MONTHYEARML24004A2092023-12-12012 December 2023 Flowline, Inc. - Interim Part 21 Report Notification Regarding Supply of 1 Sch. 80 (0.179 Wall) SB466 Uns C71500 Buttweld Long Radius 90 Degree Elbow; Manufacturer: Flowline; Heat No: 27668; 27 Pieces - Heat Code ML23352A2382023-12-0808 December 2023 56882-EN 56882 - Tioga Pipe, Inc Interim Part 21 Report Re Supply of 1 Inch Sch. 80 SB466 Uns C71500 Buttweld Long Radius 90 Degree Elbow ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23212A9502023-05-24024 May 2023 Engine Systems, Inc., Part 21 Report Re Woodward EGB-35P Governor/Actuator with Foreign Material ML22307A0602022-11-0303 November 2022 EN 56200 - Fairbanks Morse Re Basic Component Which Fails to Comply or Contains a Defect ML22301A1742022-10-28028 October 2022 Global Nuclear Fuel Americas, LLC (GNF) - Part 21 60-Day Interim Report Notification: GNF3 Raised Water Rod (SC-22-04 Rt) ML21322A0512021-10-27027 October 2021 Paragon Energy Solutions, LLC, P21-09282021, Rev. 0, Final Notification of a Deviation with Inverter Assembly (Model NLI-072034-CSI-K-5-A) ML21295A2472021-10-18018 October 2021 Engine Systems, Inc., Part 21 Reportable Notification on a Pressure Regulator Valve ML21260A0072021-09-0909 September 2021 Ametek Solidstate Controls, Notification of Potential Defect - 10CFR Part 21 Report Re Omron Timer Relay ML21225A0812021-08-0404 August 2021 Lake Engineering Co., Final Report Per 10 CFR Part 21 Degraded Snubber SF1154 Hydraulic Fluid Batch No. 17BLVS293 ML21014A2342020-12-0707 December 2020 Fourth Interim Notification Per 10 CFR Part 21 Re Degraded Snubber SF1154 Hydraulic Fluid Batch No. 17BLVS293 ML20049A0752020-02-11011 February 2020 C&D Technologies, Inc. -10 CFR Part 21 Evaluation Regarding Container Failure in KCR-07 Batteries ML20049A0742020-01-31031 January 2020 Fairbanks Morse Part 21 Re Fm Notification Report Serial Number 20-01 Fairbanks Morse ML19347A4262019-12-10010 December 2019 General Atomics - Reportable Occurrence Under 10CFR21: Reported Failure in Analog High Range Radiation Monitor (RP-2C) ML19253A0532019-08-29029 August 2019 Azz Nuclear - Report of Potential 1O CFR Part 21, Eaton Size 1 and 2 A200 Series Starters/Contactors ML19120A1062019-04-17017 April 2019 Interim Report of Potential 10 CFR Part 21, Eaton Size 1 and 2 A200 Series Starters/Contactors ML19080A0592019-03-0808 March 2019 Interim Report of Potential 10CFR Part 21, Eaton A200 Series Starters/Contactors ML19071A1122019-03-0101 March 2019 Lake Engineering Co., Corrected Potentially Degraded Snubber SF1154 Hydraulic Fluid Batch 11KLVS146 Final Report, Per 10 CFR Part 21 ML19053A5002019-02-0101 February 2019 Sor, Inc. Part 21 Notification of Deviation Sor R-Series Housing with Terminal Block ML19024A1642019-01-0707 January 2019 Ametek - Notification of Potential Defect - 10CFR Part 21 Re Solidstate Controls Safety-Related Operational Spare Parts Kits ML18295A1992018-09-24024 September 2018 Lake Engineering - Second Interim Notification Per 10 CFR Part 21: Degraded Snubber SF1154 Hydraulic Fluid Batch No. 11KLVS146 ML18102A5292018-04-0303 April 2018 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0121, Rev. 0, Refurbished Pressure Regulator Assembly, P/N 1776 506. ML18087A0032018-03-21021 March 2018 Crane Nuclear, Inc. - Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl 10x8x10 and 6x4x6 Bolted Bonnet Gate Valve (Updated) ML18075A3552018-03-0606 March 2018 10 CFR Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl 10x8x10 and 6x4x6 Bolted Bonnet Gate Valve ML18079A0142018-03-0606 March 2018 Crane Nuclear, Inc., 10 CFR Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl I0x8x10 and 6x4x6 Bolted Bonnet Gate Valve ML17313A4712017-11-0303 November 2017 Part 21 - Potentially Degraded Snubber SF1154 Hydraulic Fluid Batch 14ELVS145 Interim Report ML17212A6282017-07-24024 July 2017 Lake Engineering Co. - Potentially Degraded Snubber SF1154 Hydraulic Fluid Second - Interim Notification Per 10 CFR Part 21 ML17206A0392017-07-13013 July 2017 Part 21 - Hex Cap Screws Produced with Pre-existing Cracks ML17194A8252017-07-11011 July 2017 Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections ML17179A3782017-06-0707 June 2017 TE Connectivity - Part 21 Transfer of Information TE-023 ML17142A3232017-05-11011 May 2017 Interim Report Concerning Supply of Stainless Steel Tubing ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML17026A4142017-01-20020 January 2017 C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling ML17006A0112016-12-13013 December 2016 Part 21 Notification - Defective Safety-Related Relays Supplied by TE Connectivity ML16313A0622016-10-18018 October 2016 C&D Technologies, Inc. - 10 CFR Part 21 Evaluation Regarding Terminal Welding Failure in 3DCU-9 Batteries ML16281A2712016-09-30030 September 2016 Part 21 - Safety Related Component Welding by an Unqualified Welder ML16321A4502016-08-31031 August 2016 Part 21 Notification - Flowserve Swing Check Valves ML16243A4752016-08-26026 August 2016 Part 21 Safety Related Component Welding by an Unqualified Welder ML16209A0502016-07-13013 July 2016 Part 21 - Furmanite Nuclear Grade Leak Seal Material FSC-N-1B ML16188A3742016-06-30030 June 2016 Part 21 - Inadequate Swaging and Adherence of Silicone O-Ring and Silicone PAD Soft Seat Main Disc and Pilot Disc Assemblies ML16154A2062016-05-18018 May 2016 Part 21 Report - Defect in a Signal Converter Transformer ML16125A3602016-04-26026 April 2016 Part 21 - Hydraulic Snubber Seal Material Deviation Interim Report ML16076A2622016-03-14014 March 2016 Anvil Engineered Pipe Supports - Part 21 Regarding Hydraulic Snubber Seal Material Deviation Interim Report, Per Peach Bottom ML16039A2692016-02-0303 February 2016 Nutherm International, Inc. - Potential Issue Regarding Incorrect Industrial Irradiation Dose, Per Cooper, Oconee, Fitzpatrick, Point Beach, Brunswick, and Susquehanna ML15288A1992015-10-0909 October 2015 Part 21 Interim Report - Potential Defect on P/N 535-601 Moore Industries Milliamp Modules ML15265A4182015-09-21021 September 2015 Sor, Inc. - Part 21 Notification of Deviation - ML15251A212 Irradiation Certification with Insufficient Margin ML15223B2642015-08-0606 August 2015 Part 21 Report - Notification of Deviation Regarding Hk Circuit Breaker Pivot Pin ML15211A4962015-07-24024 July 2015 Part 21 - Actuator Shaft Did Not Meet Dimensional Requirements BSEP 15-0054, Part 21 Notification Regarding Allen Bradley Model 700RTC Relays2015-06-25025 June 2015 Part 21 Notification Regarding Allen Bradley Model 700RTC Relays 2023-09-06
[Table view] Category:Letter
MONTHYEARIR 05000352/20243012024-02-0202 February 2024 Initial Operator Licensing Examination Report 05000352/2024301 and 05000353/2024301 IR 05000352/20240112024-01-31031 January 2024 Information Request to Support Post-Approval Site Inspection for License Renewal; Inspection Report 05000352/2024011 IR 05000352/20230042024-01-31031 January 2024 Integrated Inspection Report 05000352/2023004 and 05000353/2023004 ML24026A2962024-01-26026 January 2024 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS)- Syrs, . ML24022A2262024-01-22022 January 2024 (PBAPS) Unit 3 - Submittal of the Inservice Inspection (ISI) Owner'S Activity Report (OAR) for the 24th Refueling Outage for Unit 3 ML23346A2412024-01-17017 January 2024 Staff Assessment of Updated Seismic Hazards Following the NRC Process for the Ongoing Assessment of Natural Hazards Information (EPID L-2019-PMP-0061) - Letter ML24004A0342024-01-17017 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0026 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000352/20230102024-01-11011 January 2024 Age-Related Degradation Report 05000352/2023010 and 05000353/2023010 IR 05000277/20234022024-01-11011 January 2024 Security Baseline Inspection Report 05000277/2023402 and 05000278/2023402 and Independent Spent Fuel Storage Installation Security Inspection 07200029/2023401 ML23354A1922024-01-0505 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) IR 05000324/20230112023-12-26026 December 2023 NRC Fire Protection Team Inspection - FPTI Report 05000324/2023011 and 05000325/2023011 IR 05000352/20234012023-12-21021 December 2023 Cybersecurity Inspection Report 05000352/2023401 and 05000353/2023401 ML23355A0622023-12-18018 December 2023 Independent Spent Fuel Storage Installation (Isfsi), Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines ML23321A2362023-12-14014 December 2023 Issuance of Amendment Nos. 262 and 224 Adoption of TSTF-477, Revision 3 and Associated Technical Specification Changes IR 05000324/20234022023-12-14014 December 2023 Security Baseline Inspection Report 05000324-2023402 and 05000325-2023402 ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 ML23334A2502023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement ML23333A2182023-11-29029 November 2023 Operator Licensing Examination Approval ML23297A0262023-11-27027 November 2023 Proposed Alternatives to ASME Code Section XI Subsection IWE Requirements for Torus Metallic Liner Inspections ML23325A2062023-11-21021 November 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML23313A0432023-11-13013 November 2023 Summary of Regulatory Audit in Support of Amendment Request for Control Room Air Conditioning Technical Specifications ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums ML23305A3472023-11-0101 November 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) IR 05000324/20230032023-11-0101 November 2023 Integrated Inspection Report 05000324/2023003 and 05000325/2023003 IR 05000277/20230032023-10-30030 October 2023 Integrated Inspection Report 05000277/2023003 and 05000278/2023003 and Exercise of Enforcement Discretion IR 05000352/20230032023-10-27027 October 2023 Integrated Inspection Report 05000352/2023003 and 05000353/2023003 and Independent Spent Fuel Storage Installation Inspection 07200065/2023001 ML23297A1722023-10-24024 October 2023 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000352/2024010 and 05000353/2024010 IR 05000352/20235012023-10-17017 October 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000352/2023501 and 05000353/2023501 IR 05000324/20230102023-10-17017 October 2023 Biennial Problem Identification and Resolution Inspection Report 05000324/2023010 and 05000325/2023010 IR 05000325/20234012023-10-16016 October 2023 Security Baseline Inspection Report 05000324 and 05000325 2023401 ML23286A0012023-10-13013 October 2023 Reply to a Notice of Violation (NOV) - NOV 05000277, 05000278/2023010-01 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans ML23271A1342023-10-11011 October 2023 Dtf Analysis Letter ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) 2024-02-02
[Table view] |
Text
~~
Paragon Date: 10/27/2021 To: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 Fax Number (301) 816-5151 10CFR Part 21 Formal Notification: P21-09282021, Rev. 0
Subject:
Final Notification of a Deviation with Inverter Assembly (Model NLI-072034-CSI-K-5-A)
Pursuant to 10CFR 21.21 (d) (3) (ii), Paragon Energy Solutions is providing written notification of the identification of a deviation.
On the basis of our evaluation dated 9/3/2021, it was determined that Paragon did not have sufficient information to determine if the subject condition would, or has, created a Substantial Safety Hazard or would have created a Technical Specification Safety Limit violation as it relates to the subject plant applications.
Exelon - Limerick and Peach Bottom were notified on 9/3/2021.
Duke - Brunswick was notified on 9/7/2021.
On 9/28/2021, Exelon Peach Bottom provided information indicating that the failure of the unit in service could cause a substantial safety hazard in their application.
The following information is required per 10CFR 21.21 (d) (4).
(i) Name and address of the individual or individuals informing the Commission.
Tracy Bolt, Chief Nuclear Officer Paragon Energy Solutions, LLC 7410 Pebble Drive Ft. Worth, TX 76118 (ii) Identification of the facility, activity, or the basic component supplied for such facility or such activity within the United States which fails to comply or contains a defect.
Inverter Assembly 1000VA NLI PIN: NLI-072034-CSI-K-5-A Exelon - Peach Bottom, Limerick Duke - Brunswick Paragon Energy Solutions 7410 Pebble Drive* Fort Worth, Texas* 76118 81 7-284-0077
- Fax 817-590-0484 Page 1 of 4
(iii) Identification of the firm constructing or supplying the basic component which fails to comply or contains a defect.
Components were originally supplied by Nuclear Logistics, LLC 7410 Pebble Drive, Fort Worth Texas 76118 (iv) Nature of defect or failure to comply and the safety hazard which is* created or could be created by such defect or failure to comply.
Paragon's investigation of the failed units has concluded that Absopulse Model CSI-K-B-Q9573-l units manufactured with transformer TR121Dl25/202A installed within their DC-DC converters, pose a higher risk of failing randomly during operation. These transformers were used in some of the post 2015 Absopulse inverter designs where the heat sink mounted rectifiers are being exposed to voltage levels beyond their design limits. It is our belief that prolonged operation could cause premature failure of the rectifier at indeterminate operational intervals.
The deviation relates to failure of the installed Absopulse 1OOOVA inverter (Model CSI-K-B-Q9573-1 ). The extent of condition is currently limited to Absopulse inverters manufactured or repaired in 2015 and later. As stated above, the root cause of the failure has been determined to be the transformer PIN: TR121D125/202A. It is not an issue with the transformer in general, just this specific transformer in this application. Of the post 2015 Absopulse Model CSI-K-B-Q9573-1 inverter design, the identified failures in the industry are low compared to the number of units that have been supplied. Paragon was able to run testing on an additional post 2015 unit that was on site. The additional unit did not exhibit the same high voltage spikes which were witnessed on the two failed Peach Bottom units. The reason for this is isolated to a variance in transformer model within the post 2015 converter designs.
The two failed Peach Bottom units utilized transformer model TRI 21 D 125/202A which is approximately a 4x step-up transformer, while the unit which does not exhibit high voltage spikes utilized model TR121D125/115A, which is approximately a 2.5x step-up transformer. It is Paragon's belief that post 2015 inverters, that have the TR121D125/202A (4x step-up), pose a higher risk of failing randomly during operation in this specific application.
The safety function of the DC/DC converter output rectifier is to provide the appropriate voltage output to downstream loads.
Although the failed component is the DC-DC converter output rectifiers (ROHM PIN: SCS210KE2) the root cause of the DC/DC con,verter failure is due to the 4X step-up transformer model TR121D125/202A.
(v) The date on which the information of such defect or failure to comply was obtained.
On 9/28/2021, Exelon Peach Bottom provided information indicating that the failure of the unit in service could cause a substantial safety hazard in their application if left uncorrected.
P21-09282021 Rev. 0 Page 2 of 4
(vi) In the case of a basic component which contains a defect or fails to comply, the number and location of these components in use at, supplied for being supplied for, or may be supplied for, manufactured, or being manufactured for one or more facilities or activities subject to the regulations in this part.
The following table identifies the units that were supplied or refurbished after 2015 Plant Client PO# Project Number NLIModel Qty Type of supply Peach Bottom 90 065497 351021814 NLI-072034-CSI-K-5-A 4 New Limerick 00606902 351026560 NLI-072034-CSI-K-5-A 2 New Limerick 00663381 351027091 NLI-072034-CSI-K-5-A 2 New Limerick 00704133 351029204 NLI-072034-CSI-K-5-A 2 New Brunswick 03050825 351026846 NLI-072034-CSI-K-5-A 6 New Brunswick 03052088 351026941 NLl-072034-CSI-K-5-A 1 New Limerick 90 082966 351024754 NLI-072034-CSI-K-5-A 1 Refurbished Limerick 90 083949 351024926 NLI-072034-CSI-K-5-A I Refurbished Limerick 90 086799 351025299 NLI-072034-CSI-K-5-A 1 Refurbished Limerick 00654374 351027748 NLI-072034-CSI-K-5-A 1 Refurbished Limerick 00684578 351028652 NLl-072034-CSI-K-5-A 1 Refurbished Limerick 00697845 351029024 NLI-072034-CSI-K-5-A 1 Refurbished Peach Bottom 00694785 351028920 NLI-072034-CSI-K-5-A 1 Refurbished (vii) The corrective action which has been, is being, or will be taken; the name of the individual or organization responsible for the action; and the length of time that has been or will be taken to complete the action.
This issue has been entered into the Paragon Non-Conformance and Corrective Action Program. Paragon has communicated with the commercial OEM regarding their corrective actions to prevent the recurrence of this issue in future units supplied to Paragon.
Paragon Corrective Actions:
- Paragon has created an inspection procedure for existing supplied units.
- The identified plants have been provided the inspection procedure to help identify suspect inverters that were built or refurbished after 2015 that may contain the 4x step up transformer.
- Paragon will work with the identified plants to rework the inverter assemblies that require the transformer replacement. Expected completion: at the plant's discretion
- The assembly instructions and/or Test plans will include an inspection to ensure the correct transformer is installed. Expected completion: by 11/30/2021 P21-09282021 Rev. 0 Page 3 of 4
(viii) Any advice related to the defect or failure to comply about the facility, activity, or basic component that has been, is being, or will be given to purchasers or licensees.
Paragon recommends the following:
Screen the generation of Absopulse inverter installed in your equipment through visual inspection. Paragon has written and provided Inspection Procedure JP.:NLJ-072034-CSI-K-5-A to aid the plants with their screening process.
If screening identifies the problematic transformer or if screening activities are not available at the plant; remove, segregate and return post 2015 supplied units.
sm:/4 /~£{1 TracyBol~
Chief Nuclear Officer Paragon Energy Solutions 817-284-0077 tbolt@paragones.com P21-09282021 Rev. 0 Page 4 of 4