MONTHYEARML24004A2092023-12-12012 December 2023 Flowline, Inc. - Interim Part 21 Report Notification Regarding Supply of 1 Sch. 80 (0.179 Wall) SB466 Uns C71500 Buttweld Long Radius 90 Degree Elbow; Manufacturer: Flowline; Heat No: 27668; 27 Pieces - Heat Code ML23352A2382023-12-0808 December 2023 56882-EN 56882 - Tioga Pipe, Inc Interim Part 21 Report Re Supply of 1 Inch Sch. 80 SB466 Uns C71500 Buttweld Long Radius 90 Degree Elbow ML23212A9502023-05-24024 May 2023 Engine Systems, Inc., Part 21 Report Re Woodward EGB-35P Governor/Actuator with Foreign Material ML21322A0512021-10-27027 October 2021 Paragon Energy Solutions, LLC, P21-09282021, Rev. 0, Final Notification of a Deviation with Inverter Assembly (Model NLI-072034-CSI-K-5-A) ML21295A2472021-10-18018 October 2021 Engine Systems, Inc., Part 21 Reportable Notification on a Pressure Regulator Valve ML21260A0072021-09-0909 September 2021 Ametek Solidstate Controls, Notification of Potential Defect - 10CFR Part 21 Report Re Omron Timer Relay ML19024A1642019-01-0707 January 2019 Ametek - Notification of Potential Defect - 10CFR Part 21 Re Solidstate Controls Safety-Related Operational Spare Parts Kits ML18102A5292018-04-0303 April 2018 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0121, Rev. 0, Refurbished Pressure Regulator Assembly, P/N 1776 506. ML18087A0032018-03-21021 March 2018 Crane Nuclear, Inc. - Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl 10x8x10 and 6x4x6 Bolted Bonnet Gate Valve (Updated) ML18075A3552018-03-0606 March 2018 10 CFR Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl 10x8x10 and 6x4x6 Bolted Bonnet Gate Valve ML18079A0142018-03-0606 March 2018 Crane Nuclear, Inc., 10 CFR Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl I0x8x10 and 6x4x6 Bolted Bonnet Gate Valve ML17194A8252017-07-11011 July 2017 Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections ML17142A3232017-05-11011 May 2017 Interim Report Concerning Supply of Stainless Steel Tubing ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML16281A2712016-09-30030 September 2016 Part 21 - Safety Related Component Welding by an Unqualified Welder ML16321A4502016-08-31031 August 2016 Part 21 Notification - Flowserve Swing Check Valves ML16243A4752016-08-26026 August 2016 Part 21 Safety Related Component Welding by an Unqualified Welder ML16188A3742016-06-30030 June 2016 Part 21 - Inadequate Swaging and Adherence of Silicone O-Ring and Silicone PAD Soft Seat Main Disc and Pilot Disc Assemblies ML16039A2692016-02-0303 February 2016 Nutherm International, Inc. - Potential Issue Regarding Incorrect Industrial Irradiation Dose, Per Cooper, Oconee, Fitzpatrick, Point Beach, Brunswick, and Susquehanna ML15265A4182015-09-21021 September 2015 Sor, Inc. - Part 21 Notification of Deviation - ML15251A212 Irradiation Certification with Insufficient Margin BSEP 15-0054, Part 21 Notification Regarding Allen Bradley Model 700RTC Relays2015-06-25025 June 2015 Part 21 Notification Regarding Allen Bradley Model 700RTC Relays ML15162A0232015-06-0909 June 2015 Part 21 - Incorrect Part Number Relay Shipped to Brunswick Nuclear Plant ML15173A0162015-06-0808 June 2015 Engine Systems, Inc. - 1OCFR21 Reporting of Defects and Non-Compliance - Report No. 10CFR21-0112, Rev. 0, Incorrect Relay Installed in Governor Control Panel, P/N 8002096-PANEL ML15155A5772015-05-28028 May 2015 Part 21 Notification Regarding Allen Bradley 700RTC Relay Configuration ML15103A2442015-04-0606 April 2015 Part 21 Report - Deviation of Hk Circuit Breaker Close Latch Spring ML14261A1502014-09-17017 September 2014 Interim Report to the NRC of 10 CFR 21 Event 50285, Reported by Itt 07/18/14 Concerning M1 Diaphragms, Customer Testing ML14210A0102014-07-23023 July 2014 Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve ML14204A7082014-07-23023 July 2014 Enclosure 2, Description of Closure Evaluation, Non-Proprietary Information - Class I (Public) ML14204A7072014-07-23023 July 2014 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Unseating of Valve Spring on SSPV ML14210A0092014-07-21021 July 2014 Part 21 Report - Incorrect Valve Solenoids Provided ML14070A1832014-02-14014 February 2014 Part 21 Report - Failed Pressure Regulator During Post Installation EDG Pressure Testing ML13340A3822013-12-0505 December 2013 Part 21 Reportable Condition Notification: Failure of Relay Logic Card Modules in 2 Out of 4 Voters ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13064A0122013-02-25025 February 2013 Notification of Potential Part 21 Report Re Wedge Pin Failure of an Anchor/Darling Double-Disc Gate Valve ML13044A0752013-02-0808 February 2013 Part 21 - Completed Evaluation for Potential Error in Main Steam Line High Flow Calculational Methodology ML12352A1232012-12-13013 December 2012 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12348A1362012-12-13013 December 2012 Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers ML12347A3082012-12-12012 December 2012 Part 21 60-Day Interim Report Notification: Error in Main Steam Line High Flow Calculational Methodology ML12318A0412012-11-0808 November 2012 Part 21 Report - Commercial Grade Dedication Not Properly Applied to Butterfly Valves ML12319A0122012-09-27027 September 2012 Error in Main Steam Line High Flow Calculational Methodology ML12177A0562012-06-21021 June 2012 Part 21 - Reliability Degradation of Resistors in Trip Units and Readout Assemblies ML12158A4472012-06-0606 June 2012 Part 21 60-Day Interim Report Notification - Closufailure of CRD Collet Retainer Tube/Outer Tube Weld ML12163A1302012-06-0606 June 2012 Part 21 Report - Failure of CRD Collet Retainer Tube/Outer Tube Weld ML12123A0892012-04-27027 April 2012 Abb, Inc., Notification of Potential Part 21 Report - Hk Circuit Breaker Studs Failed to Meet Specification ML12094A3712012-04-0202 April 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML12058A1412012-02-23023 February 2012 Part 21 Report - Rosemount Nuclear Instruments, Inc., Pressure Transmitter with Nonzero Based Calibrations ML12040A2832012-02-0707 February 2012 Notification of Potential Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer Guidance ML12038A0282012-02-0202 February 2012 Failure of CRD Collet Retainer Tube/Outer Tube Weld ML12032A2402012-02-0101 February 2012 Notification of Potential Part 21 - 60-Day Interim Report Notification: Failure of CRD Collet Retainer Tube/Outer Tube Weld ML11278A0762011-09-28028 September 2011 Abb, Inc. - 10 CFR Part 21 Notification of Potential Defect, Solid State Relays - Update of Previous Notification 2023-05-24
[Table view] Category:Letter
MONTHYEARIR 05000324/20230112023-12-26026 December 2023 NRC Fire Protection Team Inspection - FPTI Report 05000324/2023011 and 05000325/2023011 IR 05000324/20234022023-12-14014 December 2023 Security Baseline Inspection Report 05000324-2023402 and 05000325-2023402 ML23297A0262023-11-27027 November 2023 Proposed Alternatives to ASME Code Section XI Subsection IWE Requirements for Torus Metallic Liner Inspections ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000324/20230032023-11-0101 November 2023 Integrated Inspection Report 05000324/2023003 and 05000325/2023003 IR 05000324/20230102023-10-17017 October 2023 Biennial Problem Identification and Resolution Inspection Report 05000324/2023010 and 05000325/2023010 IR 05000325/20234012023-10-16016 October 2023 Security Baseline Inspection Report 05000324 and 05000325 2023401 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000324/20230052023-08-23023 August 2023 Updated Inspection Plan for Brunswick Steam Electric Plant, Units 1 and 2 (Report 05000324/2023005 and 05000325/2023005) IR 05000324/20230022023-08-0404 August 2023 Integrated Inspection Report 05000324/2023002 and 05000325/2023002 ML23201A2042023-07-28028 July 2023 Summary of Regulatory Audit in Support of Alternative Request RA-22-0308 for Inservice Inspection of the Torus Metallic Liner IR 05000324/20243012023-07-25025 July 2023 Notification of Licensed Operator Initial Examination 05000325/2024301 and 05000324/2024301 ML23212B2682023-07-25025 July 2023 Notification of Licensed Operator Initial Examination 05000325/2024301 and 05000324/2024301 ML23146A0012023-05-24024 May 2023 EN 56538 - Engine Systems Inc and Brunswick ML23212A9502023-05-24024 May 2023 Engine Systems, Inc., Part 21 Report Re Woodward EGB-35P Governor/Actuator with Foreign Material ML23130A3902023-05-12012 May 2023 Regulatory Audit Plan in Support of Alternative Request RA 22-0308 for Inservice Inspection of the Torus Metallic Liner IR 05000324/20230012023-05-10010 May 2023 Integrated Inspection Report 05000324 2023001 and 05000325 2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000324/20220042023-04-0404 April 2023 Reissue - Brunswick Steam Electric Plant - Integrated Inspection Report 05000324/2022004 and 05000325/022004 ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000324/20220062023-03-0101 March 2023 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 NRC Inspection Reports 05000324/2022006 and 05000325/2022006 ML23033A5252023-02-0808 February 2023 Integrated Inspection Report 05000324/2022004 and 05000325/2022004 IR 05000324/20223012023-02-0303 February 2023 NRC Operator License Examination Report 05000325/2022301 and 05000324/2022301 IR 05000324/20224022022-11-23023 November 2022 Security Baseline Inspection Report 05000324 2022402 and 05000325 2022402 ML22332A0132022-11-23023 November 2022 Operator Licensing Written Examination Approval 05000325/2022301 and 05000324/2022301 ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000324/20224032022-11-10010 November 2022 Cyber Security Inspection Report 05000324/2022403 and 05000325/2022403 ML22307A1762022-11-0707 November 2022 Notification of an NRC Fire Protection Team Inspection (FPTI) IR 05000324/20220032022-11-0707 November 2022 Integrated Inspection Report 05000324/2022003 and 05000325/2022003 ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports IR 05000324/20220052022-08-24024 August 2022 Updated Inspection Plan for Brunswick Steam Electric Plant (Report 05000324/2022005 and 05000325/2022005) ML22230D0692022-08-22022 August 2022 Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai-ichi Accident IR 05000324/20220022022-08-0505 August 2022 Integrated Inspection Report 05000324/2022002 and 05000325/2022002 IR 05000324/20220102022-06-27027 June 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000324 2022010 and 05000325 2022010 ML22028A1742022-05-12012 May 2022 Issuance of Amendment Nos. 309 and 337 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-580, Revision 1 IR 05000324/20220012022-05-10010 May 2022 Integrated Inspection Report 05000324/2022001 and 05000325/2022001 ML22119A1352022-05-0909 May 2022 Information Request for the Cyber-Security Baseline Security Inspection, Notification to Perform Inspection 05000325/2022403; 05000324/2022403 ML22082A2682022-05-0202 May 2022 Issuance of Amendment Nos. 308 and 336 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-505, Revision 2 ML22102A0502022-04-11011 April 2022 301 Corporate Notification Letter IR 05000324/20224012022-03-16016 March 2022 Security Baseline Inspection Report 05000324/2022401 and 05000325/2022401 ML22054A2152022-03-0808 March 2022 Correction to Amendments to Revise Standby Liquid Control System Boron Solution Storage Tank Volume Technical Specifications IR 05000324/20210062022-03-0202 March 2022 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 (Reports No. 05000324/2021006 and 05000325/2021006) IR 05000324/20210042022-02-14014 February 2022 Integrated Inspection Report 05000324/2021004 and 05000325/2021004 ML22035A1262022-02-0909 February 2022 Withdrawal of Exemption Request from the Requirements of 10 CFR Part 50, Appendix E, Section IV.F.2.d (EPID L-2021-LLE-0055 (COVID-19)) ML21354A5032022-01-24024 January 2022 Requested Exemption from 10 CFR 50, Appendix E, Section IV.F.2.D Not Required (EPID L-2021-LLE-0055 (COVID-19)) ML22018A1842022-01-18018 January 2022 Notification of Brunswick Steam Electric Plant, Units 1 & 2 - Design Bases Assurance Inspection - U.S. Nuclear Regulatory Inspection Report 05000324/2022010 and 05000325/2022010 ML21348A7192021-12-21021 December 2021 Regulatory Audit Summary Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times 2023-09-25
[Table view] |
Text
I!
EENGINE 175 Freight Road SYSTEMS, INC. Telephone: 252/977-2720 Rocky Mount, NC 27804 Fax: 252/446-1134 September 3, 2009 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001
Subject:
10CFR21 Reporting of Defects and Non-Compliance -
Engine Systems, Inc. Report No. 10CFR21-0096, Rev. 0 Air Start Solenoid Valve Nordberg P/N 1698 760 Magnatrol P/N 42A57AHT
Dear Sir:
The enclosed report addresses a reportable notification for a diesel engine air start solenoid valve, Nordberg P/N 1698 760 (Magnatrol P/N 42A57AHT).
A copy of the report has also been sent to the NRC.
Please sign below, acknowledging receipt of this report, and return a copy to the attention of Document Control at the address above (or, fax to number 252/446-1134) within 10 working days after receipt.
Yours very truly, ENGINE SYSTEMS, INC.
Susan Woolard Document Control Please let us know if ANY of your mailing information changes - name of recipient, name of company/facility, address, etc. Mark the changes on this acknowledgment form and send to us by mail or FAX to the number above.
RECEIVED:
93 DATE:
Quality Performance With Pride
ENGINE SYSTEMS, INC.
175 Freight Road, Rocky Mount, NC 27804 Telephone: 252/977-2720 Fax: 252/446-1134 Report No. 10CFR21-0096 Rev. 0: 09/02/09 IOCFR21 REPORTING OF DEFECTS AND NON-COMPLIANCE COMPONENT: Air Start Solenoid Valve Nordberg P/N 1698 760 Magnatrol P/N 42A57AHT SYSTEM: Emergency Diesel Generator - air starting system CONCLUSION: Reportable in accordance with 10CFR21 Prepared By: Date: t / 3 /?
Engineering Manager Reviewed By: Date:
Quality Assurance Manager Quality Performance With Pride
Report No. 10CFR21-0096 Record of Revisions Page: 1 of 1 REV DATE PAGE DESCRIPTION 0 09/02/09 Initial issue.
Report No. 10CFR21-0096 Revision: 0 Date: 09/02/09 Page: 1 of 7 COMPONENT:
Diesel engine air start solenoid valve, Nordberg P/N 1698 760 (Magnatrol P/N 42A57AHT)
DISCUSSION:
Engine Systems Inc. (ESI) began a 10CFR21 deviation evaluation on 08/17/09 after Brunswick Nuclear Plant (BNP) notified ESI of a failure of one of their air start solenoid valves. The valve failure reportedly occurred on 08/02/09 as indicated by a slow start of the safety-related emergency diesel generator during a surveillance run. This caused DG2 to be declared inoperable. Subsequently, ESI opened up an internal work order to receive back the failed valve (S/N 1230588) as well as two more valves believed to be suspect (S/Ns 1230583 and 1230586).
Soon after, another internal, work order was opened up to receive and evaluate 10 additional air start solenoid valves from BNP inventory. ESI completed an evaluation on 8/31/09 that determined the issue to be reportable in accordance with 10CFR-part 21, "Reporting of Defects and Non-compliance".
Magnatrol P/N 42A57AHT is a solenoid actuated valve which opens when energized and closes when de-energized. The valve is installed in-line with the starting air piping via 2" NPT connections in the valve body and is utilized for two applications oh the Nordberg diesel engine. Upon receipt of a diesel generator start signal, the valve is energized and directs the starting air supply to either the starting air header of the diesel engine or turbocharger jet assist piping. Failure of the valve in these applications could result in a failure of the diesel engine to start and therefore prevent the diesel generator from performing its safety-related function. A total quantity of four valves are used per engine; one installed in the left bank starting air piping, one in the right bank starting air piping, and two in parallel supplying the turbocharger jet assist.
Internally, the valve uses a solenoid coil to produce the required magnetic field to lift a plunger which in turn lifts a pilot valve and piston assembly. The action of these components opens the valve and allows air flow from the inlet to the outlet of the valve. Without the magnetic field produced by the coil, the valve would not actuate properly. Figures 1, 2, and 3 on the following page illustrate the overall appearance of the S/N 1230588 valve assembly and show the internals of the solenoid housing.
Installed within the solenoid housing is the encapsulated solenoid coil (which is retained by a 3-wave spring washer) as well as an upper DC sleeve and lower DC sleeve. These items all surround a stationary bonnet which encases the plunger. The upper and lower DC sleeves direct the magnetic field to the proper location within the valve to move the plunger/piston assembly. Without the sleeves, the magnetic field would be altered and the valve would not open.
Report No. 10CFR21-0096 Revision: 0 Date: 09/02/09 Page: 2 of 7 I Figure 2: Dislodged Sleeve I I Figure 1: Overall Valve Assembly I I Figure 3: Correct Sleeve Location I ESI's investigation determined that in the failed valve, the upper DC sleeve had dislodged from the solenoid housing and slid down the bonnet, contacting the lower DC sleeve. This action disrupted the magnetic field to the extent that the valve would not function properly. Figure 2 depicts the upper DC sleeve missing from the housing and located inside the coil, resting against the lower DC sleeve.
This figure also illustrates the condition of failed valve S/N 1230588 when the solenoid housing was first removed. Figure 3 shows a disassembled valve in which the upper DC sleeve is installed in its proper location (note that a slight interference between the wave washer I.D. and sleeve O.D. keeps the washer in the housing).
Report No. 10CFR21-0096 Revision: 0 Date: 09/02/09 Page: 3 of 7 I
Upper DC sleeve contacting Upper DC sleeve is still retained in lower DC sleeve I solenoid housing, only lower DC i sleeve on bonnet Figure 4: Actual Condition with Figure 5: Expected Condition Housing Removed with Housing Removed II I Figure 4 shows the condition of valve S/N 1230588 when the solenoid housing and coil were first removed. As shown above, the upper DC sleeve is not in the solenoid housing but has slid down the bonnet and contacted the lower DC sleeve. Figure 5 illustrates how the valve should have looked with the solenoid housing and coil removed.
Aside from the valve that failed at the customer's site, the two other valves S/Ns 1230583 and 1230586 were inspected. Though the upper DC sleeve remained installed in the solenoid housing, the sleeve of S/N 1230586 displayed a slight amount of wiggle when actuated by hand. Based on correspondence with the manufacturer, this may not ultimately result in failure but is unacceptable none the less. The sleeve of SIN 1230583 did not have any wiggle. ESI also inspected a previous seismic specimen valve, S/N 1238281, for the same condition. The seismic specimen valve was also able to be wiggled by hand and was actually able to be removed from the housing by hand by working the sleeve back and forth.
During that time, BNP also returned 10 more solenoid valves on ESI IWO 8001479. All of the valves were tested and functioned properly; however ESI's disassembly inspection revealed that of the 10, qty six had sleeves that were loose. The serial numbers of the returned valves are listed in Table 1 on the following page.
Report No. 10CFR21-0096 Revision: 0 Date: 09/02/09 Page: 4 of 7 AFFECTED USERS:
ESI has supplied a total of qty. 33 of these Nordberg P/N 1698 760 (Magnatrol P/N 42A57AHT) solenoid valves and all of the valves were supplied to Brunswick Nuclear Plant. There are only two utilities that use Nordberg diesel engines for safety-related power supply and BNP is the only nuclear site ESI is aware of that uses the Magnatrol valve (Duke-McGuire does not). ESI supplied the valves on two separate jobs (corresponding to two BNP purchase orders). The list of solenoid valve serial numbers supplied is provided in Table 1 below:
ESI S.O. ESI C-of-C Date Qty Customer Customer Valve S/Ns ESI P.O.
P.O.
1225127 1225140 10/19/07 6 1225133 1225137 81163 1225139 1225132 3003544 00333377 12305831 1230584 1230585 03/20/08 8 12305861 82625 1230587 12305881 1230589 1230590 1238271 Progress Energy - 1238272 Brunswick Nuclear Plant 12382732 1238274 12382752 1238276 12382772 1238278 12382792 3004173 05/05/08 19 00358798 1238280 84601 1238282 12382832 12382842 1238285 1238286 12382872 12382882 12382892 12382902 Table 1: Listing of Nuclear Safety Related Air Start Solenoid Valves Shipped with Suspect DC Sleeves Installed Notes:
1: These three valves were returnedto ESI on IWO 8001478.
2: These 10 valves were returned to ESI on IWO 8001479.
Report No. 10CFR21-0096 Revision: 0 Date: 09/02/09 Page: 5 of 7 CORRECTIVE ACTION:
- 1. The 13 solenoid valves returned by BNP will be reworked at ESI by replacing the solenoid housing on each of the valves with a new, dedicated housing.
- 2. ESI has added verification of proper DC sleeve assembly to the critical characteristic inspection activity for future air start solenoid valve shipments.
- 3. The remaining solenoid valves at BNP should be inspected and reworked as necessary with dedicated, replacement solenoid housings. The recommended inspection and rework procedure is listed below.
INSPECTION I REWORK PROCEDURE:
The below steps are provided to give the customer guidance on how to inspect valves that are already installed in the starting air piping as well as valves which may be in inventory. Since the procedure does not require disturbing the pressure boundary of the installed system, it is much more advantageous for the customer to perform this inspection on-site with the valve installed rather than remove the valve from the piping system.
- 1. If installed in a piping system, disconnect power to the valve.
- 2. Identify the solenoid housing and associated hardware (qty 4, 3/8-16 capscrews).
Reference Figure 6 below. Remove the capscrews and housing.
Figure 6: View of Air Start Solenoid Assembly
Report No. 10CFR21-0096 Revision: 0 Date: 09/02/09 Page: 6 of 7
- 3. Once removed, the interior of the solenoid housing should resemble Figure 7 below. Note that the upper DC sleeve and wave washer are still installed in the housing.
Figure 7: View Inside of Solenoid Housing
- 4. There are two inspection criteria that must be satisfied to verify acceptable installation of the upper DC sleeve. These two criteria are:
a) No movement or "wiggle" of the upper DC sleeve is allowed. This inspection is performed by grabbing the housing with both hands and placing both thumbs inside the sleeve and attempting to rock the sleeve back and forth. Then rotate the housing 900 and repeat the inspection. The sleeve shall be staked in firm with no movement allowed in either direction. Any movement is cause for rejection.
b) The upper DC sleeve shall be staked to the solenoid housing in four locations. The presence of staking shall be visually apparent (see Figure 9). The absence of four visual stake marks at the interface of the sleeve and housing is cause for rejection.
Following Step 4, perform one of the following actions:
5a. If both of the above referenced criteria are met, re-install the solenoid housing. Verify the wave washer is present. Torque the four 3/8-16 capscrews to 24 ft-lbs.
5b. If the DC sleeve is found loose in the housing or staking is missing, replace with a new, dedicated housing provided by ESI. Note that the wave washer must be reused and the nameplate from the original solenoid housing must be removed and installed on the replacement housing. The nameplate is affixed via two self-tapping screws which must also be reused. Tighten the self-tapping screws hand tight (snug) until fully seated. Torque the housing's four 3/8-16 capscrews to 24 ft-lbs.
Report No. 10CFR21-0096 Revision: 0 Date: 09/02/09 Page: 7 of 7 5c. If the DC sleeve has dislodged and is missing from the housing, remove the coil from the assembly to expose the sleeve (see Figure 8). Remove the upper DC sleeve and re-install the coil. The coil will fit loosely around the bonnet and the wire leads should be fed through the conduit opening. Then replace with a new, dedicated housing provided by ESI. Note that the wave washer must be reused and the nameplate from the original solenoid housing must be removed and installed on the replacement housing. The nameplate is affixed via self-tapping screws which must also be reused. Tighten the self-tapping screws hand tight (snug) until fully seated. Torque the housing's four 3/8-16 capscrews to 24 ft-lbs.
Upper DC sleeve contacting lower DC sleeve I Figure 8: View Showing Upper DC Sleeve Contacting Lower DC Sleeve Note: If replacing the solenoid housing, the customer may notice that there has been a process change for the DC sleeve.
Whereas the valves supplied by ESI have a black paintedsleeve, in mid-to-late 2008 the manufacturerdeleted the painting process and switched to zinc plating. According the manufacturer, this is the only process change that has taken place as far as records indicate.
Figure 9: Replacement Housing With Zinc Plated Sleeve
°