VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, V I RGINIA 23261 April 29, 2024 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 10 CFR 50.54(q)
Serial No.:
24-168 NRA/GDM:
RO Docket Nos.:
50-280/281 72-2/55 License Nos.: DPR-32/37 SNM-2501 AND ASSOCIATED INDEPENDENT SPENT FUEL STORAGE INSTALLATION REVISION TO EMERGENCY PLAN REPORT OF CHANGE Pursuant to 10 CFR 50.54(q)(5) and 10 CFR 72.44{f), a summary of the change analysis for Revision 73 to the Surry Power Station {SPS) Emergency Plan is provided in the attachment. The Plan was effective on April 2, 2024. The revision incorporates an editorial correction, as well as changes that required and received prior NRC approval, and does not implement actions that reduce the effectiveness of the SPS Emergency Plan. The Emergency Plan continues to meet the standards of 10 CFR 50.47(b) and Appendix E.
If you have any questions or require additional information, please contact Mr. Gary D.
Miller at 804-273-2771.
Respectfully, James E. Holloway Vice President - Nuclear Engineering and Fleet Support Commitments made by this letter: None
Attachment:
Surry Power Station Emergency Plan, Revision 73, 10 CFR 50.54(q) Summary
cc:
U.S. Nuclear Regulatory Commission - Region II Attn: Regional Administrator Marquis One Tower 245 Peachtree Center Avenue, NE., Suite 1200 Atlanta, Georgia 30303-1257 Mr. L. John Klos NRC Project Manager - Surry Power Station U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 09 E-3 11555 Rockville Pike Rockville, Maryland 20852-2738 Mr. G. Edward Miller Serial No.: 24-168 Docket Nos.: 50-280/281; 72-2/55 Page 2 of 2 NRC Senior Project Manager - North Anna Power Station U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 09 E-3 11555 Rockville Pike Rockville, Maryland 20852-2738 A TIN: Document Control Desk Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 NRC Senior Resident Inspector Surry Power Station Ms. Yen-Ju J. Chen NRC Senior Project Manager-lSFSls U. S. Nuclear Regulatory Commission Mail Stop 4834 Two White Flint North 11545 Rockville Pike Rockville, Maryland 20852-2738
ATTACHMENT Serial No.: 24-168 Docket Nos.: 50-280/281; 72-2/55 SURRY POWER STATION EMERGENCY PLAN, REVISION 73 10 CFR 50.54(ql
SUMMARY
Virginia Electric and Power Company (Dominion Energy Virginia)
Surry Power Station - Units 1 and 2 Surry Independent Spent Fuel Storage Installation
Serial No.: 24-168 Docket Nos.: 50-280/281; 72-2/55 SPS EPlan Rev. 73 Attachment Surry Power Station Emergency Plan, Revision 73 10 CFR 50.54(g) Summary Surry Emergency Plan (SEP), Revision 73, incorporated the changes described below. A description of why each change was not a reduction in the effectiveness of the emergency plan and the regulatory basis for each non-editorial change are provided.
Surry Power Station (SPS) Emergency Plan Revision 73 incorporated the changes described below.
- 1. There was one editorial change associated with SEP, Revision 73. When the SEP was updated in February 2023 to Revision 72, page 8.1 of the SEP was inadvertently not updated. This has been corrected with the update of the page 8.1 revision number in Revision 73.
- 2. The proposed changes listed below (a - e) are fully bounded by the NRC Safety Evaluation Report for the approved SPS Units 1 and 2 TSC Relocation License Amendments 315/315. (
Reference:
ADAMS Accession Nos. ML22322A182, ML23220A148 and ML23242A229.)
- a. Section 1.0, Technical Support Center, Page 1.5: Replaced "Unit 1 Control Room" with "the Training Building."
- b. Section 7.1.3, Technical Support Center, Page 7.4: Replaced "Unit 1 Control Room, and its alternate location is the Control Room" with "the Training Building."
- c. Section 7.1.3, Page 7.4,
References:
Added "Reliable power is provided to the TSC from utility power and backed up by a UPS and a dedicated diesel generator with auto transfer capability."
- d. Section 7.3.4, Page 7.11: Added a reference to a detailed PCS description in the UFSAR. PCS also serves as the Emergency Response Facility System, fulfilling the requirements of NUREG-0737 and NUREG-0696.
- e. Appendix 10.7, Page 10.7.2: Emergency Kit contents were updated to reflect quantities in the HP Area, Control Room, OSC and TSC.