MONTHYEARIR 05000280/20240052024-08-26026 August 2024 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2024005 and 05000281-2024005), Rev 1 ML24179A2932024-07-0101 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24141A2862024-05-22022 May 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000280/2024403 and 05000281- 2024403 ML24115A1952024-04-24024 April 2024 Notification of Surry Power Station Comprehensive Engineering Team Inspection - U.S. NRC Inspection Report 05000280/2024011 and 05000281/2024011 ML24144A2432024-03-0808 March 2024 002 Radiation Safety Baseline Inspection Information Request IR 05000280/20230062024-02-28028 February 2024 Annual Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Reports 05000280/2023006 and 05000281/2023006 IR 05000280/20230052023-08-23023 August 2023 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2023005 and 05000281/2023005) IR 05000280/20220062023-03-0101 March 2023 Annual Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Reports 05000280/2022006 and 05000281/2022006 ML22339A1582022-11-30030 November 2022 Requalification Inspection Notification Letter IR 05000280/20220052022-08-24024 August 2022 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Reports 05000280/2022005 and 05000281/2022005) ML22223A1192022-08-14014 August 2022 RP Inspection Document Request Letter Final ML22168A0272022-06-15015 June 2022 Information Request for the Cyber-Security Baseline Security Inspection, Notification to Perform Inspection 05000280/2022404; 05000281/202240 IR 05000280/20210062022-03-0202 March 2022 Annual Assessment Letter for Surry Power Station, Units 1 and 2 (Reports No. 05000280/2021006 and 05000281/2021006) ML22018A0292022-01-18018 January 2022 Region 2 RFI - 2022 Program Inspections IR 05000280/20210052021-08-31031 August 2021 Mid-Cycle Letter Revised Updated Inspection Plan for Surry Power Station, Units 1 and 2 (05000280/2021005 and 05000281/2021005) ML21239A0052021-08-26026 August 2021 Updated Inspection Plan for North Anna Power Station, Units 1 and 2 - (Report 05000280/2021001 and 05000281/2021001) IR 05000280/20210012021-08-26026 August 2021 Updated Inspection Plan for Surry Power Station, Units 1 and 2 -(05000280/2021001 and 05000281/2021001) IR 05000280/20200062021-03-0303 March 2021 Annual Assessment Letter for Surry Power Station, Units 1 and 2 NRC Inspection Reports 05000280/2020006 and 05000281/2020006 ML21061A0292021-03-0101 March 2021 2021 Sur - POV Inspection Information Request ML21050A0352021-02-18018 February 2021 Radiation Safety Baseline Inspection Information Request ML20315A2492020-11-0909 November 2020 Requal Inspection Notification Letter W Materials List IR 05000280/20200052020-08-24024 August 2020 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2020005 and 05000281/2020005) ML20175A7802020-06-23023 June 2020 Heat Sink RFI ML20092J5002020-04-0101 April 2020 Radiation Safety Baseline Inspection Information Request IR 05000280/20190062020-03-0303 March 2020 Annual Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Reports 05000280/2019006 and 05000281/2019006 IR 05000280/20190052019-08-27027 August 2019 Updated Inspection Plan for Surry Power Station, Units 1 and 2, NRC Report 05000280/2019005 and 05000281/2019005 IR 05000280/20180062019-03-0404 March 2019 Annual Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Report 05000280/2018006 and 05000281/2018006 ML19057A1052019-02-26026 February 2019 License Renewal Phase 4 2019003 RFI - SD ML18283A7332018-10-0101 October 2018 Rad Safety Inspection RFI IR 05000280/20180052018-08-23023 August 2018 Updated Inspection Plan for Surry Power Station Units 1 and 2, NRC Report 05000280/2018005 and 05000281/2018005 ML18215A1252018-08-0303 August 2018 U2 ISI SGI 2018004 - Notification of Inspection and RFI (Public) IR 05000280/20170062018-02-28028 February 2018 Annual Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Reports 05000280/2017006 and 05000281/2017006, 05000280/2017402 and 05000281/2017402, 05000280/2017501 and 05000281/2017501 ML18037B1092018-02-0505 February 2018 Emergency Preparedness Inspection and Request for Information ML17290A0592017-10-13013 October 2017 Radiation Safety Inspection Document Request IR 05000280/20170052017-08-21021 August 2017 Updated Inspection Plan for Surry Power Station, Units 1 and 2 - Report 05000280/2017005 and 05000281/2017005 IR 05000280/20160062017-03-0101 March 2017 Annual Assessment Letter for Surry Power Station, Units 1 and 2 - Report 05000280/2016006 and 05000281/2016006 ML16307A1972016-11-0202 November 2016 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML16244A1262016-08-31031 August 2016 Mid-Cycle Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Report 05000280,281/2016005 ML16062A2732016-03-0202 March 2016 Annual Assessment Letter IR 05000280/20150052015-09-0101 September 2015 Mid-Cycle Letter for Surry Power Station Units 1 and 2 - NRC Assessment Report 05000280/2015005 and 05000281/2015005 ML15140A4142015-05-20020 May 2015 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000280/20140012015-03-0404 March 2015 Annual Assessment Letter for Surry Power Station, Units 1 and 2 Report 05000280/2014001 and 05000281/2014001 IR 05000280/20140062014-09-0202 September 2014 Mid-Cycle Letter for Surry, Units 1 & 2, NRC Assessment Report 05000280/2014006, 05000281/2014006 IR 05000280/20130012014-03-0404 March 2014 Annual Assessment Letter for Surry Power Station, Units 1 and 2 - Report 05000280/2013001 and 05000281/2013001 ML13262A1812013-09-17017 September 2013 Notification of Inspection and Request for Information ML13246A1352013-09-0303 September 2013 Mid Cycle Assessment Letter ML13123A3552013-05-0202 May 2013 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000280/20120012013-03-0404 March 2013 Annual Assessment Letter, Surry Power Station, Units 1 and 2, 05000280/2012001 and 05000281/2012001 ML12248A1232012-09-0404 September 2012 Mid Cycle Assessment Letter Surry 2012 ML1206506182012-03-0505 March 2012 EOC Report 22 2024-08-26
[Table view] Category:Inspection Report
MONTHYEARIR 05000280/20244032024-10-0303 October 2024 Cyber Security Inspection Report 05000280-2024403 and 05000281-2024403 Cover Letter (Public) IR 05000280/20240102024-10-0202 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000280/2024010 and 05000281/2024010 IR 05000280/20240052024-08-26026 August 2024 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2024005 and 05000281-2024005), Rev 1 IR 05000280/20240112024-08-13013 August 2024 Comprehensive Engineering Team Inspection Report 05000280/2024011 and 05000281/2024011 IR 05000280/20240022024-08-0101 August 2024 Integrated Inspection Report 05000280/2024002 and 05000281/2024002 IR 05000280/20240012024-04-30030 April 2024 Integrated Inspection Report 05000280-2024001 and 05000281-2024001 IR 05000280/20244022024-04-29029 April 2024 Security Baseline Inspection Report 05000280/2024402 and 05000281/2024402 ML24095A2172024-04-12012 April 2024 – Review of the Spring 2023 Steam Generator Tube Inspection Report IR 05000280/20230062024-02-28028 February 2024 Annual Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Reports 05000280/2023006 and 05000281/2023006 IR 05000280/20230042024-02-0909 February 2024 Integrated Inspection Report 05000280/2023004 and 05000281/2023004 IR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 IR 05000280/20230102024-01-18018 January 2024 – Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 IR 05000280/20233012023-12-28028 December 2023 – NRC Operator License Examination Report 05000280/2023301 and 05000281/2023301 IR 05000280/20230032023-10-25025 October 2023 Integrated Inspection Report 05000280/2023003 and 05000281/2023003 ML23256A2672023-09-21021 September 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report IR 05000280/20220042023-09-0101 September 2023 Reissue - Surry Power Station - Integrated Inspection Report 05000280/2022004 and 05000281/2022004 IR 05000280/20230052023-08-23023 August 2023 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2023005 and 05000281/2023005) IR 05000280/20230022023-08-0404 August 2023 Integrated Inspection Report 05000280/2023002 and 05000281/2023002 IR 05000280/20230012023-05-0505 May 2023 Integrated Inspection Report 05000280/2023001 and 05000281/2023001 IR 05000280/20234012023-04-21021 April 2023 Security Baseline Inspection Report 05000280 2023401 and 05000281 2023401 ML23086B9172023-03-24024 March 2023 Steam Generator Tube Inspection Report for the Fall 2022 Refueling Outage IR 05000280/20220062023-03-0101 March 2023 Annual Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Reports 05000280/2022006 and 05000281/2022006 ML23041A0232023-02-13013 February 2023 Integrated Inspection Report 05000280/2022004 and 05000281/2022004 IR 05000280/20220032022-11-0707 November 2022 Integrated Inspection Report 05000280/2022003 and 05000281/2022003, Operation of an Independent Spent Fuel Storage Installation Report 07200055/2022001, and Exercise of Enforcement Discretion IR 05000281/20224022022-10-21021 October 2022 Security Baseline Inspection Report 05000280/ 2022402 and 05000281/2022402 IR 05000280/20224042022-10-19019 October 2022 Security Baseline Inspection Report 05000280/2022404 and 05000281/2022404 IR 05000280/20224032022-09-0808 September 2022 Security Baseline Inspection Report 05000280/2022403 and 05000281/2022403 IR 05000280/20220052022-08-24024 August 2022 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Reports 05000280/2022005 and 05000281/2022005) IR 05000280/20220022022-08-0404 August 2022 Integrated Inspection Report 05000280/2022002 and 05000281/2022002 Final IR 05000280/20220112022-07-0606 July 2022 Biennial Problem Identification and Resolution Inspection Report 05000280/2022011 and 05000281/2022011 IR 05000280/20220012022-05-11011 May 2022 Integrated Inspection Report 05000280/2022001 and 05000281/2022001 IR 05000280/20224012022-03-29029 March 2022 Security Baseline Inspection Report 05000280/2022401 and 05000281/2022401 IR 05000280/20224052022-03-22022 March 2022 Material Control and Accounting Program Inspection Report 05000280/2022405 and 05000281/2022405 IR 05000280/20220102022-03-15015 March 2022 NRC Inspection Report 05000280/2022010 and 05000281/2022010 IR 05000280/20210062022-03-0202 March 2022 Annual Assessment Letter for Surry Power Station, Units 1 and 2 (Reports No. 05000280/2021006 and 05000281/2021006) IR 05000280/20210042022-02-11011 February 2022 Integrated Inspection Report 05000280/2021004 and 05000281/2021004 IR 05000280/20210032021-11-24024 November 2021 Integrated Inspection Report 05000280/2021003 and 05000281/2021003 IR 05000280/20213012021-11-10010 November 2021 NRC Operator License Examination Report 05000280/2021301 and 05000281/2021301 IR 05000280/20210112021-11-0101 November 2021 Triennial Fire Protection Team Inspection Report 05000280/2021011 and 05000281/2021011 ML21265A4532021-10-0505 October 2021 Inspection Report 2021 FOF (IP92707) IR 05000280/20210052021-08-31031 August 2021 Mid-Cycle Letter Revised Updated Inspection Plan for Surry Power Station, Units 1 and 2 (05000280/2021005 and 05000281/2021005) IR 05000280/20210012021-08-26026 August 2021 Updated Inspection Plan for Surry Power Station, Units 1 and 2 -(05000280/2021001 and 05000281/2021001) IR 05000280/20210102021-08-16016 August 2021 Design Basis Assurance Inspection (Programs) Inspection Report 05000280/2021010 and 05000281/2021010 IR 05000280/20210022021-08-12012 August 2021 Integrated Inspection Report 05000280/2021002 and 05000281/2021002 IR 05000280/20214022021-06-14014 June 2021 Security Baseline Inspection Report 05000280/2021402, 05000281/2021402 and 07200002/2021401 ML21120A1552021-04-30030 April 2021 Integrated Inspection Report 05000280/2021001 and 05000281/2021001 IR 05000280/20200062021-03-0303 March 2021 Annual Assessment Letter for Surry Power Station, Units 1 and 2 NRC Inspection Reports 05000280/2020006 and 05000281/2020006 IR 05000280/20214012021-02-0909 February 2021 Security Baseline Inspection Report 05000280/2021401 and 05000281/2021401 IR 05000280/20200042021-02-0202 February 2021 Integrated Inspection 05000280/2020004 and 05000281/2020004; and 07200055/2020003 IR 05000281/20200402020-12-30030 December 2020 95001 Supplemental Inspection Supplemental Report 05000281/2020040 2024-08-26
[Table view] Category:Letter
MONTHYEARML24283A0702024-10-0707 October 2024 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J IR 05000280/20244032024-10-0303 October 2024 Cyber Security Inspection Report 05000280-2024403 and 05000281-2024403 Cover Letter (Public) IR 05000280/20240102024-10-0202 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000280/2024010 and 05000281/2024010 ML24270A0022024-09-25025 September 2024 Inservice Inspection Owners Activity Report (OAR) ML24248A1712024-09-0303 September 2024 Proposed License Amendment Request - Temporary Service Water Supply to the Component Cooling Heat Exchangers IR 05000280/20240052024-08-26026 August 2024 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2024005 and 05000281-2024005), Rev 1 ML24219A2372024-08-23023 August 2024 Issuance of Amendment Nos. 319 and 319, Adoption of TSTF-577, Rev. 1, Revised Frequencies for Steam Generator Tube Inspection, ML24207A0402024-08-21021 August 2024 Summary of July 17, 2024, Public Meeting - TS 3.7/3.14 AOT for SW Piping Maintenance IR 05000280/20240112024-08-13013 August 2024 Comprehensive Engineering Team Inspection Report 05000280/2024011 and 05000281/2024011 ML24164A0012024-08-12012 August 2024 Proposed Alternative Relief Request V-1 Inservice Testing of Pressure Isolation Valves (EPID l-2023-LLR-0060) IR 05000280/20240022024-08-0101 August 2024 Integrated Inspection Report 05000280/2024002 and 05000281/2024002 05000280/LER-2024-001, Troubleshooting Initiated Unknown Turbine Trip Feature in Control System2024-07-30030 July 2024 Troubleshooting Initiated Unknown Turbine Trip Feature in Control System ML24165A2782024-07-17017 July 2024 Issuance of Amendment Nos. 318 and 318, Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection ML24165A1232024-07-17017 July 2024 Proposed Alternative Relief Request P-1, P-2 Inservice Testing of Residual Heat and Containment Spray Pumps (EPID l-2023-LLR-0058) ML24190A4192024-07-0808 July 2024 Inservice Testing (IST) Program for Pumps and Valves Revised Sixth IST Interval Start Date and Updated Technical Specifications References for Alternative Request V-1 ML24179A2932024-07-0101 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24166A0622024-06-18018 June 2024 – Proposed Alternative Relief Request P-3, P-4 Inservice Testing of Boric Acid, Component Cooling Water Pumps ML24157A0542024-06-13013 June 2024 Audit Summary in Support of License Amendment Request for Proposed Reclassification of Low Head Safety Injection Flow Instrumentation Related to Regulatory Guide 1.97 ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML24141A2862024-05-22022 May 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000280/2024403 and 05000281- 2024403 ML24141A2512024-05-20020 May 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable - Supplemental Information ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A2302024-05-13013 May 2024 Core 1 Cycle 33 Pattern Mdr Revision 0 ML24130A2492024-05-0909 May 2024 Submittal of Information in Support of Surry Power Station Unit 1 Thermal Shield Flexure Replacement Campaign ML24130A2032024-05-0909 May 2024 Proposed License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections Supplemental Information ML24130A1192024-05-0707 May 2024 Inservice Test Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests - Response to Request for Additional Information Regarding Alternative Request V-1 ML24142A3852024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report IR 05000280/20240012024-04-30030 April 2024 Integrated Inspection Report 05000280-2024001 and 05000281-2024001 ML24122C6522024-04-30030 April 2024 Annual Radiological Environmental Operating Report ML24122B3032024-04-29029 April 2024 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change IR 05000280/20244022024-04-29029 April 2024 Security Baseline Inspection Report 05000280/2024402 and 05000281/2024402 ML24115A1952024-04-24024 April 2024 Notification of Surry Power Station Comprehensive Engineering Team Inspection - U.S. NRC Inspection Report 05000280/2024011 and 05000281/2024011 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24108A1812024-04-15015 April 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable Supplemental Information ML24095A2172024-04-12012 April 2024 – Review of the Spring 2023 Steam Generator Tube Inspection Report ML24088A2482024-03-26026 March 2024 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests- Response to Request for Additional Information ML24087A2082024-03-22022 March 2024 Proposed License Amendment Request Addition of Containment Limiting Condition for Operation and Surveillance Requirements ML24078A2642024-03-21021 March 2024 – Regulatory Audit in Support of License Amendment Request to Proposed Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML24087A1522024-03-18018 March 2024 Annual Changes, Tests, and Experiments Report Regulatory Commitment Evaluation Report ML24023A5762024-03-0808 March 2024 Correction to Issuance of Amendment Nos. 315 and 315, Regarding Revised Emergency Plan for Relocation of the Technical Support Center IR 05000280/20230062024-02-28028 February 2024 Annual Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Reports 05000280/2023006 and 05000281/2023006 ML24032A4712024-02-20020 February 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24051A1782024-02-19019 February 2024 Proposed License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML24057A0612024-02-19019 February 2024 and Virgil C. Summer Power Nuclear Stations - Nuclear Property Insurance Coverage IR 05000280/20230042024-02-0909 February 2024 Integrated Inspection Report 05000280/2023004 and 05000281/2023004 IR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 IR 05000280/20230102024-01-18018 January 2024 – Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 2024-09-03
[Table view] |
Inspection Report - Surry - 2023006 |
---|
|
|
Text
February 28, 2024
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR SURRY POWER STATION, UNITS 1 AND 2 - NRC INSPECTION REPORTS 05000280/2023006 AND 05000281/2023006
Dear Eric Carr:
The NRC has completed its end-of-cycle performance assessment of Surry Power Station, Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2023 through December 31, 2023. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC concluded that overall performance at your facility preserved public health and safety.
The baseline inspection program was completed at your facility as defined in Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase.
The NRC determined the performance at Surry Power Station, Units 1 and 2, during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e.,
Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through December 31, 2025.
The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 404-997-4547 with any questions you have regarding this letter.
Sincerely, Matthew S. Fannon, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos.: 05000280, 05000281 License Nos.:DPR-32, DPR-37 Enclosure:
Surry Inspection Plan (3/1/2024 - 12/31/2025)
cc: Distribution via ListServ Signed by Fannon, Matthew on 02/28/24 SUBJECT: ANNUAL ASSESSMENT LETTER FOR SURRY POWER STATION, UNITS 1 AND 2 - NRC INSPECTION REPORTS 05000280/2023006 AND 05000281/2023006 DATED - FEBRUARY 28, 2024
DISTRIBUTION:
A. Wilson, RII S. Kennedy, RII M. Fannon, RII R2EICS RidsNRRDRO Resource ROPAssessment Resource RidsNrrPMSurry Resource
ADAMS ACCESSION NUMBER: ML24053A291 X Non-Sensitive X Publicly Available X SUNSI Review Sensitive Non-Publicly Available
OFFICE RII/DRP RII/DRP NAME A. Wilson M. Fannon DATE 2/23/2024 2/28/2024 OFFICIAL AGENCY RECORD 07200055 - Surry (ISFSI)
03/01/2024 - 12/31/2025
Unit Start End Activity CAC Title Staff Count OPERATION OF AN ISFSI 2
7/7/2025 7/11/2025 IP 60855 001001 Operation Of An ISFSI
1 of 3 Surry
03/01/2024 - 12/31/2025
Unit Start End Activity CAC Title Staff Count UNIT 1 IN-SERVICE INSPECTION +SG 2
1 4/15/2024 4/19/2024 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION 3
1,2 4/15/2024 4/19/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
1,2 5/6/2024 5/10/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
1,2 5/6/2024 5/10/2024 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation
1,2 5/6/2024 5/10/2024 IP 71124.04 000728 Occupational Dose Assessment
1,2 5/6/2024 5/10/2024 IP 71124.05 000729 Radiation Monitoring Instrumentation
1,2 5/6/2024 5/10/2024 IP 71151 000746 Performance Indicator Verification
SECURITY BASELINE INSPECTION 1
1,2 4/15/2024 4/18/2024 IP 71130.02 000734 Access Control
1,2 4/15/2024 4/18/2024 IP 71130.09 001656 Security Plan Changes
1,2 4/15/2024 4/18/2024 IP 71151 001338 Performance Indicator Verification
COMPREHENSIVE ENGINEERING TEAM INSPECTION (CETI) 7
1,2 7/15/2024 7/19/2024 IP 71111.21M 000713 Comprehensive Engineering Team Inspection
1,2 7/29/2024 8/2/2024 IP 71111.21M 000713 Comprehensive Engineering Team Inspection
PROBLEM IDENTIFICATION & RESOLUTION 4
1,2 8/12/2024 8/16/2024 IP 71152B 000747 Problem Identification and Resolution
1,2 8/26/2024 8/30/2024 IP 71152B 000747 Problem Identification and Resolution
CYBER SECURITY INSPECTION 4
1,2 9/9/2024 9/13/2024 IP 71130.10 000741 Cybersecurity
EMERGENCY PREPAREDNESS PROGRAM INSPECTION 2
1,2 9/23/2024 9/27/2024 IP 71114.02 000717 Alert and Notification System Testing
1,2 9/23/2024 9/27/2024 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System
1,2 9/23/2024 9/27/2024 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
1,2 9/23/2024 9/27/2024 IP 71114.05 000720 Maintenance of Emergency Preparedness
1,2 9/23/2024 9/27/2024 IP 71151 001397 Performance Indicator Verification
UNIT 2 IN-SERVICE INSPECTION 1
2 10/28/2024 11/8/2024 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
MATERIAL CONTROL AND 1 ACCOUNTING 1,2 1/27/2025 1/31/2025 IP 71130.11 000742 Material Control and Accounting (MC&A)
SURRY REQUAL INSPECTION 2
1,2 2/23/2025 3/1/2025 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance
2 of 3 FOCUSED ENGINEERING INSPECTION (FPTI) 3
1,2 4/7/2025 4/11/2025 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
1,2 4/21/2025 4/25/2025 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
SECURITY BASELINE INSPECTION 2
1,2 4/7/2025 4/10/2025 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance
1,2 4/7/2025 4/10/2025 IP 71130.07 000739 Security Training
OPERATION OF AN ISFSI 2
1,2 7/7/2025 7/11/2025 IP 60855 001001 Operation Of An ISFSI
RP PUBLIC RAD SAFETY BASELINE INSPECTION 2
1,2 7/14/2025 7/18/2025 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment
1,2 7/14/2025 7/18/2025 IP 71124.07 000731 Radiological Environmental Monitoring Program
1,2 7/14/2025 7/18/2025 IP 71151 000746 Performance Indicator Verification
EMERGENCY PREPAREDNESS EXERCISE INSPECTION 5
1,2 7/21/2025 7/25/2025 IP 71114.01 000716 Exercise Evaluation
1,2 7/21/2025 7/25/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
1,2 7/21/2025 7/25/2025 IP 71151 001397 Performance Indicator Verification
SECURITY BASELINE INSPECTION 3
1,2 9/15/2025 9/18/2025 IP 71130.02 000734 Access Control
1,2 9/15/2025 9/18/2025 IP 71130.05 000737 Protective Strategy Evaluation
1,2 9/15/2025 9/18/2025 IP 71130.09 001656 Security Plan Changes
1,2 9/15/2025 9/18/2025 IP 71151 001338 Performance Indicator Verification
SURRY INITIAL LICENSE EXAM 4
1,2 8/24/2025 8/30/2025 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
1,2 10/5/2025 10/18/2025 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)
TARGET SET INSPECTION 2
1,2 10/20/2025 10/24/2025 IP 71130.14 000743 Review of Power Reactor Target Sets
UNIT 1 IN-SERVICE INSPECTION +SG 2
1 11/3/2025 11/14/2025 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
RP OCCUPATIONAL RAD SAFETY AND TRANSPORTATION BASELINE INSPECTION 2
1,2 11/3/2025 11/7/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
1,2 11/3/2025 11/7/2025 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation 1,2 11/3/2025 11/7/2025 IP 71151 000746 Performance Indicator Verification