Responses to RAI Set 19 & Set 20 and Amendment 20 to the Callaway LRA
ML13029A243
Person / Time
Site: Callaway Ameren icon.png
Issue date: 01/24/2013
From: Kremer G
Ameren Missouri, Union Electric Co
To:
Office of Nuclear Reactor Regulation, Document Control Desk
Shared Package
ML130290353 List:
References
ULNRC-05950, TAC ME7708
Download: ML13029A243 (4)


Text

~'t..

WAmeren MISSOURI January 24, 2013 Callaway Plant ULNRC-05950 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Ladies and Gentlemen:

10 CFR 2.101 10 CFR 2.109(b) 10 CFR 50.4 10 CFR 50.30 10 CFR 51.53(c) 10 CFR 54 DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.

FACILITY OPERATING LICENSE NPF-30 RESPONSES TO RAJ SET #19 & Set #20 AND AMENDMENT 20 TO THE CALLAWAY LRA

References:

1) ULNRC-05830 dated December 15, 2011
2) NRC Letter, "Request for Additional Information for the Review of the Callaway Plant, Unit 1 License Renewal Application, Set 19 (TAC No. ME7708)," dated December 27,2012.
3) NRC Letter, "Request for Additional Information for the Review of the Callaway Plant, Unit 1 License Renewal Application, Set 20 (TAC No. ME7708)," dated January 14, 2013
4) ULNRC-05923 dated October 31, 2012
5) ULNRC-05891 dated August 9, 2012 By the Reference 1 letter, Union Electric Company (Ameren Missouri) submitted a license renewal application (LRA) for Callaway Plant Unit 1. Reference 2 dated December 27, 2012 and Reference 3 dated January 14, 2013 transmitted the nineteenth and twentieth Requests for Additional Information (RAis) related to our application. contains Ameren Missouri's responses to the individual requests contained in the December 27, 2012 and January 14, 2013 RAis. Enclosure 2 contains LRA Amendment 20 to reflect changes made as a result of the RAI responses.

PO Box 620 Fulton, MD 65251 AmerenMissouri.com

ULNRC-05950 January 24, 2013 Page 2 also contains updates to the following three (3) commitments in LRA Table A4-l:

o Item #4 is revised to include activities related to MRP-227-A Applicant/Licensee Action Item

  1. 1 and #8 item 5 o Item # 12 has been revised to clarify the commitment to inspect blisters in the coating of the Train A Emergency Diesel Generator Fuel Oil Storage Tank based on discussions held with NRC staff by phone on January 22,2013. This clarification is related to the response to Regional Inspection Item RI178 transmitted by Reference 4.

o Item #23 is revised to indicate completion ofthe seismic isolation gap inspection of plant structures by an engineer familiar with the seismic design of the plant. This closes a portion of the commitment modified in Reference 5. also includes an editorial revision to the NUREG-180 1 consistency section of LRA Appendix B2.1.27 so that it is consistent with the conclusion section.

If you have any questions with regard to these RAI responses, or Amendment 20, please contact me at (314) 954-4319 or Ms. Sarah Kovaleski at (314) 225-1134.

I declare under penalty of perjury that the foregoing is true and correct.

Sincerely, Executed on:

~"'-v""!:\\ z.'-l-, -z..o 13 DS/SGK/nls

Enclosures:

1) Request for Additional Information (RAI) Set #19 and Set #20 Responses
2) Amendment 20 LRA Changes from RAI Responses and Commitment Updates

ULNRC-05950 January 24, 2013 Page 3 cc:

U.S. Nuclear Regulatory Commission (Original)

Attn: Document Control Desk Washington, DC 20555-0001 Mr. Elmo E. Collins Regional Administrator U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 7 60 11-4 511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Samuel Cuadrado De Jesus Project Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-11F1 Washington, DC 20555 Mr. Fred Lyon Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 0-8B 1 Washington, DC 20555-2738 Mr. Gregory A. Pick U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511

ULNRC-05950 January 24,2013 Page4 Index and send hardcopy to QA File A160.0761 Hardcopy:

Certrec Corporation 4150 International Plaza Suite 820 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)

Electronic distribution for the following can be made via Tech Spec ULNRC Distribution:

A. C. Heflin F. M. Diya C. 0. Reasoner III D. W. Neterer L. H. Graessle J. S. Geyer S. A. Maglio R. Holmes-Bobo NSRB Secretary L. H. Kanuckel G. S. Kremer S. G. Kovaleski T. B. Elwood G. G. Yates E. Blocher (STARS PAM COB)

Mr. Mike Westman (WCNOC)

Mr. Tim Hope (Luminant Power)

Mr. Ron Barnes (APS)

Mr. Tom Baldwin (PG&E)

Mr. Mike Murray (STPNOC)

Ms. Linda Conklin (SCE)

Mr. John O'Neill (Pillsbury Winthrop Shaw Pittman LLP)

Missouri Public Service Commission Mr. Dru Buntin (DNR)