Category:LICENSEE EVENT REPORT (SEE ALSO AO
MONTHYEARML20024J3211994-10-0505 October 1994 LER 94-006-00:on 940909,failure to Perform Slave Relay Test Associated W/One Containment Isolation Valve Due to Improper Work Practices.Reviewed All Slave Relay Test Procedures & Trained All Qualified reviewers.W/941005 Ltr ML20046B5251993-08-0404 August 1993 LER 93-007-00:on 930705,TS Required Surveillance Was Not Performed Because of Inappropriate Action Because of Lack of Attention to Detail.Generated WO 93047633 to Perform Required Surveillance on Unit 1 IPE CA 9010.W/930729 Ltr ML20045H9821993-07-12012 July 1993 LER 93-005-00:on 930612,manual Rt in Unit 1 Occurred Due to Equipment Failure Due to Failure of L-13 Field Cable Between Data Cabinet B & Bulkhead for Undetermined Reasons.Replaced Field cable.W/930709 Ltr ML20045D9681993-06-25025 June 1993 LER 93-006-00:on 930526,discovered That Sample Blower for Radiation Monitor 1 EMF-43B Off & Monitor Declared Inoperable & Ventilation Sys Air Intakes Not Isolated.Caused by Deficient Procedures.Test Procedures Revised ML20045B2811993-06-11011 June 1993 LER 93-004-00:on 930513,both Trains of CR Ventilation Sys Declared Inoperable Due to Equipment Failure.Exact Cause of Failure Could Not Be Determined.Train B Nuclear Svc Water Sys Flow Balance completed.W/930611 Ltr ML20029C2091991-03-21021 March 1991 LER 91-003-00:on 910219,both Trains of Control Room Ventilation Sys Inoperable.Caused by Design Malfunction & Management Deficiency.Temporary Modifications,Removing Automatic Closure Function implemented.W/910321 Ltr ML20028G9561990-09-26026 September 1990 LER 90-025-00:on 900827,Unit 1 Shut Down Because of Unidentified RCS Leakage Exceeding Tech Spec Limits.Caused by Equipment Failure.Procedure AP/1/A/5500/10 Implemented. Valve 1NC-33 Will Be Repacked at Next outage.W/900926 Ltr ML20044A0091990-06-25025 June 1990 LER 90-015-00:on 900524,Tech Spec 3.0.3 Entered Because More than One Power Range Nuclear Instrumentation Channel Exceeded 5% Deviation.Caused by Mgt Deficiency.Boric Acid Added to Coolant sys.W/900625 Ltr ML20043H4991990-06-21021 June 1990 LER 90-012-00:on 900522,loose Matl,Consisting of Masslin Cloths & Stepoff Pad,Discovered in Upper Containment.Caused by Failure to Follow Procedures.Loose Items Removed & Cleanliness Procedures revised.W/900621 Ltr ML20043H2641990-06-20020 June 1990 LER 90-011-00:on 900521,noted That Valve 1RN-69A Auxiliary Feedwater Assured Supply from Train a Nuclear Svc Water Repositioned to Open Position After Start of Pump.Cause Unknown.Pump Shut Down & Valve closed.W/900620 Ltr ML20043F7471990-06-13013 June 1990 LER 90-010-00:on 900427,discovered That Annulus Ventilation & Control Room Ventilation Sys Headers Would Not Operate,As Designed,Under Postulated Operating Conditions. Caused by Design Deficiency.Change submitted.W/900613 Ltr ML20043F5071990-06-11011 June 1990 LER 90-009-00:on 900512,feedwater Isolation Occurred as Result of Steam Generator 1B Reaching hi-hi Level Setpoint of 82% Level.Caused by Inappropriate Action Because of Lack of Attention to Detail.Feedwater Logic reset.W/900611 Ltr ML20043D6541990-05-30030 May 1990 LER 90-007-00:on 881018,during Insp Ice Condenser Basket Found W/Bottom Screws Missing.Caused by Installation Deficiency Because of Improper Matl Selection.Work Request Initiated to Replace Improper screws.W/900530 Ltr ML20043D7121990-05-30030 May 1990 LER 90-006-00:on 900226,discovered Abnormal Degradation on Steel Containment Vessel.Corrosion Caused by Design Deficiency Caused by Unanticipated Environ Interaction. Detailed Insps conducted.W/900529 Ltr ML20043C8041990-05-30030 May 1990 LER 90-008-00:on 900430,radiation Monitor for Contaminated Parts Warehouse Ventilation & Sampler Min Flow Device Declared Inoperable.Caused by Personnel Error.Appropriate Procedures Enhanced to Prevent recurrence.W/900530 Ltr ML20012D1651990-03-19019 March 1990 LER 90-004-00:on 900208,determined That Holes Left in Auxiliary Shutdown Panel Could Allow Water Spray Into Cabinet.Cause Unknown.Holes Covered W/Duct Tape & Repaired. W/900319 Ltr ML20011F4261990-02-16016 February 1990 LER 90-002-00:on 900117,hold Down Screws on Sylvania Contactors in Motor Control Ctrs Found Loose.Caused by Mfg Deficiency.Contactor Screws Tightened.All Hold Down Screws Will Be Replaced W/Another type.W/900223 Ltr ML20006D5571990-02-0707 February 1990 LER 90-001-00:on 900108,reactor Trip Occurred Due to Clogged Strainer on Feedwater Pump a Speed Controller.Caused by Water in Oil Sys.Cause for Water Presence in Sys Unknown. Sludge Minimization Attempts pursued.W/900207 Ltr ML20006A8771990-01-21021 January 1990 LER 89-028-00:on 891204,self-initiated Technical Audit Team Personnel Identified Gap Around Control Room Ventilation Air Handling Unit Access Door.Caused by Possible Const/ Installation Deficiency.Door Sys modified.W/900122 Ltr ML19327C2581989-11-13013 November 1989 LER 89-031-00:on 891012,ac Power Supply Fuse Blew Resulting in Automatic Isolation of Four Outside Air Intakes on Ventilation Sys.Caused by Inappropriate Action.Intake Valves Returned to Svc & Tech Spec 3.3.3.1 exited.W/891113 Ltr ML19324C2031989-11-10010 November 1989 LER 89-024-00:on 890908,MSIV Stroke Timing Periodic Test Performed W/O Air Assistance & Three MSIVs Failed to Close within 5 S.Caused by Brass Guide Screws Excessively Tightened.Set Screws Properly set.W/891106 Ltr ML19324C2011989-10-31031 October 1989 LER 88-019-02:on 880719,damper Compartment Flows Did Not Meet Flow Requirements Due to Closure of Some Sys Dampers. Caused by Defective procedure.As-found Measurements Taken While Operating Fans for Damper positions.W/891030 Ltr ML19327B5611989-10-26026 October 1989 LER 89-030-00:on 890714,visual Insp Revealed 3/4 Inch Open Conduit Connection Which Would Have Prevented Successful Leak Test.Cause Unknown.Connection Removed & Hole Sealed. W/891026 Ltr ML19327B4771989-10-23023 October 1989 LER 89-029-00:on 890922,ESF Actuation Occurred When Diesel Generator 1A Started Due to Momentary Undervoltage Condition on Train a 4,160-volt Essential Switchgear.Cause Unknown. Offsite Power Source Returned to Normal svc.W/891023 Ltr ML19327B1511989-10-19019 October 1989 LER 89-026-00:on 890720,both Trains of Control Area Ventilation Sys Inoperable.Caused by Design Deficiency Because of Unanticipated Interaction of Components.Original Check Damper Reinstalled in Fan on Train B.W/891019 Ltr ML19351A4301989-10-18018 October 1989 LER 89-025-00:on 890918,jumper Came Loose & Inadvertently Made Contact W/Sliding Link B-14 Directly Above Link B-15, Resulting in Turbine Driven Feedwater Pump Automatically Starting.Caused by Inappropriate action.W/891018 Ltr ML19325D4991989-10-16016 October 1989 LER 89-027-00:on 890915,preheaters Did Not Start Because Air Flow Permissive Was Not Made & Cross Connect Dampers Were Closed & Tagged & Ventilation Sys Train a Remained Logged Inoperable.Caused by Design deficiency.W/891016 Ltr ML19325C4871989-09-28028 September 1989 LER 89-018-00:on 890829,both Trains of Control Area Ventilation (VC) & Chilled Water (Yc) Sys Declared Inoperable.Caused by Equipment/Failure Malfunction. Refrigerant Added to Vc/Yc chiller.W/890928 Ltr ML20043D7041989-09-25025 September 1989 LER 89-022-01:on 890826,reactor Trip Occurred Due to Failed Universal Board in Solid State Protection Sys Cabinet A. Caused by Equipment/Malfunction.Universal Board Replaced. W/900530 Ltr ML19325C4731989-09-18018 September 1989 LER 89-015-00:on 890722,discovered That Neutral Pressure Was Best That Could Be Achieved in Some Required Sys Configurations.Caused by Design Deficiency Due to Design Oversight.Outside Air Ref Point installed.W/891004 Ltr ML20024F2791983-08-29029 August 1983 LER 83-066/03L-0:on 830817,invalid Alarm Received for Fire Detection Zone Efa 90 Which Would Not Clear.Caused by Unusual Svc Conditions.Detector Cleaned & replaced.W/830829 Ltr ML20024D8101983-07-29029 July 1983 LER 83-050/03L-0:on 830629,control Area Ventilation Sys Train B Declared Inoperable.Caused by Automatic Reset Preheater Overtemp Cutout Switch Failure.Replacement Switch Will Be installed.W/830729 Ltr ML20024D7531983-07-27027 July 1983 LER 83-048/03L-0:on 830624,control Area Ventilation Sys Train B Declared Inoperable Following Low Refrigerant Temp Alarm Trip of Control Room Chiller B.Caused by Cleaning of Condenser tubes.W/830727 Ltr ML20024D7701983-07-27027 July 1983 LER 83-049/03L-0:on 830624,surveillance Compliance Review Revealed Three Time Response Tests Not Performed.Cause Not Stated.Remaining Channels Will Be Tested During Next refueling.W/830727 Ltr ML20024D8951983-07-27027 July 1983 LER 83-047/03L-0:on 830627,discovered That 18-month Insp of Fire Hose Station 180 Not Performed During Nov 1981.Caused by Order Preventing Personnel from Entering Area Due to High Radiation Levels.Procedural Change instituted.W/830727 Ltr ML20024C4091983-06-28028 June 1983 Updated LER 83-002/03X-1:on 830110,pressurizer Heater Group 1B Failed to Energize in Manual & Declared Inoperable.Heat Damage Found at Heat Dissipating Resistor Connections.Caused by Design Defect in Contactor Coil circuit.W/830628 Ltr ML20024C3941983-06-28028 June 1983 LER 83-035/03L-0:on 830515,pressurizer Heater Group 1B Failed to Energize in Manual & Declared Inoperable Per Tech Spec 3.4.3.Caused by Blown Fuse in Heater Contactor Control Circuit.Fuse replaced.W/830628 Ltr ML20024C0001983-06-27027 June 1983 LER 83-030/01T-0:on 830526,discovered Monthly Test of Containment Pressure Control Sys Failed to Satisfy Surveillance Requirements to Check Permissive/Termination Setpoint Accuracy.Alarm Modules recalibr.W/830627 Ltr ML20023C4691983-05-0505 May 1983 LER 83-017/03L-0:on 830405,during Draining of Refueling Cavity RHR (Nd) Pumps Began to Cavitate & Eventually Both Nd Pumps Stopped.Caused by Level Gauge Isolation.Cavity Refilled.Nd Sys Vented.Procedures Revised ML20028E0131983-01-10010 January 1983 LER 82-081/03L-0:on 821211,lower Personnel Airlock Declared Inoperable After Reactor Door Found Partially Closed W/Small Seal Ruptured & Large Seal Inflated.Cause Not Known.Seal Not Designed to Withstand Unrestrained Inflationary Forces ML20028A5301982-11-10010 November 1982 LER 82-073/03L-0:on 820403,during QA Audit of Test Procedures,Incore & Nuclear Instrumentation Sys Correlation Monthly Check Found Not Performed.Caused by Incorrect Test Schedule ML20027D3351982-10-22022 October 1982 LER 82-071/03L-0:on 820922,motor Control Ctr Lemxd Lost Power Causing Temporary Inoperability of Several Essential Sys/Components.Caused by Automatic Trip of Feeder Breaker. Breaker Reset & Closed.Power Restored ML20027B5051982-09-10010 September 1982 LER 82-067/03L-0:on 820813,two Auxiliary Feedwater Pump Turbine Low Suction Pressure Switches Failed to Perform During Functional Test.Caused by Switches Being Out of Calibr,Possibly Due to Instrument Drift or Misadjustment ML20027B5521982-09-0808 September 1982 LER 82-064/03L-0:on 820809,vent Flow Monitor Indicated Zero W/Vent in Operation During Process of Returning to Mode 1. Caused by Out of Calibr Differential Pressure Transmitter Due to Instrument Drift.Transmitter Recalibr ML20052H5831982-05-10010 May 1982 LER 82-027/03L-0:on 820326,one Channel of Position Indication for RCS Power Operated Relief Valves NC-32 & NC-36 Declared Inoperable When Closed Indicator Lights Failed.Caused by Loose Fitting Bulb Due to Crack in Socket ML20052G6791982-05-0707 May 1982 LER 82-030/01T-0:on 820423,diesel Generator 1A Declared Inoperable After Failing to Start for Periodic Test.Caused by Failure of Station Design Change Implementation Program to Control Work on Station Mods ML20052H7421982-05-0707 May 1982 LER 82-031/03L-0:on 820408,boric Acid Transfer Pump a Failed to Perform at Capacity & Declared Inoperable.Caused by Reverse Rotation Due to Improperly Connected Windings. Personnel Counseled & Maint Routine Modified ML20052H7481982-05-0606 May 1982 LER 82-029/03L-0:on 820402,investigation of Power Operated Relief Valve (PORV) & Pressurizer Code Safety Discharge Line High Temp Alarms Revealed Indications of Leakage for PORV NC-34.Cause Undetermined.Valve Will Be Repaired ML20052H6091982-04-30030 April 1982 LER 82-028/03L-0:on 820401,during Mode 1 Operation,Radiation Monitors EMF-31 & EMF-33 Lost Power.Caused by Monitor EMF-46 Tripping Circuit Breaker Due to Direct Short Across Power bulb.EMF-46 Isolated & EMF-31 & 33 Returned to Svc ML20052G3611982-04-29029 April 1982 LER 82-025/03L-0:on 820318,vol Control Tank Makeup Frequency Increased & Containment Floor & Equipment Sump 1A Level Increased During RCS Leak Test.Caused by Failure to Verify Isolation Valves Closed Due to Procedural Deficiency 1994-10-05
[Table view] Category:RO)
MONTHYEARML20024J3211994-10-0505 October 1994 LER 94-006-00:on 940909,failure to Perform Slave Relay Test Associated W/One Containment Isolation Valve Due to Improper Work Practices.Reviewed All Slave Relay Test Procedures & Trained All Qualified reviewers.W/941005 Ltr ML20046B5251993-08-0404 August 1993 LER 93-007-00:on 930705,TS Required Surveillance Was Not Performed Because of Inappropriate Action Because of Lack of Attention to Detail.Generated WO 93047633 to Perform Required Surveillance on Unit 1 IPE CA 9010.W/930729 Ltr ML20045H9821993-07-12012 July 1993 LER 93-005-00:on 930612,manual Rt in Unit 1 Occurred Due to Equipment Failure Due to Failure of L-13 Field Cable Between Data Cabinet B & Bulkhead for Undetermined Reasons.Replaced Field cable.W/930709 Ltr ML20045D9681993-06-25025 June 1993 LER 93-006-00:on 930526,discovered That Sample Blower for Radiation Monitor 1 EMF-43B Off & Monitor Declared Inoperable & Ventilation Sys Air Intakes Not Isolated.Caused by Deficient Procedures.Test Procedures Revised ML20045B2811993-06-11011 June 1993 LER 93-004-00:on 930513,both Trains of CR Ventilation Sys Declared Inoperable Due to Equipment Failure.Exact Cause of Failure Could Not Be Determined.Train B Nuclear Svc Water Sys Flow Balance completed.W/930611 Ltr ML20029C2091991-03-21021 March 1991 LER 91-003-00:on 910219,both Trains of Control Room Ventilation Sys Inoperable.Caused by Design Malfunction & Management Deficiency.Temporary Modifications,Removing Automatic Closure Function implemented.W/910321 Ltr ML20028G9561990-09-26026 September 1990 LER 90-025-00:on 900827,Unit 1 Shut Down Because of Unidentified RCS Leakage Exceeding Tech Spec Limits.Caused by Equipment Failure.Procedure AP/1/A/5500/10 Implemented. Valve 1NC-33 Will Be Repacked at Next outage.W/900926 Ltr ML20044A0091990-06-25025 June 1990 LER 90-015-00:on 900524,Tech Spec 3.0.3 Entered Because More than One Power Range Nuclear Instrumentation Channel Exceeded 5% Deviation.Caused by Mgt Deficiency.Boric Acid Added to Coolant sys.W/900625 Ltr ML20043H4991990-06-21021 June 1990 LER 90-012-00:on 900522,loose Matl,Consisting of Masslin Cloths & Stepoff Pad,Discovered in Upper Containment.Caused by Failure to Follow Procedures.Loose Items Removed & Cleanliness Procedures revised.W/900621 Ltr ML20043H2641990-06-20020 June 1990 LER 90-011-00:on 900521,noted That Valve 1RN-69A Auxiliary Feedwater Assured Supply from Train a Nuclear Svc Water Repositioned to Open Position After Start of Pump.Cause Unknown.Pump Shut Down & Valve closed.W/900620 Ltr ML20043F7471990-06-13013 June 1990 LER 90-010-00:on 900427,discovered That Annulus Ventilation & Control Room Ventilation Sys Headers Would Not Operate,As Designed,Under Postulated Operating Conditions. Caused by Design Deficiency.Change submitted.W/900613 Ltr ML20043F5071990-06-11011 June 1990 LER 90-009-00:on 900512,feedwater Isolation Occurred as Result of Steam Generator 1B Reaching hi-hi Level Setpoint of 82% Level.Caused by Inappropriate Action Because of Lack of Attention to Detail.Feedwater Logic reset.W/900611 Ltr ML20043D6541990-05-30030 May 1990 LER 90-007-00:on 881018,during Insp Ice Condenser Basket Found W/Bottom Screws Missing.Caused by Installation Deficiency Because of Improper Matl Selection.Work Request Initiated to Replace Improper screws.W/900530 Ltr ML20043D7121990-05-30030 May 1990 LER 90-006-00:on 900226,discovered Abnormal Degradation on Steel Containment Vessel.Corrosion Caused by Design Deficiency Caused by Unanticipated Environ Interaction. Detailed Insps conducted.W/900529 Ltr ML20043C8041990-05-30030 May 1990 LER 90-008-00:on 900430,radiation Monitor for Contaminated Parts Warehouse Ventilation & Sampler Min Flow Device Declared Inoperable.Caused by Personnel Error.Appropriate Procedures Enhanced to Prevent recurrence.W/900530 Ltr ML20012D1651990-03-19019 March 1990 LER 90-004-00:on 900208,determined That Holes Left in Auxiliary Shutdown Panel Could Allow Water Spray Into Cabinet.Cause Unknown.Holes Covered W/Duct Tape & Repaired. W/900319 Ltr ML20011F4261990-02-16016 February 1990 LER 90-002-00:on 900117,hold Down Screws on Sylvania Contactors in Motor Control Ctrs Found Loose.Caused by Mfg Deficiency.Contactor Screws Tightened.All Hold Down Screws Will Be Replaced W/Another type.W/900223 Ltr ML20006D5571990-02-0707 February 1990 LER 90-001-00:on 900108,reactor Trip Occurred Due to Clogged Strainer on Feedwater Pump a Speed Controller.Caused by Water in Oil Sys.Cause for Water Presence in Sys Unknown. Sludge Minimization Attempts pursued.W/900207 Ltr ML20006A8771990-01-21021 January 1990 LER 89-028-00:on 891204,self-initiated Technical Audit Team Personnel Identified Gap Around Control Room Ventilation Air Handling Unit Access Door.Caused by Possible Const/ Installation Deficiency.Door Sys modified.W/900122 Ltr ML19327C2581989-11-13013 November 1989 LER 89-031-00:on 891012,ac Power Supply Fuse Blew Resulting in Automatic Isolation of Four Outside Air Intakes on Ventilation Sys.Caused by Inappropriate Action.Intake Valves Returned to Svc & Tech Spec 3.3.3.1 exited.W/891113 Ltr ML19324C2031989-11-10010 November 1989 LER 89-024-00:on 890908,MSIV Stroke Timing Periodic Test Performed W/O Air Assistance & Three MSIVs Failed to Close within 5 S.Caused by Brass Guide Screws Excessively Tightened.Set Screws Properly set.W/891106 Ltr ML19324C2011989-10-31031 October 1989 LER 88-019-02:on 880719,damper Compartment Flows Did Not Meet Flow Requirements Due to Closure of Some Sys Dampers. Caused by Defective procedure.As-found Measurements Taken While Operating Fans for Damper positions.W/891030 Ltr ML19327B5611989-10-26026 October 1989 LER 89-030-00:on 890714,visual Insp Revealed 3/4 Inch Open Conduit Connection Which Would Have Prevented Successful Leak Test.Cause Unknown.Connection Removed & Hole Sealed. W/891026 Ltr ML19327B4771989-10-23023 October 1989 LER 89-029-00:on 890922,ESF Actuation Occurred When Diesel Generator 1A Started Due to Momentary Undervoltage Condition on Train a 4,160-volt Essential Switchgear.Cause Unknown. Offsite Power Source Returned to Normal svc.W/891023 Ltr ML19327B1511989-10-19019 October 1989 LER 89-026-00:on 890720,both Trains of Control Area Ventilation Sys Inoperable.Caused by Design Deficiency Because of Unanticipated Interaction of Components.Original Check Damper Reinstalled in Fan on Train B.W/891019 Ltr ML19351A4301989-10-18018 October 1989 LER 89-025-00:on 890918,jumper Came Loose & Inadvertently Made Contact W/Sliding Link B-14 Directly Above Link B-15, Resulting in Turbine Driven Feedwater Pump Automatically Starting.Caused by Inappropriate action.W/891018 Ltr ML19325D4991989-10-16016 October 1989 LER 89-027-00:on 890915,preheaters Did Not Start Because Air Flow Permissive Was Not Made & Cross Connect Dampers Were Closed & Tagged & Ventilation Sys Train a Remained Logged Inoperable.Caused by Design deficiency.W/891016 Ltr ML19325C4871989-09-28028 September 1989 LER 89-018-00:on 890829,both Trains of Control Area Ventilation (VC) & Chilled Water (Yc) Sys Declared Inoperable.Caused by Equipment/Failure Malfunction. Refrigerant Added to Vc/Yc chiller.W/890928 Ltr ML20043D7041989-09-25025 September 1989 LER 89-022-01:on 890826,reactor Trip Occurred Due to Failed Universal Board in Solid State Protection Sys Cabinet A. Caused by Equipment/Malfunction.Universal Board Replaced. W/900530 Ltr ML19325C4731989-09-18018 September 1989 LER 89-015-00:on 890722,discovered That Neutral Pressure Was Best That Could Be Achieved in Some Required Sys Configurations.Caused by Design Deficiency Due to Design Oversight.Outside Air Ref Point installed.W/891004 Ltr ML20024F2791983-08-29029 August 1983 LER 83-066/03L-0:on 830817,invalid Alarm Received for Fire Detection Zone Efa 90 Which Would Not Clear.Caused by Unusual Svc Conditions.Detector Cleaned & replaced.W/830829 Ltr ML20024D8101983-07-29029 July 1983 LER 83-050/03L-0:on 830629,control Area Ventilation Sys Train B Declared Inoperable.Caused by Automatic Reset Preheater Overtemp Cutout Switch Failure.Replacement Switch Will Be installed.W/830729 Ltr ML20024D7531983-07-27027 July 1983 LER 83-048/03L-0:on 830624,control Area Ventilation Sys Train B Declared Inoperable Following Low Refrigerant Temp Alarm Trip of Control Room Chiller B.Caused by Cleaning of Condenser tubes.W/830727 Ltr ML20024D7701983-07-27027 July 1983 LER 83-049/03L-0:on 830624,surveillance Compliance Review Revealed Three Time Response Tests Not Performed.Cause Not Stated.Remaining Channels Will Be Tested During Next refueling.W/830727 Ltr ML20024D8951983-07-27027 July 1983 LER 83-047/03L-0:on 830627,discovered That 18-month Insp of Fire Hose Station 180 Not Performed During Nov 1981.Caused by Order Preventing Personnel from Entering Area Due to High Radiation Levels.Procedural Change instituted.W/830727 Ltr ML20024C4091983-06-28028 June 1983 Updated LER 83-002/03X-1:on 830110,pressurizer Heater Group 1B Failed to Energize in Manual & Declared Inoperable.Heat Damage Found at Heat Dissipating Resistor Connections.Caused by Design Defect in Contactor Coil circuit.W/830628 Ltr ML20024C3941983-06-28028 June 1983 LER 83-035/03L-0:on 830515,pressurizer Heater Group 1B Failed to Energize in Manual & Declared Inoperable Per Tech Spec 3.4.3.Caused by Blown Fuse in Heater Contactor Control Circuit.Fuse replaced.W/830628 Ltr ML20024C0001983-06-27027 June 1983 LER 83-030/01T-0:on 830526,discovered Monthly Test of Containment Pressure Control Sys Failed to Satisfy Surveillance Requirements to Check Permissive/Termination Setpoint Accuracy.Alarm Modules recalibr.W/830627 Ltr ML20023C4691983-05-0505 May 1983 LER 83-017/03L-0:on 830405,during Draining of Refueling Cavity RHR (Nd) Pumps Began to Cavitate & Eventually Both Nd Pumps Stopped.Caused by Level Gauge Isolation.Cavity Refilled.Nd Sys Vented.Procedures Revised ML20028E0131983-01-10010 January 1983 LER 82-081/03L-0:on 821211,lower Personnel Airlock Declared Inoperable After Reactor Door Found Partially Closed W/Small Seal Ruptured & Large Seal Inflated.Cause Not Known.Seal Not Designed to Withstand Unrestrained Inflationary Forces ML20028A5301982-11-10010 November 1982 LER 82-073/03L-0:on 820403,during QA Audit of Test Procedures,Incore & Nuclear Instrumentation Sys Correlation Monthly Check Found Not Performed.Caused by Incorrect Test Schedule ML20027D3351982-10-22022 October 1982 LER 82-071/03L-0:on 820922,motor Control Ctr Lemxd Lost Power Causing Temporary Inoperability of Several Essential Sys/Components.Caused by Automatic Trip of Feeder Breaker. Breaker Reset & Closed.Power Restored ML20027B5051982-09-10010 September 1982 LER 82-067/03L-0:on 820813,two Auxiliary Feedwater Pump Turbine Low Suction Pressure Switches Failed to Perform During Functional Test.Caused by Switches Being Out of Calibr,Possibly Due to Instrument Drift or Misadjustment ML20027B5521982-09-0808 September 1982 LER 82-064/03L-0:on 820809,vent Flow Monitor Indicated Zero W/Vent in Operation During Process of Returning to Mode 1. Caused by Out of Calibr Differential Pressure Transmitter Due to Instrument Drift.Transmitter Recalibr ML20052H5831982-05-10010 May 1982 LER 82-027/03L-0:on 820326,one Channel of Position Indication for RCS Power Operated Relief Valves NC-32 & NC-36 Declared Inoperable When Closed Indicator Lights Failed.Caused by Loose Fitting Bulb Due to Crack in Socket ML20052G6791982-05-0707 May 1982 LER 82-030/01T-0:on 820423,diesel Generator 1A Declared Inoperable After Failing to Start for Periodic Test.Caused by Failure of Station Design Change Implementation Program to Control Work on Station Mods ML20052H7421982-05-0707 May 1982 LER 82-031/03L-0:on 820408,boric Acid Transfer Pump a Failed to Perform at Capacity & Declared Inoperable.Caused by Reverse Rotation Due to Improperly Connected Windings. Personnel Counseled & Maint Routine Modified ML20052H7481982-05-0606 May 1982 LER 82-029/03L-0:on 820402,investigation of Power Operated Relief Valve (PORV) & Pressurizer Code Safety Discharge Line High Temp Alarms Revealed Indications of Leakage for PORV NC-34.Cause Undetermined.Valve Will Be Repaired ML20052H6091982-04-30030 April 1982 LER 82-028/03L-0:on 820401,during Mode 1 Operation,Radiation Monitors EMF-31 & EMF-33 Lost Power.Caused by Monitor EMF-46 Tripping Circuit Breaker Due to Direct Short Across Power bulb.EMF-46 Isolated & EMF-31 & 33 Returned to Svc ML20052G3611982-04-29029 April 1982 LER 82-025/03L-0:on 820318,vol Control Tank Makeup Frequency Increased & Containment Floor & Equipment Sump 1A Level Increased During RCS Leak Test.Caused by Failure to Verify Isolation Valves Closed Due to Procedural Deficiency 1994-10-05
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G7951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for McGuire Nuclear Station,Units 1 & 2 ML20217F3661999-09-22022 September 1999 Rev 18 to McGuire Unit 1 Cycle 14 Colr ML20212D1911999-09-20020 September 1999 SER Accepting Exemption from Certain Requirements of 10CFR50,App A,General Design Criterion 57 Closed System Isolation Valves for McGuire Nuclear Station,Units 1 & 2 ML20216E8851999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for McGuire Nuclear Station,Units 1 & 2 ML20211B1281999-08-31031 August 1999 Dynamic Rod Worth Measurement Using Casmo/Simulate ML20217G8101999-08-31031 August 1999 Revised Monthly Operating Repts for Aug 1999 for McGuire Nuclear Station,Unit 1 & 2 ML20211G5261999-08-24024 August 1999 SER Accepting Approval of Second 10-year Interval Inservice Insp Program Plan Request for Relief 98-004 for Plant,Unit 1 ML20211F3441999-08-17017 August 1999 Updated non-proprietary Page 2-4 of TR DPC-NE-2009 ML20210S2371999-07-31031 July 1999 Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2 ML20216E8951999-07-31031 July 1999 Revised Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2 ML20209E4361999-07-0909 July 1999 SER Agreeing with Licensee General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation ML20196K6631999-07-0707 July 1999 Safety Evaluation Supporting Licensee 990520 Position Re Inoperable Snubbers ML20209H1631999-06-30030 June 1999 Monthly Operating Repts for June 1999 for McGuire Nuclear Station,Units 1 & 2 ML20210S2491999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for McGuire Nuclear Station,Units 1 & 2 ML20209H1731999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for McGuire Nuclear Station,Units 1 & 2 ML20206T4771999-05-31031 May 1999 Rev 3 to UFSAR Chapter 15 Sys Transient Analysis Methodology ML20196L1881999-05-31031 May 1999 Non-proprietary Rev 1 to DPC-NE-3004, Mass & Energy Release & Containment Response Methodology ML20195K3691999-05-31031 May 1999 Monthly Operating Repts for May 1999 for McGuire Nuclear Station,Units 1 & 2 ML20206N3511999-05-11011 May 1999 Safety Evaluation Accepting Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related Movs ML20195K3761999-04-30030 April 1999 Revised MORs for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 ML20206R0891999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205L2341999-04-0505 April 1999 SFP Criticality Analysis ML20206R0931999-03-31031 March 1999 Revised Monthly Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205P8991999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205C4171999-03-25025 March 1999 Special Rept 99-02:on 801027,Commission Approved for publication,10CFR50.48 & 10CFR50 App R Delineating Certain Fire Protection Provisions for Nuclear Power Plants Licensed to Operate Prior to 790101.Team Draft Findings Reviewed ML20207K2051999-03-0505 March 1999 Special Rept 99-01:on 990128,DG Tripped After 2 H of Operation During Loaded Operation for Monthly Test.Caused by Several Components That Were Degraded or Had Intermittent Problems.Parts Were Replaced & Initial Run Was Performed ML20204C8911999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205P9021999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2 ML20204C8961999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for McGuire Nuclear Station,Units 1 & 2 ML20199E0301998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for McGuire Nuclear Station,Units 1 & 2 ML20216F9931998-12-31031 December 1998 Piedmont Municipal Power Agency 1998 Annual Rept ML20198A4481998-12-11011 December 1998 Safety Evaluation Concluding That for Relief Request 97-004, Parts 1 & 2,ASME Code Exam Requirements Are Impractical. Request for Relief & Alternative Imposed,Granted ML20198D7561998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for McGuire Nuclear Station,Units 1 & 2 ML20199E0491998-11-30030 November 1998 Revised Monthly Operating Rept for Nov 1998 for McGuire Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20199E9651998-11-24024 November 1998 Rev 1 to ATI-98-012-T005, DPC Evaluation of McGuire Unit 1 Surveillance Weld Data Credibility ML20196D4171998-11-24024 November 1998 Special Rept 98-02:on 981112,failure to Implement Fire Watches in Rooms Containing Inoperable Fire Barrier Penetrations,Was Determined.Repair of Affected Fire Barriers in Progress ML20196G0581998-11-0606 November 1998 Rev 17 to COLR Cycle 13 for McGuire Unit 1 ML20196G0761998-11-0606 November 1998 Rev 15 to COLR Cycle 12 for McGuire Unit 2 ML20198D7771998-10-31031 October 1998 Revised Monthly Operating Rept for Oct 1998 for McGuire Nuclear Station,Units 1 & 2 ML20195E5961998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for McGuire Nuclear Station,Units 1 & 2 ML20154L6251998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for McGuire Nuclear Station,Units 1 & 2 ML20195E6021998-09-30030 September 1998 Revised Monthly Operating Rept for Sept 1998 for McGuire Nuclear Station,Units 1 & 2 ML20154B4131998-09-22022 September 1998 Rev 0 to ISI Rept for McGuire Nuclear Unit 1 Twelfth Refueling Outage ML20151W3521998-09-0808 September 1998 Special Rept 98-01:on 980819,maint Could Not Be Performed on FPS Due to Isolation Boundary Leakage.Caused by Inadequate Info Provided in Fire Impairment Plan.Isolated Portion of FPS Was Returned to Svc ML20154L6321998-08-31031 August 1998 Rev 1 to MOR for Aug 1998 for McGuire Nuclear Station,Unit 1 ML20153B3741998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for McGuire Nuclear Station,Units 1 & 2 ML20236U1601998-07-31031 July 1998 Non-proprietary DPC-NE-2009, DPC W Fuel Transition Rept ML20237B2381998-07-31031 July 1998 Monthly Operating Repts for July 1998 for McGuire Nuclear Station,Units 1 & 2 ML20153B3931998-07-31031 July 1998 Revised Monthly Operating Repts for Jul 1998 for McGuire Nuclear Station,Units 1 & 2 ML20236P0451998-07-0808 July 1998 Part 21 Rept Re non-conformance & Potential Defect in Component of Nordberg Model FS1316HSC Standby Dg.Caused by Outer Spring Valves Mfg from Matl That Did Not Meet Specifications.Will Furnish Written Rept within 60 Days 1999-09-30
[Table view] |
Text
p. 1
^^ :
?. -^ DukeIbuvr Compaqy (104)8?S 4000
, hlcCuire NucitarStation
' 12700 flagers Ferry Road flantersville, NC28078 8985
- DUKENWER.
MayI 30, 1990 U.S. Nuclear Regulatory Commission' Document-Control Desk Washington, D.C. 20555-
Subject:
McGuire Nuclear' Station, Unit 1 & 2 Docket No. 50-369 Licensee Event Report 369/89-07 Gentlemen:
- Pursuant to 10CFR 50.73 Sections (a)(1) and (d), attached is Licensee Event Report 369/89-07 concerning improper screws that were- installed in the bottom of ice ,
condenser baskets. .This report is being submitted in accordance with 10 CFR i 50.73(a)(2)(1). This event is considered to be of no significance with respect to the health and safety of the public.
i Very truly yours, j
i f/ 'l' 2ft T.L. McConnell ,
DVE/ADJ/cbl/
Attachment xc: Mr. S.D. Ebneter American Nuclear Insurers Administrator, Region II c/o Dottie Sherman, ANI Library i U.S. Nuclear Regulatory Commission The Exchange, Suite 245 101 Marietta St., NW, Suite 2900 270 Farmington Avenue.
Atlanta, GA 30323 Farmington, CT 06032 INPO Records Center Mr. Darl Hood, Project Manager ,
Suite 1500 U.S. Nuclear Regulatory Commission 1100 circle 75 Parkway Office of Nuclear Reactor Regulation Atlanta, GA 30339 Washington, D.C. 20555 M&M Nuclear Consultan'cs Mr. P.K. Van Doorn 1221 Avenue of the Americas NRC Senior Resident Inspector New' York, NY 10020 McGuire Nuclear Station O kD [
n
j Document' Control Deak-4 P. age 2'-
> bxc: B.W.'Bline L.G. Bost.
~J.S. Warren R.L. Gill'
"". . Ch;;; (C;G) - C t. Norfle//
T.D. Curtis (ONS)
P.R.:Herran S.S. Kilborn (W)
M.S. Tuckman
-R.E. Lopez-Ibanez-M.A. Mullen-R.O.-Sharpe.(MNS)'
G.B. Swindlehurst_
K.D. Thomas L.E. Weaver R.L.-Weber J.D. Wylie (PSD)
J.W..Willis (MNS QA)
QA Tech. Services NRC Coordinator (EC 12/55)
MC-815-04 (20) i
~!
I i
.x .
elaC Pere Egg
- U.S. NUCLEM 6 4.utaTORY C08AMitB@et
- APPROVID oess ,so sim0ies
LICENSEE EVENT REPORT (LER)
,,,,,n, ooCati NUMetR m === m i
,$c,,GuireNuclearStation, Unit 1 oisto;o;ol3l6l 9 i lor l016
"' Improper Screws Were Installed In The Bottom Of* Ice Condenser Baskets-Because of Improper Material Selection SV9edi DAf t 198 Lia NUeSER tel R$ PORT DAf t (76 OTMER f ACILITill INVOLVED 181 1
"* N4 T MMS' MONTM DAY YEAR YEAR bib 4 vw".$ MONTH DAY]YtAR G W" W8 I McGuire, Unit 2 o isto;oioi 3,7,0 90 9 l 0,- 0 l 0l7 Oj q 1l 7 0l0 0l5 3l0 9l 0 o,5,n,o,n, , ,
Tiat REPoR3 is sueuiTr4o PURSUANT To int ataUimtutN,3 o, 30 C,R e <ca.4 e ., ..,. ., caee .~.. . tiii 88004 W 20 402469 30 405tel 90 73aeH2 Hest - 73 71161 30 405teH1 Hit to 3steH11 to 73teH2Het 73 71tel a _
pop 80 40ttelt1Het to 38teH2) 90 72ieH2Hval O Mt see nA cf
, l _ _
X to.73aeH2 Hit 00 73teH2HvedH Al Js54) (
/;q _
30 4esteH1Hdel _
20 405teit1Hivl 90 73aeH2Het to.73teH2HestiHel 20 degliettilles 90.73aelt2 Hie 6 90.73:eH2Het LIClasSEE CONTACT FOR THis LER till qwg TtttPHONE NUMBE R ARE A CODE l Alan Sipe, Chairman, McGuire Safety Review Group 7; Oi 4 8;7, S j i 4i l83i 9 COMPLETE ONE LINE FOR S ACH C0esPONENT F AILURt OtsCRISED IN TMis REPORT (13:
R P sysTIM
- AC R PomfA f C3.USE SYtitM COMPONENT Ma[y'g A C. O NPR S s CAust COMPONENT Ng o pp f I I i i i l l l 1 I i i i I l I I I l !
l I l I I I I 'l MONTM Dav vEAR
$UPPLEMENTAL REPORf ERPICTED tidi SU8 Mission tit (It ves e.m. tere iM9fCTED $UOMISSION CA TE) eO s
l l l A TR ACT 9L., R, > = =<. , e . e,.,...e., a,,se. e .<e ,,-- .e a.eo o ei On October 18, 1988, during routine inspection, a Unit 1 Ice Condenser Basket was found with the bottom screws missing. At that time, a Problem Investigation Report .
(PIR) was initiated to resolve the problem. Subsequently, work requests were written to inspect and repair all Ice Condenser Baskets in Units 1 and 2. Number 10-16, type 410 stainless steel screws were used for these repairs. Screws were replaced in the bottom or intermediate section of ten baskets in Unit 1 and one basket in Unit 2, On March 30,=1990, during an evaluation being performed by Design Engineering personnel, it was discovered that the original equipment supplier (Westinghouse) had specified specially treated number 10-32, AISI 1022 carbon steel screws for use in the bottom and intermediate sections of the baskets.
A review of the shear and bending forces during seismic and design basis events showed that the number 10-16, type 410 stainless steel screws were unacceptable as used. A PIR was initiated to resolve the problem. All stainless steel screws were replaced in the bottom and intermediate sections of the ten Unit 1 baskets and temporary reinforcing cables were added to support the one Unit 2 basket until the screws can be replaced. This event is' assigned a cause of Installation Deficiency because of improper material selection. Units 1 and 2 have been in all modes of operation during the time the inappropriate screws were installed.
tRCe.. m
..____SYW________._________________.____ _ _ _ _ _ _ _ _ _ _ . _ . - -
U.S. huCLEAR dIuLAtoEY COnansassoons esset Perm ageA *-
" emovto owe no mo-om
. UCENSEE EVENT REPORT (LER) TEXT CONTINUATION EXPints. 41115 PACILity esAatt tal Docust Nuteth QI ggg gyngggg gg, pagg g33 YI'" NaIn UIdain McGuire Nuclear Station, Unit 1 o ls jo jo jo l3l 6l9 9}O __
0l0l7 0l0 0l2 0F 0l6 renv er . =s simisowie s.-.mmamm EVALUATIOh:
Background
The primar) function of the Ice Condenser {EIIS:BC) (NF) system is the absorption of thermal energy released abruptly in the event of a Loss-Of-Coolant Accident (LOCA) for the purpose of limiting the initial peak pressure in Containment. A secondary function of the NF system is the further absorption of energy after the.
initial incident causing the Containment pressure to be reduced to and held at a lower level for a period of time.
The Ice Condenser is subdivided into 24 bays which contain 1944 ice baskets
[EIIStBSKT) that are 12 inches in diameter and 48 feet long. Each bay consists of 9 columns and 9 rows of ice baskets. The ice columns are composed of four basket sections approximately 12 feet long each, filled with borated flake ice.
The baskets are formed ' from a 14 gage ( 075) perforated sheet metal. 'The perforations are 1.0 inch x 1.0 inch holes spaced on a 1.25 inch center. The radius at the junction of the perforation is 0.0625 inch. The ice basket material is made from ASTM-569 which is a commercial quality, low carbon steel. The basket component parts are corrosion protected by a hot dip galvanized process. The perforated basket assembly has an open area of approximately 64 percent to provide tia necessary surface area for heat transfer between the steam / air mixture and the ice to limit the Containment pressure within design limits. Interconnection couplings and stiffening rings are located at the bott.om and at 6 foot levels of each basket section respectively. The bottom coupling and stiffening ring are cylindrical in shape and approximately 3 inches high with a rolled internal lip.
The lip provides stiffening to the basket. These couplings are attached to the ice basket by locking steel metal screws and basket detents.
The basket sections are assembled into the lattice frames to form a continuous column of ice 48 feet high. The bottom wire mesh is designed to allow water to flow out of the basket and has attachments for mechanical connection to the lower support structure to prevent uplift of the ice baskets during a LOCA. The lattice frames provide only lateral ice basket support at intervals corresponding to the stiffened ice basket sections. The vertical loads of the ice and ice basket are transmitted by the basket to the lower support structure. The attachment between the ice basket and the lower support structure is disengaged to permit weighing of the baskets. Provision is made for lifting and weighing the whole length of selected columns for surveillance purposes.
Technical Specification (TS) 3/4.6.5.1 specifies that the ice bed shall be operable cith:
- a. The stored ice having a boron concentration of at least 1800 ppm boron as sodium tetraborate and pH of 9.0 to 9.5,
- b. Flow channels through the Ice Condenser,
- c. A maximum ice bed temperature of less than or equal to 27'F,
,,, e , ,,m .
.u. m m.e-ui =
sRC Peein assa s U S NUCLEAR CBIULiTORY COMMcEB6088
" '. umovio oMe no vu.cim LICENSEE EVENT REPORT (LER) TEXT CONTINUATION t oiRes.nau m
'ACabit f esAut H) ' ! 00CEST 88 UMBER tal gga ,eyesgan (g, Pact (3) h vtan IS8 gEd[,^ 6 c "51e
, p McGuire Nuclear Station, Unit 1 o l5 l0 l0 j o l3 l 6l9 9l0 --
0l 0 l7 --
0l0 ol 3oF 0 l6 rixt ,, . < =ac F a meu nn
- d. A total ice weight of at least 2,466,420 pounds at a 95 percent level of confidence, and
- e. 1944 ice baskets. .
These conditions are applicable in Mode 1 (Power Operation), Mode 2 (Startup), Mode 3 (Hot Standby), and Mode 4 (Hot Shutdown). The TS action statement states that with the ice bed inoperable, restore the ice bed to operable status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in-at least Hot Standby within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in Cold Shutdown within
~
the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
Description of Event During previous Ice Loudenser maintenance, the ice baskets were disassembled at the base to remove foreign material. Because of this practice, it was discovered that some baskets had not been reassembled properly and that attachment pins and screws were missing from the bottom and intermediate couplings. As a result of this discovery, PIR 1-M88-0255 was initiated on October 18, 1988 to address the problem.
The proposed resolution of the problem was to install pins and screws in the bottom
' and intermediate couplings of the baskets which had been found deficient and to 3
perform an inspection of all ice baskets for missing pins or screws, i-Consequently, work requests 501372 and 501948 were generated to inspect all ice baskets to ensure that the bottoms were properly attached and that all necessary screws were installed. During the performance of the repair, McGuire Engineering Support personnel made a decision to replace all missing screws with number 10-16, type 410 stainless steel screws. A previous McGuire Variation Notice had authorized use of the stainless steel screws in one part of the ice b;skets. Since all of the metal screws used in assembly of the ice baskets were originally the same, McGuire Engineering Support personnel involved believed that the stainless steel screws approved by the variation notice were also appropriate for use in any part of the ice basket assembly. Screws were subsequently replaced in the bottom or intermediate sections of ten baskets in Unit 1 and one basket in Unit 2.
On February 19, 1990, during ice unloading operations on Unit 1, Basket 7-8 in Bay 3 was dropped and damaged whi,le attempting to lower it back to the normal position.
Because of this damaged basket, Design Engineering personnel began performing an engineering evaluation of Ice Condenser operability. During the course of this evaluation the Design Engineering personnel involved also received queries from McGuire personnel concerning commercial grade screws for Ice Condenser use.
Because of the questions about commercial grade and the evaluation of Ice Condenser basket structure, Design Engineering personnel discovered the error in the type of screw used in the previous repairs.
A review of the shear and bending forces applied to the basket couplings during seismic and design basis events showed that the number 10-16, type 410 stainless steel screws were unacceptable for use in the bottom or intermediate couplings.
i
'U.8 GPC' 19se.5J 0 38t > 00 0 7-NAC.ORM3004 NSU
a _ :
Isac Pero ageA U 4. souctEaa 5 soukifony consuseseose l
- . LICENSEE EVENT REPORT ILER) TEXT CONTINUATION unovto owe No mo-om .
. DMatt. 011/5 FACILITY leAAAE m o0CEET 88Undeln tai tan Nuessan ist Past ta i
"*a " M fik" "%*3
~
l McGuire Nuclear Stat' ion, Unit 1 o l6 l0 l0 lo l3 l 6] 9 9l0 --
0l0]7 --
0'l0 0l4 0F 0l 6 text a.-- e mum .as== mac r.= anamm l
-1
'On April 17, 1990, PIR 1-M90-0107 was initiated to_ resolve the problem. As a l result, all stainless steel screws were replaced in the bottom or intermediate couplings of the baskets in Unit 1 Ice Condenser. Stainless steel reinforcing cables were added to prevent movement of the basket in question in the Unit 2 Ice Condenser until the screws can be replaced.
Conclusion l l
This event is assigned a cause of Installation Deficiency because of improper .
material selection. Self tapping stainless steel screws (number 10-16, type 410 l stainless steel) were used for the ice basket couplings in McGuire Unit 1 and Unit l 2 Ice Condensers. The decision to use the stainless steel screws was based on the fact that a previous McGuire Variation Notice had been initiated to allow the use of number 10-16, type 410 stainless steel screws to hold stiffener rings in baskets replacing damaged rings. No other reference was noted on the Manufacturers Drawing as to the material required for screws for the ice baskets and; therefore, the wrong material was chosen when replacing the missing coupling screws. A review of the Design Report for Ice Condenser baskets showed that the original equipment supplier (Westinghouse) had specified carbon steel screws (number 10-32, AISI 1022 E carbon steel) for the Ice Condenser basket couplings. l The basket assembly drawing (MCM 1201.17-0596 sh. 001) does not show a material specification for these screws. During Design Engineering's most recent review of the damaged basket,'a Westinghouse stress analysis was discovered which indicated that the tensile strength of the 10-32, AISI 1022 carbon steel screws was 140 KSI.
The type 410 stainless steel screws used as replacement fasteners have a tensile strength of 75 KSI.
Based on the additional ~information provided by the Westinghouse stress analysis, a review of the shear and bending forces applied to the banket couplings during seismic and design basis events was performed. The review showed that the'410- -
stainless steel screws were unacceptable. The Ice Condenser was therefore inoperable while the 410 stainless steel screws were instilled.
Work requests 97639 and 503532 were initiated to implement orrective actions. The screws were changed in the bottom or intermediate couplings to the original carbon I
steel screws for the baskets in Unit 1. Stainless steel support cables were added to support the basket in Unit 2 until the screws can be replaced. These actions corrected the problem by preventing the possibility of the ice baskets moving out of the Ice Condenser matrix. Subsequently, Unit 1 and Unit 2 Ice Condensers have been declared operable.
A review of the Operating Experience Program database for the past twenty-four months prior to this event revealed no events involving TS violations because of Installation Deficiencies caused by improper material selection. Therefore, this event is not considered to be recurring.
This event is not Nuclear Plant Reliability Data System (NPRDS) reportable.
i
- NJtC FOAM 344A
- U.S. CPGs 19884& Mt 900 h
. 0&I '
i_
!. e. . . 4 li i
1000C Po,2 mea
- U S NUC4 TLC C.E!ULATORY COMueOS40.e ,
Anemovlo ow wo mo-om UCENSEE EVENT REPORT (LER) TEXT CONTINUATION EXPtRES: O'31/3
$ACitify asAmet H3 00CRET Nuestem to LLR teUMSE A 161 #A04 t3l
"^a " b'2 '
57.*JR i McGuire Nuclear Station, Unit 1 o p jo jo lo l3 l 6l9 9l0 _ Oj o l7 0l0 0] 5 or 0l6 rext n . = e.we.w mei-ii.manw Hn There were' no personnel- injuries, radiation overexposures, or uncontrolled releases of radioactive material as a result of this event.
y i
COP.RECTIVE ACTIONS:
l Innediate: None i
Subsequent: 1) Work Request 97639 was initiated to replace all improper screws -
1 in the'of intermediate and bottom couplings of the ice baskets !
l in Unit 1 Ice Condenser. !
- 2) Work Request 503532 was initiated to repair basket 7-6 in bay 10 of Unit 2 Ice Condenser.
- 3) Mechanical Maintenance p.:rsonnel replaced all stainless steel .
screws in the intermediate and bottom couplings of ice baskets I in the Unit 1 Ice Condenser with the proper type screws.
- 4) Mechanical Maintenance personnel installed temporary stainless L steel support cables around basket 7-6 in bay 10 of Unit 2 Ice 1 l' Condenser, ti Planned: 1) Mechanical Maintenance personnel will install proper type I screws in the bottom coupling of basket 7-6 in bay 10 of Unit 2 Ice Condenser and the temporary support cables will be removed during the next refueling outage.
1 l 2) Design Engineering personnel will initiate an e,ditorial change I to drawing MCM 1201.17-0596 sh. 001 to specify the special I material required for the screws used in the-Ice Condenser i basket couplings.
i ' SAFETY ANALYSIS:
The safety evaluation of the McGuire Ice Condensers is based on having a required number of ice baskets operable with a sufficient quantity of ice. The presence of the stainless steel screws in the bottom or intermediate coupling of the ice l l
baskets did not result in any degradation of Ice Condenser conditions during. normal j operation. The effect of the inappropriate screws was that during a postulated LOCA plus Seismic Event a loaded ice basket could possibly have moved out of the Ice Condenser matrix. The movement could change the flow of fluid through the Ice Condenser, permit increased bypass of fluid around the Ice Condenser, or prevent the ice in the subject basket or adjacent baskets from contributing to the condensing and cooling of the fluid released during a LOCA. Additionally, movement of a loaded ice basket out of the Ice Condenser structure would represent a missile with possible unanalyzed safety questions. However, while the condition is not analyzed, potential damage to other safety related structures should be minimal.
At no time during the period when the inappropriate screws were installed was the Ice Condenser system challenged. No seismic events occurred and no movement of the
.U.S. GPoi 1996 S N.See ,000 F fetc 80mM 3ssa N- - -_ _ _ n _ ______ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ __ _
A e . . .
U S NUCLEA2 KEYUL& TORY ComenetEStOss IIRC Pere 3pSA ,
" Aw.ovto owe no sino-e+
LICENSEE EVENT REPORT (LER) TEXT CONTINUATION emans a ave 00CElf NUtIDER (21 4th NutsSSR 441 PAGE L3)
PACILITV meAsst H) viaa " E!.M'. -
fJ *.O McGuire Nuclear Stat' ion, Unit 1
~
o ls10loloj3.] 6l9 9l0 _
0] 0l 7 0l0 0 g6 or 0g6 YEsf7 ff mee assee e opusof, use assunnsnof NIIC hwm W ts (171 subject baskets occurred. Also, during this time period, the Containment Spray
[ Ells:BE] (NS) system, the Safety Injection [EIIS:BQ) (NI) system, and other safeguard systems were available to mitigate possible problems during a LOCA to control containment pressure.
This event did not affeet the health and safety of the public.
. f Nec FOmW 346A
, .,