ML20042F647

From kanterella
Jump to navigation Jump to search
Ack That NRC Will Issue Supplementary Info to NRC 900307 Request for Installation of Neutron Flux Monitoring Instrumentation That Conforms to Requirements of Reg Guide 1.97 & 10CFR50.49 at Plant
ML20042F647
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 05/04/1990
From: Tremblay L
VERMONT YANKEE NUCLEAR POWER CORP.
To: Fairtile M
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
References
RTR-REGGD-01.097, RTR-REGGD-1.097 BVY-90-051, BVY-90-51, NUDOCS 9005090200
Download: ML20042F647 (1)


Text

g JERMONT rYANKEE

LN,UcLEARc POWER CORPORATION l

3 Ferry Road. Brattleboro. VT 05301-7002 f ENGINEERING OFFICE 580 MAIN STREET g

BOLTON, MA 01740 (508;774 6711 -i May 4,1990 BVY 90 - 051

- United States Nuclear Regulatory Commission  !

Document Control Desk Washington, DC 20555 q

Att'n: Mr. Morton B. Fairtile, Project Manager j Project Directorate I-3  !

1 Division of Reactor Projects I/II i

\

\

References:

a. License No. DPR-28 (Docket No. 50-271)  :'
b. Letter, M.B. Fairtile (USNRC) to L. A. Tremblay (VYNPC), NVY 90-035, dated March 7,1990.

g i

Subject:

Post-Accident Neutron Flux Monitoring for BWR's - l Vermont Yankee Nuclear Power Station (VYNPS)  ;

Dear Mr. Fairtile:

I

-l By Reference (b), USNRC requested.VYNPC to install neutron flux monitoring l

instrumentation that conforms to the requirements of Regulatory Guide 1.97 and 10 CFR 50.49 at  !

L - VYNPS and to provide a schedule for such, within 60 days, for installation of neutron flux 1 monitoring instrumentation that meets these requirements, i During a telephone conversation between M.B. Fairtile (USNRC) and L.A. Tremblay y (VYNPC) on Monday, April 4,1990, VYNPC was informed that supplementary information to j g , Reference (b) was being prepared by USNRC. VYNPC was instructed not to respond to i

Reference (b) until such supplementary infonnation was received.

l 1

. This letter is to serve as acknowledgement, within the original 60 day time frame stipulated in l

= Reference (b), that USNRC plans on issuing suoplementary information to Reference (b).  !

L VYNPC will withhold response to ~ Reference (b) as instructed until such supplementary  ;

l information has been received and evaluated by VYNPC. i l Very truly yours,  :

VE MONT YANKEE NUCLEAR POWER CORPORATION i M OL Ah -

Leonard A.Tremblay,Jr. \

Senior Licensing Engineer  !

i , cc: USNRC Region I Administrator USNRC Resident Inspector- VYNPS

- USNRC Project Manager- VYNPS g50Kjj@fdbbb f g

,