ML19242A326

From kanterella
Jump to navigation Jump to search
Submits Interim Rept Re Status of Steam Generator Level Errors During Accident Conditions.Errors Being Studied by Westinghouse & Further Evaluation Required.Results Will Be Forwarded to NRC
ML19242A326
Person / Time
Site: North Anna Dominion icon.png
Issue date: 07/27/1979
From: Brown S
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 7908010396
Download: ML19242A326 (1)


Text

Vepco _._ _._. _ _.-

July 27, 1979 Mr. Jacas P. O'Reilly, Director Serial No. 539A Office of Inspection & Enforcement PSELC/GLP:adw:mc U. S. Nuclear Regulatory Coce;ission Region II Docket No. 50-339 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

In our 5 day report Serial No. 539 concerning Steam Generator level errors during accident conditions we indicated that the problem was being studied by Westingnouse.

We have been inforr.ed by Westinghouse that further evaluation of the proolen is required therefore we are sending this letter as an interim re-port on this tratter.

Work is continuing and we are trying to fonnulate a viable solution to this problem. We will continue to werk with Westinghouse and to keep you informed of the progress on this problem.

Very truly yours,

/ /-Y,,.e<, ~

l / ,,

Sam C. Brown, Jr.

Senior Vice President-Power Station Engineering and Construction cc: Mr. Victor Stello, Director Office of Inspection a Enforcsent Mr. Harold R. Denton, Director Office of huclear Reactor Regulation ob ~