Forwards 781024 Summary Rept on Low Strength 90-day Concrete Test Cylinders.Reactor Bldg Base Mat Concrete Is Above 5000 Psi Design Strength
ML20027A497
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 10/26/1978
From: Koester G
KANSAS GAS & ELECTRIC CO.
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20027A495 List:
References
TASK-AS, TASK-BN-78-31 BN--78-31, BN-78-31, NUDOCS 7812110271
Download: ML20027A497 (4)


Text

av *

. 4 KANSAS GAS AND ELECTRIC CC*n".PANY GLChkL.MCCETse

= c - .. .. .. . .

October 26, 1978 Mr. W.C. Seidle, Chief Reactor Construction and Engineering Support Branch U.S. Nuclear Regulatory Co:r: mission Region IV 611 Ryan Plaza Drive Suite 1000 ,

Arlington, Texas 76011 Subj : Final Report - Investigation of Low Strength 90-Day Concrete Test cylinders Ref: STN 50-482/Rpt 78-04

Dear Mr. Seidle:

The investigation of the low strength results obta.ined from the reactor building base mat 90-day concrete test cylinders has been

  • conpleted. The attached letter dated October 24, 1978, from J.L.

Turdera, Bechtel's Project Enaineering Manager for SNOPPS, summarizes the studies which were cenducted and the results obtained.

Ife believe these studies adcquately. demonstrate that the in-situ strength of the reactor buildinc base mat concrote is considerably above the 5000 psi design strength and that the apparent low strength of a, portion of the 90-day cylinders was due to testing conditions in measuring their actual strength.

The studies su::r.arized in Mr. Turdera's letter, including the report transmitted to you with my letter of May 25, are on file at the Wolf Creek Site and may be reviewed by NRC personnel during any future on-site inspection.

, Please advise if you need additional information.

Yours very truly, CLK:bb

.. ed ' N Attach cc: .70Arterburn EWCresl WEHitt (Daniel)

DIMcPhee (KCPL)

Attach to Cys 787p'702U -

..?

- - ,