Requests Temporary or Permanent Relief Re Refueling Outage During Jan 1983.Outage Would Be in Violation of Njdes Permit Condition Prohibiting Planned Winter OutageML20054K198 |
Person / Time |
---|
Site: |
Oyster Creek |
---|
Issue date: |
07/01/1982 |
---|
From: |
Califano R NEW JERSEY, STATE OF |
---|
To: |
Masnik M NRC |
---|
References |
---|
NUDOCS 8207010286 |
Download: ML20054K198 (7) |
|
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217J3341999-10-19019 October 1999 Forwards Request for Addl Info Re Sale of Portion of Land Part of Oyster Creek Nuclear Generating Station Site Including Portion of Exclusion Area ML20217E0181999-10-0606 October 1999 Provides Nj Dept of Environ Protection Comments on Oyster Creek Nuclear Generating Station TS Change Request 267 Re Clarifications to Several TS Sections ML20216J7591999-09-30030 September 1999 Informs NRC That Remediation Efforts for Software Sys Etude & Rem/Aacs/Cico Have Been Completed According to Schedule & Now Y2K Ready 05000219/LER-1998-011, Forwards LER 98-011-02, Three Small Bore Pipe Lines Did Not Meet Design Bases for Siesmic & Thermal Allowables. Engineering Std Will Not Be Completed Until End of 4th Quarter of 1999 Due to Scheduling Conflicts1999-09-30030 September 1999 Forwards LER 98-011-02, Three Small Bore Pipe Lines Did Not Meet Design Bases for Siesmic & Thermal Allowables. Engineering Std Will Not Be Completed Until End of 4th Quarter of 1999 Due to Scheduling Conflicts ML20212J6721999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Oyster Creek Nuclear Generating Station on 990913.No Areas Identified in Which Licensee Performance Warranted Addl Insp Beyond Core Insp Program.Historical Listing of Plant Issues Encl ML20216K1421999-09-29029 September 1999 Provides NRC with Name of Single Point of Contact for Purpose of Accessing Y2K Early Warning Sys,As Requested by NRC Info Notice 99-025 ML20217D1661999-09-27027 September 1999 Forwards Proprietary Completed NRC Forms 396 & 398,in Support of License Renewal Applications for Listed Individuals,Per 10CFR55.57.Encl Withheld ML20217B2531999-09-24024 September 1999 Informs That on 980903,Region I Field Ofc of NRC Ofc of Investigations Initiated Investigation to Determine Whether Crane Operator Qualification/Training Records Had Been Falsified at Oyster Creek Nuclear Generating Station ML20212E1971999-09-16016 September 1999 Forwards Rev 11 of Gpu Nuclear Operational QAP, Reflecting Organizational Change in Which Functions & Responsibilities of Nuclear Safety & Technical Support Div Were Assigned to Other Divisions ML20212A7921999-09-13013 September 1999 Forwards Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, Issued on 950817 to Plant ML20212B5571999-09-10010 September 1999 Forwards Rev 11 to Oyster Creek Emergency Dose Calculation Manual, IAW 10CFR50,App E,Section V ML20211N2941999-09-0303 September 1999 Responds to NRC 990802 Telcon Request for Environ Impact Assessment of TS Change Request 251 Concerning Movement of Loads Up to 45 Tons with RB Crane During Power Operations ML20211J9831999-09-0202 September 1999 Discusses 990804 Telcon Re Sale of Portion of Oyster Creek Nuclear Generating Station Land.Requests Info Re Location of All Areas within Property to Be Released Where Licensed Radioactive Matl Present & Disposition of Radioactive Matl ML20211J6771999-08-30030 August 1999 Submits Response to NRC 990802 Telcon Request for Gpu to Provide Environ Impact Assessment for Tscr 251 ML20211K2391999-08-23023 August 1999 Forwards fitness-for-duty Performance Data Repts for TMI, Oyster Creek & Corporate Headquarters Located in Parsippany, Nj ML20211C0161999-08-19019 August 1999 Advises That Info Submitted by Ltr,Dtd 990618, Licensing Rept for Storage Capacity Expansion of Oyster Creek Spent Fuel Pool, Holtec Rept HI-981983,rev 4,will Be Withheld from Public Disclosure,Per 10CFR2.790 ML20211B9011999-08-18018 August 1999 Forwards Rev 0 to EPIP 1820-IMP-1720.01, Emergency Public Info Implementing Procedure ML20210U4341999-08-17017 August 1999 Responds to to Chairman Dicus of NRC on Behalf of Fm Massari Concern About Oyster Creek Nuclear Generating Station Not Yet Being Fully Y2K Compliant ML20210Q7331999-08-12012 August 1999 Responds to Re TS Change Request (TSCR)264 from Oyster Creek Nuclear Generating Station.Questions Re Proposed Sale of Property within Site Boundary & Exclusion Area ML20210L6311999-08-0606 August 1999 Discusses Licensee Response to GL 92-01,Rev1,Suppl 1, Rv Structural Integrity, for Plant.Staff Has Revised Info in Rv Integrity Database & Releasing as Rvid Version 2 ML20210D2801999-07-22022 July 1999 Submits Response to Administrative Ltr 99-02 Operating Reactor Licensing Action Estimates. Estimate of Licensing Actions Projected for Fy 2000 Encl.No Projection Provided for Fy 2001 ML20209H5001999-07-14014 July 1999 Forwards Revised TS Pages 3.1-15 & 3.1-17 Which Include Ref to Note (Aa) & Approved Wording of Note H of Table 3.1.1, Respectively ML20210U4411999-07-12012 July 1999 Forwards Article from Asbury Park Press of 990708 Faxed to Legislative Officer by Mutual Constitute Fm Massari Indicating That Oyster Creek Nuclear Generating State Not Fully Y2K Compliant ML20209G1451999-07-0909 July 1999 Forwards Rev 1 to 2000-PLN-1300.01, Oyster Creek Generating Station Emergency Plan. Attachment 1 Contains Brief Summary of Changes,Which Became Effective on 990702 ML20209E0821999-07-0707 July 1999 Forwards TS Change Request 269 for License DPR-16,changing Component Surveillance Frequencies to Indicate Frequency of Once Per Three Months ML20209B7501999-07-0101 July 1999 Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Generic Ltr 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Licensee Y2K Readiness Disclosure for Ocngs,Encl ML20196G1361999-06-23023 June 1999 Provides Status of Corrective Actions Proposed in in Response to Insp Rept 50-219/98-80 & Revised Schedule for Completion of Actions Which Are Not Yet Complete ML20196E6421999-06-22022 June 1999 Forwards Revised Pages of TS Change Request 261,dtd 990618. Replacement Requested Due to Several Dates Being Omitted on Certain Pages ML20195G6541999-06-0707 June 1999 Discusses 981204 Initiation to Investigate Whether Contract Valve Technician,Was Discriminated Against for Raising Concern Re Use of Untrained/Unqualified Workers Performing Valve Repairs.Technician Was Not Discriminated Against ML20195G6631999-06-0707 June 1999 Discusses 981204 Intiation to Investigate Whether Contract Valve Technician Was Discriminated Against for Raising Concern Re Use of Untrained/Unqualified Workers Performing Valve Repairs.Technician Was Not Discriminated Against ML20209B0561999-06-0404 June 1999 Informs That NRR Has Reorganized,Effective 990328.Forwards Organizational Chart ML20195D0551999-06-0303 June 1999 Forwards TS Change Request 226 to License DPR-16,permitting Operation with Three Recirculation Loops.Certificate of Svc & Tss,Encl ML20195C5511999-05-25025 May 1999 Forwards Book of Controlled Drawings Currently Ref But Not Contained in Plant Ufsar.Drawings Were Current at Time of Submittal ML20206N7711999-05-11011 May 1999 Forwards Rev 0 to Oyster Creek Emergency Plan, IAW 10CFR50.47(b) & 10CFR50.54(q).Changes Became Effective on 990413 ML20206H9441999-04-28028 April 1999 Forwards Application for Amend to License DPR-16,requesting Approval to Handle Loads Up to & Including 45 Tons Using Reactor Bldg Crane During Power Operations,Per NRC Bulletin 96-002 ML20206B6991999-04-26026 April 1999 Forwards Copy of Rev 11 to UFSAR & Rev 10 to Oyster Creek Fire Hazards Analysis Rept. Without Fire Hazard Analysis ML20206D3801999-04-26026 April 1999 Forwards Rev 11 to UFSAR, & Rev 10 to Fire Hazards Analysis Rept, for Oyster Creek Nuclear Generating Station, Per 10CFR50.712(e) ML20206A9931999-04-22022 April 1999 Forwards Number of Personnel & Person Rems by Work & Job Function Rept for Period Jan-Dec 1998. Included in Rept Is Listing of Number of Station,Util & Contractor Personnel as Well as Diskette Reporting 1998 Occupational Radiation ML20206C8261999-04-22022 April 1999 Submits Financial Info IAW Requirements of 10CFR50.71(b) & 10CFR140.21 ML20205P8411999-04-15015 April 1999 Forwards TS Change Request 267 to License DPR-16,modifying Items in Sections 2 & 3 of Ts,Expanding Two Definitions in Section 1 & Modifying Bases Statements in Sections 2,3 & 4. Certificate of Svc Encl ML20205P5381999-04-14014 April 1999 Ack Receipt of Re Request for Exception to App J. Intended Correction Would Need to Be Submitted as Change to TS as Exceptions to RG 1.163 Must Be Listed in Ts,Per 10CFR50,App J ML20205P9401999-04-12012 April 1999 Informs NRC That Gpu Nuclear Is Modifying Oyster Creek FSAR to Reflect Temp Gradient of 60 F & to Correct Historical Record ML20205P0651999-04-0909 April 1999 Discusses 990225 PPR & Forwards Plant Issues Matrix & Insp Plan.Results of PPR Used by NRC Mgt to Facilitate Planning & Allocation of Insp Resources 05000219/LER-1998-015, Forwards LER 98-015-01,as Original Submittal on 981028 Inadvertently Indicated That Suppl Would Be Submitted.Suppl Should Not Have Been Required as Only Change Is on Cover Page1999-04-0505 April 1999 Forwards LER 98-015-01,as Original Submittal on 981028 Inadvertently Indicated That Suppl Would Be Submitted.Suppl Should Not Have Been Required as Only Change Is on Cover Page ML20205J3281999-04-0101 April 1999 Discusses Arrangements Made on 990323 for NRC to Inspect Licensed Operator Requalification Program at Oyster Creek Nuclear Generating Station During Week of 990524 ML20205H1081999-03-31031 March 1999 Forwards Current Funding Status for Decommissioning Funds Established for OCNPP,TMI-1,TMI-2 & SNEC ML20205F0611999-03-25025 March 1999 Submits Info on Sources & Levels of Property Insurance Coverage Maintained & Currently in Effect for Oyster Creek Nuclear Generating Station,Iaw 10CFR50.54(w)(3) ML20205E1171999-03-24024 March 1999 Forwards Rev 39 to Oyster Creek Security Plan & Summary of Changes,Iaw 10CFR50.54(p).Rev Withheld ML20207F0331999-03-0404 March 1999 Forwards Insp Rept 50-219/98-12 During Periods 981214-18, 990106-07 & 20-22.Areas Examined During Insp Included Implementation of GL 89-10 & GL 96-05.No Violations Noted ML20207K2471999-02-25025 February 1999 Forwards Fitness for Duty Performance Data Repts for TMI, Oyster Creek & Corporate Headquarters Located in Parsippany, Ny 1999-09-30
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217E0181999-10-0606 October 1999 Provides Nj Dept of Environ Protection Comments on Oyster Creek Nuclear Generating Station TS Change Request 267 Re Clarifications to Several TS Sections 05000219/LER-1998-011, Forwards LER 98-011-02, Three Small Bore Pipe Lines Did Not Meet Design Bases for Siesmic & Thermal Allowables. Engineering Std Will Not Be Completed Until End of 4th Quarter of 1999 Due to Scheduling Conflicts1999-09-30030 September 1999 Forwards LER 98-011-02, Three Small Bore Pipe Lines Did Not Meet Design Bases for Siesmic & Thermal Allowables. Engineering Std Will Not Be Completed Until End of 4th Quarter of 1999 Due to Scheduling Conflicts ML20216J7591999-09-30030 September 1999 Informs NRC That Remediation Efforts for Software Sys Etude & Rem/Aacs/Cico Have Been Completed According to Schedule & Now Y2K Ready ML20216K1421999-09-29029 September 1999 Provides NRC with Name of Single Point of Contact for Purpose of Accessing Y2K Early Warning Sys,As Requested by NRC Info Notice 99-025 ML20217D1661999-09-27027 September 1999 Forwards Proprietary Completed NRC Forms 396 & 398,in Support of License Renewal Applications for Listed Individuals,Per 10CFR55.57.Encl Withheld ML20212E1971999-09-16016 September 1999 Forwards Rev 11 of Gpu Nuclear Operational QAP, Reflecting Organizational Change in Which Functions & Responsibilities of Nuclear Safety & Technical Support Div Were Assigned to Other Divisions ML20212B5571999-09-10010 September 1999 Forwards Rev 11 to Oyster Creek Emergency Dose Calculation Manual, IAW 10CFR50,App E,Section V ML20211N2941999-09-0303 September 1999 Responds to NRC 990802 Telcon Request for Environ Impact Assessment of TS Change Request 251 Concerning Movement of Loads Up to 45 Tons with RB Crane During Power Operations ML20211J6771999-08-30030 August 1999 Submits Response to NRC 990802 Telcon Request for Gpu to Provide Environ Impact Assessment for Tscr 251 ML20211K2391999-08-23023 August 1999 Forwards fitness-for-duty Performance Data Repts for TMI, Oyster Creek & Corporate Headquarters Located in Parsippany, Nj ML20211B9011999-08-18018 August 1999 Forwards Rev 0 to EPIP 1820-IMP-1720.01, Emergency Public Info Implementing Procedure ML20210D2801999-07-22022 July 1999 Submits Response to Administrative Ltr 99-02 Operating Reactor Licensing Action Estimates. Estimate of Licensing Actions Projected for Fy 2000 Encl.No Projection Provided for Fy 2001 ML20209H5001999-07-14014 July 1999 Forwards Revised TS Pages 3.1-15 & 3.1-17 Which Include Ref to Note (Aa) & Approved Wording of Note H of Table 3.1.1, Respectively ML20210U4411999-07-12012 July 1999 Forwards Article from Asbury Park Press of 990708 Faxed to Legislative Officer by Mutual Constitute Fm Massari Indicating That Oyster Creek Nuclear Generating State Not Fully Y2K Compliant ML20209G1451999-07-0909 July 1999 Forwards Rev 1 to 2000-PLN-1300.01, Oyster Creek Generating Station Emergency Plan. Attachment 1 Contains Brief Summary of Changes,Which Became Effective on 990702 ML20209E0821999-07-0707 July 1999 Forwards TS Change Request 269 for License DPR-16,changing Component Surveillance Frequencies to Indicate Frequency of Once Per Three Months ML20209B7501999-07-0101 July 1999 Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Generic Ltr 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Licensee Y2K Readiness Disclosure for Ocngs,Encl ML20196G1361999-06-23023 June 1999 Provides Status of Corrective Actions Proposed in in Response to Insp Rept 50-219/98-80 & Revised Schedule for Completion of Actions Which Are Not Yet Complete ML20196E6421999-06-22022 June 1999 Forwards Revised Pages of TS Change Request 261,dtd 990618. Replacement Requested Due to Several Dates Being Omitted on Certain Pages ML20195D0551999-06-0303 June 1999 Forwards TS Change Request 226 to License DPR-16,permitting Operation with Three Recirculation Loops.Certificate of Svc & Tss,Encl ML20195C5511999-05-25025 May 1999 Forwards Book of Controlled Drawings Currently Ref But Not Contained in Plant Ufsar.Drawings Were Current at Time of Submittal ML20206N7711999-05-11011 May 1999 Forwards Rev 0 to Oyster Creek Emergency Plan, IAW 10CFR50.47(b) & 10CFR50.54(q).Changes Became Effective on 990413 ML20206H9441999-04-28028 April 1999 Forwards Application for Amend to License DPR-16,requesting Approval to Handle Loads Up to & Including 45 Tons Using Reactor Bldg Crane During Power Operations,Per NRC Bulletin 96-002 ML20206B6991999-04-26026 April 1999 Forwards Copy of Rev 11 to UFSAR & Rev 10 to Oyster Creek Fire Hazards Analysis Rept. Without Fire Hazard Analysis ML20206D3801999-04-26026 April 1999 Forwards Rev 11 to UFSAR, & Rev 10 to Fire Hazards Analysis Rept, for Oyster Creek Nuclear Generating Station, Per 10CFR50.712(e) ML20206C8261999-04-22022 April 1999 Submits Financial Info IAW Requirements of 10CFR50.71(b) & 10CFR140.21 ML20206A9931999-04-22022 April 1999 Forwards Number of Personnel & Person Rems by Work & Job Function Rept for Period Jan-Dec 1998. Included in Rept Is Listing of Number of Station,Util & Contractor Personnel as Well as Diskette Reporting 1998 Occupational Radiation ML20205P8411999-04-15015 April 1999 Forwards TS Change Request 267 to License DPR-16,modifying Items in Sections 2 & 3 of Ts,Expanding Two Definitions in Section 1 & Modifying Bases Statements in Sections 2,3 & 4. Certificate of Svc Encl ML20205P9401999-04-12012 April 1999 Informs NRC That Gpu Nuclear Is Modifying Oyster Creek FSAR to Reflect Temp Gradient of 60 F & to Correct Historical Record 05000219/LER-1998-015, Forwards LER 98-015-01,as Original Submittal on 981028 Inadvertently Indicated That Suppl Would Be Submitted.Suppl Should Not Have Been Required as Only Change Is on Cover Page1999-04-0505 April 1999 Forwards LER 98-015-01,as Original Submittal on 981028 Inadvertently Indicated That Suppl Would Be Submitted.Suppl Should Not Have Been Required as Only Change Is on Cover Page ML20205H1081999-03-31031 March 1999 Forwards Current Funding Status for Decommissioning Funds Established for OCNPP,TMI-1,TMI-2 & SNEC ML20205F0611999-03-25025 March 1999 Submits Info on Sources & Levels of Property Insurance Coverage Maintained & Currently in Effect for Oyster Creek Nuclear Generating Station,Iaw 10CFR50.54(w)(3) ML20205E1171999-03-24024 March 1999 Forwards Rev 39 to Oyster Creek Security Plan & Summary of Changes,Iaw 10CFR50.54(p).Rev Withheld ML20207K2471999-02-25025 February 1999 Forwards Fitness for Duty Performance Data Repts for TMI, Oyster Creek & Corporate Headquarters Located in Parsippany, Ny ML20206S2541999-01-20020 January 1999 Confirms Resolution of Thermo-Lag Fire Barriers in Fire Zones OB-FZ-6A & OB-FZ-6B (480 Switchgear Rooms) IAW Previous Commitments Contained in Gpuns Ltrs to NRC & 971001 ML20199J2631999-01-18018 January 1999 Requests That Listed Changes Be Made to Correspondence Distribution List for Oyster Creek Generating Station ML20199D0271999-01-11011 January 1999 Requests Listed Addl Info in Order to Effectively Review TS Change Request 264 Re Ownership of Property within Exclusion Area ML20199A6521999-01-0707 January 1999 Notifies That Reactor Operators G Scienski,License SOP-11319 & D Mcmillan,License SOP-3919-4 Have Terminated Licenses at Oyster Creek Nuclear Generating Station, Effective 990101 ML20198T1061999-01-0606 January 1999 Forwards Rev 15 to Gpu Nuclear Corporate Emergency Plan for TMI & Oyster Creek Nuclear Station. with Summary of Changes Which Reflect Use of EALs Approved in NRC Ltr to Gpun on 980908 & Other Changes Not Related to Use of New EALs ML20198K0331998-12-23023 December 1998 Forwards Change Request 268 for Amend to License DPR-16. Amend Would Change TS to Specify Surveillance Frequency of Once Per Three Months ML20198H0181998-12-22022 December 1998 Forwards Attachment Addressing New Info & Modifying 980505 Submittal Re Request for Change to Licensing Bases for ECCS Overpressure,In Response to NRC Bulletin 96-03, Potential Plugging of ECCS by Debris in Bwrs ML20198H8521998-12-16016 December 1998 Dockets Completion of Physical Inventory Performed in July 1997,as Addl Info to Nuclear Matl Balance Rept Submitted on 980416 ML20196H4461998-12-0202 December 1998 Provides Final Response to NRC GL 96-01, Testing of Safety-Related Logic Circuits ML20196B4471998-11-23023 November 1998 Provides Required Response 2 to NRC Bulletin 96-003, Potential Plugging of ECC Suction Strainers in Bwrs. During Recently Completed 17R Refueling Outage,New Strainers Were Installed ML20195J8451998-11-12012 November 1998 Forwards Rev 11 to 1000-PLN-7200.01, Gpu Nuclear Operational QA Plan, as Change Previously Made Without Appropriate Notification to NRC ML20195C7201998-11-11011 November 1998 Forwards 120-day Required Response to GL 98-04, Potential for Degradation of ECCS & CSS After LOCA Because of Construction & Protective Coating Deficiencies & Foreign Matl in Containment, ML20195E1221998-11-10010 November 1998 Notifies NRC of First Time Usage of Code Case N-504 & Inclusion Into OCNGS ISI Program,As Accepted by RG 1.147, Inservice Insp Code Case Acceptability ML20155J6851998-11-0505 November 1998 Forwards TS Change Request 266,to Modify Safety Limits & Surveillances of LPRM & APRM Sys & Related Bases to Ensure APRM Channels Respond within Necessary Range & Accuracy & Verify Channel Operability ML20155H5641998-11-0202 November 1998 Informs That Bne Has No Comments on Proposed Change 259 to Ts,Correcting Required Water Level in Condensate Storage Tank So That Design Basis Is Correctly Implemented ML20155G3741998-10-29029 October 1998 Forwards Response to NRC 980619 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions 1999-09-30
[Table view] Category:STATE/LOCAL GOVERNMENT TO NRC
MONTHYEARML20055C8901990-06-0808 June 1990 Forwards Ltr to Gpu & Tracking List of Outstanding Issues Re Plant,For Info ML20055E1521990-05-23023 May 1990 Forwards Resolution of Forked River Civic Assoc Re Ongoing Dispute on Severe Shoaling of South Branch of Forked River & Adjacent Lagoons.Nrc Review of Matter Requested.W/O Encl ML20043H1401990-05-22022 May 1990 Advises That State of Nj Holds Public Meeting to Explain Plant Licensing Process.Plant Should Be Subj of Level III PRA Due to Unusual Characteristics of Design,Aging & Proximity to Population ML20042F6391990-03-30030 March 1990 Forwards Anonymous Ltr Raising Serious Charges Re Operations at Facility.Investigation Requested ML20011E5981990-02-0505 February 1990 Requests That Listed Individuals Be Deleted from Svc List for Facilities.Documents Already Sent to Dept of Environ Protection of State of Nj ML20006D1711990-01-30030 January 1990 Clarifies 891211 Comments on Draft SER for Plant full-term Ol.Agency Has Confidence That Population Around Plant EPZ Could Be Evacuated in Efficient & Timely Manner ML19332F4801989-12-11011 December 1989 Comments on Draft SER Re Util full-term OL Application for Plant.Nrc Concluded That Plant Can Continue to Operate Without Endangering Health & Safety of Public.Recommends That Ser,Which Depends Upon Sep,Study Technical Basis More ML20005D6711989-10-31031 October 1989 Proposes Meeting Between State & NRC to Discuss Review Process Re NRC Formal Consideration of Facility full-term OL ML20151N0501988-07-21021 July 1988 Recommends Denial of Util 880513 Tech Spec Change Request 169 Re Core Spray Sparger Insps.Change Would Eliminate Requirement to Document Insp Results Prior to Restarting After Each Refueling Outage ML20195E1291988-06-15015 June 1988 Recommends That NRC Consider Listed Two Alternatives to Util 880331 Tech Spec Change Request 164 to Delete Safety Limit 2.1.E,requiring at Least Two Recirculation Valves to Be Open Except When Reactor Head Taken Off ML20207F6791986-12-31031 December 1986 Forwards Technical Review of Util Tech Spec Change Request 148 Re Issues Including SEP Topic XV-16, Radiological Consequences of Failure of Small Lines Carrying.... NRC Response Will Provide Basis for State Concurrence ML20215B3081986-12-0505 December 1986 Discusses Review of Application for Amend to License DPR-16, Consisting of Tech Spec Change Request 147 Re Change in High Drywell Pressure Trip Setting & Bypassing High Flow Trip Function of Isolation Condenser.App R Exemption Supported ML20213F1241986-11-0707 November 1986 Concurs W/Intent of Amend 108 to License DPR-16,revising Radiological Effluent Tech Specs,Per 10CFR50,App I.Exception Taken to Basis 3.6.A (SEP Topic XV-16) Re Radiological Consequences ML20214M2801986-07-25025 July 1986 Requests Info on NRC Policy Re Location of Hazardous Waste Disposal or Storage Facilities Near Plant.Under Existing State Law,Siting of Facility within 20 Miles of Nuclear Generating Plant Prohibited ML20205A4721985-02-26026 February 1985 Expresses Concern W/Shipment of Spent Nuclear Fuel Rods from West Valley,Ny to Oyster Creek Nuclear Station.Requests NRC Reinspect Already Approved Route,Focusing on Portion of I-287 Scheduled for Const ML20086T2751984-03-0101 March 1984 Forwards Ordinance Prohibiting Import of Spent Nuclear Fuel or Radwaste for Storage within Township & Regulating Storage of Spent Nuclear Fuel & Radwaste at Facility.Nrc Requested to Meet W/Township to Discuss Problem ML20080M5471984-02-14014 February 1984 Forwards Current List of Endangered & Threatened Wildlife in State of Nj,In Response to NRC Request for Info Re Unique or Sensitive Biota in Area of Facility ML20087N7601984-01-26026 January 1984 Informs That State of PA Expects to Be Full Participant in NRC Proceedings,Meetings & Decisions Re Routing or Related Aspects of Spent Fuel Shipments ML20083G3451984-01-0303 January 1984 Suggests NRC Postpone Approval of 820521 Amend Request 104 & 831011 Rev 1 to Request Until Independent Review Confirms Adequacy of Flow Water from Existing Facility Core Spray Sys ML20054K1981982-07-0101 July 1982 Requests Temporary or Permanent Relief Re Refueling Outage During Jan 1983.Outage Would Be in Violation of Njdes Permit Condition Prohibiting Planned Winter Outage ML20041F8131982-03-0909 March 1982 Forwards Township Committee Resolution Opposing Imposition of Fine on Util for Failure to Install One of 46 Required Siren Warning Sys by 820301 ML19254E1381979-08-21021 August 1979 Forwards Resolution Seeking Congressional Action to Provide Independent Monitoring of Nuclear Generating Station ML20084C0971969-02-21021 February 1969 Advises of 690213 Meeting W/Officers of Pipeco Steel Corp Who Refused to Supply Pipe for Use at Oyster Creek Due to Inappropriate Specs.Use of Filler Also Objectionable & Led to Unallowable Quality Reduction 1990-06-08
[Table view] |
Text
e l fi y e..
9 tate of Nem 3rrary DEPARTMENT OF ENVIRONMENTAL PROTECTION DIVISION OF WATER RESOURCES P. O. DOX CN 029 TRENTON. NEW JERSEY 08025 ARNOLD SCHIFFM AN DIR ECTOR Dr. Michael Masnik l Environmental Specialist Branch U.S. Nuclear Regulatory Commission P-234 Washington, DC 20555
Dear Dr. Masnik:
l GPU Nuclear Corporation has submitted a request to schedule a refueling outage for its Oyster Creek Nuclear Generating Station during January, 1983. Since this outage would be in violation of its NJPDES permit condition prohibiting a planned winter outage, GPU has again requested temporary (or permanent) relief from this condition.
I have enclosed a copy of their request for your review.
As you are aware of the past and potential impacts of such an outage end have had previous input to the adoption of permit conditions and/or other similar requests by GPU, I would like to solicit your comments for inclusion in my technical review and recommendation.
GPU's request and mitigative plans are similar to past requests and I anticipate that NJDEP will continue to maintain to opposition to such an outage. I would appreciate your comments, however brief, in regard to this matter. A prompt response would also be appreciated. Thank you for your attention to this matter.
I can be reached by phone at (609) 292-0407 should you need to contact me.
Sincerely, Richard J. ifano, h.D.
Bureau of Industria Waste Mgt.
Water Quality Management j Enclosure WQM106-A/lf:Iml bD 8207010286 820701 PDR ADOCK 05000219 p PDR New Jersey is An Equal Opportunity Employer
' + O g.
mw A * '
f
,~Q y r.ny>gm ai,w
J!'" 4 1982 e u 7"'" ~ GPU Nuc CA-Y
!I h* Ab Q b d bU. g *"
h Quei. y run g.m.ns 100 Inte ace 'aric..ay Parsippany. New Jersey 07054 201 263-6500 TELEX 136 432 Writer's D. ect O I Number.
June 2, 1982 kf l
Mr. Arnold Schiffman, Director New Jersey Department of Environmental Protection
. Trenton, NJ 08625 '
-: Dear Mr. Schiffman Subj ec t : GPU Nuclear Corporation (CPUN)
Oyster Creek Nuc1 car Cencrating Station (OCNCS)
NPDES permit No. 000 5550 Request for Modification -
On May 30, 1981 written requests were submitted to the NJDEP and USEPA to either permanently delete or authorize temporary relief from Condition 9(b)(4) of the subj ec t permit. This condition prohibits routine shutdown of the OCNCS from December through March. At that time a refueling outage was scheduled to begin on November 30, 1981 but it was recognized that certain factors could delay that date and put us into the period in which shutdowns are prohibited.
Following a meeting with your staff, the USEPA, and the National t Marine Fisheries Service a detailed report was submitted on July 24 1981 justifying our request. This justification included fuel considerations, electric system reliability, engineering considerations, outage planning, and environmental considerations .
This was followed by a letter on August 2 7., 1981 reiterating our request for relief from condition 9(b)(4) so that the OCNGS could shutdown in February 1982. By 1ctter dated October 20, 1981 the USEPA denied this request but indicated that such requests would be reviewed
[
in the future on a case-by-case basis. Subsequently, that specific l request was mooted because on December 4, 1981 there was a nonroutine l shutdovn of the plant due to equipment failure. The plant was not returned to rervice until April 15, 1982.
The refueling previously planned for February 1982 has yet to be l conducted. For many of the reasons cited in our previous request, a
, rea s s e s sc:ent of plant operational capability, engineering factors and economic considerations has led us to the conclusion that the j refueling shutdown should be rescheduled to January 15, 1983. The .
! scope of work for this refueling outage which includes such major items as: the torus system modifications, additional NRC requirements l
- r. n. . . . . . . . . . - . , . . . . . ,, n ,,,, o , e n. + i . ,. e i . ,i . . e c , e . o -
2 Nr. Arnold Schiffman to bring the plant up to todays technical standards, and the major items mentioned in our previous request will cause this to be an extended outage. The schedule and management of such a major outage requires that su f ficient time be allotted to provide for safe, effective and efficient execution of this work. It should be noted that the OCNCS has operated for over 12 years without a major overhaul and that such a major effort is required in order to fulfill'our committment to provide safe, reliable and economic service to our customers.
As the EPA stated in their October 20 letter,, ail elements involved in a vinter outage except for the possible environmental impacts of fishkills were adequately addressed in our previous submittal. In our December 30, 1981 response to EPA we disagreed with their position that environmental impacts were inadequately addressed.
We considered and still do that sufficient data is availabic t o' justify a vinter outage. As indicated in our December 30, 1981 submittal conservative estimates of cold shock mortality of Atlantic menhaden due to winter shutdown of the OCNCS amounts to approximately 0.59 percent of the annual New Jersey commercial catch. Again we believe that it is highly unlikely that the loss of such a small number of individual s could adversely impact the New Jersey coast population of this species. While the proposed schedule will result in a planned shutdown during the period such shutdown is prohibited, .
it should be noted that under this proposed schedule the plant will be operating at reduced power icvels and in actuality will be in a coastdown mode starting in June 1982. As a result of this coastdown, during the period when the autumnal migration would be expec ted to occur in Barnegat Bay (i.e. late October through mid-November) the plant will be operating at approximately 50 percent of full rated poscr. Because of this reduced power level, the heat addition to Oyster Creek as a result of plant operation will be reduced thereby tending to reduce the attractiveness of the discharge canal to migrating fishes. To further mtaimize this attraction, we plan that two dilution pumps will be. operated continuously, whenever possibic, starting in early October until the plant shutdown is commenced. At a 100 percent power icvel with one dilution pump operating the delta-T in Oyster Creek would be approximately 7.7'C; however at 50 percent power Icvc1 with two dilution pumps operating this delta-T 'is reduced
~
to approximately 3.4*C.
In order to accurately assess the impact of this proposed, shutdown we have included as Attachment I a proposed outage fish
- sampling program to be conducted prior to and following the shutdown of the station. As indicated in that attachment, a report on the results of the sampling program will be submitted within two months after shutdown--well before any subsequent planned shutdown.
Since the administration of the NPDES program has been delegated to the NJDEp by the EPA, CPUN hereby requests that permanent relief f rom cond it ion 9(b)(4) be granted, or as an alternative temporary i
relief from this condition be authorized to allow the conduc ting of a i refueling outage shutdown on or about January 15, 1983.
_ . _ _ . .~ . . _ . . - -. ___ _ _ _ _ _ _ _ _ _ . _
. . . kr.ArnoldSchiffman 3 Representatives of CPUN and I are available to meet with you and members of your staff to support and discuss our request and its environmental implications. Please call Mr. Mitchell Certz of our Environmental Licensing staff at (201) 299-2186 to arrange such a meeting at your earliest convenience.
Very truly yours, f
g -
Philip R Clark Executive Vice President MC: dis '
cc: Dr. R. A. Baker, USEPA '
b g Dr. M. M. Sadat, P.E.,SJDEP - -
e e
e S
9
~
. . . . . - . . - ~ . - - - - --
ATTACHMENT I Proposed Outace Fich Sampling Program introduction:
In response to regulatory agency requests, sampics of the fish fauna of Oyster Creek will be collected prior to and following the shutdewn of the Oyster Creek Station, in order to document any cold shock mortality.
Objectives: .
The objectives of the program-~are:
- 1. To document the species composition, abundance and N-distribution of fishes in Oyster Creek prior to -
~
. Station shutdown.
-2. 'To quantify the extent of any shutdown induced mortalitics.
- 3. To document any movement into or out of the discharge canal subsequent to plant shutdown.
Mathodology: .
Pre-Shutdown Survey (to commence no more than one month in advance of the shutdown with the greatest effort concentrated in the two weeks prior to shutdown)
- 1. Mark and Recapture Study - Fish caught by hook and line, cast not or scoop net; marked and released. Any species that can be captured in suffi'cient numbers and tagged without injury will be included.
I
- 2. Gill netting and trawling in discharge canal and residential lagoons. .
l During and Post-Shutdown Survey i
l 1 Fishkill conitoring A. Qualitative and quantitative assessment of impact by actual enumeration.
- 3. Trawling in Oyster Creek and the residential lagoons.
l ,
- 2. Gill netting at couth of Oyster Creek to determine if any movement to l . or from the discharge canal takes place subsequent to plant shutdown.
l
- 3. Determination of species composition and enumeration of species that remain on bottom of Oyster Creek. ,
I A. Transects by divers along the entire length of Oyster Creek i and in the residential lagoons.
B. Trawling in Oyster Creek
- 4. Tag Returns - Petersen population estimates for marked species. i Trawling will be done with a 4.8 meter semiballon trawl with a 3.9 cm !
stretch mesh body, a 3.2 cm stretch mesh cod end and a 1.3 cm stretch mesh liner. Gill netting will be done with a 60 m ac 2.4 m monofilament net consisting of two 30 m panels, one of 3.9 cm stretch mesh and the other of 8.5 cm stretch mesh'.
The details of the taggin; methodology will depend upon the species present in Oyster Creek prior to the shutdown and will be furnished in the report.on the results of the program.
Samples will be co11ceted at a minimum of 4 stations in Oyster Creek and in at least two residential lagoons. Exact locations and number of stations will depend upon prevailing weather conditions and knowledge of type of fish present based upon routine sampling. ,
All fish captured will be identified to the lowest possible Taxon and enumerated; lengths will be measured for key species.
Temperature and salinity data will be taken with all samples.
Reporting:
A report on the results of the sampling program will be submitted to USEPA and NJDEP within two months of the date of shutdown.