ML12115A070

From kanterella
Jump to navigation Jump to search
Summary of Public Meeting with Surry Power Station, Unit 2 to Discuss a Preliminary White Finding Involving One Apparent Violation of Technical Specification 6.4.A.7
ML12115A070
Person / Time
Site: Surry Dominion icon.png
Issue date: 04/24/2012
From: Gerald Mccoy
NRC/RGN-II/DRP/RPB5
To: Heacock D
Virginia Electric & Power Co (VEPCO)
Catherine Morrison
References
Download: ML12115A070 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 April 24, 2012 Mr. David A. Heacock President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060

SUBJECT:

PUBLIC MEETING

SUMMARY

- SURRY POWER STATION, UNIT 2 DOCKET NO. 50-281

Dear Mr. Heacock:

This refers to the Category 1 public meeting which was held on April 19, 2012, at the U.S. NRC Region 2 office in Atlanta, GA. The meeting was a regulatory conference, which was convened in order to discuss a preliminary White finding involving one Apparent Violation (AV) of Technical Specification (TS) 6.4.A.7 associated with Surry Unit 2 reactor coolant system (RCS) standpipe level erratic indications. This issue was documented in NRC Inspection Report No.

05000280, 281/2012007 (ML120730510). A listing of the meeting attendees and a copy of the information presented during the meeting are enclosed.

In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its enclosures will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (Public Electronic Reading Room).

Should you have any questions concerning this meeting, please contact me at (404) 997-4551.

Sincerely,

/RA/

Gerald J. McCoy, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket No.: 50-281 License No.: DPR-37

Enclosures:

1. List of Attendees
2. Dominion Presentation

April 24, 2012 Mr. David A. Heacock President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060

SUBJECT:

PUBLIC MEETING

SUMMARY

- SURRY POWER STATION, UNIT 2 DOCKET NO. 50-281

Dear Mr. Heacock:

This refers to the Category 1 public meeting which was held on April 19, 2012, at the U.S. NRC Region 2 office in Atlanta, GA. The meeting was a regulatory conference, which was convened in order to discuss a preliminary White finding involving one Apparent Violation (AV) of Technical Specification (TS) 6.4.A.7 associated with Surry Unit 2 reactor coolant system (RCS) standpipe level erratic indications. This issue was documented in NRC Inspection Report No.

05000280, 281/2012007 (ML120730510). A listing of the meeting attendees and a copy of the information presented during the meeting are enclosed.

In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its enclosures will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (Public Electronic Reading Room).

Should you have any questions concerning this meeting, please contact me at (404) 997-4551.

Sincerely,

/RA/

Gerald J. McCoy, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket No.: 50-281 License No.: DPR-37

Enclosures:

1. List of Attendees
2. Dominion Presentation G PUBLICLY AVAILABLE G NON-PUBLICLY AVAILABLE G SENSITIVE G NON-SENSITIVE ADAMS: G Yes ACCESSION NUMBER:_PKG ML12115A066_____________ G SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE GJM1 for GJM1 NAME SNinh GMcCoy DATE 04/24/2012 04/24/2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: G:\DRPII\RPB5\SURRY\SURRY-REGULATORY CONFERENCE\SLIDES\THUMBDRIVE\SURRY RCS STANDPIPE -MEETING

SUMMARY

.DOCX

VEPCO 2 cc w/encl: Michael M. Cline Larry Lane Director Site Vice President Virginia Department of Emergency Services Surry Power Station Management Virginia Electric and Power Company Electronic Mail Distribution Electronic Mail Distribution B. L. (Sonny) Stanley Director, Nuclear Safety and Licensing Virginia Electric and Power Company Electronic Mail Distribution Kenny B. Sloane Plant Manager Surry Power Station Virginia Electric & Power Company Electronic Mail Distribution Lillian M. Cuoco, Esq.

Senior Counsel Dominion Resources Services, Inc.

Electronic Mail Distribution Tom Huber Director, Nuclear Licensing & Operations Support Innsbrook Technical Center Electronic Mail Distribution Ginger L. Rutherford Virginia Electric and Power Company Electronic Mail Distribution Virginia State Corporation Commission Division of Energy Regulation P.O. Box 1197 Richmond, VA 23209 Attorney General Supreme Court Building 900 East Main Street Richmond, VA 23219 Senior Resident Inspector Surry Power Station U.S. Nuclear Regulatory Commission 5850 Hog Island Rd Surry, VA 23883

VEPCO 3 Letter to David A. Heacock from Gerald J. McCoy dated April 24, 2012

SUBJECT:

PUBLIC MEETING

SUMMARY

- SURRY POWER STATION, UNIT 2 DOCKET NO. 50-281 Distribution w/encl:

C. Evans, RII EICS L. Douglas, RII EICS OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMSurry Resource

OPEN REGULATORY CONFERENCE SURRY POWER STATION, UNIT 2 APRIL 19, 2012 NRC REGION II, ATLANTA, GEORGIA ATTENDEES Dominion L. Lane, Site Vice President, Surry B. Stanley, Director, Station Safety and Licensing C.Olsen, Director, Station Engineering, Surry J. Harrell, Manager, Nuclear Engineering, Surry A. Moldenhauer, Nuclear Engineer, PRA, Surry D. Sommers, Supervisor, Corporate Licensing B. Garber, Supervisor, Station Licensing J. Lash, I&C Engineer, Surry R. Dunkle, Senior I&C Tech, Surry L. Lauf, Supervisor, Surry NRC V. McCree, Regional Administrator, Region II (RII)

R. Croteau, Director, Division of Reactor Projects, RII H. Christensen, Deputy Director, Division of Reactor Safety (DRS), RII G. McCoy, Chief, Reactor Projects Branch 5, DRP, RII J. Nadel, Resident Inspector, Surry, RII R. Clagg, Resident Inspector, North Anna, RII C. Evans, Regional Council, RII S. Sparks, Senior Enforcement Specialist, RII G. Waig, Technical Reviewer, Office of Nuclear Reactor Regulation (NRR)

N. Coleman, Office of Enforcement (OE)

G. MacDonald, Senior Reactor Analyst, RII A. Zoulis, Reliability and Risk Analyst, NRR S. Ninh, Senior Project Engineer, RII T. Stephen, RIDP, RII J. Rivera, RII Public (by phone)

P. Bacque, Newspaper - RTD R. Zuercher, Dominion K. Cotton, NRR A. Foli, NRR G. Kolcum, Senior Resident Inspector, North Anna S. Sanchez, Senior Resident Inspector, Surry S. Vaughn, NRR S. Weerakkody, Chief, PRA Operational Support Branch, NRR*

F. Ferrante, Reliability and Risk Analyst, NRR Enclosure 1