Text
..
.-~
I l
2 VESMONT YANKEE i
NUCLEAR POWER CORPORATION 1
L l
Ferry Road, Brattleboro, VT os301 7002 -
'/
.I i
September 10, 1990 g 3 3 7.s271 TDL 90.048 BVY 90.90 j
U.S. Nuclear Regulatory Conynission Document Control Desk.
i Washington, D.C. 20555
{
Attention:.Mr. Kenneth E. Perkins, Jr..' Chief i
Operator Licensing Branch. OWFN-100-22
References:
a.
License No. DPR-28 (Docket No.~ 50-271) i b.
Letter USNRC to All Power Reactor Licentees, i
dated 08/10/90 (Generic Letter 90-07) i c.
Letter, VYNPC to USNRC.'TOL-89.20 dated 08/17/89 d.
Letter. USNRC to'All Power Reactor Licensees,-
dated 07/06/89 (Generic Letter 89-12).
e.
Letter, USNRC to All Power Reactor Licensees, dated 3/24/89 (Generic Letter 89-03)
Subject:
Vermont Yankee Reactor Operator Licensing Examination. Schedule
Dear Sir:
U
(
In accordance with your request from Generic Letter 90-07.[ Reference (b)], I have attached Vermont Yankee's updated operator license examination schedule.
This schedule supersedes an earlier one forwarded via Reference (c). in response l
to Generic Letter 89-12 [ Reference (d)]; and is consistent with the nationel exam schedule in Generic Letter 89-03 [ Reference (e)].
j Should you have any questions regarding this~ schedule, please contact Mr.-Gary
[
LeClair, Operations Training Supervisor, in our Brattleboro office at (802) 257-5271, ext. 391.
Very truly yours, i
VER T YANKEE NUCLEAR POWER CORPORATION n r () N
)
L Randall W. Spinne 7
Training Manager RWS/pjs:90.48 Attachment c:
USNRC Region I Administrator USNRC Resident Inspector - VYNPS i
_USNRC Project Manager - YYNPS 4
9009190251 900910 t
1001; PDR ADOCK 0500 1
4 PROPOSED OPERATOR LICENSING EXAMIllATION SCHEDULE FORPAT
' EACILITY Vermont Yankee NRC REGION i
(10/1/90-(10/1/91-(10/1/92- '
. FY 1994 FY 1991.
FY 1992 FY 1993 (10/1/93-9/30/91)'
-9/30/92) 9/30/93).
9/30/94) 1.
Assigned
'Date (Gl89-03)
February _
February February February
- RO 4
2 o
o
- SRO. Instant o _.
o 9
0
- SR0 Upgrade-o 4
o o
- SRO Limited o-o
'o o
2.
Assigned Date (GL89-03) _ August
' August August August
- RO o
o 4-2 j
o
- FRO Instant o
o o
- SRO Upgrade o
o 0
4
- SRO Limited o
o o
o Please indicate initial cold license examinations by placing an asterisk (*) ;v the date. Please indicate examinations intended to extend an operator's license to a second or subsequent unit with two asterisks (**).
(For example, if Unit 1 is in operation and Unit 2 is approaching fuel load, and three RO candidates with no previous license are to be examined on both Units 1 and 2 and five R0 candidateslicensedonUnit1aretobeexaminedtoextend:theirlicensesto Unit 2,thenindicate"R03,5**.")
N.
1
. =.
i
- )
J PROPOSED REQUALIFICATION EXAMINATION SCHEDULE' FORMAT
- 1 FACILITY
= Vermont lankee-NRC REGION _
i q
FY 1991 FY 1992 FY 1993-FY 1994i i
)
(10/1/90.
(10/1/91-(10/1/92-(10/1/93-I
/
- 9/30/91) 9/30/92) 9/30/93),
9/30/94);
1.
Date..
02/91 (12).-
None 02/93 (14) wan.
.2.
Date
.f l
j 3.
Date
- 4.
cate 5.
Date g
i l
i I
f i
e i
f
'l i
i
. b
,'l
-1 i
l
-i
)
k
.f 1
t m
i
l
..,?
l l
PROPOSED CENERIC FUNDAMENTA1. EXAMINATION SCHEDULE FORMAT
)
FACILITY Vermont Yankee NRC REGION 7
i OCTOBER 1990 FEBRUARY 1991 JUNE 1991 Estimated i
Humber of Candidates 1
0 6
i i
The Generic Fundamental Examination Schedule (GFES) is administered three times a year, on the Wednesday following the first Sunday in February, June, and October.
I
(
f' l
-)
l l
l l
-[
b