Final Deficiency Rept Re Possible Nonconformances in Reinforcing Steel in Areas of Clear Cover,Member Thickness & Size of Reinforcing Bar.Corrective Actions Described in Section 2 of Const Verification Program.
ML19332A561
Person / Time
Site: Marble Hill
Issue date: 09/11/1980
From: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
To:
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8009160400
Download: ML19332A561 (2)


Text

~

,)C? ?gn,,-4 ,

r n u u u

- -* y

. ._. ,_/

.a .

PUBLIC SERVICE .

INDIANA September 11, 1980 S. W. Shields Senior Vice President -

Dg /(h y

/

Nuclear DMsion Mr. Jcmes G. Keppler, Director Docket Nos.: SIN 50-546 U. S. Nuclear Regulatory Coemission STN 50-547 Region III Construction Permit Nos.:

799 Roosevelt Road CPPR - 170 Glen Ellyn, Illinois 60137 CPPR - 171 Marble Hill Nuclear Generating Station - Units 1 and 2

Dear Mr. Keppler:

On June 27, 1980, Mr. S. J. Brewer of Public Service Company of Indiana, t Inc. , (PSI) notified your office of a potentially reportable item as required by 10 CFF 50.53(e). During the Construction Verification Program reinforcing stuel was inspected in accordance with SPP-2.

This inspection resulted in a nu=ber of nonconformances in the generic areas of clear cover, member thickness, size of reinforcing bar, number of bars and bar spacing.

In the interim report dated July 24, 1980, PSI committed to performing an engineering evaluation of these nonconformances and also described the manner in which any necessary repairs would be made to the affected structural elements. It was also-indicated that a more detailed description of these concerns and corrective actions would be available in Section 2.0 of the report on the Construction Verification Program which has since been submitted to your office.

In that report PSI determined, based upon engineering evaluations, that corrective measures would be necessary to meet the design requirements of a number of equipment pads which had dowels missing. Were these dowels to have remained missing, failure of the pads in question may have resulted if subjected to the extreme loadings which may occur during certain design basis events. Repair of these pads and other corrective measures which are being taken to prevent reoccurence are described in more detail in Section 2.0 of the report on the Constructica

. Verification Program.

30//

S

}D P.O. Box 190, New Washington, Indiana 47162 2. 293.4441 8009180

//dd

~*

^

?'?

.~

.: /

PUBUC SERVICE INDIANA Letter: James G. Keppler This letter is intended to fulfill the requirements of a final report as defined in 10 CFR 50.55(e). If you have any questions on this report, please feel free to contact me.

Sincerely, JU,w/5 S. W. Shields TDG/cg ec: Director of Inspection and Enforectent U. S. Nuclear Regulatory Commission Washington, D. C. 20555 E. R. Schweibinz, P. E.

J. J. Harrison l

1 1