ML19130A049

From kanterella
Jump to navigation Jump to search
NRC Staff Initial Disclosures
ML19130A049
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/10/2019
From: Jeremy Wachutka
NRC/OGC
To: Sue Abreu, Hawkens E, Kennedy M
Atomic Safety and Licensing Board Panel
SECY RAS
References
50-250-SLR, 50-251-SLR, ASLBP 18-957-01-SLR-BD01, RAS 54971
Download: ML19130A049 (28)


Text

May 10, 2019 Administrative Judge Administrative Judge E. Roy Hawkens, Chair Dr. Sue H. Abreu Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 Administrative Judge Dr. Michael F. Kennedy Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 In the Matter of FLORIDA POWER & LIGHT COMPANY (Turkey Point Nuclear Generating Units 3 and 4)

Docket Nos. 50-250-SLR & 50-251-SLR; ASLBP No. 18-957-01-SLR-BD01

Dear Administrative Judges:

Pursuant to 10 C.F.R. §§ 2.336 and 2.1203, and as modified by the Atomic Safety and Licensing Boards Initial Scheduling Order of March 21, 2019, the U.S. Nuclear Regulatory Commission Staff herein notifies the Board and the parties that a hearing file has been created for this proceeding. Materials in the hearing file may be accessed through the Agencywide Documents Access and Management System (ADAMS) and through the Electronic Hearing Docket (EHD). The EHD may be accessed at the following URL: http://adams.nrc.gov/ehd/.

The hearing file will be contained in a sub-folder in the Turkey Point 50-250 & 50-251-SLR folder of the EHD. An index containing the ADAMS accession number, date, and title or description of each item in the hearing file is appended hereto as Attachment 1.

Attached is the affidavit of Manny Comar certifying that all materials required to be disclosed pursuant to 10 C.F.R. §§ 2.336 and 2.1203 and the Boards Initial Scheduling Order have been disclosed, and that the disclosures are accurate and complete for documents identified as of April 30, 2019. In addition, pursuant to the Boards Initial Scheduling Order, the Staff is producing a log of proprietary documents, which is appended hereto as Attachment 2.

The Staff notes that it has made a good faith effort to identify and characterize all documents meeting the criteria of 10 C.F.R. §§ 2.336 and 2.1203 in this proceeding. In identifying these documents, the Staff does not concede their relevance to the issues to be decided in this proceeding.

Judge Hawkens May 10, 2019 Judge Kennedy Judge Abreu Sincerely,

/Signed (electronically) by/

Jeremy L. Wachutka Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O14-A44 Washington, DC 20555 Telephone: (301) 287-9188 E-mail: Jeremy.Wachutka@nrc.gov

Enclosures:

Attachment 1 - Hearing File Index Attachment 2 - Proprietary Log Affidavit of Manny Comar cc: Service List

Attachment 1 - Hearing File Index Initial Disclosures - May 10, 2019 ID# Document Title Accession Date Number NRC-0001 12/19/2013 Turkey Point, Units 3 and 4 - Offsite Dose Calculation Manual for Gaseous and ML14070A086 Liquid Effluents, Revision 20.

NRC-0002 08/23/2017 09/07/2017 Notice Of Forthcoming Closed Teleconference To Discuss Pre- ML18080A170 Application Activities Related To The Anticipated Submittal Of A Subsequent License Renewal Application From An Unnamed Plant -Environmental Topics And SAMA.

NRC-0003 08/23/2017 Attachment L: Direct Testimony and Exhibits of Sorab Panday. ML18213A430 NRC-0004 11/29/2017 Attachment 1 to Applicant's Answer Opposing Southern Alliance for Clean ML18239A451 Energy's Request for Hearing and Petition to Intervene.

NRC-0005 01/05/2018 Summary of Closed Pre-Application Telecon Held on September 7, 2017, ML18080A175 Between NRC and FPL to Discuss the Environmental Report Associated with the Turkey Point Subsequent License Renewal Application.

NRC-0006 01/30/2018 Enclosure 1 - Turkey Point Subsequent License Renewal Application Enclosure ML18037A828 Summary.

NRC-0007 01/30/2018 Enclosure 2 - Applications for Withholding Proprietary Information from Public ML18037A829 Disclosure Pursuant to 10 CFR 2.390.

NRC-0008 01/30/2018 Enclosure 4 - Non-Proprietary Reference Documents and Redacted Versions of ML18037A837 Proprietary Reference Documents (Public Version).

NRC-0009 01/30/2018 Turkey Point Units 3 and 4 - Submittal of Subsequent License Renewal ML18037A824 Application.

NRC-0010 01/31/2018 Appendix E - Turkey Point Nuclear Plant Units 3 and 4 Environmental Report ML18037A836 Subsequent Operating License Renewal Stage.

Attachment 1 - Hearing File Index Initial Disclosures - May 10, 2019 ID# Document Title Accession Date Number NRC-0011 01/31/2018 Turkey Point, Units 3 and 4 - Appendix E, Applicant's Environmental Report ML18113A145 Subsequent Operating License Renewal Stage (Public Version).

NRC-0012 02/09/2018 Turkey Point Units 3 and 4 - License Renewal Application - Supplement 1. ML18044A653 NRC-0013 02/16/2018 Turkey Point, Units 3 & 4, Replacement Pages to Enclosure 3, SLRA Section 4. ML18078A027 NRC-0014 02/16/2018 Turkey Point, Units 3 and 4 - 2017 Annual Radioactive Effluent Release Report. ML18066A562 NRC-0015 02/16/2018 Turkey Point, Units 3 and 4, Subsequent License Renewal Application - ML18053A137 Supplement 2.

NRC-0016 02/28/2018 Turkey Point Units 3 and 4, Subsequent License Renewal Application. ML18072A232 NRC-0017 03/01/2018 Turkey Point Units 3 and 4, Subsequent License Renewal Application - ML18072A230 Supplement 3.

NRC-0018 03/14/2018 2018/03/14 Turkey Point 3&4 - SLR - [External_Sender] March 23 Turkey Point ML19077A110 Meeting Agenda NRC-0019 04/10/2018 Turkey Point, Units 3 and 4 - Enclosure 1 to L-2018-082, Subsequent License ML18113A141 Renewal Application, Enclosure Summary.

NRC-0020 04/10/2018 Turkey Point, Units 3 and 4 - Enclosure 2 to L-2018-082, Applications for ML18113A142 Withholding Proprietary Information from Public Disclosure Per 10 CFR 2.390 (Public Version).

NRC-0021 04/10/2018 Turkey Point, Units 3 and 4 - Enclosure 4 to L-2018-082 - Non-Proprietary ML18113A148 Reference Documents and Redacted Versions of Proprietary Documents (Public Version).

Attachment 1 - Hearing File Index Initial Disclosures - May 10, 2019 ID# Document Title Accession Date Number NRC-0022 04/10/2018 Turkey Point, Units 3 and 4 - Transmittal of Subsequent License Renewal ML18113A134 Application, Revision 1.

NRC-0023 04/10/2018 Turkey Point, Units 3 and 4, Subsequent License Renewal Application ML18102A521 Appendix E Environmental Report Supplemental Information.

NRC-0024 04/12/2018 Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Status of Subsequent ML18074A252 License Renewal Application (EPID No. L-2018-RNW-0002).

NRC-0025 04/13/2018 FRN for Receipt and Availability of the Subsequent License Renewal ML17338A139 Application for the Turkey Point Nuclear Generating Units 3 and 4 (EPID No. L-2018-RNW-0002).

NRC-0026 04/13/2018 Receipt and Availability of the Subsequent License Renewal Application for the ML17338A134 Turkey Point Nuclear Generating Units 3 and 4 (EPID No. L-2018-RNW-0002).

NRC-0027 04/23/2018 Turkey Point Units 3 and 4, Submittal of 2017 Annual Radiological ML18137A201 Environmental Operating Report.

NRC-0028 04/25/2018 Turkey Point Nuclear Generating Unit Nos. 3 and 4, Subsequent License ML17360A054 Renewal Application Online Reference Portal (EPID No. L-2018-RNW-002).

NRC-0029 04/26/2018 Determination of Acceptability and Sufficiency for Docketing, Proposed Review ML18003A047 Schedule, and Opportunity for a Hearing Regarding the Application from FPL for Subsequent Renewal of the Turkey Point Units 3 and 4 (EPID Nos. L-2018-RNW-0002, L-2018-LNE-0001)

NRC-0030 04/30/2018 Turkey Point, Units 3 and 4 - Enclosure 3 to L-2018-082, Subsequent License ML18113A146 Application, Revision 1 (Public Version)

NRC-0031 05/14/2018 Attachment 10: Bill Powers Expert Report. ML18213A545 NRC-0032 05/14/2018 Attachment 4 William Nuttle Expert Report. ML18213A533 Attachment 1 - Hearing File Index Initial Disclosures - May 10, 2019 ID# Document Title Accession Date Number NRC-0033 05/14/2018 Attachment 6: Larry Brand Expert Report. ML18213A536 NRC-0034 05/14/2018 Attachment 7: Edward Swakon Expert Report. ML18213A537 NRC-0035 05/14/2018 Attachment 8: J.W. Fourqurean Expert Report. ML18213A540 NRC-0036 05/14/2018 Attachment K: Expert Report of Bill Powers, P.E., Powers Engineering. ML18213A429 NRC-0037 05/14/2018 Notice Of Intent To Prepare An Environmental Impact Statement And Conduct ML18109A518 Scoping Process For Turkey Point Nuclear Plant Units 3 And 4.

NRC-0038 05/16/2018 Federal Register Notice - Notice Of Intent To Prepare An Environmental Impact ML18109A517 Statement For The Turkey Point SLR.

NRC-0039 05/18/2018 Attachment 5: Kirk Martin Expert Report. ML18213A534 NRC-0040 05/24/2018 Request For Scoping Comments Concerning The Environmental Review Of ML18114A202 Turkey Point Nuclear Plant, Units 3 And 4 Subsequent License Renewal Application-ACHP.

NRC-0041 05/24/2018 Request for Scoping Comments Concerning the Environmental Review of ML18114A204 Turkey Point Nuclear Plant, Units 3 and 4 Subsequent License Renewal Application-Miami Dade.

NRC-0042 05/24/2018 Request For Scoping Comments Concerning The Environmental Review Of ML18114A206 Turkey Point Nuclear Plant, Units 3 And 4 Subsequent License Renewal Application-SHPO.

NRC-0043 05/24/2018 Request For Scoping Comments Concerning The Environmental Review Of ML18114A381 Turkey Point Nuclear Plant, Units 3 And 4, Subsequent License Renewal Application-Tribal Letters.

Attachment 1 - Hearing File Index Initial Disclosures - May 10, 2019 ID# Document Title Accession Date Number NRC-0044 05/27/2018 Comment (1) of Matthew Cook on Florida Power & Light Company; Turkey ML18155A329 Point Nuclear Plant Units 3 and 4.

NRC-0045 05/28/2018 Comment (2) of Hannah Gardiner Supporting License Renewal for Turkey Point ML18155A331 Nuclear Plant Units 3 and 4.

NRC-0046 05/30/2018 Comment (3) of Gabriel Ignetti on Turkey Point Nuclear Plant Units 3 and 4. ML18155A332 NRC-0047 05/30/2018 Comment (4) of John Karahalios Supporting License Renewal of Florida Power ML18155A333

& Light Company; Turkey Point Nuclear Plant Units 3 and 4.

NRC-0048 05/30/2018 Slides for Turkey Point Public Scoping Meeting on May 31 2018 - English ML18150A240 NRC-0049 05/30/2018 Slides for Turkey Point Public Scoping Meeting on May 31 2018 - Spanish. ML18150A255 NRC-0050 05/31/2018 Comment (5) of Elaine Trotter on Turkey Point Nuclear Plant, Units 3 and 4. ML18155A334 NRC-0051 05/31/2018 Comment (6) of Anthony DeNardo Supporting Turkey Point Nuclear Plant, Units ML18162A063 3 and 4 License Renewal.

NRC-0052 05/31/2018 Documents Provided by Laura Sue Wilansky to the U.S. Nuclear Regulatory ML18187A221 Commission During the Turkey Point Nuclear Generating Units 3 and 4 Public Environmental Scoping Meeting on May 31, 2018.

NRC-0053 05/31/2018 Documents Provided by Steve Schoedinger to U.S. Nuclear Regulatory ML18187A224 Commission During the Turkey Point Unit 3 & 4 Public Environmental Scoping Meeting on May 31, 2018.

NRC-0054 06/02/2018 Comment (7) of James Hopf Supporting Turkey Point Nuclear Plant, Units 3 ML18162A065 and 4 License Renewal.

NRC-0055 06/03/2018 Comment (8) of D. Sotelo Opposing Turkey Point Nuclear Plant, Units 3 and 4 ML18162A066 License Renewal.

Attachment 1 - Hearing File Index Initial Disclosures - May 10, 2019 ID# Document Title Accession Date Number NRC-0056 06/03/2018 Comment (9) of Jonathan Bauer Objecting to Extension of the License of ML18162A067 Florida Power & Light Company, Turkey Point Nuclear Plant Units 3 and 4.

NRC-0057 06/04/2018 Comment (10) of Diane Johnson on Turkey Point Nuclear Plant Units 3 and 4. ML18162A068 NRC-0058 06/04/2018 Comment from Geoffrey H. Fettus & Richard E. Ayres on Request for Extension ML18158A185 of Time for Opportunity to Request a Hearing and Petition for Leave to Intervene in the NRC's Review of FPL License Renewal Application, Docket ID NRC-2018-0074.

NRC-0059 06/05/2018 Comment (11) of Sarah Fangman of US Dept of Commerce, National Oceanic ML18162A069

& Atmospheric Admin on Florida Power & Light Company; Turkey Point Nuclear Plant Units 3 and 4.

NRC-0060 06/06/2018 Comment (12) of Ian Zink on Florida Power & Light Company; Turkey Point ML18162A070 Nuclear Plant Units 3 and 4.

NRC-0061 06/07/2018 Comment (13) of Robert Pike on Florida Power & Light Company; Turkey Point ML18162A074 Nuclear Plant Units 3 and 4 License Renewal.

NRC-0062 06/07/2018 Comment (28) of Kirk C. Zuelch on behalf of Florida Keys Aqueduct Authority ML18179A158 on Florida Power and Light Application for Renewal.

NRC-0063 06/09/2018 Comment (14) of Patricia Milone on Turkey Point Nuclear Plant Units 3 and 4. ML18163A113 NRC-0064 06/13/2018 License Renewal Environmental Site Audit Regarding the Turkey Point Nuclear ML18158A335 Generating Units 3 and 4 Subsequent License Renewal Application (EPID No.

L-2018-LNE-0001).

NRC-0065 06/14/2018 2018/06/14 - Comment (1) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18178A182 NRC-0066 06/14/2018 2018/06/14 - Comment (10) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18178A680 NRC-0067 06/14/2018 2018/06/14 - Comment (11) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18178A681 NRC-0068 06/14/2018 2018/06/14 - Comment (110) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18183A031 NRC-0069 06/14/2018 2018/06/14 - Comment (12) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18178A682 Attachment 1 - Hearing File Index Initial Disclosures - May 10, 2019 ID# Document Title Accession Date Number NRC-0070 06/14/2018 2018/06/14 - Comment (13) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18178A683 NRC-0071 06/14/2018 2018/06/14 - Comment (14) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A030 NRC-0072 06/14/2018 2018/06/14 - Comment (15) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A034 NRC-0073 06/14/2018 2018/06/14 - Comment (16) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A037 NRC-0074 06/14/2018 2018/06/14 - Comment (17) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A047 NRC-0075 06/14/2018 2018/06/14 - Comment (18) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A062 NRC-0076 06/14/2018 2018/06/14 - Comment (19) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A071 NRC-0077 06/14/2018 2018/06/14 - Comment (2) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18178A663 NRC-0078 06/14/2018 2018/06/14 - Comment (20) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A077 NRC-0079 06/14/2018 2018/06/14 - Comment (21) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A226 NRC-0080 06/14/2018 2018/06/14 - Comment (22) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A228 NRC-0081 06/14/2018 2018/06/14 - Comment (23) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A229 NRC-0082 06/14/2018 2018/06/14 - Comment (24) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A230 NRC-0083 06/14/2018 2018/06/14 - Comment (25) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A232 NRC-0084 06/14/2018 2018/06/14 - Comment (26) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A233 NRC-0085 06/14/2018 2018/06/14 - Comment (27) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A235 NRC-0086 06/14/2018 2018/06/14 - Comment (28) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A239 NRC-0087 06/14/2018 2018/06/14 - Comment (29) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A242 NRC-0088 06/14/2018 2018/06/14 - Comment (3) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18178A665 NRC-0089 06/14/2018 2018/06/14 - Comment (30) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A244 NRC-0090 06/14/2018 2018/06/14 - Comment (31) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A245 NRC-0091 06/14/2018 2018/06/14 - Comment (32) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A333 NRC-0092 06/14/2018 2018/06/14 - Comment (33) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A341 NRC-0093 06/14/2018 2018/06/14 - Comment (34) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A354 Attachment 1 - Hearing File Index Initial Disclosures - May 10, 2019 ID# Document Title Accession Date Number NRC-0094 06/14/2018 2018/06/14 - Comment (35) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A363 NRC-0095 06/14/2018 2018/06/14 - Comment (36) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A390 NRC-0096 06/14/2018 2018/06/14 - Comment (37) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A404 NRC-0097 06/14/2018 2018/06/14 - Comment (38) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A415 NRC-0098 06/14/2018 2018/06/14 - Comment (39) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A426 NRC-0099 06/14/2018 2018/06/14 - Comment (4) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18178A670 NRC-0100 06/14/2018 2018/06/14 - Comment (40) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A437 NRC-0101 06/14/2018 2018/06/14 - Comment (41) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A449 NRC-0102 06/14/2018 2018/06/14 - Comment (42) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A462 NRC-0103 06/14/2018 2018/06/14 - Comment (43) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A470 NRC-0104 06/14/2018 2018/06/14 - Comment (44) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A476 NRC-0105 06/14/2018 2018/06/14 - Comment (45) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A484 NRC-0106 06/14/2018 2018/06/14 - Comment (46) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A489 NRC-0107 06/14/2018 2018/06/14 - Comment (47) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A491 NRC-0108 06/14/2018 2018/06/14 - Comment (48) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A495 NRC-0109 06/14/2018 2018/06/14 - Comment (5) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18178A671 NRC-0110 06/14/2018 2018/06/14 - Comment (6) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18178A674 NRC-0111 06/14/2018 2018/06/14 - Comment (7) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18178A675 NRC-0112 06/14/2018 2018/06/14 - Comment (8) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18178A677 NRC-0113 06/14/2018 2018/06/14 - Comment (9) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18178A679 NRC-0114 06/14/2018 Comment (15) of John Kocol Opposing Turkey Point Nuclear Plant Units 3 and ML18169A144 4 to Install Addition Reactor.

NRC-0115 06/15/2018 2018/06/15 - Comment (49) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A496 NRC-0116 06/15/2018 2018/06/15 - Comment (50) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A512 Attachment 1 - Hearing File Index Initial Disclosures - May 10, 2019 ID# Document Title Accession Date Number NRC-0117 06/15/2018 2018/06/15 - Comment (51) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A514 NRC-0118 06/15/2018 2018/06/15 - Comment (52) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A516 NRC-0119 06/15/2018 2018/06/15 - Comment (53) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A518 NRC-0120 06/15/2018 2018/06/15 - Comment (54) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A519 NRC-0121 06/15/2018 2018/06/15 - Comment (55) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A520 NRC-0122 06/15/2018 2018/06/15 - Comment (56) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A524 NRC-0123 06/15/2018 2018/06/15 - Comment (57) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A528 NRC-0124 06/15/2018 2018/06/15 - Comment (58) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A529 NRC-0125 06/15/2018 2018/06/15 - Comment (59) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A533 NRC-0126 06/15/2018 2018/06/15 - Comment (60) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A534 NRC-0127 06/15/2018 2018/06/15 - Comment (61) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A535 NRC-0128 06/16/2018 2018/06/16 - Comment (62) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A536 NRC-0129 06/16/2018 2018/06/16 - Comment (63) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A537 NRC-0130 06/16/2018 2018/06/16 - Comment (64) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A539 NRC-0131 06/16/2018 2018/06/16 - Comment (65) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A541 NRC-0132 06/16/2018 2018/06/16 - Comment (66) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A542 NRC-0133 06/16/2018 2018/06/16 - Comment (67) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18179A543 NRC-0134 06/18/2018 2018/06/18 - Comment (68) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18180A000 NRC-0135 06/18/2018 2018/06/18 - Comment (69) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18180A001 NRC-0136 06/18/2018 2018/06/18 - Comment (70) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18180A002 NRC-0137 06/18/2018 2018/06/18 - Comment (71) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18180A003 NRC-0138 06/18/2018 2018/06/18 - Comment (72) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18180A004 NRC-0139 06/18/2018 2018/06/18 - Comment (73) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18180A005 NRC-0140 06/18/2018 2018/06/18 - Comment (74) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18180A007 Attachment 1 - Hearing File Index Initial Disclosures - May 10, 2019 ID# Document Title Accession Date Number NRC-0141 06/18/2018 2018/06/18 - Comment (75) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18180A008 NRC-0142 06/19/2018 2018/06/19 - Comment (76) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18180A009 NRC-0143 06/20/2018 2018/06/20 - Comment (109) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18180A424 NRC-0144 06/20/2018 2018/06/20 - Comment (77) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18180A010 NRC-0145 06/20/2018 2018/06/20 - Comment (78) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18180A011 NRC-0146 06/20/2018 2018/06/20 - Comment (79) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18180A012 NRC-0147 06/20/2018 2018/06/20 - Comment (80) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18180A013 NRC-0148 06/20/2018 2018/06/20 - Comment (81) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18180A014 NRC-0149 06/20/2018 2018/06/20 - Comment (82) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18180A015 NRC-0150 06/20/2018 Comment (16) of Bonnie Clancy on Turkey Point Nuclear Plant, Units 3 and 4. ML18177A180 NRC-0151 06/20/2018 Comment (29) of David C. Ritz on Behalf of Ocean Reef Community ML18197A072 Association on Florida Power & Light's Subsequent License Renewal Application for Turkey Point Nuclear Generating Station's Reactor Units 3 & 4.

NRC-0152 06/21/2018 2018/06/21 - Comment (100) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18180A075 NRC-0153 06/21/2018 2018/06/21 - Comment (101) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18180A076 NRC-0154 06/21/2018 2018/06/21 - Comment (102) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18180A105 NRC-0155 06/21/2018 2018/06/21 - Comment (103) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18180A109 NRC-0156 06/21/2018 2018/06/21 - Comment (104) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18180A110 NRC-0157 06/21/2018 2018/06/21 - Comment (105) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18180A118 NRC-0158 06/21/2018 2018/06/21 - Comment (106) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18180A120 NRC-0159 06/21/2018 2018/06/21 - Comment (83) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18180A016 NRC-0160 06/21/2018 2018/06/21 - Comment (84) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18180A017 NRC-0161 06/21/2018 2018/06/21 - Comment (85) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18180A018 NRC-0162 06/21/2018 2018/06/21 - Comment (86) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18180A019 Attachment 1 - Hearing File Index Initial Disclosures - May 10, 2019 ID# Document Title Accession Date Number NRC-0163 06/21/2018 2018/06/21 - Comment (87) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18180A020 NRC-0164 06/21/2018 2018/06/21 - Comment (88) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18180A023 NRC-0165 06/21/2018 2018/06/21 - Comment (89) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18180A026 NRC-0166 06/21/2018 2018/06/21 - Comment (90) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18180A031 NRC-0167 06/21/2018 2018/06/21 - Comment (91) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18180A035 NRC-0168 06/21/2018 2018/06/21 - Comment (92) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18180A046 NRC-0169 06/21/2018 2018/06/21 - Comment (93) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18180A051 NRC-0170 06/21/2018 2018/06/21 - Comment (94) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18180A054 NRC-0171 06/21/2018 2018/06/21 - Comment (95) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18180A055 NRC-0172 06/21/2018 2018/06/21 - Comment (96) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18180A057 NRC-0173 06/21/2018 2018/06/21 - Comment (97) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18180A058 NRC-0174 06/21/2018 2018/06/21 - Comment (98) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18180A059 NRC-0175 06/21/2018 2018/06/21 - Comment (99) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18180A074 NRC-0176 06/21/2018 2018/06/21 - Comment (E) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18219A165 NRC-0177 06/21/2018 2018-06 Comment A E-mail regarding TP 3&4 SLR EIS ML18183A016 Scoping_Redacted.

NRC-0178 06/21/2018 2018-06 Comment B E-mail regarding TP 3&4 SLR EIS ML18183A021 Scoping_Redacted.

NRC-0179 06/21/2018 Comment (17) of Mayor David Rice of Monroe County Board of County ML18177A181 Commissioners on Florida Power & Light Company; Turkey Point Nuclear Plant Units 3 and 4.

NRC-0180 06/21/2018 Comment (18) of Anonymous Regarding Florida Power & Light Company; ML18177A185 Turkey Point Nuclear Plant Units 3 and 4.

Attachment 1 - Hearing File Index Initial Disclosures - May 10, 2019 ID# Document Title Accession Date Number NRC-0181 06/21/2018 Comment (19) of Caroline McLaughlin on Turkey Point Nuclear Plant, Units 3 ML18177A186 and 4.

NRC-0182 06/21/2018 Comment (22) of Michael Hall on Florida Power & Light Company; Turkey Point ML18177A190 Nuclear Plant Units 3 and 4.

NRC-0183 06/21/2018 Comment (23) of Ken Rumelt, et al, on Turkey Point Nuclear Plant, Units 3 and ML18177A192 4.

NRC-0184 06/21/2018 Comment (24) of Albert Gomez on Florida Power & Light Company; Turkey ML18177A193 Point Nuclear Plant Units 3 and 4.

NRC-0185 06/21/2018 Comment (25) of Matthew Schwartz of South Florida Wildlands Association on ML18177A194 Florida Power & Light Company; Turkey Point Nuclear Plant Units 3 and 4.

NRC-0186 06/21/2018 Comment (31) of Lee N. Hefty on behalf of Miami-Dade County on Turkey Point ML18197A074 Units 3 and 4 on License Renewal Application.

NRC-0187 06/22/2018 2018/06/22 - Comment (107) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18180A175 NRC-0188 06/22/2018 2018/06/22 - Comment (108) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18180A176 NRC-0189 06/22/2018 Letter from the National Park Service (S. Craighead), to the NRC pertaining to ML18193B074 the Turkey Point, Units 3 and 4 Subsequent License Renewal.

NRC-0190 06/26/2018 2018/06/26 - Comment (111) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18183A482 NRC-0191 06/28/2018 Comment (26) of Patricia Milone on License Renewal for FPL's Turkey Point. ML18179A155 NRC-0192 06/28/2018 Comment (27) of Sylvia J. Murphy on License Renewal for FPL's Turkey Point. ML18179A156 NRC-0193 07/03/2018 2018/07/03 - Comment (112) E-mail regarding T.P. 3&4 SLR EIS Scoping ML18184A462 NRC-0194 07/03/2018 Comment (30) of Victoria L. Menchaca on Behalf of Seminole Tribe of Florida ML18197A073 Concerning the Environmental Review of Turkey Point Nuclear Plant, Units 3 and 4 Subsequent License Renewal Application.

Attachment 1 - Hearing File Index Initial Disclosures - May 10, 2019 ID# Document Title Accession Date Number NRC-0195 07/10/2018 Attachment P: Expert Report by Wilbur Mayorga re Site Assessment Report ML18213A435 Dated March 17, 2017.

NRC-0196 07/18/2018 Attachment M: Expert Reports from Lee Hefty. ML18213A432 NRC-0197 07/19/2018 July 2, 2018, Summary of Teleconference Between U.S. Nuclear Regulatory ML18190A179 Commission and The Seminole Nation of Oklahoma Regarding The Turkey Point Nuclear Generating Units 3 and 4 Subsequent License Renewal Application (EPID NO. L-2018-LNE-0001).

NRC-0198 07/20/2018 National Park Service Cooperating Agency Request for Subsequent License ML18197A294 Reenwal of Turkey Point Nuclear Generating Units 3 and 4 (EPID No. L 2018 LNE-0001).

NRC-0199 07/20/2018 Summary of the Site Environmental Audit Related to the Review of the ML18178A229 Subsequent License Renewal Application for Turkey Point Nuclear Generating Units 3 and 4 (EPID No. L-2018-LNE-0001).

NRC-0200 07/23/2018 05/31/2018 Summary of Public Scoping Meeting for the Environmental Review ML18176A403 of the Subsequent License Renewal Application for Turkey Point Nuclear Plant Units 3 and 4 (EPID No. L-2018-LNE-0001).

NRC-0201 07/23/2018 1st Amended Complaint 10-11-2016 (2). ML18204A185 NRC-0202 07/23/2018 Bill Powers Report with Attachments. ML18204A079 NRC-0203 07/23/2018 Documents provided by Laura Reynolds, Conservation Concepts, LLC, to the ML18187A037 U.S. Nuclear Regulatory Commission during the Turkey Point Nuclear Generating Units 3 and 4 Public Environmental Scoping Meeting on May 31, 2018.

NRC-0204 07/23/2018 Documents Provided by Zac Cosner, Conservation Concepts, LLC, to the U.S. ML18187A196 Nuclear Regulatory Commission During the Turkey Point Nuclear Generating Units 3 and 4 Public Environmental Scoping Meeting on May 31, 2018.

NRC-0205 07/23/2018 Edward Swakon PE Report and Figure 8. ML18204A088 Attachment 1 - Hearing File Index Initial Disclosures - May 10, 2019 ID# Document Title Accession Date Number NRC-0206 07/23/2018 EJ Wexler Report and Attachments. ML18204A119 NRC-0207 07/23/2018 Expert Report of William Nuttle. ML18204A146 NRC-0208 07/23/2018 Florida Keys Aqueduct Authority Press Release on March 3, 2018. ML18187A025 NRC-0209 07/23/2018 FPLs Turkey Point Nuclear Power Plant - Existing and Future Threats. ML18187A027 NRC-0210 07/23/2018 JW Fourqurean Expert Statement 5-14-2018 Final. ML18204A129 NRC-0211 07/23/2018 Kirk Martin Expert Report with Exhibits. ML18204A133 NRC-0212 07/23/2018 Larry Brand, Ph.D. Report and Attachments. ML18204A140 NRC-0213 07/23/2018 Monroe County Resolution. ML18187A034 NRC-0214 07/23/2018 Numeric Nutrient Criteria Violations. ML18187A028 NRC-0215 07/23/2018 Tritium Plume in Biscayne Bay. ML18187A029 NRC-0216 07/23/2018 Turkey Point 3 & 4 Cooling Tower Retrofit Is Feasible and Cost-Effective. ML18187A030 NRC-0217 07/23/2018 Water Gradient Charts. ML18187A032 NRC-0218 07/24/2018 Attachment H: Declaration of Philip Stoddard. ML18213A426 NRC-0219 07/24/2018 Transcripts for Public Meeting Regarding the Turkey Point SLRA Environmental ML18176A399 Scoping - Afternoon Session.

NRC-0220 07/24/2018 Transcripts for Public Meeting Regarding the Turkey Point SLRA Environmental ML18176A401 Scoping - Evening Session.

NRC-0221 07/26/2018 Attachment N: Declaration of Robert Kopp. ML18213A433 NRC-0222 07/28/2018 Attachment Q: Declaration of David A. Lochbaum. ML18213A436 NRC-0223 07/30/2018 2018/07/30 Turkey Point 3&4 - SLR - [External_Sender] Fwd: [EXTERNAL] FW: ML19077A088 Letter - Crandall - Rach 120 Extension Request FPL Attachment 1 - Hearing File Index Initial Disclosures - May 10, 2019 ID# Document Title Accession Date Number NRC-0224 07/30/2018 2018/07/30 Turkey Point 3&4 - SLR - [External_Sender] RE: Crocodile reports ML19077A114 NRC-0225 08/01/2018 Attachment O: Expert Report by David Chin - The Cooling-Canal System at FPL ML18213A434 Turkey Point Station.

NRC-0226 08/01/2018 Turkey Point Nuclear Plant, Units 3 & 4 - Subsequent License Renewal ML18214A171 Application.

NRC-0227 08/08/2018 L-2018-136-Attachment 19 Enclosure 1 - Expert Report of Ron Seagraves for ML18247A525 Southern Alliance for Clean Energy, et al. v. Florida Power & Light Co., Case No. 1:16-cv-23017 (S.D Fla.)

NRC-0228 08/08/2018 L-2018-136-Attachment 20 Enclosure 1 - E-Mail Re: Result of Least Tern ML18247A526 Survey at Turkey Point.

NRC-0229 08/08/2018 L-2018-136-Attachment 21 Enclosure 1 - Eastern Indigo Stake (Drymarchon ML18247A529 Couperi) M-Rc Survey Form Dated 06/20/2013.

NRC-0230 08/08/2018 L-2018-136-Attachment 21 Enclosure 2 - Eastern Indigo Snake (Drymarchon ML18247A530 Couperi) M-Rc Survey Form Dated 10/19/2016.

NRC-0231 08/08/2018 L-2018-136-Attachment 22 Enclosure 1 - FPL Response to NRC RAI No. SS- ML18247A531 FWS-3.

NRC-0232 08/08/2018 L-2018-136-Attachment 22 Enclosure 2 - 01/31/2017 Letter Submitting 2016 ML18247A532 Annual Report for the Federal Fish & Wildlife Endangered Species Permit.

NRC-0233 08/08/2018 L-2018-136-Attachment 22 Enclosure 3 - Submittal of Florida Power & Light ML18247A533 Company's 2017 Annual Report for the Federal Fish & Wildlife Endangered Species Permit.

NRC-0234 08/08/2018 L-2018-136-Attachment 22 Enclosure 4 - Spreadsheet. ML18247A534 NRC-0235 08/08/2018 L-2018-136-Attachment 28 Enclosure 1 - Figures, Page 1 of 60 through Page ML18247A536 60 of 60.

Attachment 1 - Hearing File Index Initial Disclosures - May 10, 2019 ID# Document Title Accession Date Number NRC-0236 08/08/2018 L-2018-136-Attachment 32 Enclosure 1 - Exhibit B Detailed Scope of Work ML18247A537 for Grounds Keeping Duties in Support of the Turkey Point Land Utilization Services and Cooling Canal System Maintenance Group.

NRC-0237 08/08/2018 L-2018-136-Attachment 43 Enclosure 1 - Submittal of FPL Turkey Point, Unit 5 ML18247A540 Groundwater Monitoring Plan Thirty-Ninth Quarterly Well Report.

NRC-0238 08/08/2018 L-2018-136-Attachment 43 Enclosure 11 - FPL Turkey Point Unit 5 ML18247A550 Groundwater Monitoring Plan Forty-Seventh Quarterly Well Report.

NRC-0239 08/08/2018 L-2018-136-Attachment 43 Enclosure 14 - South Florida Water Management ML18247A553 District Pumpage Report for Water Use Permit.

NRC-0240 08/08/2018 L-2018-136-Attachment 43 Enclosure 15 - FPL Turkey Point Unit 5 Quarterly ML18247A554 Well Report.

NRC-0241 08/08/2018 L-2018-136-Attachment 43 Enclosure 16 - South Florida Water Management ML18247A555 District Pumpage Report for Water Use Permit.

NRC-0242 08/08/2018 L-2018-136-Attachment 43 Enclosure 17 - South Florida Water Management ML18247A556 District Pumpage Report for Water Use Permit.

NRC-0243 08/08/2018 L-2018-136-Attachment 43 Enclosure 18 - South Florida Water Management ML18247A557 District Pumpage Report for Water Use Permit.

NRC-0244 08/08/2018 L-2018-136-Attachment 43 Enclosure 19 - South Florida Water Management ML18247A558 District Pumpage Report for Water Use Permit.

NRC-0245 08/08/2018 L-2018-136-Attachment 43 Enclosure 2 - Submittal of FPL Turkey Point, Unit 5 ML18247A541 Groundwater Monitoring Plan Fortieth Quarterly Well Report.

NRC-0246 08/08/2018 L-2018-136-Attachment 43 Enclosure 20 - Upper Floridan Freshening Wells. ML18247A559 NRC-0247 08/08/2018 L-2018-136-Attachment 43 Enclosure 3 - Submittal of FPL Turkey Point, Unit 5 ML18247A542 Groundwater Monitoring Plan Forty-First Quarterly Well Report.

Attachment 1 - Hearing File Index Initial Disclosures - May 10, 2019 ID# Document Title Accession Date Number NRC-0248 08/08/2018 L-2018-136-Attachment 43 Enclosure 4 - Submittal of FPL Turkey Point, Unit 5 ML18247A543 Groundwater Monitoring Plan Forty-Second Quarterly Well Report.

NRC-0249 08/08/2018 L-2018-136-Attachment 43 Enclosure 5 - Submittal of FPL Turkey Point, Unit 5 ML18247A544 Groundwater Monitoring Plan Forty-Third Quarterly Well Report.

NRC-0250 08/08/2018 L-2018-136-Attachment 43 Enclosure 6 - FPL Turkey Point Unit 5 Groundwater ML18247A545 Monitoring Plan Forty-Fourth Quarterly Well Report.

NRC-0251 08/08/2018 L-2018-136-Attachment 43 Enclosure 7 - FPL Turkey Point Unit 5 Groundwater ML18247A546 Monitoring Plan Forty-Fifth Quarterly Well Report.

NRC-0252 08/08/2018 L-2018-136-Attachment 43 Enclosure 8 - Florida Power & Light Company - ML18247A547 Conditions of Certification PA 03-45E for Turkey Point Units 3-5.

NRC-0253 08/08/2018 L-2018-136-Attachment 43 Enclosure 9 - FPL Turkey Point Unit 5 Groundwater ML18247A548 Monitoring Plan Forty-Sixth Quarterly Well Report.

NRC-0254 08/08/2018 L-2018-136-Attachment 44 Enclosure 1 - Cumulative Hypersaline Groundwater ML18247A563 Withdrawals.

NRC-0255 08/08/2018 L-2018-136-Attachment 46 Enclosure 1 - Letter from Bob Bertelson, FLP dated ML18247A564 March 25, 2016 on Total Suspended Solids to Florida Dept. of Environmental Protection.

NRC-0256 08/08/2018 L-2018-136-Attachment 46 Enclosure 2 - Letter from Miami-Dade County, Dept. ML18247A565 of Regulatory and Economic Resources dated July 10, 2018 on Site Assessment Report.

NRC-0257 08/08/2018 L-2018-136-Attachment 5 Enclosure 1 - Joint Application for Individual ML18247A510 Environmental Resource Permit/Authorization to Use State-Owned Submerged Lands/Federal Dredge and Fill Permit.

NRC-0258 08/08/2018 L-2018-136-Attachment 5 Enclosure 4 - Florida Department of Environmental ML18247A513 Protection Letter Submitting Environmental Resource Permit No. 13-0127512-013.

Attachment 1 - Hearing File Index Initial Disclosures - May 10, 2019 ID# Document Title Accession Date Number NRC-0259 08/08/2018 L-2018-136-Attachment 5 Enclosure 5 - FPL Turkey Point Cooling Canal ML18247A514 System Characterization Study.

NRC-0260 08/08/2018 L-2018-136-Attachment 53 Enclosure 1 - Slides and Presentations. ML18247A566 NRC-0261 08/08/2018 L-2018-136-Attachment 53 Enclosure 2 - Graphical Table. ML18247A567 NRC-0262 08/08/2018 L-Turkey Point Units 3 and 4 - Subsequent License Renewal Application - ML18247A509 Environmental Report Requests for Additional Information Responses.

NRC-0263 09/11/2018 Letter from U.S. Fish and Wildlife Service Re: Federally Threatened and ML18254A347 Endangered Species Near Turkey Point.

NRC-0264 09/15/2018 Requests for Additional Information for The Turkey Point Subsequent License ML18248A160 Renewal Application - Environmental Set 3 (EPID No. L-2018-LNE-0001) -

enclosure NRC-0265 09/18/2018 08/28/2018 Summary of Meeting to Discuss Turkey Point Subsequent License ML18247A301 Renewal Application Review - Discussion of Responses to Two Environmental Requests for Additional Information - HC-7 and WR-2 (EPID No. L-2018-LNE-0001).

NRC-0266 09/27/2018 Teleconference Summary with NRC and FWS Re Species under Joint NMFS ML18270A154 and FWS Jurisdiction for Turkey Point Subsequent License Renewal.

NRC-0267 10/05/2018 Enclosure 1: Turkey Point, Units 3 and 4, Recovery Well System Startup ML19095B382 Report.

NRC-0268 10/05/2018 Turkey Point, Units 3 and 4, Responses to Requests for Additional Information ML18283A310 for Subsequent License Renewal Application Environmental Review.

NRC-0269 10/08/2018 Enclosure 2: Turkey Point, Units 3 and 4, Response to Miami Dade County July ML19095B384 10, 2018 Letter Regarding the Site Assessment Report (SAR) dated March 17, 2017 and the SAR Supplemental Information submittal dated November 11, 2017.

Attachment 1 - Hearing File Index Initial Disclosures - May 10, 2019 ID# Document Title Accession Date Number NRC-0270 10/26/2018 2018/10/26 Turkey Point 3&4 - SLR - [External_Sender] Re: [EXTERNAL] ML19077A101 Crocodile Takes at Turkey Point NRC-0271 11/28/2018 Comment (32) Of Virginia A. Panico, On Behalf Of The Greater Key West ML18355A198 Chamber Of Commerce, On Florida Power & Light's Subsequent License Renewal Application for Turkey Point Nuclear Generating Station, Units 3 & 4.

NRC-0272 11/28/2018 Turkey Point, Units 3 and 4, Supplemental Response to Request for Additional ML18334A101 Information (RAI) Set 1, Subsequent License Renewal Application Environmental Review.

NRC-0273 11/30/2018 Memo of Understanding between NRC and U.S. National Park Service ML18355A847 NRC-0274 12/14/2018 Enclosures 6 & 7: Turkey Point, Units 3 and 4, Recovery Well System (RWS) ML19095B428 Second and Third Quarter Status Reports; DERM File Number HWR-851.

NRC-0275 12/14/2018 U.S. Fish and Wildlife Service Turkey Point FWS Updated List of Threatened ML19078A292 and Endangered Species For Subsequent License Renewal.

NRC-0276 12/19/2018 NRC to FWS Request for Formal Consultation and Concurrence with NLAA ML18333A205 Determination Turkey Point SLR.

NRC-0277 12/26/2018 06/18/18 Summary Of Interagency Meeting Related To Subsequent License ML18360A445 Renewal For Turkey Point Nuclear Generating Unit Nos. 3 And 4.

NRC-0278 12/27/2018 Enclosure 4: Turkey Point Units 3 and 4, Florida Department of Environmental ML19095B424 Protection (FDEP) Notice of Draft National Pollutant Discharge Elimination System (NPDES) Permit No. FL0001562 Renewal.

NRC-0279 12/31/2018 Biological Assessment for the Turkey Point Units 3 and 4 Proposed Subsequent ML18353A835 License Renewal.

NRC-0280 12/31/2018 Enclosure 3: Turkey Point Units 3 and 4, 2018 Annual Remediation/Restoration ML19095B494 Report.

Attachment 1 - Hearing File Index Initial Disclosures - May 10, 2019 ID# Document Title Accession Date Number NRC-0281 01/07/2019 Approval Of A Memorandum Of Understanding Between The U.S. National ML18355A846 Park Service and The U.S. Nuclear Regulatory Commission On The Environmental Review Of The Turkey Point Nuclear Generating Units 3 and 4 Subsequent License Renewal Application.

NRC-0282 01/07/2019 Issuance of Environmental Scoping Summary Report Associated with the ML18342A013 Staff's Review of the Turkey Point Nuclear Generating Units 3 and 4 Subsequent License Renewal Application (EPID No. L-2018-LNE-0001).

NRC-0283 01/23/2019 Turkey Point, Units 3 and 4, Subsequent License Renewal Application ML19025A077 Environmental Report Environmental Authorizations Updated Information.

NRC-0284 01/31/2019 Enclosure 5: Turkey Point, Units 3 and 4, 2018 Annual American Crocodile ML19095B426 (Crocodylus Acutus) Report Federal Permit TE092945-3 (in renewal).

NRC-0285 01/31/2019 Environmental Scoping Summary Report Associated with the Staff's Review of ML18342A014 the Turkey Point Nuclear Generating Units 3 and 4 Subsequent License Renewal Application (EPID No. L-2018-LNE-0001).

NRC-0286 03/05/2019 National Park Service, Southeast Regional Office, Comments dated March 5, ML19072A162 2019, on Turkey Point Nuclear Generating Units 3 and 4 Preliminary Draft SEIS Regarding Subsequent License Renewal.

NRC-0287 03/12/2019 2019/03/12 Turkey Point 3&4 - SLR - [External_Sender] RE: Snail kites in ML19077A093 everglades mitigation bank NRC-0288 03/25/2019 2019/03/25 Turkey Point 3&4 - SLR - [External_Sender] RE: turkey point ML19085A158 requested conservation measures NRC-0289 03/25/2019 2019/03/25 Turkey Point 3&4 - SLR - RE: turkey point requested conservation ML19092A350 measures NRC-0290 03/27/2019 2019/03/27 Turkey Point 3&4 - SLR - FW: Transmittal of Draft Environmental ML19086A361 Audit Needs List Attachment 1 - Hearing File Index Initial Disclosures - May 10, 2019 ID# Document Title Accession Date Number NRC-0291 03/31/2019 NUREG-1437 DFC, Supplement 5, Second Renewal, "Generic Environmental ML19078A330 Impact Statement for License Renewal of Nuclear Plants - Supplement 5, Second Renewal - Regarding Subsequent License Renewal for Turkey Point Nuclear Generating Unit Nos. 3 and 4."

NRC-0292 04/01/2019 2019/04/01 Turkey Point 3&4 - SLR - FYI: Turkey Point SLR Consultations with ML19092A167 NMFS NRC-0293 04/01/2019 FRN - Notice of Availability of the Draft Supplement 5, Second Renewal, To the ML19007A022 Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Turkey Point Nuclear Generating Unit Nos. 3 and 4 (EPID No.

L-2018-LNE-0001)

NRC-0294 04/01/2019 Notice of Availability of the Draft Supplement 5, Second Renewal, To the ML19007A017 Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Turkey Point Nuclear Generating Unit Nos. 3 and 4 (EPID No.

L-2018-LNE-0001).

NRC-0295 04/01/2019 Turkey Point Units 3 and 4 Subsequent License Renewal Application -First ML19093A060 Annual Update.

NRC-0296 04/03/2019 Notice Of Availability Of The Draft Supplemental Environmental Impact ML19066A301 Statement For Subsequent License Renewal Of Turkey Point Nuclear Plant, Units 3 and 4 For Public Comment - ACHP.

NRC-0297 04/03/2019 Notice Of Availability Of The Draft Supplemental Environmental Impact ML19066A300 Statement For Subsequent License Renewal Of Turkey Point Nuclear Plant, Units 3 and 4 For Public Comment - County.

NRC-0298 04/03/2019 Notice Of Availability Of The Draft Supplemental Environmental Impact ML19066A302 Statement For Subsequent License Renewal Of Turkey Point Nuclear Plant, Units 3 and 4 For Public Comment - SHPO.

NRC-0299 04/03/2019 Notice Of Availability Of The Draft Supplemental Environmental Impact ML19066A303 Statement For Subsequent License Renewal Of Turkey Point Nuclear Plant, Units 3 and 4 For Public Comment - Tribal.

Attachment 1 - Hearing File Index Initial Disclosures - May 10, 2019 ID# Document Title Accession Date Number NRC-0300 04/03/2019 Turkey Point, Units 3 and 4, Subsequent License Renewal Application ML19095B380 Environmental Report Additional Information.

NRC-0301 04/08/2019 2019/04/08 Turkey Point 3&4 - SLR - REQUEST: FPL review of crocodile injury ML19120A541 and mortality data for FWS NRC-0302 04/18/2019 Turkey Point Units 3 and 4 Subsequent License Renewal Application FPL ML19112A023 Comments Regarding the NRC Biological Assessment.

NRC-0303 04/22/2019 2019/04/22 Turkey Point 3&4 - SLR - [External_Sender] Re: [EXTERNAL] RE: ML19120A393 Follow up from Turkey Point meeting NRC-0304 04/22/2019 2019/04/22 Turkey Point 3&4 - SLR - [External_Sender] Re: Re: [EXTERNAL] ML19120A376 RE: Follow up from Turkey Point meeting NRC-0305 04/22/2019 2019/04/22 Turkey Point 3&4 - SLR - RE: Follow up from Turkey Point meeting ML19120A411 NRC-0306 04/22/2019 2019/04/22 Turkey Point 3&4 - SLR - RE: Re: [EXTERNAL] RE: Follow up from ML19120A391 Turkey Point meeting NRC-0307 04/25/2019 2019/04/25 Turkey Point 3&4 - SLR - [External_Sender] RE: crocodile condition ML19120A565 and distribution NRC-0308 05/07/2019 2019/05/07 Turkey Point 3&4 - SLR - FW: NPS NPDES Comment Letter ML19127A027 Attachment 2 - Proprietary Log Initial Disclosures - May 10, 2019 ID# Accession Author Title Document Document Type Addressee Estimated Number Name & Date Name & Page Affiliation Affiliation Count NRC- ML18037A842 Florida Enclosure 5 - 10 CFR 2.390 01/30/2018 License-Application for NRC/NRR 2474 0001P Power & Withheld Proprietary Facility Operating License Light Co. Documents. (Amend/Renewal)

NRC- ML18037A838 Florida Enclosure 3 - Turkey Point 01/31/2018 License-Application for NRC/NRR 1907 0002P Power & Nuclear Plant Units 3 and 4 Facility Operating License Light Co. Subsequent License Renewal (Amend/Renewal)

Application.

NRC- ML18053A138 Florida Turkey Point, Units 3 and 4, 02/16/2018 Calculation NRC/NRR 17 0003P Power & Subsequent License Renewal Report, Technical Light Co. Application - Supplement 2 (Proprietary)

NRC- ML18072A236 Florida Turkey Point Units 3 and 4, 02/28/2018 License-Application for NRC/NRR 1907 0004P Power & Subsequent License Renewal Facility Operating License Light Co. Application. (Amend/Renewal)

Report, Technical NRC- ML18072A231 Florida Turkey Point Units 3 and 4, 02/28/2018 License-Application for NRC/NRR 23 0005P Power & Subsequent License Renewal Facility Operating License Light Co. Application - Section 4 - Time- (Amend/Renewal)

Limited Aging Analyses. Report, Technical Attachment 2 - Proprietary Log Initial Disclosures - May 10, 2019 NRC- ML18113A167 Florida Turkey Point, Units 3 and 4 - 04/30/2018 License-Application for NRC/NRR 2477 0006P Power & Enclosure 5 to L-2018-082, 10 Facility Operating License Light Co. CFR 2.390 Withheld (Amend/Renewal)

Proprietary Documents.

May 8, 2019 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of FLORIDA POWER & LIGHT COMPANY Docket Nos. 50-250-SLR 50-251-SLR (Turkey Point Nuclear Generating Units 3 and 4)

AFFIDAVIT OF MANNY COMAR CONCERNING MANDATORY DISCLOSURE REQUIREMENTS I, Manny Comar, do hereby state as follows:

1. I am employed as a Senior Project Manager in the U.S. Nuclear Regulatory Commissions Office of New Reactors. Among other things, I have been assisting the NRC staff with the preparation of the hearing file and mandatory disclosures in connection with the subsequent license renewal application at issue in this proceeding.
2. I hereby certify that all materials required to be disclosed pursuant to 10 C.F.R.

§§ 2.336 and 2.1203 and the Atomic Safety and Licensing Boards Initial Scheduling Order of March 21, 2019 in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete for documents identified as of April 30, 2019.

3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information, and belief.

Executed in Accord with 10 CFR 2.304(d)

Manny Comar Senior Project Manager U.S. Nuclear Regulatory Commission Washington, DC 20555 Telephone: (301) 415-3863 Email: Manny.Comar@nrc.gov Executed in Rockville, Maryland this 8th day of May, 2019

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of FLORIDA POWER & LIGHT COMPANY Docket Nos. 50-250-SLR 50-251-SLR (Turkey Point Nuclear Generating Units 3 and 4)

CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305, I hereby certify that copies of the foregoing Letter to the Atomic Safety and Licensing Board regarding the Hearing File, including: Attachment 1 - Hearing File Index; Attachment 2 - Proprietary Log; and Affidavit of Manny Comar, have been filed through the Electronic Information Exchange, the NRCs E-Filing System, in the above-captioned proceeding, this 10th day of May 2019.

Copies of the foregoing have also been sent by e-mail to Richard E. Ayres, Esq. (for Friends of the Earth, Inc.) at ayresr@ayreslawgroup.com, this 10th day of May 2019.

/Signed (electronically) by/

Jeremy L. Wachutka Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O14-A44 Washington, DC 20555 Telephone: (301) 287-9188 E-mail: Jeremy.Wachutka@nrc.gov Dated at Rockville, Maryland this 10th day of May 2019