine Whether Program Incorporated Appropriate Requirements for Evaluation Operator IR 05000298/19990051999-06-16016 June 1999 Insp Rept 50-298/99-05 on 990502-29.Noncited Violations Identified.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000298/19990041999-05-19019 May 1999 Insp Rept 50-298/99-04 on 990321-0501.Non-cited Violations Identified.Major Areas Inspected:Operations,Maint & Plant Status.Emergency Procedures Failed to Instruct Operators When to Reduce Core Spray Pump Flow Following DBA IR 05000298/19990011999-05-0505 May 1999 Insp Rept 50-298/99-01 on 990207-0320.Non-cited Violations Noted.Major Areas Inspected:Operations & Maint ML20204D9811999-03-18018 March 1999 Insp Rept 50-298/98-09 on 981227-990206.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000298/19980081999-01-22022 January 1999 Insp Rept 50-298/98-08 on 980115-1226.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20199E1691999-01-0707 January 1999 Insp Rept 50-298/98-22 on 981116-1208.Violations Noted.Major Areas Inspected:Licensee Performance in Completing Engineering Strategy Action Item 3.2.e IR 05000298/19980151998-12-17017 December 1998 Insp Rept 50-298/98-15 on 980504-22 & 980608-26.Violations Noted.Major Areas Inspected:Safety Sys Engineering Insp Performed for Dgs,Vital Ac Eds & CR Emergency Filtration Sys IR 05000298/19980071998-12-11011 December 1998 Insp Rept 50-298/98-07 on 981004-1114.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980211998-10-29029 October 1998 Insp Rept 50-298/98-21 on 981005-09.No Violations Noted. Major Areas Inspected:Third 10-yr Interval Inservice Insp Program,Including GE Reactor Insp Sys Automated Ultrasonic Exams of Reactor Vessel Circumferential Weld IR 05000298/19980061998-10-21021 October 1998 Insp Rept 50-298/98-06 on 980823-1003.No Violations Noted. Major Areas Inspected:Operations,Maintenance & Plant Support IR 05000298/19980201998-09-21021 September 1998 Insp Rept 50-298/98-20 on 980831-0904.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000298/19980051998-09-18018 September 1998 Insp Rept 50-298/98-05 on 980712-0822.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000298/19980041998-08-19019 August 1998 Errata to Insp Rept 50-298/98-04.Page 10 of Rept Was Inadvertently Omitted ML20237A6221998-08-10010 August 1998 Insp Rept 50-298/98-04 on 980531-0711.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980181998-06-30030 June 1998 Insp Rept 50-298/98-18 on 980518-21 & 0608-11.No Violations Noted.Major Areas Inspected:Reviewed Radiation Protection Activities Including Exposure Controls,Controls of Radioactive Matls & Contamination IR 05000298/19980031998-06-23023 June 1998 Insp Rept 50-298/98-03 on 980419-0530.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980161998-06-22022 June 1998 Insp Rept 50-298/98-16 on 980608-11.Weakness Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale Biennial Exercise of Emergency Plan & Implementing Procedures IR 05000298/19980191998-06-17017 June 1998 Cancelled Insp Rept 50-298/98-19.Open Items Insp That Was Assigned NRC Insp Rept 50-298/98-19 Will Be Combined W/ Engineering Insp Documented in NRC Insp Rept 50-298/98-15 IR 05000298/19980021998-06-11011 June 1998 Errata to Insp Rept 50-298/98-02,dtd 980515.Changes Have Been Made to Fourth Paragraph IR 05000298/19980171998-05-26026 May 1998 Insp Rept 50-298/98-17 on 980504-08.Violations Noted.Major Areas Inspected:Plant Support ML20247L2721998-05-15015 May 1998 Insp Rept 50-298/98-02 on 980308-0418.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980131998-04-17017 April 1998 Insp Rept 50-298/98-13 on 980406-09.No Violations Noted. Major Areas Inspected:Training & Qualifications,Quality Assurance Oversight,Facilities & Equipment,Procedural Guidance & Annual Repts IR 05000298/19980141998-04-17017 April 1998 Insp Rept 50-298/98-14 on 980406-09.No Violations Noted. Major Areas Inspected:Organization & Mgt Controls, Radioactive Effluent Monitoring & safety-related Air Cleaning Sys ML20216F8721998-04-14014 April 1998 Insp Rept 50-298/98-12 on 980316-19.No Violations Noted. Major Areas Inspected:Emergency Plan & Implementing Procedures,Emergency Facilities & Equipment,Organization & Mgt Control,Training & Audits IR 05000298/19980111998-04-0909 April 1998 Cancelled Insp Rept 50-298/98-11.No Rept Will Be Issued W/Subj Number IR 05000298/19980011998-03-31031 March 1998 Insp Rept 50-298/98-01 on 980125-0307.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980101998-03-19019 March 1998 Insp Rept 50-298/98-10 on 980302-06.Violations Noted.Major Areas Inspected:Review of Access Authorization,Vehicle Access Control,Assessment Aids,Safeguards Event Logs,Plans & Procedures & Audit & self-assessment Programs IR 05000298/19970111998-02-23023 February 1998 Insp Rept 50-298/97-11 on 971214-980124.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19972011998-02-0505 February 1998 Insp Repts 50-298/97-201 on 971027-1121 & 1201-04.No Violations Noted.Major Areas Inspected:Rhr Sys & REC Sys ML20198L0471998-01-12012 January 1998 Insp Rept 50-298/97-10 on 971102-1213.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19970091997-12-19019 December 1997 Insp Rept 50-298/97-09 on 970921-1101.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19970191997-12-17017 December 1997 Insp Rept 50-298/97-19 on 971117-20.No Violations Noted. Major Areas Inspected:Implementation of Radiological Environ Monitoring & Meteorological Monitoring,Training & Qualifications,Qa Oversight,Facilities & Equipment IR 05000298/19970181997-12-17017 December 1997 Insp Rept 50-298/97-18 on 971020-1117.No Violations Noted. Major Areas Inspected:Maint & Engineering IR 05000298/19970171997-12-10010 December 1997 Insp Rept 50-298/97-17 on 971117-20.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program Evaluation IR 05000298/19970081997-10-20020 October 1997 Insp Rept 50-298/97-08 on 970810-0920.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000298/19970161997-10-0909 October 1997 Insp Rept 50-298/97-16 on 970915-24.Violations Noted.Major Areas Inspected:Follow Up on Licensee Planned & Implemented Activities Associated W/Erosion/Corrosion Monitoring Program & Open NRC Items IR 05000298/19970121997-10-0303 October 1997 Insp Rept 50-298/97-12 on 970708-0905.Violations Being Considered for Escalated Ea.Major Areas Inspected:Evaluation of Licensee Performance Re Recognizing Documenting & Correcting Conditions Adverse to Quality ML20154F2061997-09-19019 September 1997 Partially Withheld Insp Rept 50-298/97-15 on 970818-22 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Licensee Vehicle Barrier Sys Utilizing Technical Instruction 2515-132,dtd 960118 IR 05000298/19970131997-09-12012 September 1997 Insp Rept 50-298/97-13 on 970728-0814.Violation Noted.Major Areas Inspected:Surveillance Procedure IR 05000298/19970071997-09-0404 September 1997 Insp Rept 50-298/97-07 on 970629-0809.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000298/19970141997-08-27027 August 1997 Insp Rept 50-298/97-14 on 970804-08.No Violations Noted. Major Areas Inspected:Licensee FFD Program Utilizing IP 81502, FFD Program, ML20149K8881997-07-25025 July 1997 Insp Rept 50-298/97-06 on 970518-0628.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support 1999-09-27
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000298/19990121999-10-22022 October 1999 Insp Rept 50-298/99-12 on 990927-30.No Violations Noted. Major Areas Inspected:Licensee Emergency Preparedness Program & Included Review of Emergency Preparedness Performance Indicators IR 05000298/19990101999-10-14014 October 1999 Insp Rept 50-298/99-10 on 990920-24.No Violations Noted. Major Areas Inspected:Radiological Environ & Meteorological Monitoring Programs & Program for Unrestricted Release of Matl from Radiological Controlled Area IR 05000298/19990031999-10-0808 October 1999 Insp Rept 50-298/99-03 on 990823-27 & 990907-10.No Violations Noted.Major Areas Inspected:Methods Used for Identification,Cause Investigation & Correction of Quality Related Problems IR 05000298/19990071999-09-27027 September 1999 Insp Rept 50-298/99-07 on 990718-0828.No Violations Noted. Major Areas Inspected:Implementation of Reactor Safety & Emergency Preparedness Programs IR 05000298/19990091999-09-22022 September 1999 Insp Rept 50-298/99-09 on 990823-26.No Violations Noted. Major Areas Inspected:Radioactive Matl Processing & Shipping Programs & Occupational Radiation Safety Performance Indicator IR 05000298/19990081999-09-14014 September 1999 Insp Rept 50-298/99-08 on 990816-20.No Violations Noted. Major Areas Inspected:Access Authorization/Fitness-for-Duty (Behavior Observation) Program,Access Control of Personnel, Packages & Vehicles Into Protected & Vital Areas & PIs IR 05000298/19990061999-08-0909 August 1999 Insp Rept 50-298/99-06 on 990530-0717.No Violations Noted. Major Areas Inspected:Inspectors Performed Partial Walkdown of high-pressure Coolant Injection Sys,Including Components Located in Sys Pump Room IR 05000298/19990021999-07-21021 July 1999 Insp Rept 50-298/99-02 on 990628-0702.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program to Determine Whether Program Incorporated Appropriate Requirements for Evaluation Operator IR 05000298/19990051999-06-16016 June 1999 Insp Rept 50-298/99-05 on 990502-29.Noncited Violations Identified.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000298/19990041999-05-19019 May 1999 Insp Rept 50-298/99-04 on 990321-0501.Non-cited Violations Identified.Major Areas Inspected:Operations,Maint & Plant Status.Emergency Procedures Failed to Instruct Operators When to Reduce Core Spray Pump Flow Following DBA IR 05000298/19990011999-05-0505 May 1999 Insp Rept 50-298/99-01 on 990207-0320.Non-cited Violations Noted.Major Areas Inspected:Operations & Maint ML20204D9811999-03-18018 March 1999 Insp Rept 50-298/98-09 on 981227-990206.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000298/19980081999-01-22022 January 1999 Insp Rept 50-298/98-08 on 980115-1226.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20199E1691999-01-0707 January 1999 Insp Rept 50-298/98-22 on 981116-1208.Violations Noted.Major Areas Inspected:Licensee Performance in Completing Engineering Strategy Action Item 3.2.e IR 05000298/19980151998-12-17017 December 1998 Insp Rept 50-298/98-15 on 980504-22 & 980608-26.Violations Noted.Major Areas Inspected:Safety Sys Engineering Insp Performed for Dgs,Vital Ac Eds & CR Emergency Filtration Sys IR 05000298/19980071998-12-11011 December 1998 Insp Rept 50-298/98-07 on 981004-1114.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980211998-10-29029 October 1998 Insp Rept 50-298/98-21 on 981005-09.No Violations Noted. Major Areas Inspected:Third 10-yr Interval Inservice Insp Program,Including GE Reactor Insp Sys Automated Ultrasonic Exams of Reactor Vessel Circumferential Weld IR 05000298/19980061998-10-21021 October 1998 Insp Rept 50-298/98-06 on 980823-1003.No Violations Noted. Major Areas Inspected:Operations,Maintenance & Plant Support IR 05000298/19980201998-09-21021 September 1998 Insp Rept 50-298/98-20 on 980831-0904.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000298/19980051998-09-18018 September 1998 Insp Rept 50-298/98-05 on 980712-0822.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000298/19980041998-08-19019 August 1998 Errata to Insp Rept 50-298/98-04.Page 10 of Rept Was Inadvertently Omitted ML20237A6221998-08-10010 August 1998 Insp Rept 50-298/98-04 on 980531-0711.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980181998-06-30030 June 1998 Insp Rept 50-298/98-18 on 980518-21 & 0608-11.No Violations Noted.Major Areas Inspected:Reviewed Radiation Protection Activities Including Exposure Controls,Controls of Radioactive Matls & Contamination IR 05000298/19980031998-06-23023 June 1998 Insp Rept 50-298/98-03 on 980419-0530.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980161998-06-22022 June 1998 Insp Rept 50-298/98-16 on 980608-11.Weakness Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale Biennial Exercise of Emergency Plan & Implementing Procedures IR 05000298/19980191998-06-17017 June 1998 Cancelled Insp Rept 50-298/98-19.Open Items Insp That Was Assigned NRC Insp Rept 50-298/98-19 Will Be Combined W/ Engineering Insp Documented in NRC Insp Rept 50-298/98-15 IR 05000298/19980021998-06-11011 June 1998 Errata to Insp Rept 50-298/98-02,dtd 980515.Changes Have Been Made to Fourth Paragraph IR 05000298/19980171998-05-26026 May 1998 Insp Rept 50-298/98-17 on 980504-08.Violations Noted.Major Areas Inspected:Plant Support ML20247L2721998-05-15015 May 1998 Insp Rept 50-298/98-02 on 980308-0418.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980131998-04-17017 April 1998 Insp Rept 50-298/98-13 on 980406-09.No Violations Noted. Major Areas Inspected:Training & Qualifications,Quality Assurance Oversight,Facilities & Equipment,Procedural Guidance & Annual Repts IR 05000298/19980141998-04-17017 April 1998 Insp Rept 50-298/98-14 on 980406-09.No Violations Noted. Major Areas Inspected:Organization & Mgt Controls, Radioactive Effluent Monitoring & safety-related Air Cleaning Sys ML20216F8721998-04-14014 April 1998 Insp Rept 50-298/98-12 on 980316-19.No Violations Noted. Major Areas Inspected:Emergency Plan & Implementing Procedures,Emergency Facilities & Equipment,Organization & Mgt Control,Training & Audits IR 05000298/19980111998-04-0909 April 1998 Cancelled Insp Rept 50-298/98-11.No Rept Will Be Issued W/Subj Number IR 05000298/19980011998-03-31031 March 1998 Insp Rept 50-298/98-01 on 980125-0307.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980101998-03-19019 March 1998 Insp Rept 50-298/98-10 on 980302-06.Violations Noted.Major Areas Inspected:Review of Access Authorization,Vehicle Access Control,Assessment Aids,Safeguards Event Logs,Plans & Procedures & Audit & self-assessment Programs IR 05000298/19970111998-02-23023 February 1998 Insp Rept 50-298/97-11 on 971214-980124.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19972011998-02-0505 February 1998 Insp Repts 50-298/97-201 on 971027-1121 & 1201-04.No Violations Noted.Major Areas Inspected:Rhr Sys & REC Sys ML20198L0471998-01-12012 January 1998 Insp Rept 50-298/97-10 on 971102-1213.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19970091997-12-19019 December 1997 Insp Rept 50-298/97-09 on 970921-1101.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19970191997-12-17017 December 1997 Insp Rept 50-298/97-19 on 971117-20.No Violations Noted. Major Areas Inspected:Implementation of Radiological Environ Monitoring & Meteorological Monitoring,Training & Qualifications,Qa Oversight,Facilities & Equipment IR 05000298/19970181997-12-17017 December 1997 Insp Rept 50-298/97-18 on 971020-1117.No Violations Noted. Major Areas Inspected:Maint & Engineering IR 05000298/19970171997-12-10010 December 1997 Insp Rept 50-298/97-17 on 971117-20.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program Evaluation IR 05000298/19970081997-10-20020 October 1997 Insp Rept 50-298/97-08 on 970810-0920.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000298/19970161997-10-0909 October 1997 Insp Rept 50-298/97-16 on 970915-24.Violations Noted.Major Areas Inspected:Follow Up on Licensee Planned & Implemented Activities Associated W/Erosion/Corrosion Monitoring Program & Open NRC Items IR 05000298/19970121997-10-0303 October 1997 Insp Rept 50-298/97-12 on 970708-0905.Violations Being Considered for Escalated Ea.Major Areas Inspected:Evaluation of Licensee Performance Re Recognizing Documenting & Correcting Conditions Adverse to Quality ML20154F2061997-09-19019 September 1997 Partially Withheld Insp Rept 50-298/97-15 on 970818-22 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Licensee Vehicle Barrier Sys Utilizing Technical Instruction 2515-132,dtd 960118 IR 05000298/19970131997-09-12012 September 1997 Insp Rept 50-298/97-13 on 970728-0814.Violation Noted.Major Areas Inspected:Surveillance Procedure IR 05000298/19970071997-09-0404 September 1997 Insp Rept 50-298/97-07 on 970629-0809.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000298/19970141997-08-27027 August 1997 Insp Rept 50-298/97-14 on 970804-08.No Violations Noted. Major Areas Inspected:Licensee FFD Program Utilizing IP 81502, FFD Program, ML20149K8881997-07-25025 July 1997 Insp Rept 50-298/97-06 on 970518-0628.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support 1999-09-27
[Table view] Category:UTILITY
MONTHYEARIR 05000298/19900331990-11-0606 November 1990 Insp Rept 50-298/90-33 on 900904-1016.Noncited Violation Identified.Major Areas Inspected:Operational Safety Verification,Monthly Surveillance & Maint Observations, Review of Previously Identified Insp Findings IR 05000298/19900301990-09-27027 September 1990 Insp Rept 50-298/90-30 on 900827-31.Violations Noted.Major Areas Inspected:Licensee Water Chemistry & Radiochemistry Program,Including Water Chemistry & Radiochemistry Confirmatory Measurements IR 05000298/19900311990-09-26026 September 1990 Sys Entry & Retest Insp Rept 50-298/90-31 on 900910-14 & 17. No Violations Noted.Major Areas Inspected:Sys Entry Retest in Areas of Design Changes,Temporary Design Changes & Maint Activities IR 05000298/19900321990-09-14014 September 1990 Advises That Insp Rept 50-298/90-32 Canceled,Therefore,No Insp Rept Issued for Number IR 05000298/19900261990-08-0808 August 1990 Insp Rept 50-298/90-26 on 900616-0715.One Unresolved Item Identified.Major Areas Inspected:Operational Safety Verification,Monthly Maint & Surveillance Observations,Esf Walkdown & Onsite Followup of Written Repts IR 05000298/19900271990-07-20020 July 1990 Insp Rept 50-298/90-27 on 900709-13.No Violations or Deviations Noted.Major Areas Inspected:Licensee Startup Testing Following Refueling & Followup on Corrective Actions for Violation & Deviation IR 05000298/19900201990-07-18018 July 1990 Insp Rept 50-298/90-20 on 900611-15 & 25-29.No Violations or Deviations Noted.Major Areas Inspected:Quality Verification Function,Including Corrective Action & Audit Programs IR 05000298/19900221990-06-30030 June 1990 Insp Rept 50-298/90-22 on 900516-0615.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Monthly Surveillance & Maint Observation,Onsite Followup of Written Repts & IE Notice Followup IR 05000298/19900181990-06-15015 June 1990 Insp Rept 50-298/90-18 on 900416-0515.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Monthly Surveillance Observation,Complex Surveillance,Monthly Maint Observation & LER IR 05000298/19890241989-09-0606 September 1989 Insp Rept 50-298/89-24 on 890731-0804.Deviations Noted.Major Areas Inspected:Triennial post-fire Safe Shutdown Capability Reverification & Assessment & Implementation of Fire Protection Program IR 05000298/19890271989-09-0505 September 1989 Insp Rept 50-298/89-27 on 890821-25.No Violations Noted. Major Areas Inspected:Surveillance Procedures & Records IR 05000298/19890261989-08-28028 August 1989 Partially Withheld Insp Rept 50-298/89-26 on 890717-21 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Security Plan & Procedures,Mgt Effectiveness,Audits,Testing & Maint & Alarms IR 05000298/19890301989-08-24024 August 1989 Insp Rept 50-298/89-30 on 890807-11.Violation Noted.Major Areas Inspected:Qa Program Re Document Control IR 05000298/19890281989-08-18018 August 1989 Insp Rept 50-298/89-28 on 890731-0804.Violations Noted.Major Areas Inspected:Implementation of ATWS Requirements & Licensee Actions on Findings of Previous Insps ML20246G3441989-08-15015 August 1989 Insp Rept 50-298/89-25 on 890701-31.Violation Noted.Major Areas Inspected:Previously Identified Items,Ler Followup, Operational Safety Verification & Monthly Surveillance & Maint Observation IR 05000298/19890211989-07-26026 July 1989 Insp Rept 50-298/89-21 on 890626-30.No Violations or Deviations Noted.Major Areas Inspected:Licensee Liquid, Gaseous & Solid Radwaste Sys IR 05000298/19890221989-07-20020 July 1989 Insp Rept 50-298/89-22 on 890601-30.Violations Noted.Major Areas Inspected:Operational Safety Verification,Monthly Surveillance & Maint Observations & Onsite Followup of Events IR 05000298/19890231989-07-20020 July 1989 Insp Rept 50-298/89-23 on 890626-30.No Violations or Deviations Noted.Major Areas Inspected:Plant Mods & Licensed Operator Training Program IR 05000298/19890181989-06-15015 June 1989 Insp Rept 50-298/89-18 on 890416-0531.Violations Noted.Major Areas Inspected:Operational Safety Verification,Monthly Surveillance & Maint Observations,Installation & Testing of Mods & Refueling Activities ML20244C8001989-06-0202 June 1989 Insp Rept 50-298/89-19 on 890501-05 & 15-19.Violation Noted. Major Areas Inspected:Licensee Actions in Response to NRC Requirements for Motor Operated Valve Testing & Programs for Instrument Calibr & Piping Supports ML20244C9491989-06-0202 June 1989 Insp Rept 50-298/89-16 on 890501-05.Violations Noted.No Deviations Noted.Major Areas Inspected:Selected Areas of Radiation Protection Program as Set Forth in Core Insp Program,As Related to Outage Activities IR 05000298/19890201989-05-25025 May 1989 Reactive Insp Rept 50-298/89-20 on 890515-19.No Violations or Deviations Noted.One Weakness Identified.Major Areas Inspected:Commitments Made Re Facility Welding Program Enhancements IR 05000298/19890171989-05-15015 May 1989 Insp Rept 50-298/89-17 on 890501-05.Violations Noted.Major Areas Inspected:Action on Previously Identified Insp Findings,Inservice Insp & Welding IR 05000298/19890111989-05-0909 May 1989 Insp Rept 50-298/89-11 on 890301-15.No Violations Noted. Major Areas Inspected:Plant Status,Followup of Lers, Operational Safety Verification,Monthly Surveillance & Maint Observations,Balance of Plant Insp & QA Implementation IR 05000298/19890151989-04-27027 April 1989 Insp Rept 50-298/89-15 on 890410-14.Violations Noted.Major Areas Inspected:Welding Activities IR 05000298/19890101989-04-21021 April 1989 Insp Rept 50-298/89-10 on 890327-31.No Violations or Deviations Noted.Major Areas Inspected:Selected Areas in Radiation Protection Program as Set Forth in Core Insp Program (83750) IR 05000298/19890131989-04-12012 April 1989 Insp Rept 50-298/89-13 on 890327-30.No Violations or Deviations Noted.Major Areas Inspected:Licensee Actions Resulting from NRC Info Notice 86-053 Re Improper Installation of Heat Shrinkable Tubing at Nuclear Plants IR 05000298/19890031989-04-10010 April 1989 Insp Rept 50-298/89-03 on 890213-17.Violations Noted.Major Areas Inspected:Unresolved Items from Safety Sys Functional Insp,Including Emergency Electrical Sys,Auxiliary Support Sys & Other Related Issues IR 05000298/19890071989-03-14014 March 1989 Insp Rept 50-298/89-07 on 890206-28.Violation Noted.Major Areas Inspected:Followup of Previously Identified Insp Findings,Operational Safety Verification & Monthly Surveillance & Maint Observations IR 05000298/19880321989-03-0707 March 1989 Informs That Insp Rept 50-298/88-32 Cancelled,Therefore No Insp Rept Will Be Issued for Rept ML20246H4661989-03-0101 March 1989 Partially Withheld Insp Rept 50-298/89-06 on 890206-10 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Physical Security Program Including,Mgt Support,Security Program Plan & Audits & Protected Area Physical Barriers IR 05000298/19890051989-03-0101 March 1989 Insp Rept 50-298/89-05 on 890123-27 & 0206-10.Violation Noted.Major Areas Inspected:Action on Previously Identified Insp Findings & Licensee self-assessment Capability ML20235Y7271989-02-28028 February 1989 Insp Rept 50-289/89-09 on 890213-16.Potential Violation Noted.Major Areas Inspected:Diesel Generator Air Sys Failures IR 05000298/19890081989-02-28028 February 1989 Insp Rept 50-298/89-08 on 890215-17.No Violations or Deviations Noted.Major Areas Inspected:Operational Status of Emergency Preparedness Program,Including Changes to EPIPs & Changes to Emergency Facilities,Equipment & Instrumentation ML20235T8481989-02-27027 February 1989 Insp Rept 50-298/89-02 on 890123-27.Violation Noted.Major Areas Inspected:Engineering & Technical Support Capabilities & Activities IR 05000298/19890041989-02-23023 February 1989 Insp Rept 50-298/89-04 on 890123-27.No Violations or Deviations Noted.Major Areas Inspected:Solid Radwaste & Radioactive Matls Transportation Programs ML20235R7661989-02-23023 February 1989 Insp Rept 50-298/89-01 on 890101-0205.Deviation Noted.Major Areas Inspected:Plant Status,Operational Safety Verification,Monthly Surveillance & Maint Observations & Safety Sys Walkdown IR 05000298/19880271988-11-30030 November 1988 Insp Rept 50-298/88-27 on 881024-28.Violation Noted.Major Areas Inspected:Licensee Chemistry/Radiochemistry Program & Water Chemistry & Radiochemistry Confirmatory Measurements ML20206L7931988-11-15015 November 1988 Insp Rept 50-298/88-31 on 881001-31.Violations Noted.Major Areas Inspected:Followup of Plant Events,Operational Safety Verification,Access Control,Monthly Surveillance & Maint Observations & Emergency Excercise ML20206K5921988-11-14014 November 1988 Insp Rept 50-298/88-29 on 881017-20.No Violations or Deviations Noted.Major Areas Inspected:Licensee Performance & Capabilties During Annual Exercise of Emergency Plan & Procedures ML20206A6431988-11-0707 November 1988 Insp Rept 50-298/88-24 on 880912-23.Violation & Unresolved Item Noted.Major Areas Inspected:Followup of Previous Insp Findings,Onsite Review Committee,Offsite Review Committee & Equipment Qualification/Seismic Design of Agastat Relays, IR 05000298/19880281988-10-19019 October 1988 Insp Rept 50-298/88-28 on 880901-30.Violations Noted.Major Areas Inspected:Ler Followup,Transportation,Facility Mods, Operational Safety Verification & Monthly Surveillance & Maint Observations IR 05000298/19880261988-10-18018 October 1988 Insp Rept 50-298/88-26 on 880606-0921.Violations Noted. Major Areas Inspected:Licensee Actions on Previously Identified Items Re Equipment Qualification IR 05000298/19880251988-09-12012 September 1988 Insp Rept 50-298/88-25 on 880801-31.No Violations Noted. Major Areas Inspected:Info Notices Followup,Operational Safety Verification,Monthly Surveillance & Maint, Observations,Esf Walkdown & Security IR 05000298/19882001988-09-0606 September 1988 Insp Rept 50-298/88-200 on 880627-0715.No Violations Noted. Major Areas Inspected:Review of Emergency Operating Procedures Validation & Verification Program,Training Program & Walk Down in Control Room & Plant IR 05000298/19880231988-08-0808 August 1988 Insp Rept 50-298/88-23 on 880705-31.No Violations Noted. Major Areas Inspected:Ler Followup,Operational Safety Verification,Monthly Surveillance & Maint Observations, Radiological Protection & Security IR 05000298/19880211988-08-0505 August 1988 Insp Rept 50-298/88-21 on 880620-24 & 880711-15.No Violations or Deviations Noted.Major Areas Inspected:Action on Previous Insp Findings & Licensee Implementation of Inservice Testing Program for Pumps & Valves ML20151V1821988-08-0303 August 1988 Insp Rept 50-298/88-22 on 880705-08.No Violations Noted. Major Areas Inspected:Assessment Aids,Contingency Plan Implementation & Matl Control & Accountability.Details Withheld (Ref 10CFR2.790) IR 05000298/19880191988-08-0303 August 1988 Insp Rept 50-298/88-19 on 880613-17.No Violations or Deviations Noted.Major Areas Inspected:Nonlicensed Staff Training,Qa Annual Review (Procurement,Receipt Insp & Audits) & Licensee Actions on Previous Concerns ML20151Q9141988-07-15015 July 1988 Insp Rept 50-298/88-20 on 880601-0704.Violations Noted.Major Areas Inspected:Operational Safety Verification,Monthly Surveillance & Maint Observations.Esf Walkdown,Ie Bulletin 88-005 Followup,Radiological Protection & Security 1990-09-27
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000298/19990121999-10-22022 October 1999 Insp Rept 50-298/99-12 on 990927-30.No Violations Noted. Major Areas Inspected:Licensee Emergency Preparedness Program & Included Review of Emergency Preparedness Performance Indicators IR 05000298/19990101999-10-14014 October 1999 Insp Rept 50-298/99-10 on 990920-24.No Violations Noted. Major Areas Inspected:Radiological Environ & Meteorological Monitoring Programs & Program for Unrestricted Release of Matl from Radiological Controlled Area IR 05000298/19990031999-10-0808 October 1999 Insp Rept 50-298/99-03 on 990823-27 & 990907-10.No Violations Noted.Major Areas Inspected:Methods Used for Identification,Cause Investigation & Correction of Quality Related Problems IR 05000298/19990071999-09-27027 September 1999 Insp Rept 50-298/99-07 on 990718-0828.No Violations Noted. Major Areas Inspected:Implementation of Reactor Safety & Emergency Preparedness Programs PNO-IV-99-040, on 990924,licensee Was Replacing Motor Operator for Suction Valve on B Recirculation Loop.After Completing Repairs,Operators Plan to Restart Reactor.Info Has Been Discussed with Licensee1999-09-24024 September 1999 PNO-IV-99-040:on 990924,licensee Was Replacing Motor Operator for Suction Valve on B Recirculation Loop.After Completing Repairs,Operators Plan to Restart Reactor.Info Has Been Discussed with Licensee IR 05000298/19990091999-09-22022 September 1999 Insp Rept 50-298/99-09 on 990823-26.No Violations Noted. Major Areas Inspected:Radioactive Matl Processing & Shipping Programs & Occupational Radiation Safety Performance Indicator IR 05000298/19990081999-09-14014 September 1999 Insp Rept 50-298/99-08 on 990816-20.No Violations Noted. Major Areas Inspected:Access Authorization/Fitness-for-Duty (Behavior Observation) Program,Access Control of Personnel, Packages & Vehicles Into Protected & Vital Areas & PIs IR 05000298/19990061999-08-0909 August 1999 Insp Rept 50-298/99-06 on 990530-0717.No Violations Noted. Major Areas Inspected:Inspectors Performed Partial Walkdown of high-pressure Coolant Injection Sys,Including Components Located in Sys Pump Room IR 05000298/19990021999-07-21021 July 1999 Insp Rept 50-298/99-02 on 990628-0702.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program to Determine Whether Program Incorporated Appropriate Requirements for Evaluation Operator IR 05000298/19990051999-06-16016 June 1999 Insp Rept 50-298/99-05 on 990502-29.Noncited Violations Identified.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000298/19990041999-05-19019 May 1999 Insp Rept 50-298/99-04 on 990321-0501.Non-cited Violations Identified.Major Areas Inspected:Operations,Maint & Plant Status.Emergency Procedures Failed to Instruct Operators When to Reduce Core Spray Pump Flow Following DBA IR 05000298/19990011999-05-0505 May 1999 Insp Rept 50-298/99-01 on 990207-0320.Non-cited Violations Noted.Major Areas Inspected:Operations & Maint ML20204D9811999-03-18018 March 1999 Insp Rept 50-298/98-09 on 981227-990206.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000298/19993011999-03-0909 March 1999 NRC Operator Licensing Exam Rept 50-298/99-301 (Including Completed & Graded Tests) for Tests Administered on 990212. Exam Results:Four Reactor Operator License Applicants Passed Exam IR 05000298/19980081999-01-22022 January 1999 Insp Rept 50-298/98-08 on 980115-1226.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20202E3261999-01-22022 January 1999 Notice of Violation from Insp on 981115-1226.Violation Noted:Licensee Failed to Take Effective Measures to Preclude Repetition of Inadvertent Opening of torus-to-drywell Vacuum Breaker Documented in LER 50-298/97-007 IR 05000298/19960041999-01-0707 January 1999 Notice of Violation from Insp on 981116-1208.Violation Noted:Deviations from Plant Design Basis Identified as Result of Investigation Following Issuance of Violation 50-298/9604-1013 Not Properly Corrected ML20199E1691999-01-0707 January 1999 Insp Rept 50-298/98-22 on 981116-1208.Violations Noted.Major Areas Inspected:Licensee Performance in Completing Engineering Strategy Action Item 3.2.e IR 05000298/19980151998-12-17017 December 1998 Insp Rept 50-298/98-15 on 980504-22 & 980608-26.Violations Noted.Major Areas Inspected:Safety Sys Engineering Insp Performed for Dgs,Vital Ac Eds & CR Emergency Filtration Sys ML20198J3531998-12-17017 December 1998 Notice of Violation from Insp on 980504-22 & 0608-26. Violation Noted:As of October 1997,licensee Failed to Provide Procedures to Implement Compensatory Measures for Standby Liquid Control Tank Heater Failure,Per USAR ML20197J7321998-12-11011 December 1998 Notice of Violation from Insp on 981004-1114.Violation Noted:On 981001,inspectors Identified That Between 980125- 980125 & 0916,licensee Failed to Properly Maintain Procedures Governing Operation of Reactor Equipment Cooling IR 05000298/19980071998-12-11011 December 1998 Insp Rept 50-298/98-07 on 981004-1114.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980211998-10-29029 October 1998 Insp Rept 50-298/98-21 on 981005-09.No Violations Noted. Major Areas Inspected:Third 10-yr Interval Inservice Insp Program,Including GE Reactor Insp Sys Automated Ultrasonic Exams of Reactor Vessel Circumferential Weld IR 05000298/19980061998-10-21021 October 1998 Insp Rept 50-298/98-06 on 980823-1003.No Violations Noted. Major Areas Inspected:Operations,Maintenance & Plant Support IR 05000298/19980201998-09-21021 September 1998 Insp Rept 50-298/98-20 on 980831-0904.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000298/19980051998-09-18018 September 1998 Insp Rept 50-298/98-05 on 980712-0822.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000298/19980041998-08-19019 August 1998 Errata to Insp Rept 50-298/98-04.Page 10 of Rept Was Inadvertently Omitted IR 05000298/19980991998-08-17017 August 1998 SALP Rept 50-298/98-99 for Cooper Nuclear Station for Period of 970112-980711 ML20237A6221998-08-10010 August 1998 Insp Rept 50-298/98-04 on 980531-0711.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980181998-06-30030 June 1998 Insp Rept 50-298/98-18 on 980518-21 & 0608-11.No Violations Noted.Major Areas Inspected:Reviewed Radiation Protection Activities Including Exposure Controls,Controls of Radioactive Matls & Contamination IR 05000298/19980031998-06-23023 June 1998 Insp Rept 50-298/98-03 on 980419-0530.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 07100022/20120311998-06-23023 June 1998 Notice of Violation from Insp on 980419-0530.Violation Noted:No Explanation Was Included in Subsequent Annual Radioactive Matls Release Rept & Condition Was Not Repaired in Timely Manner from 971022-1231 IR 05000298/19980161998-06-22022 June 1998 Insp Rept 50-298/98-16 on 980608-11.Weakness Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale Biennial Exercise of Emergency Plan & Implementing Procedures IR 05000298/19980191998-06-17017 June 1998 Cancelled Insp Rept 50-298/98-19.Open Items Insp That Was Assigned NRC Insp Rept 50-298/98-19 Will Be Combined W/ Engineering Insp Documented in NRC Insp Rept 50-298/98-15 IR 05000298/19980021998-06-11011 June 1998 Errata to Insp Rept 50-298/98-02,dtd 980515.Changes Have Been Made to Fourth Paragraph ML20249C2481998-05-26026 May 1998 Notice of Violation from Insp on 980504-08.Violation Noted: on 980506,inspector Observed Group of Visitors Enter Protected Area That Were Not Issued Visitor Badges,Did Not Card in & Did Not Enter Protected Area Through Turnstiles IR 05000298/19980171998-05-26026 May 1998 Insp Rept 50-298/98-17 on 980504-08.Violations Noted.Major Areas Inspected:Plant Support ML20247L2451998-05-15015 May 1998 Notice of Violation from Insp on 980308-0418.Violation Noted:Procedure 7.2.63 Was Inappropriate to Circumstances & Had No Appropriate Acceptance Criteria,In That Required Torque Value Not Given in Flange Bolt Work Instructions ML20247L2721998-05-15015 May 1998 Insp Rept 50-298/98-02 on 980308-0418.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980141998-04-17017 April 1998 Insp Rept 50-298/98-14 on 980406-09.No Violations Noted. Major Areas Inspected:Organization & Mgt Controls, Radioactive Effluent Monitoring & safety-related Air Cleaning Sys IR 05000298/19980131998-04-17017 April 1998 Insp Rept 50-298/98-13 on 980406-09.No Violations Noted. Major Areas Inspected:Training & Qualifications,Quality Assurance Oversight,Facilities & Equipment,Procedural Guidance & Annual Repts ML20216F8721998-04-14014 April 1998 Insp Rept 50-298/98-12 on 980316-19.No Violations Noted. Major Areas Inspected:Emergency Plan & Implementing Procedures,Emergency Facilities & Equipment,Organization & Mgt Control,Training & Audits IR 05000298/19980111998-04-0909 April 1998 Cancelled Insp Rept 50-298/98-11.No Rept Will Be Issued W/Subj Number IR 05000298/19980011998-03-31031 March 1998 Insp Rept 50-298/98-01 on 980125-0307.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20217A3681998-03-19019 March 1998 Notice of Violation from Insp on 980302-06.Violation Noted:On Five Separate Occasions,Licensee Mgt Called in Workers to Perform Back Shift Work W/O Providing Transportation or Administering Breathalyser Test IR 05000298/19980101998-03-19019 March 1998 Insp Rept 50-298/98-10 on 980302-06.Violations Noted.Major Areas Inspected:Review of Access Authorization,Vehicle Access Control,Assessment Aids,Safeguards Event Logs,Plans & Procedures & Audit & self-assessment Programs IR 05000298/19970111998-02-23023 February 1998 Insp Rept 50-298/97-11 on 971214-980124.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203F8751998-02-23023 February 1998 Notice of Violation from Insp on 971214-980124.Violation Noted:On 971222,while MSL High RM Was Inoperable & Primary Containment Integrity Was Required,Licensee Opened Both Reactor Water Sample Valves IR 05000298/19972011998-02-0505 February 1998 Insp Repts 50-298/97-201 on 971027-1121 & 1201-04.No Violations Noted.Major Areas Inspected:Rhr Sys & REC Sys ML20198L0391998-01-12012 January 1998 Notice of Violation from Insp on 971102-1213.Violation Noted:As of 971213,Procedure 6.SC.502,Rev 2,was Not Appropriate to Circumstances in That Did Not Include Appropriate Acceptance Criteria 1999-09-27
[Table view] |
Inspection Report - Cooper - 1990020 |
---|
|
|
Text
W-ll 4; f
.
.,
.
APPENDIX U.S. NUCLEAR DFGULATORY COMMISSION REG 10N IV NRC Inspection Report: 60-298/90-20 Operating License: DPR-46 Docket: 50-298
'
Licensee: NebraskaPublicPowerDistrict(NPPD)
P.O. Box 499
- Columbus NE 68602-0499 Facility Name
- Looper Nuclear Station (CWS)
Inspection At: NPPD General Office Columbus Nebraska and CNS, Brownville, Nebraska Inspection Conducted: . June 11-15, and 25-29, 1990 Inspectors: 7dd VZ _ 7-/fTd L.'I. Ellershaw, Reargor Inspector, Materials Date and Quality Prograss Section, Division of Reactor Safety ik
, D. L. Garrison, Reactor Inspector Materials n@es Wre Date
andQualityProgramsSection,DIvisionof Reactor Safety
,
Approved:
a o - M- _
s, chief, materials and Quality Date h
o ams Section, Division of Reactor Safety inspection Sumary inspection Conducted June 11-15, and 25-29. 1990 (Report 50-298/90-20) ;
Areas inspected: Routine, unannounced inspection of the quality verification function including the corrective action program and the audit progra Pesults: The inspection results indicate that the quality verification process, including both a corrective action and an audit prograni, exists and appears to be effective. The programs provide for identification of problems, determination root causes, establishment of corrective ections, verification of lgf2$@$$k [$0 e o
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ___________a
L 4 l
L, .. ,
!
!
- .
..
.
l
.
-2- !
!
l I~ .c
'
completed corrective actions, and trending. While there appeared to be certain j weaknesses in some areas, the licensee had already identified these and >
<
initiated project plans with the intent to enhance the program. Some phases of :
these project plans are not yet complete; therefore, inspector followup items I were identified. .The inspectors concluded that, collectively, these .
<
- improvement programs when implemented, should result in strengthening the overallqualityverificationfunction, i
J t
.
i e
i
.
?
t i
f'
-
<
I
,
l l
I l
..
. . . . . - . . . .. -. - . . - ,
i
. =.
.
.. .
-
.
L *
,
3-e ;
DETAILS
. k PLRSONS CONTACTED !
NpPD l l c 1
- G. Trevors. Nuclear Support, Division Manager
- G. Horn, Nuclear Power Group Manage l'
s *R. Wilbur, Nuclear Engineering Division Manager L +D.. Robinson QualityAssurance(QA) Manager,ColumbusGeneralOffice i 4V. Wolstenholm, QA Division Manager
- L ' Bray, Regulatory Compliance Specialist ,
- M. Unruh, Supervisor, Maintenance :
- C. Moeller, Acting Manager, Staff Support ,
- J. Flaherty, Acting Manager, Engineering
- J. Sayer, Radiological Manager
'
- J. Meacham, Nuclear Operations Division Manager
- G. Smith, QA Manager, CNS
% Kuta, Regulatory Complience Specialist T. Hottovy, QA Engineering Supervisor ,
J. Larson, QA Supplier Supervisor ,
S. Bray,' Operations QA Supervisor l*
R. Gibson, Audit and Procurement QA Supervisor p gC
- G. Pick, Resident Inspector The inspectors also contacted and interviewed other NPPD personnel during the:
. course of this inspectio >
- ;
'* Attended the exit conducted on June 15, 1990 t
- Attended the exit conducted on June P9, 1990 4 Attended the exits conducted on June 15 and 29, 1990 QUALITY VERIFICATION FUNCTION (35702)
l- .The purpose of this inspection was to assess the effectiveness of licensee
- quality verification activities in identifying technical issues and problems of l- safety significance and in folicwing up to ensure that the issues and problems L -identified are res'olved in a timely manner. The inspectors examined tie corrective lJ action program and the audit program. The inspection results indicated that the
'
quality verification process appears to be effective. The programs inspected
.provided for identification of problems, establishment of root causes and corrective' actions, verification of completed corrective actions, and trendin Certain weaknesses were nbserved; but the licensee appeared to have identified ,
these already and had taken steps to correct them. This should result in a '
strengthening of the overall quality verification functio .
w,w -
. - - -.
__
- -
.
.
!
c . .
. ;
-
l-4 l 2.1 Corrective Action program (92720) ;
The purpose of the inspection was to verity that the licensee had established i and implemented a comprehensive program to identify technical issues that are ;
involved in nonconformance reporting. The program attributes included the !
recognition of the problem, the depth of the issue, research for generic implications, adequate engineering solutions or resolutions to the identified problems, followup of corrective action to predude recurrences, verification of the corrective action, and trending, i The licensee utilizes Cooper Nuclear Station (CNS) Procedure 0.5.1, Revision 5 to implement the nonconformance and corrective action program.. The inspectors i reviewed this document and found it to include the necessary attributes to ;
implement a complete nonconformance and corrective action program from simple issues to major plant event :
2. Root Cause Evaluations i i
The inspectors reviewed 24 nonconformance reports (NCRs), picked at random and !
evaluatedthereportsforcompleteness,correctdeterminationofreportability, I disposition of findings and assignments. The root cause analysis of each NCR i
'
was thoroughly reviewe With the exception of one NCR, the root cause determinations and the analyses i
'
were well_ written, comprehensive, and included the cause, recommended corrective action and engineering analysis. The inspectors reviewed the root cause training manual used by the engineering group and found it to be of .
excellent quality. This document was developed specifically for engineering .
root cause determination and contained such subjects as fatigue, carrosion, vibration, waterhamer, and other related subject It was notw that the root cause codes are the sane as used by the Boiling Water Reactor: (BWR) owners group, which provides consistency in reporting throughout tne industr ;
It was also noted that several additional actions, which emphasize root cause i determination, have been im)1emented in the licensee program to improve the program's effectiveners. Tlese actions were committed to in NPPD's letter to the NRC dated August 11, 1989, and were verified as ongoing programs by the inspectors. The actions included: implementation of standard root cause coding and third party review of the program, root cause analysis training for the nuclear engineering and site engineering departments, development of an engineering department instruction to standardize investigating root causes and upgrading the NCR database, and procedural changes to control the corrective action tracking syste l The inspectors interviewed four staff engineers in order to determine the status of the engineering root ause and trending programs. Each engineer stated that they had compiled a listing of attributes, which they considered pertinent to the components they were responsible for. These attributes were currently being evaluated by engineering management.-
_ _ _ _ . . . . - - - ..
.- - .
. ..
,
.' .
[
-5-i Regarding the one NCR mentioned previously, the inspectors did not consider the root cause determination and analysis to be accurate. NPPD initiated ,
NCR 90-039 on March 19, 1990, to document the receipt of commercial grade, flexible, metal-hoseproductswhichhadbeenorderedasnuclear,(PO)
saf ety-related. On February ?,1990, NPPD placed purchase order 312642 with Omaha Valve & Fitting Co. for nine line items of varying quantities and sizes of teflon lined, flexible metal-hoses and fittings. The P0 specified that this was an essential (nuclear safety-related) order, requiring traceability, and that the parts were to be manufactured under the control of a 10 CFR Part 50, Appendix B quality assurance program. The P0 also stated that all requirements of the order were to be transmitted and imposed on any manufacturer or subtier supplier involved in the manufacture of the listed components. Approximately March 5, 1990, the items were received at CNS, and a receipt inspection was performed. The receiving inspector identified a problem with respect to traceability. Further investigation revealed that the products '
were manufnetured as comercial grade items rather than nuclear safety-related 6
'
and that they had been supplied to the Omaha Yalve & Fitting Co. from another distributor, who had acquired them from the manufacturer. Since NPPD had previously purchased and installed flexible, metal hoses and fittings from the same supplier for safety-related applications, a potentially significant problem was evident.- HPPD determined that a comercial grade dedication effort was required. A cross section of various size hoses, which had been stored in the warehouse and which represented the hoses installed in safety-related applications, was selected for dedication. The dedication, identified as
~
CGl 90-030, consisted, in part, of testing, performed by Wyle Laboratories for ;
NPPD through EGS Corporation. The testing included pressure integrity tests, vibration aging, and seismic qualification testing. As a result of the dedication process, all hoses were considered acceptable by NPPD. Review of the NCR revealed that the disposition required a root cause analysis. The analysis identified the distributor as being the root cause to this problem in
'
that the distributor's existing program did not ensure that commercial grade items would not be supplied for safety-related applications and that an adequate training program had not been established for the distributor's people who were responsible for reviewing purchase orders to determine customer ;
requirements. The inspectors did not consider this to be an accurate analysis, in that HPPD was responsible for ensuring compliance with their stated procurement requirements. Discussions with NPPD's Columbus General Office quality assurance personnel responsible for vendor activities revealed that >
distributors have not been audited or evaluated and are not included in the program for approval of suppliers. The facts that NPPD does not really have any knowledge as to what activities are being performed by a particular ,
distributor or whether or not they have adequately trained personnel appears to be the root cause of this particular problem. The general office quality assurance manager acknowledged the inspectors' concern and reopened the NCR in order to perform a more in-depth analysi Further discussion with the quality assurance manager revealed that prior to the occurrence of this situation, it had been recognized that a potential for this type of problem existed. The licensee has initiated a project plan, which is the mechanism used to define and to provide the scope, purpose, justification, and implementing actions for effecting changes which have been
. _
_ _ . . _ . __ __ _._ _ ___. _ _ _ _ _ __
. . _ __
l
,
, ,
.
< .
.
-6 identified as program enhancers. This particular project plan is entitled,
" Distributors." Its purpose is to establish procedural control of purchases s made through distributors. The plan addresses evaluation of distributors to i determine the need for using them, the establishnent of requirements with respect to auditing distributors, and their inclusion in the supplier approval programs. The target date for completion of this project plan is December 31,
'199 ]
In addition, the inspectors determined that at the time the questionable root i cause determination was made, general office quality assurance engineers had l not received the root cause analysis training which had been provided to site I engineering personnel. However, training has been recently provided to two of i the four general office quality assurance engineers, with the other two scheduled i in the near future. Training, while not yet complete, has been provided to 1 engineers in the general office nuclear engineering departnent, inspectorFollowupItem(298/9020-01): Review the impicmentation of the project plan regarding distributor .1.2 Trending The general office quality assurance department is required to issue a quarterly nonconformance trend report in order to establish adverse trends and ,
to initiate the appropriate corrective actions. The trend report for the first quarter of 1990 was reviewed by the inspectors, who found it to be a compilation of deta, somewhat lacking as a document showing the establishnent of adverse trends. The Engineering group utili:es Engineering Department
. Instruction ED 89-02 for document research for MCR evaluations and ED 89-03 to implement the engineering trending program, which is currently ending phase 1 and represents the collection of all data being trended. The engineering >
program for trending is part of the project plan for implementation of a Plant Reliability / Performance Monitoring Program, which is a major licensee goal for 1990. The trend program and implementation should be a major step in enhancing the overall quality program, i inspector Followup Iten (298/9020-02): Review the implementation of the engineering program for trendin .2 Audit Program and Implementation (40702.40704)
The_ purpose of this phase of the inspection was to review the licensee's audit s
'
program and the implementation thereo The inspectors reviewed the principle procedures governing the audit and surveillance programs (i.e., Revision 22 of Procedure QAl-4, " Quality Assurance Surveillance" and Revision 29 of QAl-5, " Quality Assurance Audits." These procedures defined the scope and responsibilities, and provided the instructions necessary to implement the program requirerents. Each function, which has been designated as an auditable area, was described in a Quality Assurance Plan (QAP).
The YAP provided the full scope of the internal audit and the objectives and f
--- ,
, -- - ,.
_ . _ . _ _
.- .
l
..
.
. i
.
-7- !
was designed to provide the quality requirements for each designated functio l The audits are performed in accordance with the QAP and approved checklists,
'
whichaddresseach-objective. Surve111ances may either be scheduled or unscheduled and are intended to provide for verification that particular activity conforms to program requirements. Procedure QAl-4 also addresses "In-line" ,
reviews. This was described as a review of documents by quality assurance during the normal review cycle. Surveillances and in-line reviews are performed ;
in accordance with approved checklists which addressed all areas of the appropriate 1 QAPs. The resulting documentation, including the completed checklists, were l filed according to the applicable QAP and became a part of the corresponding 0A j audit. The program has provisions for documenting audit and surveillance I findings and observations, responses to findings, corrective actions, root cause analysis, and verification of completed corrective action I It was also noted that NPPD had reached agreenent with other licensees in terms i of providing qualified )ersonnel to participate in specified internal audit The use of external tec1nical expertise appears to be an excellent approach to enhancing the internal audit program. Thus far NPPD has been assisted in selected audits by Iowa Power & Light Company, TU Electric Company, and Louisiana Power & Light Compan The priinary respons1M11ty for scheduling and performing internal audits rests with the site quality assurance manager. It is this manager's responsibility to essign the qualified personnel to lead and to participate in the audit The general office qual'ty assurance manager's responsibility is to provide QA personnel, when requested, to supplement the site quality assurance staff in performing the audit. The inspectors reviewed the documentation files associated with tne following internal audits: Internal Audit 89-05, QAP 1700
- Design Control Internal Audit 89-39, QAP 1800 - In-Service Testing; Internal
,
Audit 89-29, QAP 2300 - Effectiveness of Corrective Action; Internal Audit 89-18, QAP 600 - Surveillance Testing, and Internal Audit 89-16, QAP 200
- Station Operation The inspectors noted that there were large amounts of supporting documentation (i.e., audit checklists, surveillance checklists, and in-line review checklists .
auditor (s))to conduct a thorough audit.In most instances The available there information appeared to be a di reflected in-depth audit performances which identified a number of findings. Audit findings were being responded to in a meaningful manner and the corrective actions were subsequently verified by QA as having been satisfactorily accomplished. However, during the inspectors' review and evaluation of certain objectives in the QAPs and the applicable checklists, it became apparent that a number of objectives were worded to require verification _(by the auditor) that certain activities were being performed and accomplished in accordance with applicable program requirements. The methods used by the auditors to verify these activities consisted of document review (i.e., controlling procedures and applicable records). It appeared that certain assumptions were being made (i.e., if the controlling procedure stated that a given activity was to be performed in accordance with specified requirements, and records existed to show that the activity was accomplished, that this provided the auditor with
.
. , ,
,,a y, . . , _ - - , -
.
.
.
.. ' ..
- ,
.
.
.t, .
the necessary verification). In these cases, the auditor did not actually observe the activity to verify that it was accomplished in accordance with the specified requirements. The inspectors did not consider this type of audit verification activity to be performance based and discussed this concern with the site quality assurance manager. The site quality assurance manager acknowledged the inspectors' concerns and concurred that they had validity. He also stated that these same concerns had been previously identified as a potential problem in an internal memorandum dated June 6, 1990, which was titled, "QA Surveillance Program Upgrade Rev. 2." The memorandum addressed the need to u> grade the site quality assurance surveillance program by teview of QAPs and t1eir checklists to assure that the objectives are adequately defined and that the checklists are performance based. The memorandum became the vehicle which initiated the issuance of two Project Plans: Surveillance Program Upgrade and Quality Assurance Plan and Checklist Upgrade. The stated purpose for each Plan addressed the need to upgrade the quality assurance sdrveillance program and the NPPD internal audit program process to be a more performance based methodology. Each plan defined the actions to be used for accomplishing the plan purpose. These actions will require an integrated review of QA procedures, instructions, and checklists.to assure that the identified objectives in each QAP are correct and that the methods used to verify these objectives are performance based. The anticipated date for completion of the project plans has been established as December 31,1990, inspectorFollowupItem(298/902003): Review the implementation of the project plans regarding upgrade of the surveillance and internal audit progra . Exit Interview (30703)
The inspectors met with Mr. J. M. Meacham and other members of the NPPD staff identified in paragraph 1 at the conclusion of the last segment of the inspection. At this meeting, the inspectors summarized the scope and findings of the inspection. The licensee did not identify as proprietary any of the material provided to, or reviewed by, the inspectors during this inspection.