ML24143A162

From kanterella
Jump to navigation Jump to search

– Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times
ML24143A162
Person / Time
Site: Surry, North Anna  
Issue date: 06/12/2024
From: Geoffrey Miller
NRC/NRR/DORL/LPL2-1
To: Carr E
Virginia Electric & Power Co (VEPCO)
References
EPID L-2022-LLA-0166
Download: ML24143A162 (1)


Text

June 12, 2024 Mr. Eric S. Carr, President Nuclear Operations and Chief Nuclear Officer Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT:

CORRECTION TO ISSUANCE OF AMENDMENT NOS. 297 AND 280 FOR NORTH ANNA POWER STATION, UNIT NOS. 1 AND 2, AND AMENDMENT NOS. 317 AND 317 FOR SURRY POWER STATION, UNIT NOS. 1 AND 2, REGARDING CHANGES TO EMERGENCY PLAN STAFF AUGMENTATION TIMES (EPID L-2022-LLA-0166)

Dear Eric Carr:

On April 22, 2024 (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML24054A014), the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 297 to Renewed Facility Operating License (RFOL) No. NPF-4 and Amendment No. 280 to RFOL No. NPF-7 for the North Anna Power Station, Unit Nos. 1 and 2, and Amendment No. 317 to Subsequent RFOL DPR-32 and Amendment No. 317 to Subsequent RFOL No. DPR-37 for the Surry Power Station, Unit Nos. 1 and 2.

The amendments approved changes to the Emergency Preparedness Plan related to the staff emergency plan augmentation times.

Subsequently, your staff identified an error in the associated safety evaluation (SE).

Specifically, the SE didnt reflect a change in the request from the February 5, 2024, supplement (ML24036A318). The paragraph in Section 3.1.1 of the SE should be modified with the following deletion and addition:

In its letter dated November 7, 2022, as supplemented by letters dated March 30, 2023, October 12, 2023, and February 5, 2024, Dominion proposed to extend the ERO augmentation time for the TSC and CERC, which provide relief and augmentation for the command and control function, from within 60 minutes and 75 minutes, respectively, to within 90 minutes of an Alert or greater emergency classification. Dominion states that the two Unit Supervisors (Senior Reactor Operators) noted in the proposed North Anna and Surry Table 5.1 provide Control Room oversight and direct plant operations as required by Technical Specifications. The Operations Shift Manager, who is the third Senior Reactor Operator, provides emergency preparedness (EP) command and-control functions, including event classification and oversight of event response. The on-shift operations staff administrative requirements for North Anna and Surry as noted in the Dominion Fleet Procedure for Conduct of Operations exceed the

number of senior operators required by 10 CFR 50.54(m) and site Technical Specifications. The proposed change will maintain shift staffing consistent with the existing administrative procedures.

If you have any questions, please contact me at 301-415-2481, or via email at Ed.Miller@nrc.gov.

Sincerely,

/RA/

G. Edward Miller, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-338, 50-339, 50-280, and 50-281 cc: Listserv

Correction Letter: ML24143A162 OFFICE NRR/DORL/LPL2-1/PM NRR/DORL/LPL2-1/LA NRR/DORL/LPL2-1/BC NRR/DORL/LPL2-1/PM NAME GEMiller KGoldstein MMarkley GEMiller DATE 6/11/2024 05/23/2024 6/12/2024 6/12/2024