CATEGORY 2
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
.
CCESSION NBR:9908240072
DOC.DATE: 99/08/18
NOTARIZED: NO
ACIL:50-387 Susquehanna
Steam Electric Station, Unit 1, Pennsylva
50-388
Susquehanna
Steam Electric Station, Unit 2, Pennsylva
AUTH.NAME
AUTHOR AFFILIATION
COWGILL,C.J.
Region
1 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
BYRAM,R.G.
.
Power.
&. Light Co.
SUBJECT:
Forwards insp repts
50-387/99-06
6 50-388/99-06
on 990608-
0719.'One violation noted
6 treated
as Non-Cited Violation
involved failure to make notifications to NRC within
required time.
DISTRIBUTION CODE: IE01F
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: General
(50 Dkt) -Insp Rept/Notice of Violation Response
NOTES:
DOCKET
05000387
05000388
05000387(
RECIPIENT
ID CODE/NAME
LPD1-1
COPIES
LTTR ENCL
1.
1
RECIPIENT
ID CODE/NAME
NERSES,V
COPIES
LTTR ENCL
1
1
INTERNAL: ACRS
. DEDRO
NRR/DIPM/IIPB
NRR/DRIP/REXB
RGN1
FILE
01
2
2
1
1
1
1
1
1
1
1
1
1
A 0
FILE CENTER
NRR D
ZHP
NUDOCS-ABSTRACT
OGC/RP
1
1
1
1
1
1
1
1
1
1
EXTERNAL: LMITCO MARSHALL
NRC PDR
1
1
1
1
NOAC
NUDOCS FULLTEXT
1
1
1
1
NOTES:
1
1
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LIST
OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTRC
DESK
(DCD)
ON EXTENSION 415-2083
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
19
ENCL
19
0
August 18, 1999
Mr. Robert G. Byram
Senior Vice President - Nuclear
PP8L, Inc.
2 North Ninth Street
Allentown, Pennsylvania
18101
SUBJECT:
NRC INTEGRATED INSPECTION REPORT 50-387/99-06 and 50-388/99-06
Dear Mr. Byram:
On July 19, 1999, the NRC completed an inspection at your Susquehanna
Steam Electric
Station (SSES) Unit 18 2 reactor facilities. The enclosed report documents the results of the
inspection of routine activities by the resident inspectors and an announced inspection of your
security program by Region
I security specialists.
The inspectors discussed the findings of
these inspections with Mr. R. Saunders, Vice President Nuclear Operations, and others of your
staff, at an exit meeting at the completion'of the inspection period.
During this period, we observed that your staff safely operated the facilityduring normal
operations, unplanned power reductions, and two automatic reactor shutdowns.
In addition, we
reviewed several areas in your security program and found them acceptable.
We noted that equipment failures caused the unplanned power reductions and the two
automatic reactor shutdowns during this period. These failures resulted, in part, from
deficiencies in past maintenance practices or narrowly focused corrective actions for previous
problems. We understand that your staff has recently formed an equipment reliability review
team to recommend changes to improve equipment performance.
Based on the results of this inspection, the NRC has determined that one Severity Level IV
violation of NRC requirements occurred.
This violation is being treated as a Non-Cited Violation
(NCV), consistent with Appendix C of the Enforcement Policy. This NCV is described in the
subject inspection report and involved a failure to make notifications to the NRC within the
required time. We noted that this violation occurred, in part, because of performance errors by
members of your staff. Ifyou contest the violation or severity level of this NCV, you should
provide a response within 30 days of the date of this inspection report, with the basis for your
denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC
20555-0001; with a copies to the Regional Administrator, Region I; the Director, Office of
Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and
the NRC Resident Inspector at the Susquehanna
Steam Electric Station.
i) it(");)1 ')
ADQCK 0500038
8
( gl
Mr. Robert G. Byram
2
In accordance with 10 CFR 2.790 of the NRC's "Rules'of Practice," a copy of this letter, its
enclosure(s),
and your response will be placed in the NRC Public Document Room.
Sincerely,
Original Signed By:
Curtis J. Cowgill, Chief
Projects Branch 4
Division of Reactor Projects
Docket Nos: 50-387;50-388
Enclosure:
Inspection Report 50-387/99-06, 50-388/99-06
cc w/encl:
R. F. Saunders,
Vice President - Site Operations
G. T. Jones, Vice President - Engineering and Support
T. Harpster, Supervisor, Nuclear Licensing
G. D. Miller, General Manager - Nuclear Assurance
R. R. Wehry, Nuclear Licensing
P. Nederostek, Nuclear Services Manager, General Electric
W. H. Lowthert, Manager - Nuclear Plant Services
A. Male, Manager, Nuclear Assessment
Services
H. D. Woodeshick, Special Assistant to the President
R. W. Osburne, Vice President, Supply 8 Engineering
Commonwealth of Pennsylvania
Mr. Robert G. Byram
Distnbution w/encl:
Region
I Docket Room (with concurrences)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
PUBLIC
H. Miller, RA/J. Wiggins, DRA
C. Cowgill, DRP
D. Florek, DRP
D. Cullison, DRP
C. O'Daniell, DRP
Distribution w/encl: (Via E-Mail)
M. Tschiltz, OEDO
S. Bajwa, NRR
V. Nerses, NRR
R. Correia, NRR
DOCDESK
Inspection Program Branch, NRR (IPAS)
DOCUMENT NAIV)
Toreceiveacopyofthi
d
NCH4isvstt9906
Indicateinthebox:
"C"=Copywithoutattachment/enctosure
"E"=Copywithattachment/enctosure
"N"=Nocop
OFFICE
NAME
DATE
RI/
SH
RI/DRP
CCowgill
OFF CIALRECORD COPY