ML17146B218

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-387/99-07 & 50-388/99-07 on 990720-0828.NRC Determined That Two Severity Level IV Violations of NRC Requirements Occurred.Violations Being Treated as non-cited Violations
ML17146B218
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 09/30/1999
From: Cowgill C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Byram R
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17146B219 List:
References
50-387-99-07, 50-388-99-07, NUDOCS 9910050303
Download: ML17146B218 (5)


See also: IR 05000387/1999007

Text

t A.J:KUUKX

REGULATORY INFORMATION DZSTRIBUTZON SYSTEM (RIDS)

CESSION NBR:9910050303

DOC.DATE: 99/09/30

NOTARIZED: NO

ACIL:50-387 Susquehanna

Steam Electric Station, Unit 1, Pennsylva

50-388

Susquehanna

Steam Electric Station, Unit 2, Pennsylva

AUTH.NAME

AUTHOR AFFILIATION

=-"COWGZLL,C.J.

Region

1 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

BYRAM,R.G.

Pennsylvania

Power

Ec Light Co.

SUBJECT:

Forwards insp repts 50-387/99-07

6 50-388/99-07

on

990720-0828.NRC

determined that two severity level IV

violations of NRC requirements

occurred. Violations being

'treated

as non-cited violations.

DISTRIBUTION CODE: IEOIF

COPIES

RECEIVED:LTR

(

ENCL

(

SIZE: 3

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

DOCKET

05000387

05000388

6/3

05000387(

RECIPIENT

ID CODE/NAME

LPD1-1

ZNTERNAL: ACRS

DEDRO

NRR/DXPM/ZZPB

NRR/DRIP/REXB

OE

RGN1

FILE

01

EXTERNAL: LMITCO MARSHALL

NRC PDR

NOTES:

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

NERSES,V

AEO

ZLE CENTER

/DTPM/adam

'UDOCS-ABSTRACT

OGC/RP

NOAC

NUDOCS FULLTEXT

COPIES

LTTR ENCL

1

1'

1

1

1

1

1

1

1

1

1

1

1

1

1

"~4~FD PRQkg

,",F~ i~~)QFi>i)Q

NOTE TO ALL'RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LIST

OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTRO

DESK

(DCD)

ON EXTENSION 415-2083

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

19

ENCL

19

September 30, 1999

Mr. Robert G. Byram

Senior Vice President - Nuclear

Pennsylvania Power 8 Light Company

2 North Ninth Street

Allentown, Pennsylvania

18101

SUBJECT:

NRC INTEGRATED INSPECTION REPORT 50-387/99-07 and 50-388/99-07

Dear Mr: Byram:

On August 28, 1999, the NRC completed an inspection at your Susquehanna

Steam Electric

Station (SSES) Unit 18 2 reactor facilities. The enclosed report presents the results of these

inspections.

The inspectors discussed the findings of these inspections with Mr. R. Saunders,

Vice President Nuclear Operations, and others of your staff, at an exit meeting at the completion

of the inspection period.

Overall, your staff safely operated the facilityduring this period.

However, the NRC has

determined that two Severity Level IVviolations of NRC requirements occurred.

These

violations are being treated as Non-Cited Violations (NCVs), consistent with Appendix C of the

Enforcement Policy. These NCVs are described in the subject inspection report and involve

your procedure for performing a safety function determination for out of service primary

containment isolation instrumentation and a shipment of dewatered condensate

demineralizer

resin waste.

Ifyou contest the violations or severity level of these NCVs, you should provide a

response within 30 days of the date of this inspection report, with the basis for your denial, to the

Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001,

with copies to the Regional Administrator, Region I, the Director, Office of Enforcement, United

States Nuclear Regulatory Commission, Washington, DC 20555-0001,'and the NRC resident

inspector at the Susquehanna

Steam Electric Station.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, its

enclosure(s), and your response will be placed in the NRC Public Document Room.

Sincerely,

Original Signed By:

Docket Nos: 50-387;50-388

License Nos: NPF-14, NPF-22

Curtis J. Cowgill, Chief

Projects Branch 4

Division of Reactor Projects

, Enclosure:

Inspection Report 50-387/99-07, 50-388/99-07

9'Pi0050303

990930

PDR

ADOCK 05000387

6

PDR

MR. Robert G. Byram

cc w/encl:

R. F. Saunders, Vice President - Site Operations

B. Shriver, General Manger Susquehanna

Steam Electric Station

G. T. Jones, Vice President - Engineering and Support

T. Harpster, Supervisor, Nuclear Licensing

G. D. Miller, General Manager - Nuclear Assurance

R. R. Wehry, Nuclear Licensing

P. Nederostek, Nuclear Services Manager, General Electric

W. H. Lowthert, Manager - Nuclear Plant Services

A. Male, Manager, Nuclear Assessment

Services

H. D. Woodeshick, Special Assistant to the President

R. W. Osburne, Vice President, Supply 8 Engineering

Commonwealth of Pennsylvania

MR. Robert G. Byram

3

Distnbution w/encl:

Region

I Docket Room (with concurrences)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

PUBLIC

H. Miller, RA/J. Wiggins, DRA

C. Cowgill, DRP

D. Florek, DRP

D. Cullison, DRP

C. O'Daniell, DRP

Distribution w/encl: (Via E-Mail)

M. Tschiltz, OEDO

E. Adensam, PDI, NRR

S. Bajwa, NRR

V. Nerses, NRR

R. Correia, NRR

DOCDESK

Inspection Program Branch, NRR (IPAS)

DOCUMENT

E: G:)BRANCH4'ISUS9907.WPD

To receive a cop

of th s

ocument, Indicate In the box: "C" = Copy without attachment/encfosure,

"E" = Copy with attachment/enciosure

"N" "-. No cop

OFFICE

I D

RI/DRP

NAME

DATE

orek

CCowgill

0

/99

09/

/99

OFFICIAL RECORD COPY

09/

/99

09/

/99

0