MONTHYEARML20217N3901999-10-25025 October 1999 Advises That Info Provided in & Affidavit Re Holtec Position Paper WS-115,rev 1,repts HI-87113, Rev 0,HI-87114,rev 0,HI-87102 Rev 0 & HI-87112,rev 0,marked Proprietary,Will Be Withheld from Public Disclosure ML20217L8591999-10-21021 October 1999 Discusses 990921 Request for Approval to Perform Alternative Testing as Part of Vermont Yankee Nuclear Power Station IST Program.Informs That Submittal Reviewed Against ASME Code Section XI Requirements & Forwards Safety Evaluation ML20217M1181999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates ML20217D9711999-10-13013 October 1999 Responds to Request That Information Titled Addl Info Re Cycle Specific SLMCPR for Vermont Yankee Cycle 21 Be Withheld from Public Disclosure.Determined Info to Be Proprietary & Will Be Withheld from Public Disclosure ML20217F1261999-10-12012 October 1999 Forwards Update to Previously Submitted RELAP5 Analytical Assumptions for App R,Re RAI of 961104 BVY-99-130, Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station1999-10-0808 October 1999 Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station ML20217C1501999-10-0707 October 1999 Forwards Insp Rept 50-271/99-11 on 990809-27.No Violations Noted.Insp Focused on Effectiveness of Engineering Functions in Providing for Safe Operation of Plant BVY-99-128, Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl1999-10-0606 October 1999 Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl ML20212J7891999-10-0404 October 1999 Informs That Licensee 980804,0628,29 & 990921 Responses to GL 98-01, Y2K Readiness of Computer Sys at NPPs Acceptable.Nrc Consider Subj GL to Be Closed for Plant ML20212J6501999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of VYNPS on 990913. No New Areas Identified in Which Licensee Performance Warranted Addl Insp Beyond Core Insp Program.Historical Listing of Plant Issues & Insp Plan Through Mar 2000 Encl ML20216J3531999-09-29029 September 1999 Responds to NRC Re Violations Noted in Insp Rept 50-271/99-12 on 990628-0811.Corrective Actions:Based on RFO 20 Maint Rule Outage Performance Review,Task Was Generated to Clarify & Enhance SD Monitoring Process BVY-99-122, Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-171999-09-28028 September 1999 Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-17 BVY-99-114, Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 11999-09-21021 September 1999 Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 1 BVY-99-113, Requests Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maint of Nuclear Power Plants. Attachment 1 Provides Justification for Alternative Testing1999-09-21021 September 1999 Requests Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maint of Nuclear Power Plants. Attachment 1 Provides Justification for Alternative Testing BVY-99-116, Informs of Determination That Wh Schulze,License SOP-10528-1,will No Longer Maintain License at Facility. Termination of License Requested1999-09-21021 September 1999 Informs of Determination That Wh Schulze,License SOP-10528-1,will No Longer Maintain License at Facility. Termination of License Requested BVY-99-121, Requests Extension Until 990929 to Respond to Violations Noted in Insp Rept 50-271/99-12,dtd 990819.Licensee Did Not Receive Rept Until 990830 & Addl Time Is Needed to Prepare & Allow for Adequate Review of Violation Response Submittal1999-09-20020 September 1999 Requests Extension Until 990929 to Respond to Violations Noted in Insp Rept 50-271/99-12,dtd 990819.Licensee Did Not Receive Rept Until 990830 & Addl Time Is Needed to Prepare & Allow for Adequate Review of Violation Response Submittal ML20212C1621999-09-17017 September 1999 Forwards Amend 175 to License DPR-28 & Safety Evaluation. Amend Revises TSs to Enhance Limiting Conditions for Operation & Surveillance Requirements Relating to Standby Liquid Control System BVY-99-118, Responds to RAI Concerning GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions1999-09-16016 September 1999 Responds to RAI Concerning GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions BVY-99-115, Forwards non-proprietary & Proprietary Responses to 990714 RAI Re Civil & Mechanical Engineering Considerations for Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355.Proprietary Encls Withheld1999-09-16016 September 1999 Forwards non-proprietary & Proprietary Responses to 990714 RAI Re Civil & Mechanical Engineering Considerations for Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355.Proprietary Encls Withheld ML20216F3171999-09-13013 September 1999 Forwards Insp Rept 50-271/99-06 on 990621-0801.One Violation Identified & Being Treated as Noncited Violation BVY-99-110, Informs of Util Intent to Replace Commitments Made in Licensee & Subsequently Ack in NRC with Containment Insp Criteria Defined in 10CFR50.55a(b)(2)(vi),per Drywell Coating Insp1999-08-31031 August 1999 Informs of Util Intent to Replace Commitments Made in Licensee & Subsequently Ack in NRC with Containment Insp Criteria Defined in 10CFR50.55a(b)(2)(vi),per Drywell Coating Insp BVY-99-111, Informs That Encl TS Bases Page 91 Has Been Revised to Allow Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line Uncorrected Solution & on-line 3D-Monicore Exposure Corrected Solution1999-08-31031 August 1999 Informs That Encl TS Bases Page 91 Has Been Revised to Allow Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line Uncorrected Solution & on-line 3D-Monicore Exposure Corrected Solution ML20211G4791999-08-27027 August 1999 Forwards Notice of Withdrawal of 990420 Amend Request Re TS on Reloading & Unloading Sequence of Fuel in Reactor Core When All Fuel Removed from Core BVY-99-107, Submits Response to NRC RAI Re Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355 Fuel Assemblies1999-08-26026 August 1999 Submits Response to NRC RAI Re Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355 Fuel Assemblies ML20211E8841999-08-25025 August 1999 Requests That Licensee Provide bldg-specific Justification for Use of Method A.1 at Locations Where Amplification Significantly Exceeds 1.5 Limit Above 8 Hz ML20211E1371999-08-20020 August 1999 Forwards from J Bean to H Miller & FEMA Final Exercise Rept for 990427-29 Plume Exposure & Ingestion Pathway Exercise for Vermont Yankee Nuclear Power Station.No Deficiencies Noted.Areas Requiring C/A Identified ML20211H0851999-08-19019 August 1999 Forwards Insp Rept 50-271/99-12 on 990628-0711 & Nov. Violation Re Failure to Monitor Unavailability of Specific Sys,Structures & Components During Refueling Outage Did Not Allow Adequate Assessment of Maint Effectiveness BVY-99-108, Requests That Gv Bogue,Bj Croke,Vs Ferrizzi,Me French, Bk Mcnutt,Jf Meyer & DM Navarro Take BWR Gfes of OL Exam Administered on 991006.DA Daigler & ST Brown Will Have Access to Exams Before Tests Administered1999-08-19019 August 1999 Requests That Gv Bogue,Bj Croke,Vs Ferrizzi,Me French, Bk Mcnutt,Jf Meyer & DM Navarro Take BWR Gfes of OL Exam Administered on 991006.DA Daigler & ST Brown Will Have Access to Exams Before Tests Administered BVY-99-103, Informs That Util Expects to Submit Approx Twenty Licensing Actions in FY00 & FY01,in Response to Administrative Ltr 99-021999-08-18018 August 1999 Informs That Util Expects to Submit Approx Twenty Licensing Actions in FY00 & FY01,in Response to Administrative Ltr 99-02 BVY-99-100, Forwards Revised Floor Response Spectra Diagrams,Originally Sent as Attachment 1 to Licensee to Nrc.Revised Diagrams Have More Legible Scale Markings1999-08-0202 August 1999 Forwards Revised Floor Response Spectra Diagrams,Originally Sent as Attachment 1 to Licensee to Nrc.Revised Diagrams Have More Legible Scale Markings ML20210M5791999-07-30030 July 1999 Responds to NRC 990726 Telcon Re Status of Resolution for USI A-46 Outliers.Written Summary,By Equipment Category, Listed ML20211E1701999-07-28028 July 1999 Forwards Copy of Final Exercise Rept for 990427-29,full- Participation Plume Exposure & Ingestion Pathway Exercise of Offsite Radiological Emergency Response Plans site-specific to VYNPS ML20210G5041999-07-27027 July 1999 Responds to NRC 990301 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design- Basis Accident Conditions. Licensee Will Submit Info Re Proposed Sys Mod by 990916 ML20210J3031999-07-27027 July 1999 Submits Proposed Changes to Eals.Attachment 1 Provides Listing of Changes to EALs Along with Ref to Bases Documents Supporting Change ML20210G4271999-07-27027 July 1999 Forwards Testing Data & Associated Results for Fitness for Duty Program at Plant for 990101-0630 ML20216D7321999-07-26026 July 1999 Forwards Insp Rept 50-271/99-05 on 990510-0620.Two Viiolations Being Treated as Noncited Violations ML20209G2721999-07-14014 July 1999 Discusses Licensee Response to RAI Re GL 92-01,Rev 1,Suppl Suppl 1, Rv Structural Integrity, for Vermont Yankee Nuclear Power Station ML20209J0601999-07-14014 July 1999 Forwards Rev 11 to Vols 1-10 of State of Nh Radiological Emergency Response Plan & Vols 11-50 to Town Radiological Emergency Response Plans,In Support of Vermont Yankee & Seabrook Station.Vols 17-19 of Were Not Included ML20209G6931999-07-14014 July 1999 Forwards Request for Addl Info Re Spent Fuel Storage Capacity Expansion ML20209G1531999-07-12012 July 1999 Discusses Util Setpoint Control Program Implementation Schedule,As Committed to in Licensee 990514 Response to Notice of Violation,Insp Rept 50-271/97-10 ML20196J2321999-06-30030 June 1999 Submits Input from Util Technical Staff Re Soil Disposal on-site Under 10CFR20.2002 & Expresses Interest in Pursuing Approval to Use Same Methodology (Implemented Through Util ODCM & Reported as Noted) If Possible ML20196J7421999-06-29029 June 1999 Informs NRC That Vygs Has Implemented Severe Accident Management,As Committed to in Licensee to NRC ML20209B6111999-06-29029 June 1999 Resubmits Summary of Vynp Commitments Page to Replace Original Page Submitted with Responding to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants ML20196J2431999-06-29029 June 1999 Informs That Author Received Call from NRR on Dirt Spreading Ltr & Questions Re Cover Ltr Statement Where Util Asks to Be Allowed to Dispose of Future Soil in Same Manner Provided Same Acceptance Criteria Met ML20209C3751999-06-28028 June 1999 Forwards non-proprietary Rev 16 to EPIP OP 3524, Emergency Actions to Ensure Initial Accountability & Security Response & Proprietary Rev 12 to EPIP OP 3531, Emergency Call-In Method. Proprietary Encl Withheld ML20209B5861999-06-28028 June 1999 Provides Alternative Y2K Readiness Status Described in Supplement 1 to GL 98-01, Y2K Readiness of Computer Sys at Npps. Y2K Readiness Disclosure Rept Encl ML20196G5241999-06-22022 June 1999 Responds to Re Changes to Vermont Yankee Guard Training & Qualification Plan,Rev 8,Errata A.No NRC Approval Is Required.Encl Will Be Withheld from Public Disclosure Per 10CFR73.21 BVY-99-084, Forwards Proprietary Application & Medical Certificate for Mod of Listed SRO License,For Gj Leclair.Gj Leclair Will Be Trained & Evaluated in Accordance with Util Lsro Training Description.Proprietary Info Withheld,Per 10CFR2.7901999-06-18018 June 1999 Forwards Proprietary Application & Medical Certificate for Mod of Listed SRO License,For Gj Leclair.Gj Leclair Will Be Trained & Evaluated in Accordance with Util Lsro Training Description.Proprietary Info Withheld,Per 10CFR2.790 ML20212J0541999-06-17017 June 1999 Responds to Requesting That NRC Staff ...Allow BWR Plants Identified to Defer Weld Overlay Exams Until March 2001 or Until Completion of NRC Staff Review & Approval of Proposed Generic Rept,Whichever Comes First ML20195H1741999-06-15015 June 1999 Forwards Original & Copy of Request for Approval of Certain Indirect & Direct Transfer of License & Ownership Interests of Montaup Electric Co (Montaup) with Respect to Nuclear Facilities Described as Listed 1999-09-30
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217F1261999-10-12012 October 1999 Forwards Update to Previously Submitted RELAP5 Analytical Assumptions for App R,Re RAI of 961104 BVY-99-130, Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station1999-10-0808 October 1999 Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station BVY-99-128, Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl1999-10-0606 October 1999 Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl ML20216J3531999-09-29029 September 1999 Responds to NRC Re Violations Noted in Insp Rept 50-271/99-12 on 990628-0811.Corrective Actions:Based on RFO 20 Maint Rule Outage Performance Review,Task Was Generated to Clarify & Enhance SD Monitoring Process BVY-99-122, Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-171999-09-28028 September 1999 Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-17 BVY-99-113, Requests Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maint of Nuclear Power Plants. Attachment 1 Provides Justification for Alternative Testing1999-09-21021 September 1999 Requests Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maint of Nuclear Power Plants. Attachment 1 Provides Justification for Alternative Testing BVY-99-114, Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 11999-09-21021 September 1999 Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 1 BVY-99-116, Informs of Determination That Wh Schulze,License SOP-10528-1,will No Longer Maintain License at Facility. Termination of License Requested1999-09-21021 September 1999 Informs of Determination That Wh Schulze,License SOP-10528-1,will No Longer Maintain License at Facility. Termination of License Requested BVY-99-121, Requests Extension Until 990929 to Respond to Violations Noted in Insp Rept 50-271/99-12,dtd 990819.Licensee Did Not Receive Rept Until 990830 & Addl Time Is Needed to Prepare & Allow for Adequate Review of Violation Response Submittal1999-09-20020 September 1999 Requests Extension Until 990929 to Respond to Violations Noted in Insp Rept 50-271/99-12,dtd 990819.Licensee Did Not Receive Rept Until 990830 & Addl Time Is Needed to Prepare & Allow for Adequate Review of Violation Response Submittal BVY-99-115, Forwards non-proprietary & Proprietary Responses to 990714 RAI Re Civil & Mechanical Engineering Considerations for Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355.Proprietary Encls Withheld1999-09-16016 September 1999 Forwards non-proprietary & Proprietary Responses to 990714 RAI Re Civil & Mechanical Engineering Considerations for Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355.Proprietary Encls Withheld BVY-99-118, Responds to RAI Concerning GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions1999-09-16016 September 1999 Responds to RAI Concerning GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions BVY-99-110, Informs of Util Intent to Replace Commitments Made in Licensee & Subsequently Ack in NRC with Containment Insp Criteria Defined in 10CFR50.55a(b)(2)(vi),per Drywell Coating Insp1999-08-31031 August 1999 Informs of Util Intent to Replace Commitments Made in Licensee & Subsequently Ack in NRC with Containment Insp Criteria Defined in 10CFR50.55a(b)(2)(vi),per Drywell Coating Insp BVY-99-111, Informs That Encl TS Bases Page 91 Has Been Revised to Allow Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line Uncorrected Solution & on-line 3D-Monicore Exposure Corrected Solution1999-08-31031 August 1999 Informs That Encl TS Bases Page 91 Has Been Revised to Allow Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line Uncorrected Solution & on-line 3D-Monicore Exposure Corrected Solution BVY-99-107, Submits Response to NRC RAI Re Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355 Fuel Assemblies1999-08-26026 August 1999 Submits Response to NRC RAI Re Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355 Fuel Assemblies BVY-99-108, Requests That Gv Bogue,Bj Croke,Vs Ferrizzi,Me French, Bk Mcnutt,Jf Meyer & DM Navarro Take BWR Gfes of OL Exam Administered on 991006.DA Daigler & ST Brown Will Have Access to Exams Before Tests Administered1999-08-19019 August 1999 Requests That Gv Bogue,Bj Croke,Vs Ferrizzi,Me French, Bk Mcnutt,Jf Meyer & DM Navarro Take BWR Gfes of OL Exam Administered on 991006.DA Daigler & ST Brown Will Have Access to Exams Before Tests Administered BVY-99-103, Informs That Util Expects to Submit Approx Twenty Licensing Actions in FY00 & FY01,in Response to Administrative Ltr 99-021999-08-18018 August 1999 Informs That Util Expects to Submit Approx Twenty Licensing Actions in FY00 & FY01,in Response to Administrative Ltr 99-02 BVY-99-100, Forwards Revised Floor Response Spectra Diagrams,Originally Sent as Attachment 1 to Licensee to Nrc.Revised Diagrams Have More Legible Scale Markings1999-08-0202 August 1999 Forwards Revised Floor Response Spectra Diagrams,Originally Sent as Attachment 1 to Licensee to Nrc.Revised Diagrams Have More Legible Scale Markings ML20210M5791999-07-30030 July 1999 Responds to NRC 990726 Telcon Re Status of Resolution for USI A-46 Outliers.Written Summary,By Equipment Category, Listed ML20211E1701999-07-28028 July 1999 Forwards Copy of Final Exercise Rept for 990427-29,full- Participation Plume Exposure & Ingestion Pathway Exercise of Offsite Radiological Emergency Response Plans site-specific to VYNPS ML20210G5041999-07-27027 July 1999 Responds to NRC 990301 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design- Basis Accident Conditions. Licensee Will Submit Info Re Proposed Sys Mod by 990916 ML20210G4271999-07-27027 July 1999 Forwards Testing Data & Associated Results for Fitness for Duty Program at Plant for 990101-0630 ML20210J3031999-07-27027 July 1999 Submits Proposed Changes to Eals.Attachment 1 Provides Listing of Changes to EALs Along with Ref to Bases Documents Supporting Change ML20209J0601999-07-14014 July 1999 Forwards Rev 11 to Vols 1-10 of State of Nh Radiological Emergency Response Plan & Vols 11-50 to Town Radiological Emergency Response Plans,In Support of Vermont Yankee & Seabrook Station.Vols 17-19 of Were Not Included ML20209G1531999-07-12012 July 1999 Discusses Util Setpoint Control Program Implementation Schedule,As Committed to in Licensee 990514 Response to Notice of Violation,Insp Rept 50-271/97-10 ML20196J2321999-06-30030 June 1999 Submits Input from Util Technical Staff Re Soil Disposal on-site Under 10CFR20.2002 & Expresses Interest in Pursuing Approval to Use Same Methodology (Implemented Through Util ODCM & Reported as Noted) If Possible ML20209B6111999-06-29029 June 1999 Resubmits Summary of Vynp Commitments Page to Replace Original Page Submitted with Responding to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants ML20196J7421999-06-29029 June 1999 Informs NRC That Vygs Has Implemented Severe Accident Management,As Committed to in Licensee to NRC ML20209C3751999-06-28028 June 1999 Forwards non-proprietary Rev 16 to EPIP OP 3524, Emergency Actions to Ensure Initial Accountability & Security Response & Proprietary Rev 12 to EPIP OP 3531, Emergency Call-In Method. Proprietary Encl Withheld ML20209B5861999-06-28028 June 1999 Provides Alternative Y2K Readiness Status Described in Supplement 1 to GL 98-01, Y2K Readiness of Computer Sys at Npps. Y2K Readiness Disclosure Rept Encl BVY-99-084, Forwards Proprietary Application & Medical Certificate for Mod of Listed SRO License,For Gj Leclair.Gj Leclair Will Be Trained & Evaluated in Accordance with Util Lsro Training Description.Proprietary Info Withheld,Per 10CFR2.7901999-06-18018 June 1999 Forwards Proprietary Application & Medical Certificate for Mod of Listed SRO License,For Gj Leclair.Gj Leclair Will Be Trained & Evaluated in Accordance with Util Lsro Training Description.Proprietary Info Withheld,Per 10CFR2.790 ML20195H1741999-06-15015 June 1999 Forwards Original & Copy of Request for Approval of Certain Indirect & Direct Transfer of License & Ownership Interests of Montaup Electric Co (Montaup) with Respect to Nuclear Facilities Described as Listed ML20195C5891999-05-27027 May 1999 Forwards Response to NRC 990301 RAI Re GL 96-05 Program at Vermont Yankee Nuclear Power Station ML20195D5341999-05-27027 May 1999 Forwards Description of Vermont Yankees Plans for Insp of & Mods to Certain Reactor Vessel Internals BVY-99-074, Forwards Application & Medical Certificate Required for Renewal of Jd Livingston,License OP-10049,RO License.Medical Certificate Withheld1999-05-26026 May 1999 Forwards Application & Medical Certificate Required for Renewal of Jd Livingston,License OP-10049,RO License.Medical Certificate Withheld ML20195B4081999-05-24024 May 1999 Withdraws Licensee Commitment,Contained in ,To Reinitiate ITS Project Following Completion of FSAR Accuracy Verification Project.Util Will Continue to Modify Current TS with Number of Improvements BVY-99-067, Informs That Bw Metcalf,License SOP-1761-9,has Retired from VYNPS & Will No Longer Require License.Nrc Is Requested to Terminate License1999-05-21021 May 1999 Informs That Bw Metcalf,License SOP-1761-9,has Retired from VYNPS & Will No Longer Require License.Nrc Is Requested to Terminate License ML20196L1801999-05-18018 May 1999 Withdraws Licensee & Attachment,Containing Rev 2 to Vermont Yankee Operational QA Manual, from Further Consideration by Nrc.Summary of Commitments Encl ML20206K3201999-05-0707 May 1999 Forwards Response to RAI Re Verification of Seismic Adequacy of Mechanical & Electrical Equipment ML20206J2801999-04-30030 April 1999 Forwards 1998 Annual Financial Repts for CT Light & Power Co,Western Ma Electric Co,Public Svc Co of Nh,North Atlantic Energy Corp,Northeast Nuclear Energy Co & North Atlantic Energy Svc Corp,License Holders ML20206D3731999-04-27027 April 1999 Informs NRC of Changes in Recipients of NRC Docketed Correspondence ML20206B1401999-04-23023 April 1999 Forwards Replacement of Section 3(a) of NSHC Determination Provided by Re TS Proposed Change 208,suppl Section 6 ML20205S3381999-04-16016 April 1999 Submits Revised Schedule for Response to NRC 990226 RAI Re 980630 Submittal of IPEEE Rept.Info Will Be Submitted by 991231 ML20205S3891999-04-16016 April 1999 Forwards non-proprietary & Proprietary Revised Page to Holtec Rept HI-981932,supplementing TS Proposed Changed 207 Re Spent Fuel Pool Storage Capacity Expansion ML20205S3031999-04-15015 April 1999 Forwards Revised TS Bases Pages 90,227,164 & 221a,accounting for Change in Reload Analysis from Yaec to GE Methodology, Reflecting Change in Condensation Stability Design Criteria & Accounting for More Conservative Calculation ML20205P9291999-04-14014 April 1999 Requests That Rev to NRC 821029 SER for NUREG-0737,Item II.K.3.24,be Issued to Clarify Util Installed RCIC & HPCI HVAC Configuration,As Discovered During Preparation of DBDs for Sys ML20205P8191999-04-13013 April 1999 Forwards Rev 2 to COLR for Vermont Yankee Cycle 20, Dtd Feb 1999,IAW TS Section 6.7.A.4 ML20205M3191999-04-0707 April 1999 Forwards 1998 Annual Rept of Results of Individual Monitoring, Per 10CFR20.2206(b).Licensee Is Submitting Matl to Only Addressee Specified in 10CFR20.2206(c).Without Encl ML20205K0351999-03-31031 March 1999 Informs That Certain Addl Corrections Warranted for 990121 SER for Amend 163 to License DPR-28 Re Suppression Pool Water Temp.Suggested Corrections Listed ML20205K1821999-03-31031 March 1999 Informs of Modifications That Util Made to CO(2) Fire Suppression Sys,Due to Sen 188 Which Occurred at Ineel on 980728.Compensatory Actions Will Remain in Place Until Modifications Are Complete & Systems Are Returned to Svc ML20206A6951999-03-29029 March 1999 Request Confirmation That No NRC Action or Approval,Required Relative to Proposed Change in Upstream Economic Ownership of New England Power Co,Minority Shareholder in Vermont Yankee Nuclear Power Corp,Yaec,Myap & Connecticut Yankee 1999-09-29
[Table view] |
Text
i
~
l l .-
VERMONT YANKEE l y NUCLEAR POWER CORPORATION
+ - -
185 Old Ferry Road, Brattleboro, VT 05301 7002 (802) 257-5271 l
April 16,1999 BVY 99-59 U. S. Nuclear Regulatory Commission
' ATTN: Document Control Desk Washington, DC 20555
Subject:
Vermont Yankee Nuclear Power Station License No. DPR-28 (Docket No. 50-271)
Supplement to Technical Specif1 cation Proposed Change No. 207 Spent Fuel Pool Storare Capacity Expansion By letter dated February 8,1999, Vermont Yankee (VY) submitted Technical Specification Proposed Change No. 207 to increase the spent fuel storage capacity of the VY spent fuel pool from 2,870 to 3,355 l fuel assemblies. Our submittal contained a Technical Report, completed to support the fuel pool storage capacity expansion. In section 4.5.2.5 of the Technical Report, VY identified the fuel enrichment uncertainty as 0.013wt.% 2nU. Subsequent analysis expanded the fuel enrichment uncertainty value to ,
0.05wt.% 2nU. In our letter dated February 8,1999, we submitted corrected pages to our Technical Report identifying the proper fuel enrichment and corresponding related changes. It has since been identified that an additional page warrants correction as a result of the fuel enrichment issue.
Accordingly, we hereby submit an additional corrected page to our Technical Report. The revised page l contains vertical lines and an "Rl" indicating the areas of change. j Attachment I contains the revised page of the Technical Report. It is noted that this page contains proprietary information and it is requested that this information be withheld from public disclosure per 10CFR2.790(a)(4). Attachment I also contains Holtec International's affidavit for the proprietary information contained within the attachment. Attachment 2 provides the revised page of the Technical Report in a non-proprietary format, and is provided for public disclosure.
This submittal does not change the no significant hazards consideration conclusion or the environmental impact evaluation conclusion contained within our original submittal.
l If you have any questions on this transmittal, please contact Mr. Thomas B. Silko at (802) 258-4146.
Sincerely,
., VERMONT YA 'EE N EAR POWER CORPORATlON go xW4 /7 nt, Engine ring b b"}t l 9904260204 990416 ID L PDR ADOCK 05003271 P PDR _
- w. ,
""" " '* N" u ^HPo u n Onunariins
)ss WINDHAM COUNTY )
Then personally appeared before me, Don M. Leach, who, being duly sworn, did state that he is Vice President, Engineering of Vermont Yankee Nuclear Power Corporation, that he is duly authorized to execute and file the foregoing docuinent in the name and on the behalf of Vermont Yankee Nuclear Power Corporation, and that the statements therein are true to the best of his knowledge and belief.
Thomas B. Silko, Notary Public My Commission Expires February 10,2003 Attachments cc: USNRC Region 1 Administrator USNRC Resident Inspector- VYNPS USNRC Project Manager- VYNPS Vermont Department of Public Service I
E ;
E . .
AFFIDAVIT PURSUANT TO 10CFR2.790 I, Michael P. McNamara, being duly sworn, depose and state as follows:
(1) I am the Director of Nuclear Projects for Holtee International and have been delegated the function of reviewing the information described in paragraph (2) which is sought to be withheld, and ha"e been authorized to apply for its withholding.
(2) The information sought to be withheld i: % itained in the revised pages to the original document entitled " Vermont Yankee Nuclear Power Station Spent Fuel Storage Expansion Project," Holtec Report HI-981932. The proprietary information is designated with backshading. 1 (3) In making this application for withholding of proprietary information of which it is the owner, Holtec International relies upon the exemption from disclosure set forth in the Freedom of Information Act ("FOIA"), 5 USC Sec. 552(b)(4) and the Trade Secrets Act,18 USC Sec.1905, and NRC regulations 10CFR Part 9.17(a)(4), 2.790(a)(4), and 2.790(b)(1) for " trade secrets and commercial or fm' ancial information obtained from a person and privileged or confidential" (Exemption 4). The material for which exemption from disclosure is here sought is all " confidential conunercial information", and some portions also qualify under the narrower definition of " trade secret", within the meanings assigned to those terms for purposes of FOIA Exemption 4 in, respectively, Critical Mass Energy Proiect v. Nuclear Regulatory Commission, 975F2d871 (DC Cir. 1992), and Public Citizen Health Research Group v. FDA, 3 704F2d1280 (DC Cir.1983).
(4) Some examples of categories of information which fit into the definition of proprietary information are:
- a. Information that disc'oses a process, method, or apparatus, including >
supporting data and analyses, where prevention of its use by Holtec's competitors without license from Holtec International constitutes a competitive economic advantage over other companies; i l 1 l
U- ' .- ,
AFFIDAVIT PURSUANT TO 10CFR2.790 l
i
- b. Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, i manufacture, shipment, installation, assurance of qcality, or licensing of a similar product.
l c. . Information which reveals cost or price information, production, l capacities, budget levels, or commercial strategies of Holtec International, its customers, or its suppliers; !
- d. Information which reveals aspects of past, present, or future Holtec l International customer-funded development plans and programs of .
potential commercial value to Holtec International; l
- e. Information which discloses patentable subject matter for which it may be desirable to obtain patent protection.
l The information sought to be withheld is considered to be proprietary for the ;
reasons set forth in paragraphs 4.a,4.b,4.d, and 4.e, above. !
l (5) The information sought to be withheld is being submitted to the NRC in !
confidence. The information (including that compiled from men 59urces) k of a sort customarily held in confidence by Holtec International, and is in fact so held. The information sought to be withheld has, to the best of my knowledge ,
and belief, consistently been held in confidence by Holtec International. No public disclosure has been made, and it is not available in public sources. All disclosures to third parties, including any required transmittals to the NRC, have been made, or must be made, pursuant to regulatory provisions or proprietary agreements which provide for maintenance of the information in confidence. Its initial designation as proprietary information, and the subsequent steps taken to prevent its unauthorized disclosure, are as set forth in paragraphs (6) and (7) following.
(6) Initial approval of proprietary treatment of a document is made by the manager l of the originating component, the person most likely to be acquainted with the I
value and sensitivity of the information in relation to industry knowledge.
Access to such documents within Holtec International is limited on a "need to 2
l l
AFFIDAVIT PURSUANT TO 10CFR2.790 l
l know" basis.
(7) The procedure for approval of external release of such a document typically requires review by the staff manager, project manager, principal scientist or other equivalent authority, by the manager of the cognizant marketing function (or his designee), and by the Legal Operation, for technical content, competitive effect, and determination of the accuracy of the proprietary designation.
Disclosures outside Holtec International are limited to regulatory bodies, customers, and potential customers, and their agents, suppliers, and licensees, and others with a legitimate need for the information, and then only in accordance with appropriate regulatory provisions or proprietary agreements.
(8) The information classified as proprietary was developed and compiled by Holtec International at a significant cost to Holtec International. This information is classified as proprietary because it contains detailed historical data and analytical results not available elsewhere. This information would provide other parties, l- including competitors, with information from Holtec International's technical I
database and the results of evaluations performed using codes developed by Holtec International. Release of this information would improve a competitor's j position without the competitor having to expend similar resources for the l development of the database. A substantial effort has been expended by Holtec International to develop this information.
l (9) Public disclosure of the information sought to be withheld is likely to cause substantial harm to Holtec International's competitive position and foreclose or reduce the availability of profit-making opportunities. The information is part of Holtec International's comprehensive spent fuel storage technology base, and its commercial value extends beyond the original development cost. The value of the technology base goes beyond the extensive physical database and analytical methodology, and includes development of the expertise to determine and apply the appropriate evaluation process.
The research, development, engineering, and analytical costs comprise a i substantial investment of time and money by Holtec International.
l 3
l
p .. ..
l AFFIDAVIT PURSUANT TO 10CFR2.790 1
l l
l The precise value of the expertise to devise an evaluation process and apply the correct analytical methodolo~gy is difficult to quantify, but 'it clearly is substantial.
Holtec International's competitive advantage will be lost if its competitors are able to use the results of the Holtec International experience to normalize or I
verify their own process or if they are able to claim an equivalent understanding by demonstrating that they can arrive at the same or similar conclusions.
1 The value of this information to Holtec International would be lost if the l information were disclosed to the public. Making such information available to competitors without their having been required to undertake a similar expenditure of resources would unfairly provide competitors with a windfall, and i deprive Holtec International of the opportunity to exercise its competitive advantage to seek an adequate return on its large investment in developing these very valuable analytical tools.
STATE OF NEW JERSEY )
) ss:
COUNTY OF BURLINGTON )
Michael P. McNamara, being duly sworn, deposes and says:
That he has read the foregoing affidavit and the matters stated therein are true and correct to the best of his knowledge, information, and belief.
Executed at Marlton, New Jersey, this 31st day of March,1999, i
Michael P. McNamara Holtec International l
Subscribed and sworn before me this 8/ day of N d*A ,1999.
l
$lh&t. PEE [-
NOTARY PUBUC OF NEW JERSEY My commission Empires AprG 25,2000
. vnnuosi vma; Necuan rown.n coeu ouxuos Docket No. 50-271 BVY 99-59 Attachment 2 Vermont Yankee Nuclear Power Station Proposed Technical Specification Change No. 207 Spent Fuel Pool Storage Capacity Expansion Revised page of Technical Report for the Vennont Yankee Spent Fuel Pool Storage Expansion Non-proprietary Version e