MONTHYEARML24270A2612024-10-17017 October 2024 Summary of Public Meeting with Constellation Energy Generation, LLC Concerning Peach Bottom, Units Nos. 2 and 3 Digital Upgrade of the ECCS Compensated Level System ML24207A0402024-08-21021 August 2024 Summary of July 17, 2024, Public Meeting - TS 3.7/3.14 AOT for SW Piping Maintenance ML24222A4232024-08-19019 August 2024 Summary of June 17, 2024, Meeting with Virginia Electric and Power Company About Guidance in Section 7.5 of Standard Review Plan for Light Water Reactors ML24206A1782024-07-29029 July 2024 Summary of Public Meeting with Constellation Energy Generation, LLC Concerning Peach Bottom Units Nos. 2 and 3 Digital Upgrade of the ECCS Compensated Level System ML24155A1992024-06-0303 June 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Meeting Summary ML24128A2512024-05-14014 May 2024 Summary of April 11, 2024, Public Meeting with Constellation Energy Generation, LLC Regarding Proposed Alternative to Implement American Society of Mechanical Engineers Operation and Maintenance Code Case OMN-32 ML24113A2872024-04-25025 April 2024 Summary of Public Meeting with Constellation Energy Generation, LLC Regarding Hooded Masks ML24032A0862024-02-0202 February 2024 Summary of Meeting with Constellation Energy Generation, LLC, on Planned Requests to Use Code Case N-932 ML23345A1092023-12-14014 December 2023 December 7, 2023, Summary of Public Meeting with Virginia Electric and Power Company Concerning a License Amendment Request to Revise Emergency Augmentation Times for North Anna Station, Units 1 & 2, and Surry Station, Units 1 & 2 ML23320A2472023-11-17017 November 2023 Constellation - Summary of November 14, 2023, Public Pre-Application Meeting with Constellation Energy Generation, LLC on Adoption of TSTF-591 ML23276A6522023-10-11011 October 2023 Pre-submittal Meeting Summary, September 14, 2023 ML23263B1062023-09-22022 September 2023 R. E. Ginna Nuclear Power Plant - Constellation - Pre-Application Amse 9/18/2023 Meeting Summary ML23179A0012023-06-28028 June 2023 6/7/2023 - Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - Meeting Summary ML23167A7012023-06-26026 June 2023 Summary of Public Meeting with VEPCO Concerning a License Amendment Request to Revise Emergency Plan Staff Augmentation Times ML23151A5472023-06-0101 June 2023 Public Meeting Summary - 2022 Annual Assessment Meeting Regarding North Anna Power Station, Docket Nos. 50-338 and 50-339; and Surry Power Station ML23142A1602023-05-23023 May 2023 Summary of April 11, 2023, Public Observation Meeting with Constellation Energy Generation, LLC Re Proposed Exemption Request from Work Hour Requirements ML23055A0352023-03-24024 March 2023 Summary of February 23, 2023, with Constellation Energy Generation, LLC on Proposed Changes to Emergency Plans to Revise Emergency Action Levels ML22335A5172022-12-0505 December 2022 Summary of Conference Call Regarding the Fall 2022 Steam Generator Tube Inspections (RFO 31) ML22187A1462022-07-0606 July 2022 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Meeting Summary ML22130A1702022-05-20020 May 2022 Summary of April 21, 2022, Public Meeting to Discuss Potential Emergency Preparedness License Amendment Request ML22115A0032022-05-17017 May 2022 Summary of Public Meeting with Virginia Electric and Power Company on April 13, 2022 Regarding Future LAR Request to Change the Auxiliary Feedwater System Allowed Outage Time ML22130A0332022-05-0909 May 2022 Public Meeting Summary 2021 Annual Assessment Meeting Regarding North Anna Power Station, Docket Nos. 50-338 and 50-339; and Surry Power Station, Docket Nos. 50-280 and 50-281, Meeting Number 20220349 ML22091A0902022-04-0101 April 2022 Combined 2021 Assessment Meeting Slides ML22070A8092022-03-15015 March 2022 Public Webinar Summary with Virginia Electric and Power Company Regarding Further License Amendment Relocating the Technical Services Center to the Local Emergency Operations Facility ML21342A1402021-12-0909 December 2021 Summary of Public Meeting in Tarrytown, Ny, to Discuss Indian Point Units 1, 2, and 3 (IPEC) Post-shutdown Decommissioning Activities Report ML21333A1532021-11-30030 November 2021 Summary of November 16, 2021, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Extend the Inservice Inspection Interval ML21237A0412021-08-30030 August 2021 Summary of the July 27, 2021, Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Use Case OMN-28, ML21176A0822021-07-0606 July 2021 June 15, 2021, Summary of Meeting with Exelon Generation Company, LLC Vessel Nozzle Repair Related to a Planned Request for an Alternative Related to Reactor Pressure ML21139A1852021-06-22022 June 2021 Summary of Meeting with Exelon Generation Company, LLC Regarding Its Requested Alternative to Eliminate Certain Documentation Requirements for the Replacement of Pressure Retaining Bolting ML21159A0932021-06-16016 June 2021 May 20, 2021, Summary Regarding Pre-Application Meeting to Discuss Planned License Amendment Requests ML21155A1632021-06-11011 June 2021 Summary Regarding Pre-Application Meeting to Discuss Planned License Amendment Requests ML21131A1612021-05-11011 May 2021 Public Meeting Summary - 2020 Annual Assessment Meeting Regarding Virgil C. Summer Nuclear Station, Docket No. 50-395; North Anna Power Station, Docket Nos. 50-338 and 50-339; and Surry Power Station, Docket Nos. 50-280 and 50-281, Meeting ML21027A0232021-01-28028 January 2021 Summary of January 26, 2021 Closed Meeting with Dominion Energy Regarding Performance of Force on Force Exercises in a Pandemic Environment ML21011A2822021-01-21021 January 2021 Summary of January 6, 2021, Presubmittal Meeting Between the NRC and Exelon Generation Company, LLC Regarding Licensing Activities to Support the Planned Early Closures of Byron, Unit Nos. 1 and 2 and Dresden, Units 2 and 3 ML20351A2832020-12-18018 December 2020 Summary of Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Exemption to Reduce the Frequency of Updates to Its Inservice Testing and Inspection Programs ML20342A3522020-12-10010 December 2020 Summary of November 13, 2020, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alterantive to Certain Documentation Requirements for the Replacement of Pressure Retaining Bolting (EPID-L-2020-LRM-0102) ML20335A1122020-12-0707 December 2020 Summary of November 30, 2020, Meeting with the National Marine Fisheries Service and Dominion Energy, Inc. Regarding Atlantic Sturgeon Capture at Surry Power Station ML20323A0332020-12-0101 December 2020 Summary of November 4, 2020, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Reduce the Frequency of Updates to Its Inservice Testing and Inspection Programs ML20296A4072020-11-12012 November 2020 Summary of October 14, 2020, Public Meeting with Virginia Electric and Power Company to Discuss Presubmittal Supplements for Surry Units 1 and 2 ML20197A2722020-07-15015 July 2020 2020 Beaver Valley, Calvert Cliffs, Limerick Peach Bottom, Susquehanna Annual Assessment Webinar Summary ML20181A0002020-06-29029 June 2020 Summary of 6/24/20 Meeting with Exelon Generation Company, LLC Regarding Planned Request for Alternative to Supplemental Valve Position Indication Testing Requirements for Braidwood, Calvert Cliffs, Clinton, Limerick, Nine Mile, Peach Botto ML20136A1752020-05-15015 May 2020 Sur 2019 Aam Meeting Summary ML19326A3152019-12-0303 December 2019 Summary of November 18, 2019, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Supplemental Valve Position Indication Testing Requirements ML19326C3582019-12-0303 December 2019 Summary of November 20, 2019, Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Revise the Quality Assurance Program ML19273B9692019-10-0202 October 2019 September 12, 2019 - Public Meeting to Discuss Draft Supplement 10, Second Renewal, to the Generic EIS for License Renewal of Nuclear Plants Regarding Peach Bottom Atomic Power Station Units 2 and 3 SLRA (EPID: L-201-RNW-0013) ML19266A4842019-10-0101 October 2019 Summary of Pre-Licensing Meeting with Dominion Energy Regarding a License Amendment Request to Adopt a Risk-Informed 10 CFR 50.69 Categorization Program ML19238A3032019-09-27027 September 2019 Public Clarification Call with Exelon to Discuss Exelon'S Response to NRC Requests for Additional Information on Environmental Fatigue ML19246A1452019-09-27027 September 2019 Clarification Call to Discuss Exelon'S Response to NRC Requests for Additional Information (RAI) 3.3.2.1.1-1 ML19240A3002019-09-27027 September 2019 Public Clarification Call with Exelon to Discuss Questions on Their Coatings and Linings of Certain Components Aging Management Program and Their Inspection of Buried and Underground Piping and Tanks Aging Management Program for SLR ML19253D7082019-09-24024 September 2019 Summary of August 13, 2019, Category 2 Public Meeting Related to the Safety Review of the Surry Power Station, Units 1 and 2, Subsequent License Renewal Application 2024-08-21
[Table view] |
Text
Public Meeting Summary On February 21 and 22, 2012, public meetings were conducted for the State-of-the-Art Reactor Consequence Analyses (SOARCA) project in Surry, Virginia and Delta, Pennsylvania. The SOARCA team presented an overview of the project including the findings of the study and answered public comments. The following is a summary of each meeting:
Surry (February 21, 2012)
NRC Affiliated Attendees (Affiliation):
Jonathan Barr (U.S. Nuclear Regulatory Commission)
Nathan Bixler (Sandia National Laboratories)
Scott Burnell (U.S. Nuclear Regulatory Commission)
Francis (Chip) Cameron (Zero Gravity Group, LLC)
Richard Chang (U.S. Nuclear Regulatory Commission)
Randy Gauntt (Sandia National Laboratories)
Joe Jones (Sandia National Laboratories)
Patricia Santiago (U.S. Nuclear Regulatory Commission)
Jason Schaperow (U.S. Nuclear Regulatory Commission)
Randy Sullivan (U.S. Nuclear Regulatory Commission)
Steven Sanchez (U.S. Nuclear Regulatory Commission)
Chip Cameron, the meeting facilitator, introduced the U.S. Nuclear Regulatory Commission (NRC) staff and Sandia National Laboratories. He explained the purpose of the meeting and described the process for submitting formal comments.
Pat Santiago presented an overview of the NRC and described the activities of the NRC Office of Nuclear Regulatory Research. She explained that the NRC is accepting comments on Draft NUREG-1935, which is the SOARCA main report, and summarizes the analyses for the two pilot plants. The document will be updated with consideration of the comments received. The next steps include presenting SOARCA at the Regulatory Information Conference (RIC) and submission to the NRCs Commission in June of this year. Jason Schaperow presented an overview of the SOARCA project including a description of the accident sequence selection, the severe accident modeling, emergency planning, and the consequence analysis. Questions were then received from the audience.
Randy Sullivan noted that the study is draft and out for public comment and will be finalized after consideration of public comments.
Richard Chang explained that the SOARCA project included a formal review by independent technical experts. A summary letter from these technical experts provided a generally positive review over a broad range of expertise.
Enclosure
Randy Gauntt added that SOARCA was an application of cumulative knowledge and provides a re-baseline of severe accident analysis. SOARCA shows that we have the technology to better understand severe accidents. He also described the models as largely developed by Sandia National Laboratories for NRC and these began being built after Three Mile Island (TMI). After 2001, the tools began being used in a realistic and predictive manner.
Peach Bottom (February 22, 2012)
NRC Affiliated Attendees (Affiliation)
Jonathan Barr (U.S. Nuclear Regulatory Commission)
Nathan Bixler (Sandia National Laboratories)
Scott Burnell (U.S. Nuclear Regulatory Commission)
Chris Cahill (U.S. Nuclear Regulatory Commission)
Francis (Chip) Cameron (Zero Gravity Group, LLC)
Richard Chang (U.S. Nuclear Regulatory Commission)
Randy Gauntt (Sandia National Laboratories)
Joe Jones (Sandia National Laboratories)
Patricia Santiago (U.S. Nuclear Regulatory Commission)
Jason Schaperow (U.S. Nuclear Regulatory Commission)
Randy Sullivan (U.S. Nuclear Regulatory Commission)
Samuel Hansell (U.S. Nuclear Regulatory Commission)
Adam Ziedonis (U.S. Nuclear Regulatory Commission)
Eliot Brener (U.S. Nuclear Regulatory Commission)
Rebecca Schmidt (U.S. Nuclear Regulatory Commission)
Chip Cameron introduced the NRC staff and Sandia National Laboratories. He explained the purpose of the meeting and described the process for submitting formal comments.
Pat Santiago presented an overview of the NRC and described the activities of the NRC Office of Nuclear Regulatory Research. She explained that the NRC is accepting comments on Draft NUREG-1935, which is the SOARCA main report, and summarizes the analyses for the two pilot plants. The document will be updated with consideration of the comments received. The next steps include presenting SOARCA at the RIC and submission to the NRCs Commission in June of this year. Jason Schaperow presented an overview of the SOARCA project including a description of the accident sequence selection, the severe accident modeling, emergency planning, and the consequence analysis. Questions were then received from the audience. At the Peach Bottom meeting, multiple questions were asked together and several of them were from members of Beyond Nuclear, Peach Bottom Alliance and Three Mile Island Alert. A short summary of the responses from NRC staff are described below.
Randy Sullivan explained that when an evacuation time estimate (ETE) is developed, if return trips are required for buses, they are identified. Local authorities have plans for this and these plans are inspected by the Federal Emergency Management Agency. He also explained that the 10 mile emergency planning zone (EPZ) has been found adequate for implementation of initial protective actions. These protective actions can be expanded beyond 10 miles if local 2
authorities determine this is necessary. The local authorities know how to expand evacuation areas.
Jason Schaperow explained that seismic, wind and flooding are external events and were considered in the sequence selection. The seismic event was selected for the analysis.
Randy Sullivan discussed that the seismic analysis included consideration that roadways and bridges may fail. Within the Peach Bottom EPZ, there were only a few roadway infrastructure failures identified and these were found to be few and dispersed. Therefore, there was little effect on the ETE.
Randy Sullivan explained that NRC research found that large scale evacuations occur about once a month and this is documented in NUREG/CR-6864. These evacuations have been successful and protected the public. Since the accident at Three Mile Island (TMI), there have been 30 years of NRC emergency preparedness requirements and inspections at every nuclear site and FEMA has evaluated responsible civil authorities that support power plants. The NRC expects that emergency planning, developed after TMI, will be effective.
Randy Gauntt responded to questions within a presentation from Three Mile Island Alert that was generally focused on the MELCOR model. Randy Gauntt noted that MELCOR has been validated against other codes and physical models.
Randy Sullivan stated that SOARCA does not provide a basis to reduce the size of the EPZ.
Rather, SOARCA shows that the existing emergency preparedness regulations are protective of public health and safety. He also explained that regulations require the capability to issue a protective action within about 30 minutes. The SOARCA project selected 45 minutes and found that actual exercise data showed this to be about right. SOARCA modeled evacuation beginning about 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> later. Randy explained that in reality evacuations occur as a distribution with some people leaving quickly and others taking more time. The consequence model used in SOARCA limited the level of detail to which these actions could be modeled. Jason added that SOARCA also included a sensitivity study that delayed the entire response by an additional 30 minutes.
Randy Sullivan discussed that new protective action guidance issued in December requires licensees to determine whether specialized public protective actions would be necessary for an accident that could result in a large early release. This guidance facilitates better focus on when evacuation may be needed.
At this point, Chip Cameron closed the meeting.