Category:Deficiency Report (per 10CFR50.55e and Part 21)
MONTHYEARML24004A2092023-12-12012 December 2023 Flowline, Inc. - Interim Part 21 Report Notification Regarding Supply of 1 Sch. 80 (0.179 Wall) SB466 Uns C71500 Buttweld Long Radius 90 Degree Elbow; Manufacturer: Flowline; Heat No: 27668; 27 Pieces - Heat Code ML23352A2382023-12-0808 December 2023 56882-EN 56882 - Tioga Pipe, Inc Interim Part 21 Report Re Supply of 1 Inch Sch. 80 SB466 Uns C71500 Buttweld Long Radius 90 Degree Elbow ML23212A9502023-05-24024 May 2023 Engine Systems, Inc., Part 21 Report Re Woodward EGB-35P Governor/Actuator with Foreign Material ML21322A0512021-10-27027 October 2021 Paragon Energy Solutions, LLC, P21-09282021, Rev. 0, Final Notification of a Deviation with Inverter Assembly (Model NLI-072034-CSI-K-5-A) ML21295A2472021-10-18018 October 2021 Engine Systems, Inc., Part 21 Reportable Notification on a Pressure Regulator Valve ML21260A0072021-09-0909 September 2021 Ametek Solidstate Controls, Notification of Potential Defect - 10CFR Part 21 Report Re Omron Timer Relay ML19024A1642019-01-0707 January 2019 Ametek - Notification of Potential Defect - 10CFR Part 21 Re Solidstate Controls Safety-Related Operational Spare Parts Kits ML18102A5292018-04-0303 April 2018 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0121, Rev. 0, Refurbished Pressure Regulator Assembly, P/N 1776 506. ML18087A0032018-03-21021 March 2018 Crane Nuclear, Inc. - Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl 10x8x10 and 6x4x6 Bolted Bonnet Gate Valve (Updated) ML18075A3552018-03-0606 March 2018 10 CFR Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl 10x8x10 and 6x4x6 Bolted Bonnet Gate Valve ML18079A0142018-03-0606 March 2018 Crane Nuclear, Inc., 10 CFR Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl I0x8x10 and 6x4x6 Bolted Bonnet Gate Valve ML17194A8252017-07-11011 July 2017 Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections ML17142A3232017-05-11011 May 2017 Interim Report Concerning Supply of Stainless Steel Tubing ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML16281A2712016-09-30030 September 2016 Part 21 - Safety Related Component Welding by an Unqualified Welder ML16321A4502016-08-31031 August 2016 Part 21 Notification - Flowserve Swing Check Valves ML16243A4752016-08-26026 August 2016 Part 21 Safety Related Component Welding by an Unqualified Welder ML16188A3742016-06-30030 June 2016 Part 21 - Inadequate Swaging and Adherence of Silicone O-Ring and Silicone PAD Soft Seat Main Disc and Pilot Disc Assemblies ML16039A2692016-02-0303 February 2016 Nutherm International, Inc. - Potential Issue Regarding Incorrect Industrial Irradiation Dose, Per Cooper, Oconee, Fitzpatrick, Point Beach, Brunswick, and Susquehanna ML15265A4182015-09-21021 September 2015 Sor, Inc. - Part 21 Notification of Deviation - ML15251A212 Irradiation Certification with Insufficient Margin BSEP 15-0054, Part 21 Notification Regarding Allen Bradley Model 700RTC Relays2015-06-25025 June 2015 Part 21 Notification Regarding Allen Bradley Model 700RTC Relays ML15162A0232015-06-0909 June 2015 Part 21 - Incorrect Part Number Relay Shipped to Brunswick Nuclear Plant ML15173A0162015-06-0808 June 2015 Engine Systems, Inc. - 1OCFR21 Reporting of Defects and Non-Compliance - Report No. 10CFR21-0112, Rev. 0, Incorrect Relay Installed in Governor Control Panel, P/N 8002096-PANEL ML15155A5772015-05-28028 May 2015 Part 21 Notification Regarding Allen Bradley 700RTC Relay Configuration ML15103A2442015-04-0606 April 2015 Part 21 Report - Deviation of Hk Circuit Breaker Close Latch Spring ML14261A1502014-09-17017 September 2014 Interim Report to the NRC of 10 CFR 21 Event 50285, Reported by Itt 07/18/14 Concerning M1 Diaphragms, Customer Testing ML14210A0102014-07-23023 July 2014 Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve ML14204A7082014-07-23023 July 2014 Enclosure 2, Description of Closure Evaluation, Non-Proprietary Information - Class I (Public) ML14204A7072014-07-23023 July 2014 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Unseating of Valve Spring on SSPV ML14210A0092014-07-21021 July 2014 Part 21 Report - Incorrect Valve Solenoids Provided ML14070A1832014-02-14014 February 2014 Part 21 Report - Failed Pressure Regulator During Post Installation EDG Pressure Testing ML13340A3822013-12-0505 December 2013 Part 21 Reportable Condition Notification: Failure of Relay Logic Card Modules in 2 Out of 4 Voters ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13064A0122013-02-25025 February 2013 Notification of Potential Part 21 Report Re Wedge Pin Failure of an Anchor/Darling Double-Disc Gate Valve ML13044A0752013-02-0808 February 2013 Part 21 - Completed Evaluation for Potential Error in Main Steam Line High Flow Calculational Methodology ML12352A1232012-12-13013 December 2012 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12348A1362012-12-13013 December 2012 Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers ML12347A3082012-12-12012 December 2012 Part 21 60-Day Interim Report Notification: Error in Main Steam Line High Flow Calculational Methodology ML12318A0412012-11-0808 November 2012 Part 21 Report - Commercial Grade Dedication Not Properly Applied to Butterfly Valves ML12319A0122012-09-27027 September 2012 Error in Main Steam Line High Flow Calculational Methodology ML12177A0562012-06-21021 June 2012 Part 21 - Reliability Degradation of Resistors in Trip Units and Readout Assemblies ML12158A4472012-06-0606 June 2012 Part 21 60-Day Interim Report Notification - Closufailure of CRD Collet Retainer Tube/Outer Tube Weld ML12163A1302012-06-0606 June 2012 Part 21 Report - Failure of CRD Collet Retainer Tube/Outer Tube Weld ML12123A0892012-04-27027 April 2012 Abb, Inc., Notification of Potential Part 21 Report - Hk Circuit Breaker Studs Failed to Meet Specification ML12094A3712012-04-0202 April 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML12058A1412012-02-23023 February 2012 Part 21 Report - Rosemount Nuclear Instruments, Inc., Pressure Transmitter with Nonzero Based Calibrations ML12040A2832012-02-0707 February 2012 Notification of Potential Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer Guidance ML12038A0282012-02-0202 February 2012 Failure of CRD Collet Retainer Tube/Outer Tube Weld ML12032A2402012-02-0101 February 2012 Notification of Potential Part 21 - 60-Day Interim Report Notification: Failure of CRD Collet Retainer Tube/Outer Tube Weld ML11278A0762011-09-28028 September 2011 Abb, Inc. - 10 CFR Part 21 Notification of Potential Defect, Solid State Relays - Update of Previous Notification 2023-05-24
[Table view] |
Text
EENGINE 175 Freight Road SYSTEMS, INC. Telephone: 252/977-2720 Rocky Mount, NC 27804 Fax: 252/446-1134 June 8, 2015 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001
Subject:
10CFR21 Reporting of Defects and Non-Compliance -
Engine Systems, Inc. Report No. 10CFR21-0112, Rev. 0 Incorrect Relay Installed in Governor Control Panel P/N 8002096-PANEL
Dear Sir:
The enclosed report addresses a reportable notification on an incorrect relay installed in a governor control panel, ESI P/N 8002096-PANEL, supplied to Duke Energy Progress-Brunswick Nuclear Plant.
A copy of the report has been mailed to our affected nuclear customer.
Please sign below, acknowledging receipt of this report, and return a copy to the attention of Document Control at the address above (or, fax to number 252/446-1134) within 10 working days after receipt.
Yours very truly, ENGINE SYSTEMS, INC.
Susan Woolard Document Control Please let us know if ANY of your mailing information changes - name of recipient, name of company/facility, address, etc. Mark the changes on this acknowledgment form and send to us by mail or FAX to the number above.
RECEIVED:
93 DATE:
Quality Performance With Pride
yEI ENGINE SYSTEMS, INC.
175 Freight Road, Rocky Mount, NC 27804 Telephone: 252/977-2720 Fax: 252/446-1134 Report No. 10CFR21-0112 Rev. 0: 06/05/15 10CFR21 REPORTING OF DEFECTS AND NON-COMPLIANCE COMPONENT: Incorrect Relay Installed in Governor Control Panel P/N 8002096-PANEL SYSTEM: Emergency Diesel Generator CONCLUSION: Reportable in Accordance With 10CFR21 Prepared By: Date: ____ ___"
Engineering Manager Reviewed B Date: .-- /- "
Quality Manager Quality Performance With Pride
Report No. 10CFR21-0112 Record of Revisions Page: 1 of 1 REV DATE PAGE DESCRIPTION 0 06/05/15 Initial issue.
Report No. 10CFR21-0112 Revision: 0 Date: 06/05/15 Page: 1 of 2 Component:
Incorrect relay within governor control panel P/N 8002096-PANEL Summary:
Engine Systems Inc. (ESI) began a 10CFR21 evaluation on 04/13/15 upon discovery that governor control panels shipped to Brunswick Nuclear Plant contained an incorrect part number relay. The evaluation was concluded on 06/05/15 and it was determined that this issue is a reportable defect as defined by 10CFR Part 21. Under certain adverse conditions, a panel with the incorrect part number relay may lose power thereby resulting in inoperability of the electronic control portion of the control system. This could prevent the emergency diesel generator set from performing its safety-related function during an emergency event.
Discussion:
The relay in question is the Governor Control At Setpoint (GCASP) relay installed in the governor control panel assembly P/N 8002096-PANEL. The panel provides speed control functions for the emergency diesel generator (EDG). In the original panel design the part number specified was 219XBX282NE. During the course of EMC testing, it was determined that the EMI suppression diode within in the GCASP relay must be removed in order for the EUT to comply with the requirements of IEC 61000-4-5. When the diode was installed and the negative polarity portion of surge testing forward biased the diode, this resulted in a short circuit connection between the supply and return conductors of the control panel's power. This caused the fuses designed to protect the panel from overcurrent conditions to fail open; resulting in a loss of power to the control panel.
In place of the EMI suppression diode, an MOV (P/N V150LA10AP) was added across terminals 6 &
7 of the GCASP relay socket. The MOV provides similar EMI suppression to the removed diode and responds appropriately to either polarity of surge waveform. The MOV is external to the relay and is considered a separate component. The MOV is not affected by this notification.
Removal of the internal EMI suppression diode for the GCASP relay resulted in a part number change. The relay part number that should have been installed is P/N 219XBX283NE. The part number of the relay actually installed was P/N 219XBX282NE. The difference between the two relays is that P/N 219XBX282NE contains an internal suppression diode whereas 219XBX283NE does not.
Impact on Operability:
During normal operating conditions, the EDG will perform its safety related function with the incorrect GCASP relay installed in the governor control panel. Both relays provide the same switching function.
However, if a negative polarity surge similar to the requirements of IEC 61000-4-5 were to occur on the 125 VDC bus with the incorrect relay installed, the control panel may lose power. The 27GP relay would de-energize, alerting plant personnel of an under-voltage condition within the governor control panel. The EDG would remain operable on the mechanical governor though the electronic control portion would be inoperable.
Report No. 10CFR21-0112 Revision: 0 Date: 06/05/15 Page: 2 of 2 Root cause evaluation:
An error by a technician in conjunction with a lapse in oversight allowed this problem to occur.
Contributing to the issue was that only one digit differentiates the two part number relays and both have the same overall appearance (size, shape, case style, etc).
Evaluation of previous shipments:
This issue only affects one part number (qty 4) supplied on one customer purchase order:
ESI Sales Part Number Customer Customer ESI Serial Number C-of-C Date Qty Order P.O.
8002096-1.1-1 8002096 8002096-PANEL Duke Energy Brunswick Progress Nuclear Plant- 00655050 8002096-1.1-2 8002096-1.1-3 10/14/14 8002096-1.1-4 Corrective Action:
The customer was advised of the situation via letter "Notice of GCASP Relay Discrepancy -
Governor Control Panel" sent on 04/15/15. The correct relays were then supplied to the customer as dedicated, safety-related replacements on ESI IWO 8002474 (Brunswick PO 00786240) for installation in the panels. There are four panels affected, each containing one of these relays. ESI supplied four replacement relays which were C-of-C'd and shipped on 04/17/15. These are plug-in style relays and to replace the relay only requires pulling out the old relay and plugging in the new relay. No special tools or instructions are necessary.