IR 05000280/2023006

From kanterella
Jump to navigation Jump to search
Annual Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Reports 05000280/2023006 and 05000281/2023006
ML24053A291
Person / Time
Site: Surry  Dominion icon.png
Issue date: 02/28/2024
From: Matthew Fannon
NRC/RGN-II/DRP/RPB4
To: Carr E
Virginia Electric & Power Co (VEPCO)
References
IR 2023006
Download: ML24053A291 (6)


Text

February 28, 2024

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR SURRY POWER STATION, UNITS 1 AND 2 - NRC INSPECTION REPORTS 05000280/2023006 AND 05000281/2023006

Dear Eric Carr:

The NRC has completed its end-of-cycle performance assessment of Surry Power Station, Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2023 through December 31, 2023. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC concluded that overall performance at your facility preserved public health and safety.

The baseline inspection program was completed at your facility as defined in Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase.

The NRC determined the performance at Surry Power Station, Units 1 and 2, during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e.,

Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2025.

The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 404-997-4547 with any questions you have regarding this letter.

Sincerely, Matthew S. Fannon, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos.: 05000280, 05000281 License Nos.:DPR-32, DPR-37 Enclosure:

Surry Inspection Plan (3/1/2024 - 12/31/2025)

cc: Distribution via ListServ Signed by Fannon, Matthew on 02/28/24 SUBJECT: ANNUAL ASSESSMENT LETTER FOR SURRY POWER STATION, UNITS 1 AND 2 - NRC INSPECTION REPORTS 05000280/2023006 AND 05000281/2023006 DATED - FEBRUARY 28, 2024

DISTRIBUTION:

A. Wilson, RII S. Kennedy, RII M. Fannon, RII R2EICS RidsNRRDRO Resource ROPAssessment Resource RidsNrrPMSurry Resource

ADAMS ACCESSION NUMBER: ML24053A291 X Non-Sensitive X Publicly Available X SUNSI Review Sensitive Non-Publicly Available

OFFICE RII/DRP RII/DRP NAME A. Wilson M. Fannon DATE 2/23/2024 2/28/2024 OFFICIAL AGENCY RECORD 07200055 - Surry (ISFSI)

03/01/2024 - 12/31/2025

Unit Start End Activity CAC Title Staff Count OPERATION OF AN ISFSI 2

7/7/2025 7/11/2025 IP 60855 001001 Operation Of An ISFSI

1 of 3 Surry

03/01/2024 - 12/31/2025

Unit Start End Activity CAC Title Staff Count UNIT 1 IN-SERVICE INSPECTION +SG 2

1 4/15/2024 4/19/2024 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION 3

1,2 4/15/2024 4/19/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

1,2 5/6/2024 5/10/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

1,2 5/6/2024 5/10/2024 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation

1,2 5/6/2024 5/10/2024 IP 71124.04 000728 Occupational Dose Assessment

1,2 5/6/2024 5/10/2024 IP 71124.05 000729 Radiation Monitoring Instrumentation

1,2 5/6/2024 5/10/2024 IP 71151 000746 Performance Indicator Verification

SECURITY BASELINE INSPECTION 1

1,2 4/15/2024 4/18/2024 IP 71130.02 000734 Access Control

1,2 4/15/2024 4/18/2024 IP 71130.09 001656 Security Plan Changes

1,2 4/15/2024 4/18/2024 IP 71151 001338 Performance Indicator Verification

COMPREHENSIVE ENGINEERING TEAM INSPECTION (CETI) 7

1,2 7/15/2024 7/19/2024 IP 71111.21M 000713 Comprehensive Engineering Team Inspection

1,2 7/29/2024 8/2/2024 IP 71111.21M 000713 Comprehensive Engineering Team Inspection

PROBLEM IDENTIFICATION & RESOLUTION 4

1,2 8/12/2024 8/16/2024 IP 71152B 000747 Problem Identification and Resolution

1,2 8/26/2024 8/30/2024 IP 71152B 000747 Problem Identification and Resolution

CYBER SECURITY INSPECTION 4

1,2 9/9/2024 9/13/2024 IP 71130.10 000741 Cybersecurity

EMERGENCY PREPAREDNESS PROGRAM INSPECTION 2

1,2 9/23/2024 9/27/2024 IP 71114.02 000717 Alert and Notification System Testing

1,2 9/23/2024 9/27/2024 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System

1,2 9/23/2024 9/27/2024 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

1,2 9/23/2024 9/27/2024 IP 71114.05 000720 Maintenance of Emergency Preparedness

1,2 9/23/2024 9/27/2024 IP 71151 001397 Performance Indicator Verification

UNIT 2 IN-SERVICE INSPECTION 1

2 10/28/2024 11/8/2024 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

MATERIAL CONTROL AND 1 ACCOUNTING 1,2 1/27/2025 1/31/2025 IP 71130.11 000742 Material Control and Accounting (MC&A)

SURRY REQUAL INSPECTION 2

1,2 2/23/2025 3/1/2025 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance

2 of 3 FOCUSED ENGINEERING INSPECTION (FPTI) 3

1,2 4/7/2025 4/11/2025 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

1,2 4/21/2025 4/25/2025 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

SECURITY BASELINE INSPECTION 2

1,2 4/7/2025 4/10/2025 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance

1,2 4/7/2025 4/10/2025 IP 71130.07 000739 Security Training

OPERATION OF AN ISFSI 2

1,2 7/7/2025 7/11/2025 IP 60855 001001 Operation Of An ISFSI

RP PUBLIC RAD SAFETY BASELINE INSPECTION 2

1,2 7/14/2025 7/18/2025 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment

1,2 7/14/2025 7/18/2025 IP 71124.07 000731 Radiological Environmental Monitoring Program

1,2 7/14/2025 7/18/2025 IP 71151 000746 Performance Indicator Verification

EMERGENCY PREPAREDNESS EXERCISE INSPECTION 5

1,2 7/21/2025 7/25/2025 IP 71114.01 000716 Exercise Evaluation

1,2 7/21/2025 7/25/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

1,2 7/21/2025 7/25/2025 IP 71151 001397 Performance Indicator Verification

SECURITY BASELINE INSPECTION 3

1,2 9/15/2025 9/18/2025 IP 71130.02 000734 Access Control

1,2 9/15/2025 9/18/2025 IP 71130.05 000737 Protective Strategy Evaluation

1,2 9/15/2025 9/18/2025 IP 71130.09 001656 Security Plan Changes

1,2 9/15/2025 9/18/2025 IP 71151 001338 Performance Indicator Verification

SURRY INITIAL LICENSE EXAM 4

1,2 8/24/2025 8/30/2025 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1,2 10/5/2025 10/18/2025 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

TARGET SET INSPECTION 2

1,2 10/20/2025 10/24/2025 IP 71130.14 000743 Review of Power Reactor Target Sets

UNIT 1 IN-SERVICE INSPECTION +SG 2

1 11/3/2025 11/14/2025 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP OCCUPATIONAL RAD SAFETY AND TRANSPORTATION BASELINE INSPECTION 2

1,2 11/3/2025 11/7/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

1,2 11/3/2025 11/7/2025 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation 1,2 11/3/2025 11/7/2025 IP 71151 000746 Performance Indicator Verification

3 of 3