Quadrennial Focused Engineering Inspection (FEI) Commercial Grade Dedication Report 05000390 2023011 and 05000391 2023011
ML23202A171
Person / Time
Site: Watts Bar  Tennessee Valley Authority icon.png
Issue date: 07/24/2023
From: James Baptist
Division of Reactor Safety II
To: Jim Barstow
Tennessee Valley Authority
References
IR 2023011
Download: ML23202A171 (1)


Text

SUBJECT:

WATTS BAR NUCLEAR PLANT - QUADRENNIAL FOCUSED ENGINEERING INSPECTION (FEI) COMMERCIAL GRADE DEDICATION REPORT 05000390/2023011 AND 05000391/2023011

Dear James Barstow:

On June 30, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Watts Bar Nuclear Plant and discussed the results of this inspection with Mr. Tony Williams Site Vice President and other members of your staff. The results of this inspection are documented in the enclosed report.

One finding of very low safety significance (Green) is documented in this report. This finding involved a violation of NRC requirements. We are treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violation or the significance or severity of the violation documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Enforcement; and the NRC Resident Inspector at Watts Bar Nuclear Plant.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

July 24, 2023

Sincerely, James B. Baptist, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 05000390 and 05000391 License Nos. NPF-90 and NPF-96

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000390 and 05000391

License Numbers:

NPF-90 and NPF-96

Report Numbers:

05000390/2023011 and 05000391/2023011

Enterprise Identifier:

I-2023-011-0020

Licensee:

Tennessee Valley Authority

Facility:

Watts Bar Nuclear Plant

Location:

Spring City, TN 37381

Inspection Dates:

June 12, 2023 to June 30, 2023

Inspectors:

T. Fanelli, Senior Reactor Inspector

R. Fanner, Reactor Inspector

C. Franklin, Reactor Inspector

Approved By:

James B. Baptist, Chief

Engineering Branch 1

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Quadrennial Focused Engineering Inspection (FEI) Commercial Grade Dedication at Watts Bar Nuclear Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

Failure to Control Embedded Digital Devices Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems Green NCV 05000390,05000391/2023011-01 Open/Closed None 71111.21N.

The NRC identified a Green Non-Cited Violation (NCV) of Title 10 of the Code of Federal Regulations (CFR) 50, Appendix B, Criterion IV, Procurement Document Control, with two examples, for the failure to ensure that purchase order requirements controlled unidentified embedded digital devices for safety related components, including commercial grade dedicated (CGD) components.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.21N.03 - Commercial Grade Dedication Commercial Grade Dedication (section 03.01)

The inspectors reviewed the implementation of the licensees processes for dedicating commercial-grade items/services as basic components and/or for procuring safety-related structures, systems, and components for the following samples:

(1) PEG PKG NO. CKG876A, WO 120191302,
Description:

80-9210836-90 PCB 1 PH VOLT SENSE 120VAC SCI, (125V VITAL BATTERY CHARGER)

(2) PEG PKG NO. CRE458A, WO 120277323,
Description:

80-9215501-90 PCB ASSY UPS TROUBLE 140VDC, (DG 2A-A BATTERY CHARGER 1, NORMAL)

(3) PEG PKG NO. DAP056L, WO 121461932,
Description:

HOSE, #4 HYDRAULIC.

AQP, (DIESEL GENERATOR 1B-B)

(4) PEG PKG NO. BWJ668N, WO 116534761,
Description:

Guide Spring Item# BWJ668N for

.5,.75, & 1" Series 1500 Globe VLV, (CCP 1B-B DISCHARGE VENT)

(5) PEG PKG NO. CAP374N, WO 119191200,
Description:

INDUSTRY GRADE ISO VG-46, TURBINE OIL, (SAFETY INJECTION PMP 2A-A)

(6) PEG PKG NO. CKF478V, WO 122663423,
Description:

PHILLIPS66, MULTIPLEX 220 #2 GREASE, 1/14oz TUBE/CARTRIDGE, (RHR HEAT EXCHANGER 2A INLET ISOLATION)

(7) PEG PKG NO. CWM252Fx`, WO 119909145,
Description:

BREAKER, CIRCUIT, THERMAL MAGNETIC, 480, 80, 3, 60, 3, 125 A, (125V DC Vital Power System)

(8) PEG PKG NO. CWM252Fx`, WO 117648487,
Description:

BREAKER, CIRCUIT, MAGNETIC, 600, 5, 3, 25000-480, 125 A, (Safety Injection System)

(9) PEG PKG NO. CXV589N, WO 121842856,
Description:

PUMP, AC CIRCULATING OIL PUMP, ASSEMBLY, W/ELECTRIC MOTOR, (Standby Diesel Generator System)

(10) PEG PKG NO. AEQ777G, WO119145014,
Description:

CAPACITOR, FIXED (Solid State Protection System)

(11) PEG PKG NO. CAY920W, WO122554382,
Description:

CAPACITOR, ELECTRICAL DEVICE, (Aux Feedwater)

(12) PEG PKG NO. CDT158T, WO121998756,
Description:

Resistor, Variable (EDG-1B-B)

(13) PEG PKG NO. CRE546B, WO120463676,
Description:

CAPACITOR, ELECTRICAL DEVICE, Q LEVEL (Battery Charger)

(14) PEG PKG NO. DAJ426G, WO121041296,
Description:

SCR, Q LEVEL (125V Vital Battery Charger 8-S)

INSPECTION RESULTS

Failure to Control Embedded Digital Devices Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems Green NCV 05000390,05000391/2023011-01 Open/Closed None 71111.21N.0 The NRC identified a Green Non-Cited Violation (NCV) of Title 10 of the Code of Federal Regulations (CFR) 50, Appendix B, Criterion IV, Procurement Document Control, with two examples, for the failure to ensure that purchase order requirements controlled unidentified embedded digital devices for safety related components, including commercial grade dedicated (CGD) components.

Description:

The inspectors reviewed TVA-NQA-PLN89-A, Nuclear Quality Assurance Plan (NQAP), Rev 41, to determine the quality requirements for purchasing safety related components. The inspectors noted that Section 8, Procurement and Material Control, required in part, that procurement documents shall specify or reference design basis technical requirements and inspection and test requirements (including acceptance criteria)that shall be prepared under the requirements of Section 7, Design Control. Section 7, specified, in part, that Measures shall be established and implemented to provide test requirements in design output documents for the following tests as appropriate:

1. Design qualification.

2. Product acceptance (proof).

1. The licensee purchased commercial grade replacement parts for AMETEK battery

chargers and inverters as basic components from AMETEK. In approximately 2015, AMETEK changed their sub-vendor (Carlo Gavazzi) for commercial grade timing relays to be CGD as basic components. Neither the licensee, AMETEK nor the sub-vendor documentation identified embedded digital devices associated with the timing relay functions. Based on a walkdown observation and review of the relay capabilities, the team identified that these timing relays contained unidentified embedded digital devices that controlled the timer functionality. The licensee and AMETEK substantiated the condition. The licensee purchase order for these timing relays did not include requirements to assure that any embedded digital devices were identified and controlled as criteria for qualification and acceptance. As a result, uncontrolled Carlo Gavazzi timing relays with unidentified embedded digital devices have been installed in the plant since approximately 2015.

2. In 2016, the site received Information Notice (IN) 2016-01, Recent Issues Related to

the Commercial Grade Dedication of Allen Bradley 700-RTC Relays, ML15295A173.

The site review of IN 2016-01 failed to ensure that established purchase order requirements included specifications to assure that any unidentified embedded digital devices were identified and controlled. The IN 2016-01 identified that embedded digital devices went unidentified during the CGD of Allen Bradley timing relays which was causing anomalous behavior, under certain conditions, in safety related equipment. The Allen Bradley model number did not change to reflect a design change that embedded the digital device to control the timing circuits. The site screening (CR 1163578) addressed the specific make and model of relay identified in IN 2016-01, but not the issue implications that unidentified embedded digital devices could affect any number of commercial grade manufacturers. The screening of IN 2016-01 was a failure to identify purchase order requirements were necessary to address unidentified embedded digital devices and thus was a condition adverse to quality. As a result, the site has received new orders of Carlo Gavazzi relays with unidentified digital devices. In addition, the licensee purchase orders for other control devices did not include requirements to assure that any unidentified embedded digital devices were identified and controlled as criteria for qualification and acceptance, which have not been screened for embedded digital devices.

Corrective Actions: The licensee entered the issue into the corrective action program and perform an operability evaluation.

Corrective Action References: CR 1864898-unidentified embedded device, CR 1865139-part 21 tracker, and CR 1864568-CR 1163578 did not address all concerns. (IN2016-01 and Part 21)

Performance Assessment:

Performance Deficiency: The failure to ensure that purchase order requirements controlled unidentified embedded digital devices for safety related components, including CGD components was a performance deficiency.

Screening: The inspectors determined the performance deficiency was more than minor because it was associated with the Design Control attribute of the Mitigating Systems cornerstone and adversely affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the failure to control embedded digital devices through commercial grade dedication adversely affected the reliability and capability of basic components.

Significance: The inspectors assessed the significance of the finding using IMC 0609 Appendix A, The Significance Determination Process (SDP) for Findings At-Power. Exhibit 2

- Mitigating Systems Screening Questions, Item A. Mitigating SSCs and PRA Functionality (except Reactivity Control Systems), specified that if the finding affected the design or qualification of a mitigating SSC, but it maintained its operability or PRA functionality then it screens to GREEN.

Cross-Cutting Aspect: None

Enforcement:

Violation: Title 10 Code of Federal Regulations (CFR) Part 50 Appendix B, Criterion IV, Procurement Document Control, required in part, measures shall be established to assure that applicable regulatory requirements, design bases, and other requirements which are necessary to assure adequate quality are suitably included or referenced in the documents for procurement of material, equipment, and services, whether purchased by the applicant or by its contractors or subcontractors.

Contrary to the above, since 2015, the date of installation, the licensee failed to assure measures that applicable regulatory requirements, design bases, and other requirements which are necessary to assure adequate quality are suitably included or referenced in the documents for procurement of material such as measures to ensure the control of unidentified embedded digital devices in the design and testing of commercial grade basic components.

Enforcement Action: This violation is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On June 30, 2023, the inspectors presented the Quadrennial Focused Engineering Inspection (FEI) Commercial Grade Dedication results to Mr. Tony Williams Site Vice President and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Corrective Action

Documents

1860913,

1860914

CR 1857481

Motors stored in warehouse from info gathering

05/18/2023

CR 1857483

Circuit boards from info gathering

05/18/2023

CR 1860913

WO Issue ticket missing

06/14/2023

CR 1860914

WO 116534761 does not contain an issue ticket

06/06/2023

CR 1860915

WO 120463676 does not contain an issue ticket for

CRE546B

06/06/2023

CR 1862619

Update to TVA-NQA-PLN89-A, Update Reference to NP-

5652

06/14/2023

CR 1862808

NESSD DOC Only Discrepancy

06/15/2023

CR 1863460

Capacitor Shelf Life Discrepancy

06/20/2023

CR 1864568

CR 1163578 did not address all concerns.(IN2016-01 and

Part 21)

06/26/2023

CR 1864854

AMETEK Relay Unidentified Embedded Digital Device

06/27/2023

CR 1864898

AMETEK Relay Unidentified Embedded Digital Device

06/27/2023

CR 1865139

Part 21 tracker

06/28/2023

CR 1865502

23 NRC Commercial Grade Dedication Inspection -

Green NCV: PEG Procedures

06/29/2023

CR 1865505 Rev

23 NRC Commercial Grade Dedication Inspection -

Minor Violation - Shelf Life

06/29/2023

CR 1865507

23 NRC Commercial Grade Dedication Inspection -

Observation - ASL restrictions

06/29/2023

CR 1865510 Rev

23 NRC Commercial Grade Dedication Inspection -

Observation - Shelf Life notes

06/29/2023

Corrective Action

Documents

Resulting from

Inspection

CR 1865512

Rev1

23 NRC Commercial Grade Dedication Inspection -

Observation - Shelf Life guidance

06/29/2023

1-45W709-2

CWM252F

Wiring Diagrams, Charger, Inverter and Misc. Equipment

Sheet 2

Rev 0

1-45W760-211-

Wiring Diagram 6900 Shutdown Power-Train A&B

Schematic Diagram

R21

71111.21N.03

Drawings

1-45W760-63-6

Wiring Diagrams, Safety Injection System Schematic

Rev 10

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

BVB012C

45W1766-2

BVB012C

Wiring Diagrams,480V Reactor MOV Board 1A1-A

Connection Diagram Sheet 2

Rev 11

WBN-1-45W751-

BVB012C

Wiring Diagrams,480V Reactor MOV Board 1A1-A Single

Line Sheet 2

Rev 37

WBN-1-45W751-

5-CC CWM252F

Wiring Diagrams,480V Reactor MOV Board 1A2-A Single

Line Sheet 2

Rev 38

WBN-45B1767-

13B-AC

004296917

CWM252F

Wiring Diagrams,480V Reactor MOV Board 1A2-A,

Connection Diagram Compartment 13B

Rev 3

WBN-TVDD9954

3/4 Series Y Type Globe Valve

Rev. 11

2016N-72 VAS

NUPIC JOINT UTILTIES AUDIT of AMETEK

SOLIDSTATE CONTROLS AUE # VA16-003 / NUPIC #

24149 COLUMBUS, OH, 11/06/2016

11/06/2016

PO 2234885

GE Industrial Solutions Inc., Lubricant, Oil, QA 2, Drum

Rev. 1

PO 3140696

Flowserve Corp., Guide, Valve, QA 1, SS

Rev. 1

PO 4895928

Ametek Solidstate Controls, Board, Circuit, QA 1, Voltage

Sensing, 120, 1 PH

Rev. 1

PO 5573688

Ametek Solidstate Controls, Board, Circuit, QA 1,

Assembly

Rev. 1

PO 6673375

Engine Systems Inc., Fitting, Connection, QA 1

Rev. 1

PO 6929387

GE Industrial Solutions Inc., Lubricant, grease, QA 2,

Lithium complex, NLGI grade 2, 14oz, paste, tube

Rev. 0

TVA Receiving

Report PO

27610 - 2

Vendor QUAL TECH NP, Gould Inc, Circuit Breaker

9/29/2017

TVA Receiving

Report PO

200052 - 1

Vendor QUAL TECH NP, Siemens Energy & Automation,

Circuit Breaker

4/22/2020

TVA Receiving

Report PO

6679142 - 1

Vendor Engine Systems Inc, Circulating Oil Pump

Assembly 1 NPT, W/Electric Motor TEFC 460V, 3 phase,

Hz

4/13/2021

Miscellaneous

TVA Supply

BREAKER,CIRCUIT, QA 1, THERMAL MAGNETIC, 480,

4/29/2020

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Chain Review

(SCR) 102990

80, 3, 60, 3, 125 A

WBN-VTD-A998-

0040

AMETEK SOLIDSTATE CONTROLS INSTRUCTION &

OPERATING MANUAL WITH DRAWINGS DUAL 20 AMP

BATTERY CHARGERS IN SINGLE ENCLOSURE

Rev. 1

0-MI-57.034

Agastat Time Delay Relays

Rev 4

0-SI-236-63

25V DC Vital Battery Charger III Test

Rev. 13

CEB-SS-5.10

Seismic Qualification of Electrical, Mechanical, and I&C

Devices

Rev. 3

CEB-SS-5.10

Seismic Qualification of Electrical, Mechanical, and I&C

Devices

Rev. 4

DS-M18.2.18

Std Procurement Notes

Rev 30

DS-M18.2.18

Standardized Procurement Notes

Rev 30

NEDP-8.0

Evaluations for Procurement of Materials, Items, and

Services

Rev. 8

NEDP-8.0

Evaluations for Procurement of Materials, Items, and

Services

Rev. 0

NEDP-8.2

Technical Evaluation for Procurement of Safety Related

and Quality Related Materials, Items, and Services

Rev 1

NEDP-8.3

Supplier Submittals

Rev. 4

NEDP-8.3

Supplier Submittals

Rev. 4

NEDP-8.4

Equivalency Evaluation for Procurement and Use of

Replacement Materials and Items

Rev. 0007

NEDP-8.4

Equivalency Evaluation for Procurement and Use of

Replacement Materials and Items

Rev. 7

NEDP-8.5

Other Evaluations

Rev. 7

NEDP-8.5

Other Evaluations

Rev. 0007

NEDP-8.5

Other Evaluations

Rev 7

NPG-SPP-03.16

Supplier Audits, Surveys, Source Surveillances and ASL

Maintenance

Rev. 16

Procedures

NPG-SPP-

04.001

Procurement of Material, Labor and Services

Rev. 0014

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

NPG-SPP-

04.001

Procurement of Material, Labor, and Services,

Rev 14

NPG-SPP-

04.002

Material Receipt and Inspection

Rev. 4

NPG-SPP-

04.002

Material Receipt and Inspection

Rev. 0

NPG-SPP-

04.004

Material Issue, Control and Return

Rev. 1

NPG-SPP-09.3

Plant Modifications and Engineering Change Control

Rev. 0038

P.S.4.M.1.5

CLASSIFICATION, PROCUREMENT, RECEIPT AND

USE OF LUBRICANTS

Rev. 5

Work Orders

119909145,

117648487,

21842856,

119684290,

20277320,

119190332,

2663418,

21461932,

115700387