Letter Sequence Approval |
---|
|
|
MONTHYEARML18030A4281998-07-0808 July 1998 Requests Addl Info Re Revised Relief Request in Response to NRC SE for SSES Units 1 & 2,inservice Testing Program Project stage: Approval ML17164A9641999-02-23023 February 1999 Forwards SER Granting Util Relief Request 24 from Certain ASME Code Inservice Testing Requirements for Testing of Emergency Condenser Water Circulating Water Pumps & Core Spray Keepfill Check Valves,Respectively Project stage: Approval 1998-07-08
[Table View] |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARPLA-5120, Forwards Change J to SSES Security Training & Qualification Plan.Without Encl1999-10-22022 October 1999 Forwards Change J to SSES Security Training & Qualification Plan.Without Encl ML17165A0451999-10-21021 October 1999 Responds to Requesting Exemption from Requirement of 10CFR50,App E,Items IV.F.2.b & C Re Conduct of Full Participation Exercise of Onsite & Offsite Emergency Plans at Plant.Exemption Granted ML17165A0491999-10-19019 October 1999 Forwards NRC Rept 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exams for Operators & Record Requal Pass Dates ML17146B2331999-10-14014 October 1999 Ack Receipt of Inputs & Comments Re Susquehanna Steam Electric Station Units 1 & 2 Provided by Email Dtd 990908. Informs That Info Provided Forwarded to Region I Ofc for Consideration & Appropriate Action If Necessary ML17165A0421999-10-0707 October 1999 Forwards Insp Repts 50-387/99-08 & 50-388/99-08 on 990706-0902.No Violations Noted.Concluded That Staff Properly Demonstrated Equipment,Procedures & Training of ISFSI Work Team Members ML17146B2271999-10-0606 October 1999 Forwards Exam Repts 50-387/99-302 & 50-388/99-302 on 990921 (Administration) & 21-30 (Grading).Two SRO Applicants Passed Written Retake Exam ML17146B2251999-10-0404 October 1999 Informs of Individual Exam Results for Applicants on Initial Retake Exam Conducted on 990921,at Susquehanna Steam Electric Station.Without Encl ML17146B2181999-09-30030 September 1999 Forwards Insp Repts 50-387/99-07 & 50-388/99-07 on 990720-0828.NRC Determined That Two Severity Level IV Violations of NRC Requirements Occurred.Violations Being Treated as non-cited Violations ML17146B2231999-09-30030 September 1999 Informs That on 990913,NRC Staff Completed mid-cycle Plant Performance Review (PPR) of Facility.Staff Conducted Reviews of All Operating NPPs to Integrate Performance Info & Plant for Insp Activities at Facility Though 000331 ML17146B2161999-09-24024 September 1999 Informs of Completion of Licensing Action for GL 98-01,Suppl 1, Y2K Readiness of Compturer Systems at Nuclear Power Plants for Sses,Units 1 & 2 ML17146B2131999-09-24024 September 1999 Forwards Exemption from Requirements of 10CFR50,App E, Sections IV.F.2.b & C Re Conduct of full-participation Exercise on 991115 at Susquehanna Steam Electric Station, Units 1 & 2 ML17146B2091999-09-21021 September 1999 Informs of Completion of Review of PP&L Ltr Dtd 990611, Proposing Change EAL for Gaseous Effluents to Be Consistent with Guidance in NUMARC/NESP-007 (Rev 2), Methodology for Development of Eals. Forwards SE Supporting Changes ML17146B2051999-09-13013 September 1999 Informs That RM Fry & Bj Willie Are Approved to Take Initial Written Exam Only on 990921 ML18040B2951999-09-0808 September 1999 Requests Info Re Any NRC or Susquehanna Documented Concerns with MSIV Reliability Prior to Plant Trip & Assurance to Public That NRC Able to Detect Mgt Problems Early PLA-5094, Forwards,For Review,Change 00 to SSES Physical Security Plan.Without Encl1999-08-24024 August 1999 Forwards,For Review,Change 00 to SSES Physical Security Plan.Without Encl ML17146B1791999-08-18018 August 1999 Forwards Insp Repts 50-387/99-06 & 50-388/99-06 on 990608- 0719.One Violation Noted & Treated as Non-Cited Violation Involved Failure to Make Notifications to NRC within Required Time ML17146B1571999-07-23023 July 1999 Confirms Telcon on 990721 Between J Caruso & a Fitch Re Arrangements Made for Administration of Written Exam at Facility,During Week of 990920 ML17146B1491999-07-12012 July 1999 Discusses Response to Request for Addl Info Re GL 92-01, Rev 1,supp 1, Reactor Vessel Structural Integrity ML17165A0361999-07-0808 July 1999 Discusses Request for Withholding Info from Public Disclosure.Nrc Will Destroy 990331 Request,Since New Request Fully Addresses Section 2.790 of Rept & 990331 Request Does Not PLA-5082, Forwards Rev 30 to SSES Emergency Plan, Adding EAL to Account for Potential Conditions Associated with Dry Cask Storage Sys Being Installed at Plant1999-07-0808 July 1999 Forwards Rev 30 to SSES Emergency Plan, Adding EAL to Account for Potential Conditions Associated with Dry Cask Storage Sys Being Installed at Plant ML17165A0201999-07-0101 July 1999 Advises That Info Contained in 990520 Application & Affidavit Re Allegheny Electric Cooperative,Inc Decommissioning Status Rept Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML17165A0191999-06-30030 June 1999 Forwards Completion of Licensing Action for Bulletin 96-003, Potential Plugging of Emergency Core Cooling Suction Strainers by Debris in Boiling-Water Reactors, for Plant, Units 1 & 2 ML17165A0271999-06-29029 June 1999 Forwards Insp Repts 50-387/99-05 & 50-388/99-05 on 990427-0607.Three Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML17165A0051999-06-18018 June 1999 Forwards Results of Senior Operator Initial Exam Repts 50-387/99-301 & 50-388/99-301 on 990510-28 ML17164B0661999-06-10010 June 1999 Discusses Individual Exam Results for PP&L Applicants on Initial Exam Conducted on 990507 & 990510-13 at Susquehanna Steam Electric Station.Informs That Three Applicants Passed & Two Applicants Failed Exam.Without Encls ML20207G5051999-06-0707 June 1999 Informs That NRC Office of NRR Reorganized Effective 990328.As Part of Reorganization,Divison of Licensing Project Management Created ML17164B0671999-06-0404 June 1999 Forwards Insp Repts 50-387/99-04 & 50-388/99-04 on 990316-0426.Two Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy PLA-5072, Forwards Change Nn to SSES Physical Security Plan.Util Determined That Changes Do Not Decrease Safeguards Effectiveness of Plan,Per 10CFR50.54(p).Encl Withheld from Public Disclosure,Per 10CFR73.211999-06-0404 June 1999 Forwards Change Nn to SSES Physical Security Plan.Util Determined That Changes Do Not Decrease Safeguards Effectiveness of Plan,Per 10CFR50.54(p).Encl Withheld from Public Disclosure,Per 10CFR73.21 ML17164B0591999-05-26026 May 1999 Forwards RAI Re GL 95-07,pressure Locking & Thermal Binding of safety-related Power Operated Gate Valves ML17164B0581999-05-25025 May 1999 Submits Request for Addl Info Re Exemption to Delay Schedule for Biennial Exercise Beyond 2 Years,For Plant,Units 1 & 2 ML17164B0571999-05-25025 May 1999 Informs That Util 990329 Submittal, Decommissioning Rept for Unit 1 & 2 of Susquehanna Steam Electric Station, Will Be Marked Proprietary & Be Withheld from Public Disclosure Pursuant to 10CFR2.709(b)(5) & Section 103(b) ML17164B0551999-05-25025 May 1999 Forwards Request for Addl Info Re Licensee 981120 Amends Request for Licenses NPF-14 & NPF-22 Respectively.Amends Change TSs of Both Units to Allow Increases in Min Vol of Fuel Oil to Be Stored in Day Tanks for EDGs ML17164B0561999-05-24024 May 1999 Discusses OI Investigation 1-1998-016 to Determine If Former PP&L Engineering Dept Manager Terminated for Raising Safety Concerns.Oi Did Not Substantiate That Termination Result of Individual Having Raised Safety Concerns.Synopsis Encl PLA-5067, Submits Response to RAI Re Exemption from Biennial Exercise Schedule.Changing of Drill Date Will Not Reduce Level of Emergency Preparedness at Plant1999-05-24024 May 1999 Submits Response to RAI Re Exemption from Biennial Exercise Schedule.Changing of Drill Date Will Not Reduce Level of Emergency Preparedness at Plant ML20195B2181999-05-20020 May 1999 Forwards Proprietary Decommissioning Status Rept for 10% Interest in Sses,Units 1 & 2.Proprietary Info Withheld,Per 10CFR2.790 ML17164B0361999-05-0404 May 1999 Informs That Licensee Authorized to Administer Initial Written Exam to Listed Applicants on 990507.NRC Region I Operator Licensing Staff Will Administer Operating Test to Applicants PLA-5052, Forwards Summary Rept of Safety Evaluations Approved During Period from 961024-981029,per 10CFR50.59(b).Format of Rept, Listed1999-04-30030 April 1999 Forwards Summary Rept of Safety Evaluations Approved During Period from 961024-981029,per 10CFR50.59(b).Format of Rept, Listed ML17164B0251999-04-27027 April 1999 Forwards SER Which Documents Staff Findings & Conclusions of Review of Susquehanna Steam Electric Station Individual Plant Exam of External Events Submittal.Also Included Contractor Technical Evaluation Rept & Suppl TER ML17164B0201999-04-19019 April 1999 Forwards Insp Repts 50-387/99-03 & 50-388/99-03 on 990202- 0315.Violations Identified Involving Core Spray Sys Surveillance Tests & Radiation Monitors on Residual Heat Removal SWS Being Treated as non-cited Violations ML17164B0061999-04-12012 April 1999 Forwards Request for Addl Info Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML17164B0031999-04-0909 April 1999 Forwards Suppl SE Re GL 92-08,ampacity Derating Issues Due to Application of Thermo-Lag Fire Barriers.Ampacity Derating Issues Defined in GL Resolved ML17164B0071999-04-0909 April 1999 Discusses Susquehanna Steam Electric Station Plant Performance Review Conducted for Period April 1998 Through 990115 & Informs of NRC Planned Insp Effort Resulting from Review.Historial Listing & Insp Plans Through Jan 2000 Encl ML17164B0001999-04-0505 April 1999 Forwards Insp Repts 50-387/99-02 & 50-388/99-02 on 990119- 29.No Violations Noted.Insp Covered Review of Corrective Action Program & Actions Taken in Response to GL 96-01 Re Testing of Safety Related Logic PLA-5041, Forwards Proprietary & Redacted Decommissioning Rept of Financial Assurance for Util 90% Interest in Sses,Units 1 & 2,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per 10CFR2.7901999-03-29029 March 1999 Forwards Proprietary & Redacted Decommissioning Rept of Financial Assurance for Util 90% Interest in Sses,Units 1 & 2,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per 10CFR2.790 IR 05000387/19980121999-03-26026 March 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-387/98-12 & 50-388/98-12 .Corrective Actions Will Be Examined During Future Insp ML17164A9911999-03-25025 March 1999 Informs of Completion of Review of PP&L 980804 Requests for Relief RR-14,RR-15,RR-16 & RR-17 Which Sought Relief from ASME BPV Code Requirements for Sses.Forwards SE Supporting RR-14,RR-15 & RR-16.RR-17 Denied ML17164A9891999-03-12012 March 1999 Informs That Util (PLA-5040) Submitted to NRC, Missing Encl C.Requests to Replace Package in Entirety with Encl PLA-5040, Forwards Revised Proposed Amend 227 to License NPF-14, Proposing Changes to ANFB-10 Critical Power Correlation & MCPR Safety Limits1999-03-12012 March 1999 Forwards Revised Proposed Amend 227 to License NPF-14, Proposing Changes to ANFB-10 Critical Power Correlation & MCPR Safety Limits ML18040A9721999-03-11011 March 1999 Requests That Date for full-participation SSES Exercise, Scheduled for Week of 991115,be Changed Due to FEMA Region III Scheduling Conflicts.Fema Requests That Exercise Date Be Changed to Week of 001031 IR 05000387/19980091999-03-0505 March 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-387/98-09 & 50-388/98-09 Issued on 981019.Violations D & F Are More Appropriately Classified as Minor Violations 1999-09-08
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML17165A0451999-10-21021 October 1999 Responds to Requesting Exemption from Requirement of 10CFR50,App E,Items IV.F.2.b & C Re Conduct of Full Participation Exercise of Onsite & Offsite Emergency Plans at Plant.Exemption Granted ML17165A0491999-10-19019 October 1999 Forwards NRC Rept 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exams for Operators & Record Requal Pass Dates ML17146B2331999-10-14014 October 1999 Ack Receipt of Inputs & Comments Re Susquehanna Steam Electric Station Units 1 & 2 Provided by Email Dtd 990908. Informs That Info Provided Forwarded to Region I Ofc for Consideration & Appropriate Action If Necessary ML17165A0421999-10-0707 October 1999 Forwards Insp Repts 50-387/99-08 & 50-388/99-08 on 990706-0902.No Violations Noted.Concluded That Staff Properly Demonstrated Equipment,Procedures & Training of ISFSI Work Team Members ML17146B2271999-10-0606 October 1999 Forwards Exam Repts 50-387/99-302 & 50-388/99-302 on 990921 (Administration) & 21-30 (Grading).Two SRO Applicants Passed Written Retake Exam ML17146B2251999-10-0404 October 1999 Informs of Individual Exam Results for Applicants on Initial Retake Exam Conducted on 990921,at Susquehanna Steam Electric Station.Without Encl ML17146B2231999-09-30030 September 1999 Informs That on 990913,NRC Staff Completed mid-cycle Plant Performance Review (PPR) of Facility.Staff Conducted Reviews of All Operating NPPs to Integrate Performance Info & Plant for Insp Activities at Facility Though 000331 ML17146B2181999-09-30030 September 1999 Forwards Insp Repts 50-387/99-07 & 50-388/99-07 on 990720-0828.NRC Determined That Two Severity Level IV Violations of NRC Requirements Occurred.Violations Being Treated as non-cited Violations ML17146B2161999-09-24024 September 1999 Informs of Completion of Licensing Action for GL 98-01,Suppl 1, Y2K Readiness of Compturer Systems at Nuclear Power Plants for Sses,Units 1 & 2 ML17146B2131999-09-24024 September 1999 Forwards Exemption from Requirements of 10CFR50,App E, Sections IV.F.2.b & C Re Conduct of full-participation Exercise on 991115 at Susquehanna Steam Electric Station, Units 1 & 2 ML17146B2091999-09-21021 September 1999 Informs of Completion of Review of PP&L Ltr Dtd 990611, Proposing Change EAL for Gaseous Effluents to Be Consistent with Guidance in NUMARC/NESP-007 (Rev 2), Methodology for Development of Eals. Forwards SE Supporting Changes ML17146B2051999-09-13013 September 1999 Informs That RM Fry & Bj Willie Are Approved to Take Initial Written Exam Only on 990921 ML17146B1791999-08-18018 August 1999 Forwards Insp Repts 50-387/99-06 & 50-388/99-06 on 990608- 0719.One Violation Noted & Treated as Non-Cited Violation Involved Failure to Make Notifications to NRC within Required Time ML17146B1571999-07-23023 July 1999 Confirms Telcon on 990721 Between J Caruso & a Fitch Re Arrangements Made for Administration of Written Exam at Facility,During Week of 990920 ML17146B1491999-07-12012 July 1999 Discusses Response to Request for Addl Info Re GL 92-01, Rev 1,supp 1, Reactor Vessel Structural Integrity ML17165A0361999-07-0808 July 1999 Discusses Request for Withholding Info from Public Disclosure.Nrc Will Destroy 990331 Request,Since New Request Fully Addresses Section 2.790 of Rept & 990331 Request Does Not ML17165A0201999-07-0101 July 1999 Advises That Info Contained in 990520 Application & Affidavit Re Allegheny Electric Cooperative,Inc Decommissioning Status Rept Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML17165A0191999-06-30030 June 1999 Forwards Completion of Licensing Action for Bulletin 96-003, Potential Plugging of Emergency Core Cooling Suction Strainers by Debris in Boiling-Water Reactors, for Plant, Units 1 & 2 ML17165A0271999-06-29029 June 1999 Forwards Insp Repts 50-387/99-05 & 50-388/99-05 on 990427-0607.Three Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML17165A0051999-06-18018 June 1999 Forwards Results of Senior Operator Initial Exam Repts 50-387/99-301 & 50-388/99-301 on 990510-28 ML17164B0661999-06-10010 June 1999 Discusses Individual Exam Results for PP&L Applicants on Initial Exam Conducted on 990507 & 990510-13 at Susquehanna Steam Electric Station.Informs That Three Applicants Passed & Two Applicants Failed Exam.Without Encls ML20207G5051999-06-0707 June 1999 Informs That NRC Office of NRR Reorganized Effective 990328.As Part of Reorganization,Divison of Licensing Project Management Created ML17164B0671999-06-0404 June 1999 Forwards Insp Repts 50-387/99-04 & 50-388/99-04 on 990316-0426.Two Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML17164B0591999-05-26026 May 1999 Forwards RAI Re GL 95-07,pressure Locking & Thermal Binding of safety-related Power Operated Gate Valves ML17164B0581999-05-25025 May 1999 Submits Request for Addl Info Re Exemption to Delay Schedule for Biennial Exercise Beyond 2 Years,For Plant,Units 1 & 2 ML17164B0551999-05-25025 May 1999 Forwards Request for Addl Info Re Licensee 981120 Amends Request for Licenses NPF-14 & NPF-22 Respectively.Amends Change TSs of Both Units to Allow Increases in Min Vol of Fuel Oil to Be Stored in Day Tanks for EDGs ML17164B0571999-05-25025 May 1999 Informs That Util 990329 Submittal, Decommissioning Rept for Unit 1 & 2 of Susquehanna Steam Electric Station, Will Be Marked Proprietary & Be Withheld from Public Disclosure Pursuant to 10CFR2.709(b)(5) & Section 103(b) ML17164B0561999-05-24024 May 1999 Discusses OI Investigation 1-1998-016 to Determine If Former PP&L Engineering Dept Manager Terminated for Raising Safety Concerns.Oi Did Not Substantiate That Termination Result of Individual Having Raised Safety Concerns.Synopsis Encl ML17164B0361999-05-0404 May 1999 Informs That Licensee Authorized to Administer Initial Written Exam to Listed Applicants on 990507.NRC Region I Operator Licensing Staff Will Administer Operating Test to Applicants ML17164B0251999-04-27027 April 1999 Forwards SER Which Documents Staff Findings & Conclusions of Review of Susquehanna Steam Electric Station Individual Plant Exam of External Events Submittal.Also Included Contractor Technical Evaluation Rept & Suppl TER ML17164B0201999-04-19019 April 1999 Forwards Insp Repts 50-387/99-03 & 50-388/99-03 on 990202- 0315.Violations Identified Involving Core Spray Sys Surveillance Tests & Radiation Monitors on Residual Heat Removal SWS Being Treated as non-cited Violations ML17164B0061999-04-12012 April 1999 Forwards Request for Addl Info Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML17164B0031999-04-0909 April 1999 Forwards Suppl SE Re GL 92-08,ampacity Derating Issues Due to Application of Thermo-Lag Fire Barriers.Ampacity Derating Issues Defined in GL Resolved ML17164B0071999-04-0909 April 1999 Discusses Susquehanna Steam Electric Station Plant Performance Review Conducted for Period April 1998 Through 990115 & Informs of NRC Planned Insp Effort Resulting from Review.Historial Listing & Insp Plans Through Jan 2000 Encl ML17164B0001999-04-0505 April 1999 Forwards Insp Repts 50-387/99-02 & 50-388/99-02 on 990119- 29.No Violations Noted.Insp Covered Review of Corrective Action Program & Actions Taken in Response to GL 96-01 Re Testing of Safety Related Logic IR 05000387/19980121999-03-26026 March 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-387/98-12 & 50-388/98-12 .Corrective Actions Will Be Examined During Future Insp ML17164A9911999-03-25025 March 1999 Informs of Completion of Review of PP&L 980804 Requests for Relief RR-14,RR-15,RR-16 & RR-17 Which Sought Relief from ASME BPV Code Requirements for Sses.Forwards SE Supporting RR-14,RR-15 & RR-16.RR-17 Denied IR 05000387/19980091999-03-0505 March 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-387/98-09 & 50-388/98-09 Issued on 981019.Violations D & F Are More Appropriately Classified as Minor Violations ML17164A9701999-03-0303 March 1999 Forwards Insp Repts 50-387/99-01 & 50-388/99-01 on 990105- 0201.No Violations Noted ML17164A9641999-02-23023 February 1999 Forwards SER Granting Util Relief Request 24 from Certain ASME Code Inservice Testing Requirements for Testing of Emergency Condenser Water Circulating Water Pumps & Core Spray Keepfill Check Valves,Respectively ML20203G5821999-02-17017 February 1999 Second Final Response to FOIA Request for Documents. Documents Listed in App C Being Released in Entirety. Documents Listed in App D Being Withheld in Part (Ref FOIA Exemption 5) ML17164A9621999-02-17017 February 1999 Forwards Rept Which Provides Details of Evaluations Performed Under 971006-09 Engineering follow-up Insp of Pp&L,Inc Fuel Design Analysis & Reload Licensing Activities Which Support Operation of Plant,Units 1 & 2 ML17164A9571999-02-10010 February 1999 Refers to Conversation with J Shea Re NRC Staff Meeting with PP&L to Discuss Const of ISFSI at Susquehanna Steam & Electric Station in Berwick,Pa.Meeting Was Held on 981118. Summary of 981216 Meeting Encl.Without Encl IR 05000387/19980051999-02-0202 February 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-387/98-05 & 50-388/98-05 ML20202F4761999-01-29029 January 1999 First Partial Response to FOIA Request for Documents.Records in App a Encl & Being Released in Entirety.App B Records Being Withheld in Part (Ref FOIA Exemption 7C) ML17164A9531999-01-26026 January 1999 Forwards Insp Repts 50-387/98-12 & 50-388/98-12 on 981124-990104 & Nov.Conduct of Activities Characterized by Safe Operation & Conservative Decision Making ML17164A9351998-12-24024 December 1998 Forwards Insp Repts 50-387/98-11 & 50-388/98-11 on 981013-1123.No Violations Noted.Inspectors Reviewed Adequacy & Implementation of Radiological Controls Program Including Access Control Program ML17164A9391998-12-22022 December 1998 Requests Util Provide Nrc,In Writing & Under Oath or Affirmation That Describes Actions Taken or Plan to Take to Assure That Matter Not Having Chilling Effect on Willingness of Other Employees to Raise Safety Concerns ML17164A9341998-12-22022 December 1998 Confirms 981222 Telcon Between L Briggs & a Fitch Re Arrangements Made for Administration of Licensing Exam at Facility During Week of 990510 ML17164A9301998-12-16016 December 1998 Forwards SE Providing Results of Staff Review Re Relief Valve IST Relief Request,Per Util 1999-09-30
[Table view] |
Text
Mr. Robert G. Byram Senior Vice President-G ation and Chief Nuclear Office PP&L, Inc.
2 North Ninth Street Allentown, PA 18101 February 23, 1999
SUBJECT:
EVALUATIONOF PUMP ANDVALVEINSERVICE TESTING RELIEF REQUESTS FOR SUSQUEHANNA STEAM ELECTRIC STATION (SSES)
UNITS 1 AND 2 (TAC NOS. MA0340 AND MA0341)
Dear Mr. Byram:
On July 17, 1997, the NRC staff issued a safety evaluation which, in part, requested that PP&L, Inc. (the licensee) revise and resubmit two relief requests for the SSES, Units 1 and 2, Inservice Testing Program.
These were Relief Request Nos. 15 and 24, which requested relief from certain American Society of Mechanical Engineering (ASME) Code Inservice Testing requirements for testing of the Emergency Condenser Water Circulating Water Pumps, and Core Spray Keepfill Check Valves, respectively.
By letter dated November 14, 1997, the licensee submitted the revised relief requests.
In response to an NRC staff Request for Additional Information, dated July 8, 1998, and subsequent to a telephone conference call with the NRC staff on October 26, 1998, PP&L, Inc., reevaluated the need for Relief Request No.
15 and determined that it is not required.
By letter dated November 17, 1998, the licensee formally withdrew Relief Request No. 15.
The enclosed safety evaluation provides the results of the staff's review for Relief Request No. 24. The staff finds the alternative proposal by PP&L, Inc., authorized pursuant to 10 CFR 50.55a(a)(3)(ii) on the basis that compliance with the specified requirements of the ASME Code would result in hardship or unusual difficultywithout a compensating increase in the level of quality and safety.
Ifyou have any questions regarding this evaluation, please contact the Project Manager for Susquehanna, Victor Nerses, at (301) 415-1484.
99030%0220 99022$
PDR ADOCK 05000387 P
PDR Docket Nos. 50-387 and 50-388
Enclosure:
Safety Evaluation Sincerely, Original signed by:
S. Singh Bajwa, Director Project Directorate l-1 Division of Licensing Project Management Office of Nuclear Reactor Regulation VNerses DCollins MO'Brien MKotzalas DTerao cc w/encl: See next page DISTRIBUTION Docket File PUBLIC PDI-1 Reading JZwolinski SBa wa RWessman GHill(4)
OGC ACRS CCow ill RGN-I GShear RNorsworthy(E-mail SE)
- See revious concurrence OFFICE NAME PD4 /PM Ij ollins:Icc PDI2 M
I V erses II M
en iL "i MEB*
DTerao OGC*
MYoun PDI-1/D SBa wa DATE z-/W/99 N /~499
/99 01/27/99 02/05/99 P / 99/99 OFFICIALRECORD COPY DOCUMENT NAME: REL0340.WF D '
f s q
~
fr f
4
Mr. Robert G. Byram Senior Vice President-G ation and Ghief Nuclear Officer PPSL, Inc.
2 North Ninth Street Allentown, PA 18101 February 23, 1!8.'I
SUBJECT:
EVALUATIONOF PUMP ANDVALVEINSERVICE TESTING RELIEF REQUESTS FOR SUSQUEHANNA STEAM ELECTRIG STATION (SSES)
UNITS 1 AND 2 (TAC NOS. MA0340 AND MA0341)
Dear Mr. Byram:
On July 17, 1997, the NRG staff issued a safety evaluation which, in part, requested that I
PP&L, Inc. (the licensee) revise and resubmit two relief requests for the SSES, Units 1 and 2, Inservice Testing Program.
These were Relief Request Nos. 15 and 24, which requested relief from certain American Society of Mechanical Engineering (ASME) Code Inservice Testing requirements for testing of the Emergency Condenser Water Circulating Water Pumps, and Core Spray Keepfill Check Valves, respectively.
By letter dated November 14, 1997, the licensee submitted the revised relief requests.
In response to an NRG staff Request for Additional Information, dated July 8, 1998, and subsequent to a telephone conference call with the NRC staff on October 26, 1998, PP&L, Inc., reevaluated the need for Relief Request No.
15 and determined that it is not required.
By letter dated November 17, 1998, the licensee formally withdrew Relief Request No. 15.
The enclosed safety evaluation provides the results of the staff's review for Relief Request No. 24. The staff finds the alternative proposal by PP8 L, Inc., authorized pursuant to 10 CFR 50.55a(a)(3)(ii) on the basis that compliance with the specified requirements of the ASME Code would result in hardship or.unusual difficultywithout a compensating increase in the level of quality and safety.
Ifyou have any questions regarding this evaluation, please contact the Project Manager for Susquehanna, Victor Nerses, at (301) 415-1484.
Sincerely, Original signed hy:
S. Singh Bajwa, Director Project Directorate 1-1 Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388 cc w/encl: See next page DISTRIBUTION Docket File PUBLIC PDI-1 Reading JZwolinski SBa wa VNerses DCollins MO'Brien MKotzalas DTerao
Enclosure:
Safety Evaluation RWessman GHill(4)
OGC ACRS CCow ill RGN-I.
I GShear RNorsworthy(E-mail SE)
- See revious concurrence OFFICE Ig~
ollins:Icc V erses PDN /PM PDI-2 M
DTerao OGC'Youn PDI-1/D SBa wa DATE
</N/99 4 /P499
/99 01/27/99 02/05/99 A / >~/99 OFFICIALRFCORD COPY DOCUMENT NAME: REL0340.WPD
'1
~$ L R500
~o Cy O
I 0
I
+~
~0
++**+
Mr. Robert G. Byram Senior Vice President-Generation and Chief Nuclear Officer PP8L, Inc.
2 North Ninth Street Allentown, PA 18101 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON> D.C. 20555-0001 February 23, 1999
SUBJECT:
EVALUATIONOF PUMP AND VALVEINSERVICE TESTING RELIEF REQUESTS FOR SUSQUEHANNA STEAM ELECTRIC STATION (SSES)
UNITS 1 AND 2 (TAC NOS. MA0340 AND MA0341)
Dear Mr. Byram:
On July 17, 1997, the NRC staff issued a safety evaluation which, in part, requested that PP&L, Inc. (the licensee) revise and resubmit two relief requests for the SSES, Units 1 and 2, Inservice Testing Program.
These were Relief Request Nos. 15 and 24, which requested relief from certain American Society of Mechanical Engineering (ASME) Code Inservice Testing requirements for testing of the Emergency Condenser Water Circulating Water Pumps, and Core Spray Keepfill Check Valves, respectively.
By letter dated November 14, 1997, the licensee submitted the revised relief requests.
In response to an NRC staff Request for Additional Information, dated July 8, 1998, and subsequent to a telephone conference call with the NRC staff on October 26, 1998, PP8L, Inc., reevaluated the need for Relief Request No.
15 and determined that it is not required.
By letter dated November 17, 1998, the licensee formally withdrew Relief Request No. 15.
The enclosed safety evaluation provides the results of the staff's review for Relief Request No. 24. The staff finds the alternative proposal by PP8L, Inc., authorized pursuant to 10 CFR 50.55a(a)(3)(ii) on the basis that compliance with the specified requirements of the ASME Code would result in hardship or unusual difficultywithout a compensating increase in the level of quality and safety.
Ifyou have any questions regarding this evaluation, please contact the Project Manager for Susquehanna, Victor Nerses, at (301) 415-1484.
Sincerely, S. Singh Bajwa, Director Project Directorate 1-1 Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388
Enclosure:
Safety Evaluation cc w/encl: See next page
I gs
Mr. Robert G. Byram PP&L, Inc.
Susquehanna Steam Electric Station, Units1 &2 cc:
Jay Silberg, Esq.
Shaw, Pittman, Potts &Trowbridge 2300 N Street N.W.
Washington, D.C. 20037 Bryan A. Snapp, Esq.
Assistant Corporate Counsel PP&L, Inc.
2 North Ninth Street Allentown, Pennsylvania 18101 Regional Administrator, Region I
U.S. Nuclear Regulatory Commission 475 Altendale Road King of Prussia, Pennsylvania 19406 General Manager Susquehanna Steam Electric Station PP&L, Inc.
Box 467 Benvick, Pennsylvania,18603 Licensing Group Supervisor PP&L, Inc.
2 North Ninth Street Allentown, Pennsylvania I8I01 Senior Resident Inspector U. S. Nuclear Regulatory Commission P.O. Box 35 Berwick, Pennsylvania 18603-0035 Director-Bureau of Radiation
.Protection Pennsylvania Department of Environmental Resources P. O. Box 8469 Harrisburg, Pennsylvania 17105-8469 Mr. Herbert D. Woodeshick Special Office of the President PP&L, lnc.
Rural Route 1, Box 1797 Berwick, Pennsylvania 18603'eorge T. Jones Vice President-Nuclear Operations PP&L, Inc.
2 North Ninth Street Allentown, Pennsylvania 18101 Dr. Judith Johnsrud National Energy Committee Sierra Club 433 Orlando Avenue State College, PA 16803 Mr. Jesse C. Tilton, III Allegheny Elec. Cooperativ'e, Inc.
212 Locust Street P.O. Box 1266 Harrisburg, Pennsylvania 17108-1266 Board of Supervisors Salem Township P.O. Box 405 Benvick, PA 18603
~
~