Letter Sequence Other |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement
Results
Other: 05000361/LER-1984-001, :on 840111,preparation of Fire Hazard Analysis & Review of Fire Protection Surveillance Results Identified Deficiencies in Fire Protection Program.Review in Progress. Complete Rept Will Be Submitted by 840228, 05000361/LER-1984-001-01, :on 840111,preparation of Updated Fire Hazards Analysis Resulted in 91 Nonconformance Repts (NCR) Re Fire Protection Program Deficiencies.Compensatory Measures Established.Ncr Dispositions Planned, L-85-001, Comments on Generic Ltr 85-01, Fire Protection Policy Steering Committee Rept. Revised Interpretations of App R Requirements,Proposed Enforcement Action Guidance & Proposed Fire Protection License Condition Encl, ML13309B382, ML13310A255, ML13310B109, ML13310B303, ML13311A389, ML13316A877, ML13317A139, ML13317A430, ML13317B481, ML13317B484, ML13317B485, ML13323A455, ML13324A724, ML13324A726, ML13324A804, ML13324A807, ML13324A839, ML13326A740, ML13326A742, ML13330B160, ML13330B373, ML13331A845, ML13331A954, ML13333B085, ML13333B918, ML19324A617, ML20133D318, ML20141N665, ML20153F883, ML20199B108, ML20205G800, ML20207A610, ML20210D527, ML20210S805, ML20211M577, ML20211P095, ML20214Q977, ML20245B716
|
MONTHYEARML19317G9761977-12-0808 December 1977 Responds to NRC 770804 Request.Forwards Review of Requirements,Commitments & Procedures in Conjunction W/ Proposed Tech Specs Re Fire Protection.Util Has Complied W/Fire Protection Responsibilities During NRC Audits Project stage: Request ML19309A1261978-02-28028 February 1978 Double Bibbed Supplied-Air Hood, Prepared for Doe.Fr Notice Re Respiratory Protective Devices,Tests for Permissability & Fees Encl Project stage: Request IR 05000312/19780081978-06-19019 June 1978 IE Investigation Rept 50-312/78-08 on 780609.No Noncompliance Noted.Major Area Investigated:Allegation That Bechtel Neglected to Correct Significant Design Error in 1972 Project stage: Request ML19269B7831978-11-14014 November 1978 Responds to NRC 780921 Rejection of Design Criteria for Installation of Ionization Detectors in Areas Containing Both Combustibles & Equipment/Cables Required for Safe Shutdown.Requests Approval of Schedule to Make Related Mods Project stage: Request ML20148T4491978-12-0101 December 1978 Application for Amend 61 to License DPR-54,reflecting Changes to Table 3.1 of Fire Protection Safety Evaluation Project stage: Request ML13317B4841979-04-26026 April 1979 Reactor Overpressurization System PT-425X1 & PT-425X2 Installation Detail Project stage: Other IR 05000361/19820181982-06-0303 June 1982 IE Insp Rept 50-361/82-18 on 820413-16.No Noncompliance Noted.Major Areas Inspected:Emergency Plan Exercise & Associated Critiques Project stage: Request ML13302A5631982-06-30030 June 1982 Forwards Revision 5 to Physical Security Plan.Revision Withheld (Ref 10CFR73.21) Project stage: Request ML13317A4301982-11-22022 November 1982 Discusses Implementation of Safe Shutdown Mods to Minimize Risk of Addl Retrofit & Installation Schedule Per Request Re Fire Protection Program Review.All Mods Will Be Completed Prior to Cycle 11 Startup Project stage: Other ML13317A4171982-11-22022 November 1982 Forwards Comments on Technical & Safety Evaluation Repts for SEP Topic VI-4 Re Containment Isolation Sys (Electrical),In Response to NRC .Comments Delineate Differences Between Facility Design & Licensing Bases Project stage: Request ML13317A4641982-12-15015 December 1982 Forwards Conceptual Study of Remote Shutdown Panel & Associated Circuits Evaluation Re App R,Section III.G.3 & NRC Request for Info, Supplementing 820630 Response to Generic Ltr 81-12,dtd 810220 Project stage: Supplement ML13333A9411982-12-31031 December 1982 Conceptual Study of Remote Shutdown Panel & Associated Circuits Evaluation Re App R,Section III.G.3 & NRC Request for Info Project stage: Request ML13326A7401983-03-23023 March 1983 Exemption to Time Allowed to Complete Mods & Additions to Fire Protection Features.Date Extended to 831031 Project stage: Other ML13326A7421983-03-23023 March 1983 Notice of Issuance & Availability of Exemption to Time Allowed to Complete Mods & Additions to Fire Protection Features Project stage: Other ML13317A1391983-04-25025 April 1983 Corrects NRC Re Fire Protection Mods for Items 3.1.14 & 3.1.7(b) of Fire Protection Ser.Ref Cited Should Be 10CFR50.48(d)(3),not 10CFR50.48(d)(2) Project stage: Other ML13317B4851983-07-27027 July 1983 Wiring Diagram Nuclear Misc Devices:Press,Temp,Level & Flow Sws, as-built Project stage: Other ML13333B9181983-08-0404 August 1983 Advises That Only Rancho Seco & San Onofre 1 in Region V Remain to Be Inspected Per 10CFR50,App R,Section Ii.G Re Fire Protection.Rancho Seco to Be Inspected Between Mar & Sept 1984.San Onofre 1 to Be Inspected in Late FY85 Project stage: Other ML13310B1091983-12-0505 December 1983 Addresses Fee Requirements of 10CFR170 Re Actions Concerning Fire Protection Requirements of 10CFR50.Current NRC Policy Is to Exempt from Fees All Fire Protection Exemptions Granted Per 10CFR50.12 Unless License Amend Required Project stage: Other ML13305A5141984-02-10010 February 1984 Forwards Updated FSAR for San Onofre Nuclear Generating Station,Units 2 & 3,Vols 1-22.Update Submitted as Complete New Fsar,Removing Amend Numbers from Text & Corresponding Margin & Change Bars & Repaginating Pages Project stage: Request 05000361/LER-1984-001, :on 840111,preparation of Fire Hazard Analysis & Review of Fire Protection Surveillance Results Identified Deficiencies in Fire Protection Program.Review in Progress. Complete Rept Will Be Submitted by 8402281984-02-13013 February 1984
- on 840111,preparation of Fire Hazard Analysis & Review of Fire Protection Surveillance Results Identified Deficiencies in Fire Protection Program.Review in Progress. Complete Rept Will Be Submitted by 840228
Project stage: Other 05000361/LER-1984-001-01, :on 840111,preparation of Updated Fire Hazards Analysis Resulted in 91 Nonconformance Repts (NCR) Re Fire Protection Program Deficiencies.Compensatory Measures Established.Ncr Dispositions Planned1984-02-28028 February 1984
- on 840111,preparation of Updated Fire Hazards Analysis Resulted in 91 Nonconformance Repts (NCR) Re Fire Protection Program Deficiencies.Compensatory Measures Established.Ncr Dispositions Planned
Project stage: Other ML13309B3821984-03-19019 March 1984 Forwards Updated Fire Hazards Analysis,Vols 1-4 Project stage: Other ML13310B3031984-03-26026 March 1984 Responds to NRC Fire Protection Review of Installed Mods & Two Areas of Nonconformance.Corrective Actions:Addl Fire Stop Installation Expected to Be Complete Prior to Startup from Present Outage & Pressure Verification Retested Project stage: Other ML13310A2551984-04-30030 April 1984 Conceptual Design for Dedicated Safe Shutdown Sys Project stage: Other ML13330A1701984-12-13013 December 1984 Forwards Request for Addl Info Re Dedicated Shutdown Sys for Fire Protection.Info Requested within 45 Days of Ltr Receipt Project stage: RAI L-85-001, Comments on Generic Ltr 85-01, Fire Protection Policy Steering Committee Rept. Revised Interpretations of App R Requirements,Proposed Enforcement Action Guidance & Proposed Fire Protection License Condition Encl1985-04-0303 April 1985 Comments on Generic Ltr 85-01, Fire Protection Policy Steering Committee Rept. Revised Interpretations of App R Requirements,Proposed Enforcement Action Guidance & Proposed Fire Protection License Condition Encl Project stage: Other ML13311A3891985-05-21021 May 1985 Forwards Addl Info Re Util 840424 Submittal Concerning Dedicated Shutdown Sys (Dss),Per 841213 Request.Util Proceeding W/Efforts to Comply W/Schedules for Completion of Mods,Including DSS Mods,Established by 830323 Exemption Project stage: Other ML13333B2661985-05-22022 May 1985 Notification of 850625 Meeting W/Util in Bethesda,Md to Discuss Util Approach to Complying W/Section Iii.G of App R Project stage: Meeting ML13333B2761985-06-18018 June 1985 Notification of Rescheduled 850626 Meeting W/Util in Bethesda,Md to Discuss Approach to Meeting App R, Section Iii.G Project stage: Meeting ML13333B2801985-07-16016 July 1985 Summary of 850606 Meeting W/Util,Impell & Fluor Re Util Approach to Meeting Requirements of Section Iii.G of App R to 10CFR50 Concerning Fire Protection.Mods Will Be Completed During Outage Beginning on 851130.Viewgraphs Encl Project stage: Meeting ML13324A7261985-09-30030 September 1985 Requests Extension Until 851004 to Submit Info on App R, Section Iii.G Compliance Plans & Response to Generic Ltr 81-12,per 850919 Commitment Re Fire Protection Program Review Project stage: Other ML13333B0851985-09-30030 September 1985 Rev 0 to Southern California Edison San Onofre Nuclear Generating Station Unit 1 Generic Ltr 81-12 Response Project stage: Other ML13323A4551985-09-30030 September 1985 Rev 0 to Southern California Edison San Onofre Nuclear Generating Station,Unit 1 10CFR50,App R Exemption Requests Project stage: Other ML20133D3181985-09-30030 September 1985 Rev 0 to San Onofre Nuclear Generating Station Unit 1 10CFR50,App R,Section Iii.G Compliance Evaluation Project stage: Other ML13324A7241985-10-0404 October 1985 Forwards Southern California Edison...Generic Ltr 81-12 Response, Design Description for Dedicated Safe Shutdown Sys, Southern California...10CFR50 App R Exemption Requests & San Onofre...Evaluation.. Project stage: Other ML13333B3161985-11-0808 November 1985 Notification of 851114 Meeting W/Util in Bethesda,Md to Discuss Util App R Submittal Re Fire Protection Project stage: Meeting ML13316A8801985-12-0202 December 1985 Evaluation of Exemption Requests from 10CFR50.48 & App R to 10CFR50, Request for Info Project stage: Request ML20207A6101985-12-0303 December 1985 Forwards List of Current Fire Protection Enforcement Actions,Per 851106 Request.Suggested Schedule for Affected Licensees to Comply W/App R Requirements Will Be Provided Project stage: Other ML13316A8771985-12-10010 December 1985 Forwards Franklin Research Request for Info Re 851004 Exemption Requests from 10CFR50.48 & App R to 10CFR50 Project stage: Other ML13317B4811985-12-31031 December 1985 Forwards Addl Info Re Compliance w/10CFR50,App R Safe Shutdown Requirements,Per NRC 851004,1115 & 1210 Requests. Response to Question 8 Delayed Until 860124 Due to Planned NRC 860114 & 15 Visits.W/Two Oversize Drawings Project stage: Other ML13331A8451985-12-31031 December 1985 Requests Fee for 851004 Application Requesting Fire Protection Exemptions Project stage: Other ML20137A6801986-01-0707 January 1986 Notification of 860113 Meeting W/Util in San Clemente,Ca to Review App R Fire Protection Submittal,Including Exemptions Requested for Certain Areas of Facility Project stage: Meeting ML13333B3311986-01-17017 January 1986 Summary of 851114 Meeting W/Licensee to Discuss App R Compliance Review,Including Design of Dedicated Shutdown Sys,Review of Exemptions from NRC Requirements Submitted or Pending & Possible Deviations from NRC Guidance Project stage: Meeting ML13324A8041986-02-14014 February 1986 Forwards Rev 2 to Updated Fire Hazards Analysis.Rev Includes Addl Info Which Amplifies,Clarifies or Updates Existing Text & Reflects All Changes to Facilities Up to 6 Months Prior to Filing Project stage: Other ML13324A8071986-02-18018 February 1986 Forwards List of Fire Areas Where Operator Action Necessary to Achieve Safe Shutdown W/Timing Requirements & List of All Exemption Requests Submitted,Per NRC 860113 Request During Site Visit Project stage: Other ML13331A8481986-02-25025 February 1986 Forwards Fee for 851004 Application for Review of Fire Protection Program,Per 851231 Request Project stage: Request ML20141N6651986-03-11011 March 1986 Responds to 860220 Request for Info Re Secy 85-306,including Licensees Using New Interpretations of App R to 10CFR50 & Effect of New Interpretations on Compliance Schedules in EDO 851226 Memo.List of Plants Requesting Evaluations Provided Project stage: Other ML13324A8391986-04-23023 April 1986 Forwards Rev 1 to 01-0310-1435, San Onofre Generating Station Unit 1,10CFR50,App R,Section Iii.G Compliance Evaluation. Rev Incorporates Evaluation of Circuits for Which Field Walkdown Required Project stage: Other ML13324A8551986-05-15015 May 1986 Forwards Safety Evaluation Accepting Listed Util Submittals Re Sections III.G.3 & Iii.L of App R to 10CFR50 Re Alternative Shutdown Capability Design Project stage: Approval ML13324A8581986-05-15015 May 1986 Safety Evaluation Accepting Util Proposed Alternative Shutdown Capability Design in Event of Fire to Comply w/10CFR50 App R Requirements Project stage: Approval 1984-03-26
[Table View] |
Text
_ - _ _ _ _ _. _
s
?
Southem Cellfomia Edison Company R. o..o x so o 2244 WALNUT OROVE AVENUC ROS LM CAQ. CALIFoRNI A 91770 w
P t CC 48304 40s September 2,1988 U. S. Nuclear Regulatory Commission Attention: Document Control Oesk Hashington, D.C.
20555 Gentlemen:
Subject:
Docket Nos. 50-206, 50-361 and 50-362 Updated Fire Hazards Analysis San Onofre Nuclear Generating Station Units 1, 2 and 3 (TAC Nos. 54814 and 54815)
In accordance with 10 CFR 50.71, Southern Cali Srnia Edison Company (SCE) is transmitting Revision 4 of the Updated Fire Hazards Analysis (UFHA) for the San Onofre Nuclear Generating Station, Units 1, 2 and 3.
This annual revision includes additional information which amplifies, clarifies or updates the existing text and reflects all changes made in the San Onofre Units 1, 2 and 3 facility up to a maximum of six months prior to the date of this filing.
Changes to the UFHA identified after the six-month cutoff date will be incorporated in the next revision to the UFHA.
Revision 4 consists of the appropriate revised UFHA pages for San Onofre Units 1, 2 and 3.
Each revised page includes a vertical change bar drawn in the margin adjacent to the changed portion, the date of the change and the corresponding revision number.
This revision to the UFHA represents a significant effort by SCE to reflect a reassessment of San Onofre Units 2 and 3 relative to the requirements of 10 CFR 50, Appendix R, Sections III.G III.J. III.L and III.0, including I
deviations thereto approved in the NRC's Safety Evaluation dated June 29 I
1988.
Revision 4 to the UFHA also reflects revisions to the fire protection l
program and the proposed Fire Protection Technical Specifications and License Conditions (PCN-10/15-243 and -244, respectively) for San Onofre Units 2 I
and 3.
In addition, the San Onofre Unit I specific information has been revised to reflect changes to the Unit I facility and revisions to the 10 CFR 50, Appendix R, Section III.G (safe shutdown) compliance assessment.
This revision to the UFHA does not alter any conclusions regarding the pyh e
i i
e
'h3 b s
m
F.
s Document Control Desk September 2.1988 ability to achieve and maintain safe shutdown in the event of a fire for San Onofre Units 1, 2 and 3.
This submittal fulfills the requirements of 10 CFR 50.71 for both San Onofre Unit 2 and Unit 3.
I' If you have any questions regarding this matter, please call me.
Very truly yours, s~-
Enclosure cc:
(all w/o enclosure)
J. B. Martin, Regional Administrator, NRC Region V F. R. Hurv, NRC Senior Resident Inspector, San Onofre Units 1, 2 and 3 D. J. Kuo.cki, NRC Staff C. B. Ramsey Inspector, NRC Region V w#
k
7 e
a e UNITED STATES OF AMERICA NUCLEAR REGULATORY C0044ISSION Application of SOUTHERN CALIFORNIA EDISON
)
COMPANY and SAN DIEGO GAS & ELECTRIC COMPANY )
for a Class 104(b) License to Acquire,
)
DOCKET NO. 50-206, Unit 1 Pcssess, and Use a Utilization Facility as
)
UPDATED FHA REVISION 4 Part of Unit No. I of the San Onofre Nuclear )
Generating Station
)
SOUTHERN CALIFORNIA EDISON COMPANY and SAN DIEGO GAS & ELECTRIC COMPA submit Revision 4 to the Updated Fire Hazards Analysis (UFHA) for San Onofre Nuclear Generating Station, Units 1, 2 and 3.
This revision to the UFHA includes additional information which amplifies, clarifies or updates the original text and reflects all changes up to a maximum of 6 month erlor to the date of this filing for San Onofre Units 1, 2 and 3.
This revision to the UFHA reflects a reassessment of San Onofre Units 2 and 3 relative to the requirements of 10 CFR 50, Appendix R, Sections III.G III.J. III.L and III.0, including NRC approved deviations thereto.
This submittal fulfills the requirements of 10 CFR 50.71 for both San Onofre Unit 2 and Unit 3.
The Unit 1 specific information has been revised to reflect changes to the Unit 1 facility and revisions to the 10 CFR 50, Appendix R, Section III.G (safe shutdown) compliance assessment.
The information included in this revision supersedes and replaces the previously issued UFHA information.
L J
s e i
Subscribed on this 2nd day of Santomber
, 1988.
Respectfully submitted, SOUTHERt CALIFORNIA EDISON COMPANY By:
s/s Kenneth P. Baskin Subscribed and sworn to before me this 2nd day of smotember s/s C. Sally Sabo Notary Public in and for the County of Los Angeles, State of California Charles R. Kocher James A. Booletto Attorneys for Southern California Edison Company gy.
s/s Charles R. Kocher B
i e
4 SAN DIEGO GAS & ELECTRIC COMPANY By:
s/s Gary D. Cotton l
l l
l David R. Pigott i
Samuel B. Casey Orrick, Herrington & Sutcliffe i
Attorneys for San Diego l
Gas & Electric Company By:
s/s David R. Pigott Subscribed and sworn to before me this 16th day of Auaust 1988 l
s/s Steohanie E. Hitt Notary Public in and for the City and County of San Diego, California s
e e
i UNITED STATES OF AMERICA NUCLEAR REGULATORY COMISSION In the Matter of SOUTHERN
)
CALIFORNIA EDISON COMPANY
)
and SAN DIEGO GAS & ELECTRIC
)
Docket No. 50-206 COMPANY (San Onofre Nuclear
)
Generatina Station Unit No. 1
)
CERTIFICATE OF SERVICE I hereby certify that a copy of the Updated Fire Hazards Analysis for San Onofre Unit 1 (Revision 4 to the UfHA for San Onofre Units 1, 2 and 3) was served on the following by deposit in the United States Hall, postage prepaid, on the Mth day of Seotember 1986.
Benjamin H. Vogler, Esq.
Staff Counsel U.S. Nuclear Regulatory Comission Hashington, D.C.
20555 David R. Pigott, Esq'.
Samuel B. Casey, Esq.
Orrick, Herrington & Sutcliffe 600 Montgomery Street San Francisco, California 94111 L. G. Hinkleman Bechtel Power Corporation P.O. Box 60860, Termina' Annex Los Angeles, California 90060 Michael L. Mellor, Esq.
Thelen, Harrin, Johnson & Bridgas Two Embarcadero Center San Francisco, California 94111 Huey Johnson Secretary for Resources State of California 1416 Ninth Street Sacramento, California 95814 Janice E. Kerr, General Counsel California Public Utilities Commission 5066 State Building San Francisco, California 94102
)
L
)
C. J. Craig Manager U.S. Nuclear Projects I, ESSD Westinghouse Electric Corporation Post Office Bor 355 Pittsburgh, Pennsylvania 15230 A. I. Gaede 23222 Cheswald Drive Laugna Niguel, California 92677 Frederick E. John, Executive Director California Public Utilities Commission 5050 State Building 1
San Francisco, California 94102 Docketing and Service Section Office of the Secretary U.S. Nuclear Regulatory Commissian Washington, D.C.
20555 C bbQ $P bC.h Charles R. Kocher l
Associate General Counsel Southern California Edison Company
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Application of SOUTHERN CALIFORNIA EDISON
)
COMPANY, EI S. for a Class 103 License to )
DOCKET NO. 50-361, Unit 2 Acquire, Possess, and Use Two Utilization
)
UPDATED FHA REVISION 4 Facilities and Related Licenses in
)
Connection with Units No. 2 and 3 of the
)
DOCKET NO. 50-362 Unit 3 San Onofre Nuclear Generating Station
)
UPDATED FHA REVISION 4 SOUTHERN CALIFORNIA EDISON COMPANY, EI R. hereby submit Revision 4 to the Updated Fire Hazards Analysis (UFHA) for San Onofre Nuclear Generating Station Units 1, 2 and 3.
This revision to the UFHA includes additional information which amplifies, clarifies or updates the original text and reflects all changes up to a maximum of 6 months prior to the date of this filing for San Onofre Units 1, 2 and 3.
This revision to the UFHA reflects a reassessment of San Onofre Units 2 and 3 relative to the requirements of 10 CFR 50, Appendix R. Sections III.G, III.J III.L and III.0, including NRC approved deviations thereto.
This submittal fulfills the requirements of 10 CFR 50.71 for both San Onofre Unit 2 and Unit 3.
The Unit I specific information has been revised to reflect changes to the Unit I facility and revisions to the 10 CFR CO, Appendix R Section III.G (safe shutdown) compliance assessment.
The information included in this revision supersedes and replaces the previously issued UFHA information.
L
Subscribed on this 2nd.. day of Snotember
, 1988.
Respectfully submitted, SOUTHERN CALIFORNIA EDISON COMPANY By:
s/s Kenneth P. Baskin Subscribed and sworn to before me this 2nd day of Sectember s/s C. Sally Sebo Notary Public in and for the County of Los Angeles, State of California Charles R. Kocher James A. Beoletto Attorneys for Southern California Edison Company gy.
s/s Charles R. Kocher i
C,1 s
a e
i' i
SAN DIEGO GAS & ELECTRIC COMPANY i
By:
s/s Gary D. Cotton David R. Pigott i
Samuel B. Casey Orrick, Herrington & Sutcliffe Attorneys for San Diego i
Gas & Electric Company j
i By:
s/s David R. Pigott t
Subscribed and sworn to before me this 16th day of Auoust 1988 I
I s/s Steohanie E. Hitt i
Notary Public in and for the City and County of San Diego, California i
i I
l t
i i
e
N THE CITY OF ANAHEIM By:
s/s Gordon W. Hoyt Alan R. Watts Rourke & Woodruff Attorneys for the City of Anaheim By:
___s/s Alan R. Watts Subscribed and sworn to before me this lith day of August. 1988 eft cathv varnew
__Notary Public in a'nd for the County of Orange. State of California him i i
~
f
s THE CITY OF RIVERSIDE By:
s/s B. D. Carnahan Alan R. Hatts Rourke & Hoodruff Attorneys for the City of Riverside By:
s/n Alan R. Watte Subscribed and sworn to before me this 15th day of August. 1988 t/s Marriaret f. Archambault Notary Public'in and for the County of Riverside
, State of California
TO UFHA MANUAL HOLDERS:
i INSTRUCTIONS FOR THE l
INCORPORATION OF THE SONGS 1,2&3 i
UPDATED FIRE HAZARDS ANALYSIS REVISION 4.0 i
REVISION 4 IS A COMPLETE REPRINT 0F THE FHA.
PLEASE REMOVE ALL EXISTING CONTENTS i
FROM THE UFHA BINDERS AND DISCARD.
PLACE THE ATTACHED B0UND VOLUMES IN THE CORRESPONDING BINDER.
THANK YOU, NES&L SERVICES i
l
.