ML14108A080

From kanterella
Jump to navigation Jump to search
Summary of Category 3 Public Meeting with Tennessee Valley Authority to Discuss Annual Assessment of the Watts Bar Nuclear Unit 2 Construction Project
ML14108A080
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 04/17/2014
From: Haag R
NRC/RGN-II/DCP/CPB3
To: Skaggs M
Tennessee Valley Authority
Michelle Adams
Shared Package
ML14108A085 List:
References
IR-14-601
Download: ML14108A080 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 April 17, 2014 Mr. Michael D. Skaggs Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

SUBJECT:

PUBLIC MEETING

SUMMARY

- WATTS BAR NUCLEAR PLANT UNIT 2 (NRC INSPECTION REPORT 05000391/2014601)

Dear Mr. Skaggs:

This refers to the meeting conducted at our request at the Comfort Inn Hotel in Athens, TN on April 9, 2014 at 4:00 p.m. The meeting's purpose was to provide opportunities to discuss the annual assessment of the Watts Bar Nuclear Unit 2 Construction Project with the public.

On April 9, 2014, the NRCs Chief of Construction Projects Branch 3, and the Resident Inspectors, held a Category 3 meeting that was attended by members of the public and TVA employees. This Category 3 public meeting provided an informative presentation to engage the public in a discussion of the NRCs annual assessment of the Watts Bar Nuclear Plant Unit 2 Construction Project for the period from January 1 through December 31, 2013. The list of attendees (Enclosure 1) and the presentation material used for discussions (Enclosure 2) are attached to this letter.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Should you have any questions concerning this meeting, please contact Chris Even at 404-997-4661.

Sincerely,

/RA/

Robert Haag, Chief Construction Projects Branch 3 Division of Construction Projects

Enclosures:

1. List of Attendees
2. Handout- 2013 EOC WB2 Presentation_Public

M. Skaggs 2 cc w/encl: Mr. R. R. Baron, Senior Manager Mr. Gordon P. Arent Nuclear Construction Quality Assurance Director, Licensing WBN Unit Two Watts Bar Nuclear Plant Watts Bar Nuclear Plant Tennessee Valley Authority Tennessee Valley Authority P.O. Box 2000 P.O. Box 2000 Spring City, Tennessee 37381 Spring City, Tennessee 37381 Mr. O. J. Zeringue, General Manager Mr. Joseph Shea, Vice President Engineering and Construction Nuclear Licensing WBN Unit Two Tennessee Valley Authority Watts Bar Nuclear Plant 1101 Market Street Tennessee Valley Authority 3R Lookout Place P.O. Box 2000 Chattanooga, TN 37402-2801 Spring City, Tennessee 37381 Mr. E. J. Vigluicci Mr. R. A. Hruby, General Manager Assistant General Counsel Technical Services Tennessee Valley Authority WBN Unit Two 400 West Summit Hill Drive Watts Bar Nuclear Plant 6A West Tower Tennessee Valley Authority Knoxville, Tennessee 37402 P.O. Box 2000 Spring City Tennessee 37381 Mr. Lawrence E. Nanney, Director Tennessee Department of Environmental Mr. James ODell, Manager Health & Conservation Licensing and Industry Affairs Division of Radiological Health WBN Nuclear Plant 3rd Floor, L&C Annex Tennessee Valley Authority 401 Church Street P.O. Box 2000 Nashville, TN 37243-1532 Spring City, Tennessee 37381 Mr. Chris Church Mr. Joseph P. Grimes Site Vice President Chief Nuclear Officer Watts Bar Nuclear Plant and Executive Vice President Tennessee Valley Authority Tennessee Valley Authority P.O. Box 2000 1101 Market Place Spring City, Tennessee 37381 3R Lookout Place Chattanooga, Tennessee 37402-2801 County Mayor P.O. Box 156 County Executive Decatur, Tennessee 37322 375 Church Street Suite 215 Ms. Ann P. Harris Dayton, Tennessee 37321 Public 341 Swing Loop Mr. Dave Gronek Rockwood, TN 37854 Plant Manager, WBN Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, Tennessee 37381

M. Skaggs 3 cc email distribution w/encl:

Greg Scott Tennessee Valley Authority Electronic Mail Distribution Watts Bar 2 Licensing Tennessee Valley Authority Electronic Mail Distribution

ML14108A080 SUNSI REVIEW COMPLETE OFFICE RII:DCP RII:DCP RII:DCP RII:DCP RII:DCP RII:DCP RII:DCI SIGNATURE RCH CJE NAME RHaag CEven DATE 04/17/2014 04/17/2014 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO Letter to Michael D. Skaggs from Robert C. Haag dated April 17, 2014.

SUBJECT:

PUBLIC MEETING

SUMMARY

- WATTS BAR NUCLEAR PLANT UNIT 2 (NRC INSPECTION REPORT 05000391/2014601)

Distribution w/encl:

Region II Regional Coordinator, OEDO J. Quichocho, NRR J. Poole, NRR J. Dion, NRR A. Hon, NRR C. Evans, RII L. Douglas, RII EICS S. Shaeffer, RII DRP R. Monk, RII WBN Unit 1 SRI S. Dubose, RII Administrative Assistant Region II State Liaison Officer Region II Public Affairs Officer OE Mail (email address if applicable)

ConE_Resource@nrc.gov PUBLIC

SIGN-IN SHEET WATTS BAR ANNUAL ASSESSMENT MEETING Date: 4/16/2013 Location: Comfort Inn, Athens TN Name Company Brad Devendorf Public Pete Johnson Public Gretel Johnston BEST/MATRR Garry Morgan BREDL/BEST/MATRR Jimmy Green SACE John Monninger NRC Michele Evans NRC Jeanne Dion NRC Jason Christensen NRC Robert C. Haag NRC Chris Even NRC Joel T. Munday NRC Justin Poole NRC Joe Calle TVA Raymond Hruby TVA Gordon Arent TVA Bob Williams TVA Ed Freeman TVA Nick Welch TVA Michael Skaggs TVA Enclosure 1