Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23319A24529 January 2024Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 IssuesCyber Security
Surveillance Frequency Control Program
Safeguards Contingency Plan
Fire Protection Program
ML24008A24618 January 2024Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal ScheduleAging Management
Pressure and Temperature Limits Report
Tritium Producing Burnable Absorber Rods
License Renewal
CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions17 January 2024Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions
CNL-24-016, Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)10 January 2024Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)
CNL-23-052, Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability9 January 2024Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System OperabilityTime of Discovery
Fire Barrier
Tornado Missile
Internal Flooding
Probabilistic Risk Assessment
Incorporated by reference
Turbine Missile
CNL-23-062, Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018)8 January 2024Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018)Anticipated operational occurrence
Qualified Offsite Circuit
Surveillance Frequency Control Program
Offsite Circuit
ML23346A1383 January 2024Regulatory Audit Summary Related to Request to Increase the Number of Tritium Producing Burnable Absorber RodsTritium Producing Burnable Absorber Rods
CNL-23-069, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation21 December 2023Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation
IR 05000390/202344121 December 2023Plantfinal Significance Determination for a Security-Related Greater than Green Finding, Nov, and Assessment Follow-up, 05000390-2023441 and 05000391-2023441-PublicAffidavit
CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)18 December 2023Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)Safe Shutdown
Anticipated operational occurrence
IR 05000390/202340414 December 2023Security Baseline Inspection Report 05000390/2023404 and 05000391/2023404
CNL-23-001, Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01)13 December 2023Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01)Boric Acid
Shutdown Margin
Anticipated operational occurrence
Surveillance Frequency Control Program
Process Control Program
Fuel cladding
ML23293A0576 December 2023Issuance of Amendment Nos. 163 and 70 Regarding Adoption of TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee ControlCyber Security
Surveillance Frequency Control Program
Safeguards Contingency Plan
Fire Protection Program
IR 05000390/202301030 November 2023RE-Issue Watts Bar Nuclear Plant - Biennial Problem Identification and Resolution Inspection Report 050000390/2023010 and 05000391/2023010 and Apparent ViolationCommercial Grade Dedication
Past operability
Significance Determination Process
Large early release frequency
Fire Protection Program
CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions27 November 2023Central Emergency Control Center Emergency Plan Implementing Procedure Revisions
IR 05000390/202300313 November 2023Integrated Inspection Report 05000390/2023003 and 05000391/2023003 and Apparent ViolationSafe Shutdown
Unanalyzed Condition
Boric Acid
Fire Barrier
Internal Flooding
Past operability
Enforcement Discretion
Probabilistic Risk Assessment
Temporary Modification
Functionality Assessment
FLEX
Significance Determination Process
Annual Radiological Environmental Operating Report
Operability Determination
Fire Protection Program
GOTHIC
Siren
ML23312A1438 November 2023Submittal of Dual Unit Updated Final Safety Analysis Report (UFSAR) Amendment 5
CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-20 September 2023Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03Coatings
Surveillance Frequency Control Program
Fuel cladding
CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision20 September 2023Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision
ML23251A20011 September 2023Request for Withholding Information from Public Disclosure for Watts Bar Nuclear Plant, Units 1 and 2
CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 645 September 2023Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64
IR 05000390/202300530 August 2023Updated Inspection Plan for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390/2023005 and 05000391/2023005
ML23233A00428 August 2023Proposed Alternative to the Requirements of the ASME Boiler and Pressure Vessel Code for Upper Head Injection Dissimilar Metal Butt Welds
IR 05000390/202300216 August 2023Reissue - Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2023002 and 05000391/2023002Safe Shutdown
Unanalyzed Condition
Boric Acid
High Radiation Area
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Nondestructive Examination
Temporary Modification
Functionality Assessment
Significance Determination Process
Operability Determination
Fire Protection Program
ML23220A1589 August 2023Integrated Inspection Report 05000390/2023002 and 05000391/2023002Safe Shutdown
Unanalyzed Condition
Boric Acid
High Radiation Area
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Nondestructive Examination
Temporary Modification
Functionality Assessment
Significance Determination Process
Operability Determination
Fire Protection Program
CNL-23-045, License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010)7 August 2023License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010)Incorporated by reference
Pressure and Temperature Limits Report
CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2 August 2023Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)Coatings
Surveillance Frequency Control Program
Fuel cladding
ML23192A44731 July 2023Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards InformationProbabilistic Risk Assessment
Fukushima Dai-Ichi
Earthquake
CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills25 July 2023Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills
IR 05000390/202301124 July 2023Quadrennial Focused Engineering Inspection (FEI) Commercial Grade Dedication Report 05000390 2023011 and 05000391 2023011Commercial Grade Dedication
Condition Adverse to Quality
Significance Determination Process
CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions18 July 2023Tennessee Valley Authority - Radiological Emergency Plan Revisions
CNL-23-020, Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06)28 June 2023Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06)Safe Shutdown
Hydrostatic
Surveillance Frequency Control Program
Offsite Circuit
CNL-23-049, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan .26 June 2023Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan .Offsite Dose Calculation Manual
ML23122A2327 June 2023Issuance of Amendment Nos. 162 and 69 Regarding Change to Date in Footnotes for Technical Specification 3.7.11, Control Room Emergency Air Temperature Control System (Creatcs)Cyber Security
Surveillance Frequency Control Program
Fire Protection Program
CNL-23-044, Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out1 June 2023Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out
IR 05000390/202340330 May 2023Cyber Security Inspection Report 05000390/2023403 and 05000391/2023403Cyber Security
Affidavit
ML23131A18123 May 2023Correction to Amendment No. 161 to Facility Operating License No. NPF-90
CNL-23-042, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions16 May 2023Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure RevisionsOffsite Dose Calculation Manual
IR 05000390/20220039 May 2023Reissue Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2022003 and 05000391/2022003Boric Acid
Non-Destructive Examination
Commercial Grade Dedication
Internal Flooding
Enforcement Discretion
Nondestructive Examination
Temporary Modification
Functionality Assessment
Foreign Material Exclusion
Operability Determination
Fire Protection Program
Downpower
ML23125A2205 May 2023Issuance of Amendment No. 161 Regarding a Change to Footnotes for Technical Specification Table 1.1-1 Modes (Emergency Circumstances)Safe Shutdown Earthquake
Operating Basis Earthquake
VT-2
Pressure Boundary Leakage
IR 05000390/20230014 May 2023Integrated Inspection Report 05000390/2023001 and 05000391/2023001High winds
Past operability
Functionality Assessment
FLEX
Operability Determination
Fire Protection Program
CNL-23-043, Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09)4 May 2023Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09)Safe Shutdown Earthquake
Operating Basis Earthquake
Pressure and Temperature Limits Report
Pressure Boundary Leakage
CNL-23-032, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 4127 April 2023Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 41Fitness for Duty
Offsite Dose Calculation Manual
Safe Shutdown Earthquake
Coatings
Nondestructive Examination
Cyber Security
Process Control Program
Fire Protection Program
Grace period
CNL-23-030, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update27 April 2023Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update
CNL-23-033, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision24 April 2023Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure RevisionOffsite Dose Calculation Manual
CNL-23-029, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions11 April 2023Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions
ML23072A0655 April 2023Units 1 and 2 Issuance of Amendment Nos. 364 and 358; 160 and 68 Regarding a Revision to Technical Specification 3.4.12Anticipated operational occurrence
Cyber Security
Pressure and Temperature Limits Report
Fire Protection Program
ML23073A2763 April 2023Individual Notice of Consideration of Issuance of Amendments to Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing (EPID L-2023-LLA-0029) (Letter)Exemption Request
CNL-23-023, Annual Insurance Status Report30 March 2023Annual Insurance Status Report
CNL-23-024, TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report29 March 2023TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report