Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217N3901999-10-25025 October 1999 Advises That Info Provided in & Affidavit Re Holtec Position Paper WS-115,rev 1,repts HI-87113, Rev 0,HI-87114,rev 0,HI-87102 Rev 0 & HI-87112,rev 0,marked Proprietary,Will Be Withheld from Public Disclosure ML20217L8591999-10-21021 October 1999 Discusses 990921 Request for Approval to Perform Alternative Testing as Part of Vermont Yankee Nuclear Power Station IST Program.Informs That Submittal Reviewed Against ASME Code Section XI Requirements & Forwards Safety Evaluation ML20217M1181999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates ML20217D9711999-10-13013 October 1999 Responds to Request That Information Titled Addl Info Re Cycle Specific SLMCPR for Vermont Yankee Cycle 21 Be Withheld from Public Disclosure.Determined Info to Be Proprietary & Will Be Withheld from Public Disclosure ML20217F1261999-10-12012 October 1999 Forwards Update to Previously Submitted RELAP5 Analytical Assumptions for App R,Re RAI of 961104 BVY-99-130, Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station1999-10-0808 October 1999 Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station ML20217C1501999-10-0707 October 1999 Forwards Insp Rept 50-271/99-11 on 990809-27.No Violations Noted.Insp Focused on Effectiveness of Engineering Functions in Providing for Safe Operation of Plant BVY-99-128, Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl1999-10-0606 October 1999 Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl ML20212J7891999-10-0404 October 1999 Informs That Licensee 980804,0628,29 & 990921 Responses to GL 98-01, Y2K Readiness of Computer Sys at NPPs Acceptable.Nrc Consider Subj GL to Be Closed for Plant ML20212J6501999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of VYNPS on 990913. No New Areas Identified in Which Licensee Performance Warranted Addl Insp Beyond Core Insp Program.Historical Listing of Plant Issues & Insp Plan Through Mar 2000 Encl ML20216J3531999-09-29029 September 1999 Responds to NRC Re Violations Noted in Insp Rept 50-271/99-12 on 990628-0811.Corrective Actions:Based on RFO 20 Maint Rule Outage Performance Review,Task Was Generated to Clarify & Enhance SD Monitoring Process BVY-99-122, Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-171999-09-28028 September 1999 Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-17 BVY-99-114, Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 11999-09-21021 September 1999 Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 1 BVY-99-113, Requests Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maint of Nuclear Power Plants. Attachment 1 Provides Justification for Alternative Testing1999-09-21021 September 1999 Requests Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maint of Nuclear Power Plants. Attachment 1 Provides Justification for Alternative Testing BVY-99-116, Informs of Determination That Wh Schulze,License SOP-10528-1,will No Longer Maintain License at Facility. Termination of License Requested1999-09-21021 September 1999 Informs of Determination That Wh Schulze,License SOP-10528-1,will No Longer Maintain License at Facility. Termination of License Requested BVY-99-121, Requests Extension Until 990929 to Respond to Violations Noted in Insp Rept 50-271/99-12,dtd 990819.Licensee Did Not Receive Rept Until 990830 & Addl Time Is Needed to Prepare & Allow for Adequate Review of Violation Response Submittal1999-09-20020 September 1999 Requests Extension Until 990929 to Respond to Violations Noted in Insp Rept 50-271/99-12,dtd 990819.Licensee Did Not Receive Rept Until 990830 & Addl Time Is Needed to Prepare & Allow for Adequate Review of Violation Response Submittal ML20212C1621999-09-17017 September 1999 Forwards Amend 175 to License DPR-28 & Safety Evaluation. Amend Revises TSs to Enhance Limiting Conditions for Operation & Surveillance Requirements Relating to Standby Liquid Control System BVY-99-118, Responds to RAI Concerning GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions1999-09-16016 September 1999 Responds to RAI Concerning GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions BVY-99-115, Forwards non-proprietary & Proprietary Responses to 990714 RAI Re Civil & Mechanical Engineering Considerations for Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355.Proprietary Encls Withheld1999-09-16016 September 1999 Forwards non-proprietary & Proprietary Responses to 990714 RAI Re Civil & Mechanical Engineering Considerations for Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355.Proprietary Encls Withheld ML20216F3171999-09-13013 September 1999 Forwards Insp Rept 50-271/99-06 on 990621-0801.One Violation Identified & Being Treated as Noncited Violation BVY-99-110, Informs of Util Intent to Replace Commitments Made in Licensee & Subsequently Ack in NRC with Containment Insp Criteria Defined in 10CFR50.55a(b)(2)(vi),per Drywell Coating Insp1999-08-31031 August 1999 Informs of Util Intent to Replace Commitments Made in Licensee & Subsequently Ack in NRC with Containment Insp Criteria Defined in 10CFR50.55a(b)(2)(vi),per Drywell Coating Insp BVY-99-111, Informs That Encl TS Bases Page 91 Has Been Revised to Allow Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line Uncorrected Solution & on-line 3D-Monicore Exposure Corrected Solution1999-08-31031 August 1999 Informs That Encl TS Bases Page 91 Has Been Revised to Allow Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line Uncorrected Solution & on-line 3D-Monicore Exposure Corrected Solution ML20211G4791999-08-27027 August 1999 Forwards Notice of Withdrawal of 990420 Amend Request Re TS on Reloading & Unloading Sequence of Fuel in Reactor Core When All Fuel Removed from Core BVY-99-107, Submits Response to NRC RAI Re Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355 Fuel Assemblies1999-08-26026 August 1999 Submits Response to NRC RAI Re Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355 Fuel Assemblies ML20211E8841999-08-25025 August 1999 Requests That Licensee Provide bldg-specific Justification for Use of Method A.1 at Locations Where Amplification Significantly Exceeds 1.5 Limit Above 8 Hz ML20211E1371999-08-20020 August 1999 Forwards from J Bean to H Miller & FEMA Final Exercise Rept for 990427-29 Plume Exposure & Ingestion Pathway Exercise for Vermont Yankee Nuclear Power Station.No Deficiencies Noted.Areas Requiring C/A Identified ML20211H0851999-08-19019 August 1999 Forwards Insp Rept 50-271/99-12 on 990628-0711 & Nov. Violation Re Failure to Monitor Unavailability of Specific Sys,Structures & Components During Refueling Outage Did Not Allow Adequate Assessment of Maint Effectiveness BVY-99-108, Requests That Gv Bogue,Bj Croke,Vs Ferrizzi,Me French, Bk Mcnutt,Jf Meyer & DM Navarro Take BWR Gfes of OL Exam Administered on 991006.DA Daigler & ST Brown Will Have Access to Exams Before Tests Administered1999-08-19019 August 1999 Requests That Gv Bogue,Bj Croke,Vs Ferrizzi,Me French, Bk Mcnutt,Jf Meyer & DM Navarro Take BWR Gfes of OL Exam Administered on 991006.DA Daigler & ST Brown Will Have Access to Exams Before Tests Administered BVY-99-103, Informs That Util Expects to Submit Approx Twenty Licensing Actions in FY00 & FY01,in Response to Administrative Ltr 99-021999-08-18018 August 1999 Informs That Util Expects to Submit Approx Twenty Licensing Actions in FY00 & FY01,in Response to Administrative Ltr 99-02 BVY-99-100, Forwards Revised Floor Response Spectra Diagrams,Originally Sent as Attachment 1 to Licensee to Nrc.Revised Diagrams Have More Legible Scale Markings1999-08-0202 August 1999 Forwards Revised Floor Response Spectra Diagrams,Originally Sent as Attachment 1 to Licensee to Nrc.Revised Diagrams Have More Legible Scale Markings ML20210M5791999-07-30030 July 1999 Responds to NRC 990726 Telcon Re Status of Resolution for USI A-46 Outliers.Written Summary,By Equipment Category, Listed ML20211E1701999-07-28028 July 1999 Forwards Copy of Final Exercise Rept for 990427-29,full- Participation Plume Exposure & Ingestion Pathway Exercise of Offsite Radiological Emergency Response Plans site-specific to VYNPS ML20210G5041999-07-27027 July 1999 Responds to NRC 990301 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design- Basis Accident Conditions. Licensee Will Submit Info Re Proposed Sys Mod by 990916 ML20210J3031999-07-27027 July 1999 Submits Proposed Changes to Eals.Attachment 1 Provides Listing of Changes to EALs Along with Ref to Bases Documents Supporting Change ML20210G4271999-07-27027 July 1999 Forwards Testing Data & Associated Results for Fitness for Duty Program at Plant for 990101-0630 ML20216D7321999-07-26026 July 1999 Forwards Insp Rept 50-271/99-05 on 990510-0620.Two Viiolations Being Treated as Noncited Violations ML20209G2721999-07-14014 July 1999 Discusses Licensee Response to RAI Re GL 92-01,Rev 1,Suppl Suppl 1, Rv Structural Integrity, for Vermont Yankee Nuclear Power Station ML20209J0601999-07-14014 July 1999 Forwards Rev 11 to Vols 1-10 of State of Nh Radiological Emergency Response Plan & Vols 11-50 to Town Radiological Emergency Response Plans,In Support of Vermont Yankee & Seabrook Station.Vols 17-19 of Were Not Included ML20209G6931999-07-14014 July 1999 Forwards Request for Addl Info Re Spent Fuel Storage Capacity Expansion ML20209G1531999-07-12012 July 1999 Discusses Util Setpoint Control Program Implementation Schedule,As Committed to in Licensee 990514 Response to Notice of Violation,Insp Rept 50-271/97-10 ML20196J2321999-06-30030 June 1999 Submits Input from Util Technical Staff Re Soil Disposal on-site Under 10CFR20.2002 & Expresses Interest in Pursuing Approval to Use Same Methodology (Implemented Through Util ODCM & Reported as Noted) If Possible ML20196J7421999-06-29029 June 1999 Informs NRC That Vygs Has Implemented Severe Accident Management,As Committed to in Licensee to NRC ML20209B6111999-06-29029 June 1999 Resubmits Summary of Vynp Commitments Page to Replace Original Page Submitted with Responding to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants ML20196J2431999-06-29029 June 1999 Informs That Author Received Call from NRR on Dirt Spreading Ltr & Questions Re Cover Ltr Statement Where Util Asks to Be Allowed to Dispose of Future Soil in Same Manner Provided Same Acceptance Criteria Met ML20209C3751999-06-28028 June 1999 Forwards non-proprietary Rev 16 to EPIP OP 3524, Emergency Actions to Ensure Initial Accountability & Security Response & Proprietary Rev 12 to EPIP OP 3531, Emergency Call-In Method. Proprietary Encl Withheld ML20209B5861999-06-28028 June 1999 Provides Alternative Y2K Readiness Status Described in Supplement 1 to GL 98-01, Y2K Readiness of Computer Sys at Npps. Y2K Readiness Disclosure Rept Encl ML20196G5241999-06-22022 June 1999 Responds to Re Changes to Vermont Yankee Guard Training & Qualification Plan,Rev 8,Errata A.No NRC Approval Is Required.Encl Will Be Withheld from Public Disclosure Per 10CFR73.21 BVY-99-084, Forwards Proprietary Application & Medical Certificate for Mod of Listed SRO License,For Gj Leclair.Gj Leclair Will Be Trained & Evaluated in Accordance with Util Lsro Training Description.Proprietary Info Withheld,Per 10CFR2.7901999-06-18018 June 1999 Forwards Proprietary Application & Medical Certificate for Mod of Listed SRO License,For Gj Leclair.Gj Leclair Will Be Trained & Evaluated in Accordance with Util Lsro Training Description.Proprietary Info Withheld,Per 10CFR2.790 ML20212J0541999-06-17017 June 1999 Responds to Requesting That NRC Staff ...Allow BWR Plants Identified to Defer Weld Overlay Exams Until March 2001 or Until Completion of NRC Staff Review & Approval of Proposed Generic Rept,Whichever Comes First ML20195H1741999-06-15015 June 1999 Forwards Original & Copy of Request for Approval of Certain Indirect & Direct Transfer of License & Ownership Interests of Montaup Electric Co (Montaup) with Respect to Nuclear Facilities Described as Listed 1999-09-30
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217F1261999-10-12012 October 1999 Forwards Update to Previously Submitted RELAP5 Analytical Assumptions for App R,Re RAI of 961104 BVY-99-130, Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station1999-10-0808 October 1999 Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station BVY-99-128, Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl1999-10-0606 October 1999 Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl ML20216J3531999-09-29029 September 1999 Responds to NRC Re Violations Noted in Insp Rept 50-271/99-12 on 990628-0811.Corrective Actions:Based on RFO 20 Maint Rule Outage Performance Review,Task Was Generated to Clarify & Enhance SD Monitoring Process BVY-99-122, Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-171999-09-28028 September 1999 Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-17 BVY-99-113, Requests Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maint of Nuclear Power Plants. Attachment 1 Provides Justification for Alternative Testing1999-09-21021 September 1999 Requests Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maint of Nuclear Power Plants. Attachment 1 Provides Justification for Alternative Testing BVY-99-114, Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 11999-09-21021 September 1999 Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 1 BVY-99-116, Informs of Determination That Wh Schulze,License SOP-10528-1,will No Longer Maintain License at Facility. Termination of License Requested1999-09-21021 September 1999 Informs of Determination That Wh Schulze,License SOP-10528-1,will No Longer Maintain License at Facility. Termination of License Requested BVY-99-121, Requests Extension Until 990929 to Respond to Violations Noted in Insp Rept 50-271/99-12,dtd 990819.Licensee Did Not Receive Rept Until 990830 & Addl Time Is Needed to Prepare & Allow for Adequate Review of Violation Response Submittal1999-09-20020 September 1999 Requests Extension Until 990929 to Respond to Violations Noted in Insp Rept 50-271/99-12,dtd 990819.Licensee Did Not Receive Rept Until 990830 & Addl Time Is Needed to Prepare & Allow for Adequate Review of Violation Response Submittal BVY-99-115, Forwards non-proprietary & Proprietary Responses to 990714 RAI Re Civil & Mechanical Engineering Considerations for Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355.Proprietary Encls Withheld1999-09-16016 September 1999 Forwards non-proprietary & Proprietary Responses to 990714 RAI Re Civil & Mechanical Engineering Considerations for Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355.Proprietary Encls Withheld BVY-99-118, Responds to RAI Concerning GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions1999-09-16016 September 1999 Responds to RAI Concerning GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions BVY-99-110, Informs of Util Intent to Replace Commitments Made in Licensee & Subsequently Ack in NRC with Containment Insp Criteria Defined in 10CFR50.55a(b)(2)(vi),per Drywell Coating Insp1999-08-31031 August 1999 Informs of Util Intent to Replace Commitments Made in Licensee & Subsequently Ack in NRC with Containment Insp Criteria Defined in 10CFR50.55a(b)(2)(vi),per Drywell Coating Insp BVY-99-111, Informs That Encl TS Bases Page 91 Has Been Revised to Allow Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line Uncorrected Solution & on-line 3D-Monicore Exposure Corrected Solution1999-08-31031 August 1999 Informs That Encl TS Bases Page 91 Has Been Revised to Allow Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line Uncorrected Solution & on-line 3D-Monicore Exposure Corrected Solution BVY-99-107, Submits Response to NRC RAI Re Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355 Fuel Assemblies1999-08-26026 August 1999 Submits Response to NRC RAI Re Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355 Fuel Assemblies BVY-99-108, Requests That Gv Bogue,Bj Croke,Vs Ferrizzi,Me French, Bk Mcnutt,Jf Meyer & DM Navarro Take BWR Gfes of OL Exam Administered on 991006.DA Daigler & ST Brown Will Have Access to Exams Before Tests Administered1999-08-19019 August 1999 Requests That Gv Bogue,Bj Croke,Vs Ferrizzi,Me French, Bk Mcnutt,Jf Meyer & DM Navarro Take BWR Gfes of OL Exam Administered on 991006.DA Daigler & ST Brown Will Have Access to Exams Before Tests Administered BVY-99-103, Informs That Util Expects to Submit Approx Twenty Licensing Actions in FY00 & FY01,in Response to Administrative Ltr 99-021999-08-18018 August 1999 Informs That Util Expects to Submit Approx Twenty Licensing Actions in FY00 & FY01,in Response to Administrative Ltr 99-02 BVY-99-100, Forwards Revised Floor Response Spectra Diagrams,Originally Sent as Attachment 1 to Licensee to Nrc.Revised Diagrams Have More Legible Scale Markings1999-08-0202 August 1999 Forwards Revised Floor Response Spectra Diagrams,Originally Sent as Attachment 1 to Licensee to Nrc.Revised Diagrams Have More Legible Scale Markings ML20210M5791999-07-30030 July 1999 Responds to NRC 990726 Telcon Re Status of Resolution for USI A-46 Outliers.Written Summary,By Equipment Category, Listed ML20211E1701999-07-28028 July 1999 Forwards Copy of Final Exercise Rept for 990427-29,full- Participation Plume Exposure & Ingestion Pathway Exercise of Offsite Radiological Emergency Response Plans site-specific to VYNPS ML20210G5041999-07-27027 July 1999 Responds to NRC 990301 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design- Basis Accident Conditions. Licensee Will Submit Info Re Proposed Sys Mod by 990916 ML20210G4271999-07-27027 July 1999 Forwards Testing Data & Associated Results for Fitness for Duty Program at Plant for 990101-0630 ML20210J3031999-07-27027 July 1999 Submits Proposed Changes to Eals.Attachment 1 Provides Listing of Changes to EALs Along with Ref to Bases Documents Supporting Change ML20209J0601999-07-14014 July 1999 Forwards Rev 11 to Vols 1-10 of State of Nh Radiological Emergency Response Plan & Vols 11-50 to Town Radiological Emergency Response Plans,In Support of Vermont Yankee & Seabrook Station.Vols 17-19 of Were Not Included ML20209G1531999-07-12012 July 1999 Discusses Util Setpoint Control Program Implementation Schedule,As Committed to in Licensee 990514 Response to Notice of Violation,Insp Rept 50-271/97-10 ML20196J2321999-06-30030 June 1999 Submits Input from Util Technical Staff Re Soil Disposal on-site Under 10CFR20.2002 & Expresses Interest in Pursuing Approval to Use Same Methodology (Implemented Through Util ODCM & Reported as Noted) If Possible ML20209B6111999-06-29029 June 1999 Resubmits Summary of Vynp Commitments Page to Replace Original Page Submitted with Responding to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants ML20196J7421999-06-29029 June 1999 Informs NRC That Vygs Has Implemented Severe Accident Management,As Committed to in Licensee to NRC ML20209C3751999-06-28028 June 1999 Forwards non-proprietary Rev 16 to EPIP OP 3524, Emergency Actions to Ensure Initial Accountability & Security Response & Proprietary Rev 12 to EPIP OP 3531, Emergency Call-In Method. Proprietary Encl Withheld ML20209B5861999-06-28028 June 1999 Provides Alternative Y2K Readiness Status Described in Supplement 1 to GL 98-01, Y2K Readiness of Computer Sys at Npps. Y2K Readiness Disclosure Rept Encl BVY-99-084, Forwards Proprietary Application & Medical Certificate for Mod of Listed SRO License,For Gj Leclair.Gj Leclair Will Be Trained & Evaluated in Accordance with Util Lsro Training Description.Proprietary Info Withheld,Per 10CFR2.7901999-06-18018 June 1999 Forwards Proprietary Application & Medical Certificate for Mod of Listed SRO License,For Gj Leclair.Gj Leclair Will Be Trained & Evaluated in Accordance with Util Lsro Training Description.Proprietary Info Withheld,Per 10CFR2.790 ML20195H1741999-06-15015 June 1999 Forwards Original & Copy of Request for Approval of Certain Indirect & Direct Transfer of License & Ownership Interests of Montaup Electric Co (Montaup) with Respect to Nuclear Facilities Described as Listed ML20195C5891999-05-27027 May 1999 Forwards Response to NRC 990301 RAI Re GL 96-05 Program at Vermont Yankee Nuclear Power Station ML20195D5341999-05-27027 May 1999 Forwards Description of Vermont Yankees Plans for Insp of & Mods to Certain Reactor Vessel Internals BVY-99-074, Forwards Application & Medical Certificate Required for Renewal of Jd Livingston,License OP-10049,RO License.Medical Certificate Withheld1999-05-26026 May 1999 Forwards Application & Medical Certificate Required for Renewal of Jd Livingston,License OP-10049,RO License.Medical Certificate Withheld ML20195B4081999-05-24024 May 1999 Withdraws Licensee Commitment,Contained in ,To Reinitiate ITS Project Following Completion of FSAR Accuracy Verification Project.Util Will Continue to Modify Current TS with Number of Improvements BVY-99-067, Informs That Bw Metcalf,License SOP-1761-9,has Retired from VYNPS & Will No Longer Require License.Nrc Is Requested to Terminate License1999-05-21021 May 1999 Informs That Bw Metcalf,License SOP-1761-9,has Retired from VYNPS & Will No Longer Require License.Nrc Is Requested to Terminate License ML20196L1801999-05-18018 May 1999 Withdraws Licensee & Attachment,Containing Rev 2 to Vermont Yankee Operational QA Manual, from Further Consideration by Nrc.Summary of Commitments Encl ML20206K3201999-05-0707 May 1999 Forwards Response to RAI Re Verification of Seismic Adequacy of Mechanical & Electrical Equipment ML20206J2801999-04-30030 April 1999 Forwards 1998 Annual Financial Repts for CT Light & Power Co,Western Ma Electric Co,Public Svc Co of Nh,North Atlantic Energy Corp,Northeast Nuclear Energy Co & North Atlantic Energy Svc Corp,License Holders ML20206D3731999-04-27027 April 1999 Informs NRC of Changes in Recipients of NRC Docketed Correspondence ML20206B1401999-04-23023 April 1999 Forwards Replacement of Section 3(a) of NSHC Determination Provided by Re TS Proposed Change 208,suppl Section 6 ML20205S3381999-04-16016 April 1999 Submits Revised Schedule for Response to NRC 990226 RAI Re 980630 Submittal of IPEEE Rept.Info Will Be Submitted by 991231 ML20205S3891999-04-16016 April 1999 Forwards non-proprietary & Proprietary Revised Page to Holtec Rept HI-981932,supplementing TS Proposed Changed 207 Re Spent Fuel Pool Storage Capacity Expansion ML20205S3031999-04-15015 April 1999 Forwards Revised TS Bases Pages 90,227,164 & 221a,accounting for Change in Reload Analysis from Yaec to GE Methodology, Reflecting Change in Condensation Stability Design Criteria & Accounting for More Conservative Calculation ML20205P9291999-04-14014 April 1999 Requests That Rev to NRC 821029 SER for NUREG-0737,Item II.K.3.24,be Issued to Clarify Util Installed RCIC & HPCI HVAC Configuration,As Discovered During Preparation of DBDs for Sys ML20205P8191999-04-13013 April 1999 Forwards Rev 2 to COLR for Vermont Yankee Cycle 20, Dtd Feb 1999,IAW TS Section 6.7.A.4 ML20205M3191999-04-0707 April 1999 Forwards 1998 Annual Rept of Results of Individual Monitoring, Per 10CFR20.2206(b).Licensee Is Submitting Matl to Only Addressee Specified in 10CFR20.2206(c).Without Encl ML20205K0351999-03-31031 March 1999 Informs That Certain Addl Corrections Warranted for 990121 SER for Amend 163 to License DPR-28 Re Suppression Pool Water Temp.Suggested Corrections Listed ML20205K1821999-03-31031 March 1999 Informs of Modifications That Util Made to CO(2) Fire Suppression Sys,Due to Sen 188 Which Occurred at Ineel on 980728.Compensatory Actions Will Remain in Place Until Modifications Are Complete & Systems Are Returned to Svc ML20206A6951999-03-29029 March 1999 Request Confirmation That No NRC Action or Approval,Required Relative to Proposed Change in Upstream Economic Ownership of New England Power Co,Minority Shareholder in Vermont Yankee Nuclear Power Corp,Yaec,Myap & Connecticut Yankee 1999-09-29
[Table view] Category:UTILITY TO NRC
MONTHYEARML20059J2831990-09-10010 September 1990 Forwards Updated Operator Licensing Exam Schedule for FY91, FY92,FY93 & FY94,per Generic Ltrs 90-07 & 89-12 ML20059D9831990-08-28028 August 1990 Forwards fitness-for-duty Program Performance Data for 900103-0630,per 10CFR26.71.NRC Review of Data Will Provide Realization That Positive Testing Rate Extremely Low & Limited to pre-access Testing Population BVY-90-087, Forwards Addl Info on Use of RELAP5YA Program for LOCA Analyses.Proprietary Encl Withheld1990-08-28028 August 1990 Forwards Addl Info on Use of RELAP5YA Program for LOCA Analyses.Proprietary Encl Withheld BVY-90-086, Responds to NRC Re Violations Noted in Insp Rept 50-271/90-06.Corrective Actions:Incident Rept Initiated & All Required Locking Devices in Place by 9007061990-08-24024 August 1990 Responds to NRC Re Violations Noted in Insp Rept 50-271/90-06.Corrective Actions:Incident Rept Initiated & All Required Locking Devices in Place by 900706 ML20059F6681990-08-22022 August 1990 Comments on Review of Amend 115 to License DPR-28,including Safety Evaluation.Requests Explanation of Statement in NRC Re How NRC Considers Comments & What Resolution Could Be for Each Util Comment in BVY-90-085, Informs That Sys Testing & Operator Training Successfully Completed & SPDS Declared Operable on 900813.Util Intends to Operate SPDS in Parallel W/Original Honeywell Gepac Plant Computer Until mid-Nov 19901990-08-15015 August 1990 Informs That Sys Testing & Operator Training Successfully Completed & SPDS Declared Operable on 900813.Util Intends to Operate SPDS in Parallel W/Original Honeywell Gepac Plant Computer Until mid-Nov 1990 BVY-90-084, Notifies NRC of Intentions to Install Test Fuel Assemblies & Test Control Blades During Cycle 15 Refueling Outage in Sept 19901990-07-24024 July 1990 Notifies NRC of Intentions to Install Test Fuel Assemblies & Test Control Blades During Cycle 15 Refueling Outage in Sept 1990 BVY-90-082, Informs That Effective 900723 Facility Implemented Rev 4 of Procedure Generating Package & Corresponding Revs to Eops. Revs Developed Per Rev 4 of BWR Owners Group Emergency Procedure Guidelines1990-07-24024 July 1990 Informs That Effective 900723 Facility Implemented Rev 4 of Procedure Generating Package & Corresponding Revs to Eops. Revs Developed Per Rev 4 of BWR Owners Group Emergency Procedure Guidelines BVY-90-071, Forwards Rev 2 to Training & Qualification Plan.Rev Withheld (Ref 10CFR73.21)1990-07-20020 July 1990 Forwards Rev 2 to Training & Qualification Plan.Rev Withheld (Ref 10CFR73.21) BVY-90-078, Forwards List of Refs for Proposed Change 161 to Facility OL & Tech Specs1990-07-17017 July 1990 Forwards List of Refs for Proposed Change 161 to Facility OL & Tech Specs BVY-90-072, Forwards Supplemental Effluent & Waste Disposal Semiannual Rept for Third & Fourth Quarters 1989,Including Annual Radiological Impact on Man for 19891990-06-27027 June 1990 Forwards Supplemental Effluent & Waste Disposal Semiannual Rept for Third & Fourth Quarters 1989,Including Annual Radiological Impact on Man for 1989 ML20043G4351990-06-15015 June 1990 Requests Temporary Waiver of Compliance from Tech Spec Requirements for Limiting Conditions for Operation for Certain post-accident Monitoring Instrumentation Listed in Tech Spec Table 3.2.6.Parameters Listed ML20043E4011990-06-0808 June 1990 Responds to Second Request for Addl Info on Use of RELAP5YA. Explanation Re Why More Accurate View Factor Calculation Not Included in Huxy Code Addressed ML20043C6131990-06-0101 June 1990 Forwards YAEC-1659-A, Simulate-3 Validation & Verification. ML20043C5991990-06-0101 June 1990 Forwards Accepted Version of YAEC-1683-A, MICBURN-3/ CASMO-3/TABLES-3/SIMULATE-3 Benchmarking of Vermont Yankee Cycles 9 Through 13. ML20043C4821990-05-30030 May 1990 Informs of Three Organizational Changes That Will Become Effective on 900601.WP Murphy,Jp Pelletier & DA Reid Will Be Senior Vice President of Operations,Newly Created Vice President of Engineering & Plant Manager,Respectively ML20043B7561990-05-23023 May 1990 Informs That Util Intends to Utilize Relationship Between Frosstey & FROSSTEY-2 to Support Cycle 15 Calculations.Nrc Approval of FROSSTEY-2 Needed by Aug 1990 for LOCA Analysis Program ML20043B6481990-05-17017 May 1990 Forwards Rev 19 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) BVY-90-058, Forwards Public Version of Vermont Yankee Nuclear Power Station Emergency Response Preparedness Exercise 1990. Exercise Scenario Package Includes All Info Pertinent to Performance of Exercise Scheduled for 9007181990-05-17017 May 1990 Forwards Public Version of Vermont Yankee Nuclear Power Station Emergency Response Preparedness Exercise 1990. Exercise Scenario Package Includes All Info Pertinent to Performance of Exercise Scheduled for 900718 ML20042G9061990-05-10010 May 1990 Forwards Proprietary Supplemental Info to 900419 Response to NRC 900309 Ltr Re FROSSTEY-2 Fuel Performance Code.Info Withheld ML20042F6471990-05-0404 May 1990 Ack That NRC Will Issue Supplementary Info to NRC 900307 Request for Installation of Neutron Flux Monitoring Instrumentation That Conforms to Requirements of Reg Guide 1.97 & 10CFR50.49 at Plant ML20042E7291990-04-23023 April 1990 Forwards Pages Omitted from 900314 Revs 16-18 to Physical Security Plan.Revs Withheld ML20012F3511990-03-30030 March 1990 Provides Supplemental Response to Station Blackout Rule (10CFR50.63).Util Will Use Alternate Ac Power Source Available within 10 Minutes of Onset of Station Blackout to Meet Requirements of Station Blackout Rule ML20012D0301990-03-19019 March 1990 Forwards Response to Generic Ltr 89-19 Re Resolution of USI A-47.Feedwater Sys Trip Relays,Interfacing W/Feedwater Pump Control Circuitry,Powered from Supplies Originating from safety-related Dc Sources ML20012D0241990-03-16016 March 1990 Forwards Supplemental Info Re Feedwater Check Valve V28B Flaws Evaluation,Per NRC Request.Util Remains Committed to Replacement of Subj Valve During Upcoming 1990 Refueling Outage ML20012C6381990-03-15015 March 1990 Forwards Vermont Yankee Nuclear Power Corp Financial Statements 891231,1988 & 1987. ML20012C6071990-03-15015 March 1990 Forwards Method for Generation of One-Dimensional Kinetics Data for RETRAN-02, Per NUREG-0393 & 891211 Request ML20012B8311990-03-0909 March 1990 Forwards Proprietary Vermont Yankee Evaluation Model Sample Problem 0.7 Ft(2) Break in Recirculation Discharge Loop, in Response to 900208 Telcon.Rept Withheld (Ref 10CFR2.790) ML20012B6131990-03-0909 March 1990 Informs of Schedular Changes Made W/Regard to Plant Licensed Operator Requalification Training Program ML20006E8871990-02-15015 February 1990 Provides NRC W/Results of Licensee Review of Design Bases & Operability Status of torus-to-reactor Bldg Vacuum Breakers ML20011E6791990-02-0505 February 1990 Responds to Weaknesses Noted in SALP Rept 50-271/88-99 for Jul 1988 to Sept 1989.Implementation of Emergency Response Facility Info Sys Nearing Completion & Remaining Safety Class Vendor Manuals Will Be Completed During 1990 ML20006D1571990-02-0202 February 1990 Responds to 891226 Request for Addl Info Re YAEC-1683 on MICBURN-3/CASMO-3/TABLES-3/SIMULATE-3 Benchmarking.Hot Eigenvalue Std Deviation on Table 5.7 of YAEC-1683 Reduced to 0.00098 w/SIMULATE-3 ML20006B1351990-01-22022 January 1990 Forwards Responses to Generic Ltr 89-13 Re Svc Water Sys Problems Affecting safety-related Equipment.Establishment of Program Revs Prior to Startup from Next Refueling Outage, Scheduled for Fall 1990,planned ML20006A4441990-01-16016 January 1990 Forwards Revised Page 127 of Tech Specs to Clarify Proposed Change 134, Rev of Pressure Suppression - Reactor Bldg Vacuum Breaker Sys Operability Requirements. Change Involves Adoption of Language Consistent W/Bwr STS ML19354E8001990-01-16016 January 1990 Forwards Addl Info Re Testing of Cable Vault C02 Suppression Sys During 891031-1102,per NRC 890518 & 0821 Requests.Encl Final Test Rept Demonstrates That Carbon Dioxide Sys Will Satisfy Design Bases for Greater than 10 Minutes in Room ML20005G0841990-01-10010 January 1990 Responds to NRC Bulletin 89-002 Re Stress Corrosion Cracking of high-hardness Type 410 Stainless Steel Internal Preloaded Bolting in Anchor Darling Model S350W Swing Check Valves or Valves of Similar Design ML20005E8201990-01-0202 January 1990 Forwards Minutes of NRC 890907 Meeting W/Util in Rockville,Md Re Util LOCA Analysis Program.List of Attendees Also Encl ML20005F0551990-01-0202 January 1990 Informs That Util Has Implemented Fitness for Duty Program, in Compliance w/10CFR26 ML20005E3531989-12-28028 December 1989 Forwards Response to Generic Ltr 89-10 Re safety-related motor-operated Valve Testing & Surveillance.Util Intends to Extend Existing IE Bulletin 85-003 Program to Cover motor- Operated Valves within Scope of Ltr ML20005E3191989-12-28028 December 1989 Responds to Violations Noted in Insp Rept 50-271/89-17 on 890906-1016.Corrective Actions:Plant Procedures Revised & Addl Meetings Between Plant Manager,Dept Supervisors & Personnel to Take Place ML19332G1791989-12-12012 December 1989 Forwards Rev 0 to Vermont Yankee Nuclear Power Station Cycle 14 Core Operating Limits Rept. ML19332F2781989-11-30030 November 1989 Forwards Rev 1 to YAEC-1693, Application of One-Dimensional Kenetics to BWR Transient Analysis Methods, Per 891106 Ltr.Rept Presents Methodology,Verification & Justification for Application of RETRAN-02 One Dimensional Option ML19332E3511989-11-29029 November 1989 Forwards Annual Cashflow Statements for 1989 as Evidence of Util Maint of Approved Guarantee,Per Requirements of 10CFR140.21 Re Licensee Guarantees of Payment of Deferred Premiums ML19332E5281989-11-28028 November 1989 Requests Removal of Change B to Proposed Change 148 Re Rev to Pages 5b & 6a Correcting Administrative Error in Tech Spec 2.1 ML19332D3801989-11-22022 November 1989 Responds to NRC Generic Ltr 89-21 Re Request for Info Re Status of Implementation of USI Requirements.Encl Table Details Implementation Status for USIs for Which Final Technical Resolution Achieved ML19324C1501989-11-10010 November 1989 Responds to NRC Bulletin 88-010,Suppl 1 Re Molded Case Circuit Breakers.Program Initiated to Ensure That Breakers Can Perform Safety Functions ML19324C2201989-11-0606 November 1989 Requests Change in Review & Approval Basis from Facility Specific to Generic Because Methods Described in YAEC-1693 & YAEC-1694 Applicable to All BWRs ML19325F0261989-11-0606 November 1989 Responds to Generic Ltr 89-07, Power Reactor Safeguards Contingency Planning for Surface Vehicle Bombs. Util Has Evaluated Listed Considerations,Including Safe Standoff Distances for Vital Equipment ML19324B7431989-10-30030 October 1989 Responds to Generic Ltr 89-16 Re Installation of Hardened Wetwell Vent.Util Expects to Establish Specific Design Criteria to Install Enhanced Containment Overpressure Protection Capability by End of 1992 Refueling Outage ML19324B8481989-10-30030 October 1989 Provides NRC W/Test Acceptance Criteria for Alternate Test of CO2 Suppression Sys,Per 891025 Meeting.Ability to Contain CO2 at Appropriate Concentration for Required Duration,As Well as Ability to Withstand Dynamics of Discharge,Verified 1990-09-10
[Table view] |
Text
.. .
7h 1 VERMONT Y AN KEE NUCLEAR POWER CORPORATION sEvrNTY SEVEN GROVE STREET B.4.1.1 RuTLAso, VERMONT 0G701 wyy 79-89 MEPLY TO:
ENGINEERING OFFICE August 9, 1979 TURNPIKE RO AD WECTBORO, M ASS ACHUSETTS 01581 TELEPHONE 617 366-9011 United States Nuclear Regulatory Commission Region 1 631 Park Avenue King of Prussia, Pennsylvania 19406 Attention: Office of Inspection and Enforcement Mr. Boyce H. Grier, Director
References:
(a) License No. DPR-28 (Docket No. 50-271)
(b) USNRC letter, T. A. Ippolito to R. H. Groce, '
dated July 20, 1979
Dear Sir:
Subject:
Additional Information Submitted in Response to IE Bulletin 79-08 The following information is submitted in response to Reference (b).
Response - Item No. 2 Verment Yankee's primary containment isolation system design is the standard BWR 3/4 design that General Electric provided for utilities of the grouping. In general, this design provided for two major classes of isolation valves, A & B. Class A isolation valves are in pipelines that communicate directly with the reactor vessel and penetrate the primary contain=ent. These lines generally have two isolation valves in series-one inside the primary containment and one outside the primary c ontainment. Class B isolation valves are in pipelines that do not communicate directly with tle reactar vessel, but pent: rate the pri=ary containment and communicate with the primary containment free space.
These pipelines generally have two isolation valves in series, both of them outside the primary containment.
The requirement for automatic Class A valves is to be fully cleaad in time to prevent the reactor vessel level from falling below the top of the active fuel as a result of a break of the pipeline which the valve isolates. This is achieved by automatic closure of Class A valves upon the receipt of a low or low-low water level signal.
High pressure in the drywell could indicate a break of the nuclear system process barrier inside the drywell. The automatic closure of Class B valves prevents the release of significant amounts of radioactive material from rm p.Imary containment.
- n. , ; c>
c) C G G J '
4 . United States Nuclear Regulatory Commission Page 2 August 9,1979 Specific justification for not isolating the recirculation loop sample line, main steam drain lines, and reactor cleanup syetem, on receipt of a high drywell pressure signal, as is follows:
- 1. Recirculation loop sample line:
The valves isolating this line are Class A valves which are passive (closed), during normal plant operation. The valves associated with this line isolate on a Group 1 isolation which initiates on a low-low water level condition in accordance with the Class A valve criteria stated above. This group includes the main steam and the main steam drain lines. The recirculation loop sample valves provide post-reactor coolant to be obtained >
following core reflood when high drywell pressure may still exist.
- 2. Main steam drain lines:
The valves isolating these lines are Class A valves which are manually closed following turbine startup. The valves associated with these lines isolate on a Group 1 isolation as discussed in No. 1 above. Since these valves communicate with the same process lines that the main steam isolation valves do, it is not required that these valves isolate on high drywell pressure. In addition to the low-low water level condition, Group 1 isolation valves are closed upon the receipt of any one of the following:
a) High main steam line radition; b) High main steam line flow; c) High main steam line tunnel temperature; d) Low main steam line pressure (RUN mode only);
e) Condenser low vacuum.
Should the main steam line isolation valves shut due to low main steam line pressure (a conmon event during reactor scrams) coincid nt with a high drywell pressure condition, it would be nece'Mrry to reopen the drain lines to provide pressure equali:Etion and thus allow the reopening of the main steam isolatoin valves to restore the primary heat sink.
3 Reactor cleanup system:
The valves isolating this liue are Class A valves which isolate upon receipt of a low water level condition above the level setpoint of those valves which isolate under Group 1 conditions.
This level setting, which is coincident with the reactor vessel low water level scram setting, was selected to initiate isolation at the earliest indicati;n of a possible breach in the nuclear system process barrier ye'a far enough below normal operational levels to avoid spurious isolation. A high drywell pressure condition would not be indicative of a cleanup line break unless,
- p. **%.,O sj 0 n 0 G ' A
United States Nuclear Regulatory Commission Page 3 August 9,1979 based on line size, a loss of water level was simultaneous with the condition. In that mode, the system would rapidly isolate at the reactor scram low level set point. During operational transients and design bases accidents of lesser magnitude than the maximum credible accident, the cleanup system in conjunction with the control rod drive system is capable of maintaining primary vessel water level control. Isolating this system on receipt of a high drywell pressure signal would negate this desirable feature of facility design.
In conclusion, the automatic closure of various Class A. valves prevents the excessive loss of reactor coolant and the release of significant amounts of radioactive material from the nuclear system process barrier. The systems that are designed to isolate on level do so prior to the core becoming uncovered and thus prevent the process lines affected from transporting an increase in fission product inventory. High drywell pressure could indicate a breach of the nuclear system process barrier inside the drywell. (Normal heatup without proper venting of containment can cauts a spurious high drywell pressure without any process line break). The automatic closure of various Class B valves prevents primary steam or coolant from transporting between the primary containment and the secondary contain=ent. Should a small break occur inside the primary containment, a high drywell pressure signal would be generated.
However, if no loss of level occurs, there would be no increase in fission product inventory in those systems isolated by Class A valves and thus, no reason to isolate and prevent use of those systems.
Response - Item No. 4
- 1. The range of reautor vessel water level from below the top of '
the active fuel area up to the top of the vessel is covered by a combination of narrow and wide-range instruments. Level is indicated and recorded in the control room via 9 different instruments. Of these nine instruments, three provide narrow range indication and control (0-60") from separate condensing chambers via the reactor feedwater system. This set indicates and records in the control room via two level indicators and one level recceder. (LI6-94A/B and LR6-96). The additional narrow-range level instruments (YARWAY-LITS-2-3-59A/B) are provided with independent condensing chambers which also indicate in the Control Room (LI-2-3-35A/B). Other safety-related systems are functions served by separate reactor water level instrwmentations are:
Reactor Core Isolation Cooling System (RCIC)
High Pressure Coolant Injection System (HPCI)
Low Pressure Core Spray System (LPCS)
Residual Heat Removal / Low Pressure Injection (RHR/LPCI)
Auto =atic Depressurization System (ADS)
Primary Containment Isolation System (PCIS)
SOOON
United States Nuclear Regrlatory Co= mission Page 4 August 9, 1979 The Primay Containment Isolation System initiates on low and low-low reactor water level. All other systems initiate on low-low reactor water level. In acd. tion, the RCIC and HPCI systems shut down on high reactor vessel water level. In all cases, except the RCIC, these systems automatically restart if low reactor level is again reached.
The remaining four level instruments all provide wide-range vessel level indication in the Control Room. Three (LI-2-3-91A/B and LR-2-3-98) share the same condensing chambers as the feedwater level instruments while the fourth (LI-2-3-86) has a completely independent condensing chamber.
- 2. Some of the instrumentation which the operator can use to determine change in reactor coolant inventory or other abnormal conditions are:
Drywell Pressure and Temperature Drywell Radioacti rity Levels Suppression Pool High Temperature and Level Safety Relief Valve (3RV) Discharge High Temperature High Feedwater Flow rates High Main Steam Flow Abnormal Reactor Pressure High Drywell Equipment & Floor Drain S"mp Fill and Pumpout Rates !
3 In conjunction with the special review conducted for Item One of this Bulletin all types of vessel level indicators were reviewed with the station operators. At that time, the operators were instructed to utilize all other available information to initiate safety systems. This training was completed on April 27, 1979 Response - Ite= No. 5
- 1. All operating procedures and training instructions were included in that review which was completed on April 27, 1979
- 2. It has always been the practice of Vermont Yankee to identify in the station operating procedures all symptoms and indicators which might provide additional information to the operators which would be useful in evaluating abnormal plant conditions.
Thus during our review in response to this Bulletin we concluded no further changes were necessary in this area. However, the
'1 Cj o mo ' d'-
. United States Nuclear Regulatory Commission Page 5 August 9, 1979 importance of reviewing all plant symptoms was repeated to each licensed operator in April and will again be reviewed during each annual operator requalification training program.
Response - Item No. 6 1 & 4. During the week of May 21-25 a thorough review of all accessible safety related valves, instrumentation, and electrical circuit breaker positioning requirements (required position) and actual position was conducted in the company of NRC Inspection and Enforcement Inspectors Steka, Folley and Rekito. Without exception, proper operation of all engineered safety features was demonstrated.
- 2. In accordance with Administrative Prccedure, A.P. 0156, Valve Lineup File, comprehensive valve lineup checks are made by station operators following each extended plant shutdown, following major equipment maintenance, and upon request of the Operations Supervisor or his assistant. Included in their checks are all safety system manual, locked, and motor operated valves and electrical circuit breakers. Following these, and monthly thereafter, each safety system is performance tested to further demonstrate total system operability. When plant
. conditions require changing the position of system valves, the new valve positions are record 2d in the valve lireup file. In this manner the file continuously reflects the current status of all station valves. A limited number of valves, specifically, (1) those which are associated with a tagging order (A.P. 0140, VY Local Control Switching Rules), (2) those which are repositioned to perform a surveillance test (any 4100 series OP), and (3) those which are identified as Routinely Operated or As Required on the Valve lineup sheets. (i.e., Radwaste System, Cond. Demin. Sampling System, etc.) are not updated in the Valve Lineup File because the positions of these valves is either recorded elsewhere or functicnally demonstrated on a continuous basis.
3 The refinements to our valve line-up procedure and a new ~
procedure prescribing instrumentation .and valve line-ups were completed on June 22, and July 24, 1979 respec tively .
Response - Item No. 7
- 1. The only additions to this listing are the Main Steam System (including drains) & the Recire. Sample System. These systems 5! ct isolate when high radiation indication exists. See Group 1 isolation signals as described in response to Item No. 2 of this letter.
- 2. Should a containment isolation occur, station operators are now required to review the following radiation monitors for evidence of abnormal radiation levels before resetting the isolation signal:
(;. q . q<
^ m; sj e N J 1
- United States Nuclear Regulatory Commission Page 6 August 9, 1979 Steam Jet Air Ejector (off gas) Radiation Monitor Advanced Off Gas (A0G) Radiation Monitor Area Radiation Monitors Main Steam Radiation Monitors Radwaste Radiation Mcnitors Refuel Floor Radiation Monitors Fuel Pool Radiation Monitors Existance of any abnormal radiation condition would disallow resetting of the isolation signal.
As an additional precaution, the following statement has been added to the appropriate cperating procedures.
" Prior to and immediately following the resetting of a containment isolation signal, review radiation monitors on Control Room panels 2, 10, 11 and 50 to ensure undesirable venting of radioactive effluents to the environs do not occur".
Response - Item No. 8
- 1. Your assumption that Vermont Yankee may be relying on prior operability verification within the technical specification surveillance interval is incorrect. Operability tests are performed immediately prior to removal of any redundant safety system from service irregardless of the Tech. Spec. surveillance interval. Additionally, these testa consist of total system performance demonstrations rather than only visusi inspections.
Response - Item No. 9 The appropriate plant procedure ( AP 0150) was revised on May 14, 1979 The OPX lines were installed at the required locations on June 11, 1979.
We trust that the supplemental information supplied in this letter is satisfactory and will allow the Commission to complete the safety evaluation for IE Bulletin 79-08 as relates to Vermont Yankee. However, should you have additional questions, please contact R. J. Wanczyk of this office.
Very truly yours, VERMONT YANKEE NUCLEAR POWER CORPORATION s
D. E. Moody Manager of Operations oad 'n
' ' "T" 'm dmp