ML17165A027
| ML17165A027 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 06/29/1999 |
| From: | Cowgill C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Byram R PENNSYLVANIA POWER & LIGHT CO. |
| Shared Package | |
| ML17165A028 | List: |
| References | |
| 50-387-99-05, 50-387-99-5, 50-388-99-05, 50-388-99-5, NUDOCS 9907090242 | |
| Download: ML17165A027 (7) | |
See also: IR 05000387/1999005
Text
CATEGORY 2
REGULATORY INFORMATXON DZSTRIBUT1ON SYSTEM (RIDS)
CESSXON NBR:9907090242
DOC.DATE: 99/06/29
NOTARIZED: NO
~
~
DOCKET '¹
ACXL:50-387 Susquehanna
Steam Electric Station, Unit 1, Pennsylva
05000387
50-388
Susquehanna
Steam Electric Station, Unit 2, Pennsylva
05000388
AUTH.NAME
AUTHOR AFFILIATION
CONGILL,C.J.
Region
1 (Post
820201)
RECIP .NAME
RECIPIENT AFFILIATION
BYRAM,R.G.
Power. & Light Co.
SUBJECT: Forwards insp repts 50-387/99-05.
& 50-388/99-05
on
990427-0607.Three
violations of NRC requirements
occurred
&
being treated
as non-cited violations, consistent with App
C
DISTRXBUTXON CODE: IE01F
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
A
E
NOTES:
05000387 G
RECIPIENT
ZD CODE/NAME
LPD1<<1
XNTERNAL: ACRS
DEDRO
NRR/DIPM/XXPB
NRR/DRIP/REXB
RGN1
FILE
01
COPZES
RECIPIENT
LTTR ENCL
ID CODE/NAME
1
1
NERSES,V
2
2
AEOD/~
1
"
1 ~PELE
CENTER
1
1'
NRR/DIPM/OLHP
1
1
NUDOCS -ABSTRACT
1
1
OGC/RP
1
1
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
EXTERNAL: LMITCO MARSHALL
NRC PDR
NOTES:
1
1
1
1
1
1
NOAC
NUDOCS FULLTEXT
1
1
1
'1
0
a.uAt3EQ reoh~
ELECTRONIC FILE
E
N
NOTE TO ALL'RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS
OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL
DESK
(DCD)
ON EXTENSION 415-2083
TOTAL NUMBER OF COPIES
REQUIRED: LTTR
19
ENCL
19
June 29, 1999
Mr. Robert G. Byram
Senior Vice President - Nuclear
PP8L, Inc.
2 North Ninth Street
Allentown, Pennsylvania
18101
SUBJECT:
NRC INSPECTION REPORT 50-387/99-05 and 50-388/99-05
Dear Mr. Byram:
On June 7, 1999, the NRC completed an inspection at your Susquehanna
Steam Electric
Station (SSES) Unit 18 2 reactor facilities. The inspection covered routine activities by the
resident inspectors and an announced review of your year 2000 computer software verification
activities, by a regional inspector.
The enclosed report presents the results of these inspections.
The inspectors discussed the findings of these inspections with Mr. G. Kuczynski, General
Manager SSES, and others ofyour staff, at an exit meeting at the completion of the inspection
pe nod.
Overall, your staff safely operated the facilityduring this period.
However, the NRC has
determined that three Severity Level IVviolations of NRC requirements occurred.
These
violations are being treated as Non-Cited Violations (NCVs), consistent with Appendix C ofthe
Enforcement Policy. These NCVs are described in the subject inspection report and involve use
of an invalid indication for a primary containment isolation valve, improper maintenance on the
"B"emergency diesel generator, and improper installation of all Unit 1 and 2 safety relief valve
acoustic monitors. We noted that these three violations occurred, in part, because of
performance errors by members ofyour staff. Ifyou contest the violations or severity level of
these NCVs, you should provide a response within 30 days ofthe date ofthis inspection report,
with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control
Desk, Washington DC 20555-0001, with copies to the Regional Administrator, Region I, and the
Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington,
DC 20555-0001 and the NRC Resident Inspector at the Susquehanna
Steam Electric Station.
9907090242
990629
ADQCK OS000387
8
/g0
l
Mr. Robert G. Byram
2
In accordance with 10 CFR 2.790 ofthe NRC's "Rules of Practice," a copy of this letter, its
enclosure(s),
and your response willbe placed in the NRC Public Document Room.
Sincerely,
Original Signed By:
Curtis J. Cowgill, Chief
Reactor Projects Branch 4
Division of Reactor Projects
Docket Nos: 50-387;50-388
Enclosure:
Inspection Report 50-387/99-05, 50-388/99-05
cc w/encl:
R. F. Saunders, Vice President - Site Operations
G. T. Jones, Vice President - Engineering and Support
G. Kuczynski, General Manager - SSES
T. Harpster, Supervisor, Nuclear Licensing
G. D. Miller, General Manager- Nuclear Engineering
R. R. Wehry, Nuclear Licensing
P. Nederostek, Nuclear Services Manager,,General
Electric
W. H. Lowthert, Manager- Nuclear Plant Services
A. Male, Manager, Nuclear Assessment
Services
H. D. Woodeshick, Special Assistant to the President
R. W. Osbume, Vice President, Supply 8 Engineering
Commonwealth of Pennsylvania
Mr. Robert G. Byram
Distribution w/encl:
Region
I Docket Room (with concurrences)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
PUBLIC
H. Miller, RA/J. Wiggins, DRA
C. Cowgill, DRP
D. Florek, DRP
D. Cullison, DRP
C. O'Daniell, DRP
Distribution w/encl: (Via E-Mail)
M. Tschiltz, OEDO
S. Bajwa, NRR
V. Nerses, NRR
R. Correia, NRR
DOCDESK
Inspection Program Branch, NRR (IPAS)
DOCUMENT NAM .:
NCH4>SUS>9905
i.WPD
Torecelveacop
ofthl do
nt, Indicatelnthebox:
"C"-"Cop withoutattachment/enclosure
"E"=Cop withattachment/enclosure
"N"=Nocopy
OFFICE
NAME
DATE
RI/D
SHan 'II
06/1 /99
RI/DRP
CCowgil
06/
99
06/
/99
OFFICIALRECORD COPY
06/
/99
06/ /99