Forwards Insp Repts 50-387/98-12 & 50-388/98-12 on 981124-990104 & Nov.Conduct of Activities Characterized by Safe Operation & Conservative Decision Making
ML17164A953
Person / Time
Site: Susquehanna  
Issue date: 01/26/1999
From: Anderson C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Byram R
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17164A954 List:
References
50-387-98-12, 50-388-98-12, NUDOCS 9902090342
Download: ML17164A953 (8)


See also: IR 05000387/1998012

Text

CATEGORY 2

REGULATORY INFORMATION DISTRIBUTION SYSTEM

(RIDS)

ACCESSION NBR:9902090342

DOC.DATE: 99/01/26

NOTARIZED: NO

~

~

FACIL:50-387 Susquehanna

Steam Electric Station, Unit 1, Pennsylva

50-388

Susquehanna

Steam Electric Station, Unit 2, Pennsylva

AUTH.NAME

AUTHOR AFFILIATION

ANDERSON,C.J.

Region

1 (Post

820201)

RECIP.NAME

'ECXPIENT AFFILIATION

BYRAM,R.G.

Pennsylvania

Power.

&, Light Co.

SUBJECT:

Forwards insp repts

50-387/98-12

Ec 50-388/98-12

on

981124-990104

E NOV.Conduct of activities characterized

by

safe operation

& conservative

decision making.

DISTRIBUTION CODE:

XE01F

COPIES

RECEIVED:LTR

ENCL

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

DOCKET I

05000387

05000388

E

05000387

C

RECIPIENT

ID CODE/NAME

PD1-2

PD

COPXES

RECIPIENT

LTTR ENCL

XD CODE/NAME

1

1

NERSES,V

COPIES

LTTR ENCL

1

1

INTERNAL: ACRS

AEO

/

2

2

1

1

1

1

1

1

1

1

1

'1

NRR/DRPM/PECB

NUDOCS-ABSTRACT

OGC/HDS2

AEOD/SPD/RAB

DEDRO

NRR/DRCH/HOHB

NRR/DRPM/PERB

OE DIR

RGN1

FXLE

01

1

1

1

1

1

1

1

1

1

.1

1

1'

ERNAL: LITCO BRYCE,J H

NRC PDR

1

1

1

1

NOAC

NUDOCS FULLTEXT

1

1

1

1

NOTES:

1

1

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM'DISTRIBUTION

OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION

0

DESK

(DCD)

ON EXTENSION 415-2083

ZATION, CONTACT THE DOCUMENT CONTROL

TOTAL NUMBER OF COPIES

REQUIRED: LTTR

20

ENCL

20

January 26,'999

Mr. Robert G. Byram

Senior Vice President - Nuclear

Pennsylvania Power 5 Light Company

2 North Ninth Street

Allentown, Pennsylvania

18101

SUBJECT:

NRC INSPECTION REPORT 50-387/98-12, 50-388/98-12;

AND NOTICE OF VIOLATION

Dear Mr. Byram:

i.

On January 4, 1999, the NRC completed an inspection at your Susquehanna

Steam Electric

Station (SSES) Unit 15 2 reactor facilities. The inspections covered routine activities by

the resident inspectors.

The enclosed report presents the results of these inspections.

The

inspectors discussed the findings of these inspections with Mr. R. Saunders,

Vice President

Nuclear Operations, Mr. G. Kuczynski, General Manager SSES, and others of your staff, at

an exit meeting at the completion of the inspection period.

During the 6-week period of inspection, your conduct of activities was characterized

by

safe operation and conservative decision making.

The station response to the Unit 1

offgas system isolation, Unit 1 main steam isolation valve fast stroke time, and Unit 2

standby liquid control tank foreign material removal was excellent.

However, over the past

six months we have noticed four occurrences of incorrect implementation of applicable

Technical Specification Limiting Conditions of Operation (LCOs) ~ The number of

occurrences

of incorrect implementation of LCOs, which have been minor in nature and non

consequential to date, appear to be an indicator of a potential adverse trend.

Based on the results of this inspection, the NRC has determined that a violation of NRC

requirements occurred.

On two separate

occasions incorrect gasket material was

substituted for a neoprene gasket on the "A" emergency diesel generator fuel oil storage

tank.

The violation.is cited in the enclosed Notice of Violation (Notice) and the

circumstances

surrounding it are described in detail in the subject inspection report.

The

violation is of concern because it indicates weaknesses

in your design control program

"

which were evident in your work planning process,

and it was identified by the NRC.

You are required to respond to this letter and should follow the instructions specified in the

enclosed Notice when preparing your response.

The NRC will use your response,

in part,

to determine whether further enforcement action is necessary to ensure compliance with

regulatory requirements.

VeoV090S4Z ~~0S~S

PDR

ADOCK 05000387

8

PDR

OFFICIAL RECORD

COPY

I E: 01

'

Mr. Robert G.

Byram

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of this letter,

its enclosure(s),

and your response will be placed in the NRC Public Document Room.

Sincerely,

Original Signed

by:

Clifford J. Anderson, Chief

Projects Branch 4

Division of Reactor Projects

Docket Nos: 50-387;50-388

License Nos:

NPF-14, NPF-22

Enclosures:

1.

Notice of Violation

2.

Inspection Report 50-387/98-12, 50-388/98-12

cc w/encl:

R. F. Saunders,

Vice President - Site Operations

G. T. Jones, Vice President - Engineering and Support

G. Kuczynski, General Manager - SSES

J. M. Kenny, Supervisor, Nuclear Licensing

G. D. Miller, General Manager - Nuclear Engineering

R. R. Wehry, Nuclear Licensing

F. P. Arcury, Nuclear Services Manager, General Electric

C. D. Lopes, Manager - Nuclear Security

A. Male, Manager, Nuclear Assessment

Services

H. D. Woodeshick, Special Assistant to the President

R. W. Osburne, Vice President, Supply 8c Engineering

Commonwealth of Pennsylvania

, k

Mr. Robert G.

Byram

3

Distribution w encl:

Region

I Docket Room (with concurrences)

Nuclear Safety Information Center (NSIC)

H. Miller, RA/J. Wiggins, DRA (1)

NRC Resident Inspector

PUBLIC

C. Anderson, DRP

D. Florek, DRP

R. Junod, DRP

Distribution w encl:

Via E-Mail

G. Shear, OEDO

S. Bajwa, PD 1-2, NRR

V. Nerses, Project Manager, NRR

Inspection Program Branch, NRR (IPAS)

R. Correia, NRR

DOCDESK

DOCUMENT NAME: G:iBRANCH4'USUS'tSUS981 2.WPD

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enciosure

"E" = Copy with

attachment/enclosure

" = No copy

OFFICE

NAME

DATE

Rl

D

orek

01

99

RI/DRP

CAndersori

01/. (@99

l ~ 8 )~a

01/2G/99

OFFICIAL RECORD COPY