Letter Sequence Other |
---|
EPID:L-2021-LLA-0022, Request for License Amendment - Standby Liquid Control (SLC) System Boron Solution Storage Tank Volume (Approved, Closed) |
|
|
|
---|
Category:Letter
MONTHYEARIR 05000324/20253012024-10-17017 October 2024 Notification of Licensed Operator Initial Examination 05000325/2025301 and 05000324/2025301 IR 05000324/20244012024-10-15015 October 2024 Security Baseline Inspection Report 05000324/2024401 and 05000325/2024401 ML24297A6262024-10-11011 October 2024 PCA Letter to NRC Brunswick Potential Tropical Storm Eight IR 05000324/20240102024-09-10010 September 2024 Focused Engineering Inspection Commercial Grade Dedication Report 05000324-2024010 and 05000325-2024010 ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000324/20240052024-08-23023 August 2024 Updated Inspection Plan for Brunswick Steam Electric Plant, Units 1 and 2 (Report 05000324/2024005 and 05000325/2024005) IR 05000324/20240022024-08-0505 August 2024 Integrated Inspection Report 05000324/2024002 and 05000325/2024002 and 07200006/2024001 ML24206A1062024-07-30030 July 2024 2024 Brunswick Requal Inspection Corporate Notification Letter ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 IR 05000324/20244202024-07-0202 July 2024 – Security Baseline Inspection Report 05000324/2024420 and 05000325/2024420 ML24108A0702024-06-0505 June 2024 – Issuance of License Amendments to Revise the 10 CFR 50.69 Categorization Process to Reflect an Alternative Seismic Approach IR 05000324/20244022024-05-17017 May 2024 Plan Material Control and Accounting Program Inspection Report 05000324/2024402 and 05000325/2024402 - Cover Letter IR 05000324/20240012024-05-0909 May 2024 Integrated Inspection Report 05000324/2024001 and 05000325/2024001 05000325/LER-2024-002, Re Automatic Start of Emergency Diesel Generator Due to Emergency Bus De-energization2024-04-10010 April 2024 Re Automatic Start of Emergency Diesel Generator Due to Emergency Bus De-energization 05000325/LER-2024-001, Primary Containment Penetration Local Leak Rate Testing Failure2024-04-10010 April 2024 Primary Containment Penetration Local Leak Rate Testing Failure ML24066A0132024-03-0505 March 2024 Bru 2024-002 Radiation Safety Baseline Inspection Information Request ML24026A0982024-03-0101 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0057 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000324/20230062024-02-28028 February 2024 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 – NRC Inspection Reports 05000324/2023006 and 05000325/2023006 IR 05000324/20244032024-02-14014 February 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perm Inspection 05000325/2024403; 05000324/2024403 ML24032A1392024-02-12012 February 2024 Correction of Errors within Authorized Alternative Request RA-22-0308 IR 05000324/20230042024-02-0606 February 2024 Integrated Inspection Report 05000324/2023004 and 05000325/2023004 IR 05000324/20230112023-12-26026 December 2023 NRC Fire Protection Team Inspection - FPTI Report 05000324/2023011 and 05000325/2023011 IR 05000324/20234022023-12-14014 December 2023 Security Baseline Inspection Report 05000324-2023402 and 05000325-2023402 ML23297A0262023-11-27027 November 2023 – Proposed Alternatives to ASME Code Section XI Subsection IWE Requirements for Torus Metallic Liner Inspections ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000324/20230032023-11-0101 November 2023 Integrated Inspection Report 05000324/2023003 and 05000325/2023003 IR 05000324/20230102023-10-17017 October 2023 Biennial Problem Identification and Resolution Inspection Report 05000324/2023010 and 05000325/2023010 IR 05000325/20234012023-10-16016 October 2023 Security Baseline Inspection Report 05000324 and 05000325 2023401 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000324/20230052023-08-23023 August 2023 Updated Inspection Plan for Brunswick Steam Electric Plant, Units 1 and 2 (Report 05000324/2023005 and 05000325/2023005) IR 05000324/20230022023-08-0404 August 2023 Integrated Inspection Report 05000324/2023002 and 05000325/2023002 ML23201A2042023-07-28028 July 2023 Summary of Regulatory Audit in Support of Alternative Request RA-22-0308 for Inservice Inspection of the Torus Metallic Liner IR 05000324/20243012023-07-25025 July 2023 – Notification of Licensed Operator Initial Examination 05000325/2024301 and 05000324/2024301 05000324/LER-2023-001, Two Main Steam Line Safety Relief Valves Inoperable2023-07-17017 July 2023 Two Main Steam Line Safety Relief Valves Inoperable 05000325/LER-2023-001, Loss of Redundant Power Supply Operation Causes Turbine Trip and Subsequent Reactor Scram2023-06-15015 June 2023 Loss of Redundant Power Supply Operation Causes Turbine Trip and Subsequent Reactor Scram ML23146A0012023-05-24024 May 2023 EN 56538 - Engine Systems Inc and Brunswick ML23212A9502023-05-24024 May 2023 Engine Systems, Inc., Part 21 Report Re Woodward EGB-35P Governor/Actuator with Foreign Material ML23130A3902023-05-12012 May 2023 – Regulatory Audit Plan in Support of Alternative Request RA 22-0308 for Inservice Inspection of the Torus Metallic Liner IR 05000324/20230012023-05-10010 May 2023 – Integrated Inspection Report 05000324 2023001 and 05000325 2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000324/20220042023-04-0404 April 2023 Reissue - Brunswick Steam Electric Plant - Integrated Inspection Report 05000324/2022004 and 05000325/022004 ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000324/20220062023-03-0101 March 2023 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 – NRC Inspection Reports 05000324/2022006 and 05000325/2022006 ML23033A5252023-02-0808 February 2023 Integrated Inspection Report 05000324/2022004 and 05000325/2022004 IR 05000324/20223012023-02-0303 February 2023 NRC Operator License Examination Report 05000325/2022301 and 05000324/2022301 IR 05000324/20224022022-11-23023 November 2022 Security Baseline Inspection Report 05000324 2022402 and 05000325 2022402 ML22332A0132022-11-23023 November 2022 Operator Licensing Written Examination Approval 05000325/2022301 and 05000324/2022301 ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations 2024-09-04
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24108A0702024-06-0505 June 2024 – Issuance of License Amendments to Revise the 10 CFR 50.69 Categorization Process to Reflect an Alternative Seismic Approach ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 ML22028A1742022-05-12012 May 2022 Issuance of Amendment Nos. 309 and 337 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-580, Revision 1 ML22082A2682022-05-0202 May 2022 Issuance of Amendment Nos. 308 and 336 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-505, Revision 2 ML22054A2152022-03-0808 March 2022 Correction to Amendments to Revise Standby Liquid Control System Boron Solution Storage Tank Volume Technical Specifications ML21281A1382021-12-14014 December 2021 Issuance of Amendment Nos. 306 and 334 to Revise Standby Liquid Control System Boron Solution Storage Tank Volume Technical Specifications ML21155A2132021-08-26026 August 2021 Plant ML21067A2242021-04-30030 April 2021 Issuance of Amendment Nos. 305 and 333 to Revise License Conditions to Adopt 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML20309A7842021-03-18018 March 2021 Issuance of Amendment Nos. 304 and 332 Revise Technical Specification 3.4.7 and 3.4.8 to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystem ML20342A3472021-03-0404 March 2021 Issuance of Amendment Nos. 303 and 331 Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control Enhancements ML20253A3212021-01-26026 January 2021 Issuance of Amendment Nos. 302 and 330 Revise Technical Specification 3.6.3.1 to Adopt TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 ML20269A3052020-09-29029 September 2020 Issuance of Amendment Nos. 301 and 329 to Revise Technical Specifications to Adopt TSTF-564 (EPID L-2020-LLA-0043) (Non-Proprietary) ML20258A2712020-09-21021 September 2020 Correction Letter to Amendment Nos. 301, 329, 307, 303, 178, 317, 296, 416, 418, 417, and 268 ML20083F9272020-08-12012 August 2020 Issuance of Amendments to Relocate the Unit/Facility/Plant Staff Qualification Requirements to the Duke Energy Quality Assurance Program Description ML19346C7922020-02-0606 February 2020 Issuance of Amendments Nos. 298 and 326 to Modify Technical Specification to Extend Containment Leakage Test Intervals ML19316B0572020-01-0808 January 2020 Issuance of Amendment Nos. 297 and 325 to Modify Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.11 Safety Relief Valves ML19281A3302019-11-21021 November 2019 Issuance of Amendment Nos. 296 and 324 to Adopt Technical Specification Task Force Traveler TSTF-269-A, Revision 2, Allow Administrative Means of Position Verification ML19268A0542019-10-31031 October 2019 Units 1 and 2 - Issuance of Amendment Nos. 295 and 323 to Revise Technical Specification 3.3.8.1, Loss of Power (LOP) Instrumentation ML19254E0762019-10-25025 October 2019 Issuance of Amendment Nos. 294 and 322 to Revise Technical Specification 3.7.4 for Control Room Air Conditioning Subsystems ML19233A0732019-09-23023 September 2019 Issuance of Amendment Nos. 293 and 321 to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML19149A4712019-09-17017 September 2019 Issuance of Amendment Nos. 292 and 320, Adopt 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML19018A2062019-05-0606 May 2019 Issuance of Amendment Nos. 290 and 318 to Revise Note on Brunswick TS 3.8.3 for One-Time Extension of Main Fuel Oil Storage Tank Completion Time ML19035A0062019-04-22022 April 2019 Issuance of Amendment Nos. 289 and 317 to Relocate the Pressure-Temperature Limits in the Technical Specifications to the Pressure-Temperature Limits Report ML18291B3222019-01-0909 January 2019 Issuance of Amendment Nos. 288 and 316 to Adopt TSTF-208, Revision 0, Extension of Time to Reach Mode 2 in LCO 3.0.3 ML18264A2602019-01-0707 January 2019 Issuance of Amendment Nos. 287 and 315 to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements ML18243A2982018-09-27027 September 2018 Issuance of Amendment to Modify DC Sources Technical Specification Surveillance Requirement 3.8.4.5 ML18172A2582018-09-18018 September 2018 Non-Proprietary, Issuance of Amendment Regarding Core Flow Operating Range Expansion (Mellla+) ML18106B1692018-07-0606 July 2018 Issuance of Amendment Nos. 284 and 312 Regarding Request to Allow Performance-Based Fire Protection Alternative for Thermal Insulation Material ML18137A1432018-05-23023 May 2018 Correction to Issuance of Amendment Nos. 283 and 311 to Adopt TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control (CAC Nos. MF9905 and MF9906; EPID L-2017-LLA-0242) ML18039A4442018-04-13013 April 2018 Issuance of Amendments to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control Revision 2 ML17328B0722017-11-26026 November 2017 Issuance of Amendments for Technical Specification 3.8.1, AC Sources - Operating One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements Emergency Situation ML17186A2192017-09-0606 September 2017 Issuance of Amendments to Adopt TSTF-529, REV-4, Clarify Use and Application Rules (CAC Nos. MF8819-MF8820) ML17180A5962017-08-29029 August 2017 Issuance of Amendments to Adopt TSTF-423 Technical Specifications End States, NEDC-32988-A ML17188A3872017-08-21021 August 2017 Issuance of Amendments Regarding Application to Consolidate Emergency Operations Facilities and Associated Emergency Plan Changes (CAC Nos. MF7650 Through MF7660) ML17130A7802017-07-12012 July 2017 Issuance of Amendments Regarding Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-545 ML17096A1292017-05-24024 May 2017 Issuance of Amendments Regarding Request to Relocate Specific Surveillance Frequencies to a Licensee Controlled Program ML17055A6472017-05-0808 May 2017 Brunswick, Catawba, McGuire, Shearon Harris, and H. B. Robinson - Issuance of Amendments to Revise Technical Specifications to Adopt TSTF-522, Revision 0 (CAC Nos. MF8422, MF8423, MF8424, MF8425, MF8426, MF8427, MF8428, and MF8429) ML17066A3742017-04-26026 April 2017 Issuance of Amendments Re. Application to Revise TSs to Adopt TSTF-427, Rev. 2, Using the Consolidated Line Item Improvement Process (CAC Nos. MF8039 Through MF8049) ML16343A2462017-04-11011 April 2017 Issuance of Amendments Regarding Reactor Protection System Electrical Protection Assembly Electric Power Monitoring Surveillance Requirements ML17059D1462017-03-10010 March 2017 Issuance of Amendments to Revise Technical Specification Section 2.1.1.2, Safety Limit Minimum Critical Power Ratio ML16217A1182016-09-13013 September 2016 Steam Electric Plants, Shearon Harris Nuclear Power Plant,Unit 1 -Issuance of Amendments 271, 299, 152 and 246 Re Change in Corporate Form of Duke Energy Progress, Inc ML16174A0722016-06-27027 June 2016 Correction to License Pages Issuance of Amendments Regarding Adoption of TSTF-523 (Cac Nos. MF6413 Through MF6422) ML16085A1132016-04-29029 April 2016 1 & 2; Shearon Harris Nuclear Power Plant 1; Catawba Nuclear Station 1 & 2; Mcguire Nuclear Station 1 & 2; and Oconee Nuclear Station 1, 2, & 3: Issuance of Amendments Regarding Adoption of TSTF-523 (CAC Nos. MF6413-MF6422) ML16049A2282016-02-29029 February 2016 Correction to Signature for License Amendment Nos. 268 and 296 Regarding Emergency Action Level Scheme Upgrade ML16019A0292016-02-0909 February 2016 Issuance of Amendments Regarding the Adoption of Topical Report ANP-10298P-A, Revision 1 ML15344A1532016-01-0808 January 2016 Issuance of Amendments Regarding Emergency Action Level Scheme Upgrade ML14310A8082015-01-28028 January 2015 Issuance of Amendment Regarding Transition to a Risk-Informed, Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48(C) ML14318A9292014-12-19019 December 2014 H. B. Robinson; Shearon Harris Nuclear Power Plant; and Crystal River, Unit 3 - Issuance of License Amendments Regarding Revision to Cyber Security Plan Implementation Schedule Completion Date (TAC Nos. MF3263 - MF3267) 2024-06-05
[Table view] Category:Safety Evaluation
MONTHYEARML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 ML23297A0262023-11-27027 November 2023 – Proposed Alternatives to ASME Code Section XI Subsection IWE Requirements for Torus Metallic Liner Inspections ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 ML22028A1742022-05-12012 May 2022 Issuance of Amendment Nos. 309 and 337 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-580, Revision 1 ML22082A2682022-05-0202 May 2022 Issuance of Amendment Nos. 308 and 336 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-505, Revision 2 ML22054A2152022-03-0808 March 2022 Correction to Amendments to Revise Standby Liquid Control System Boron Solution Storage Tank Volume Technical Specifications ML21343A2002021-12-20020 December 2021 Authorization and Safety Evaluation for Alternative from Certain Requirements of American Society of Mechanical Engineers Boiler and Pressure Vessel Code of Buried Service Water Piping (EPID L-2021-LLR-0014) (Non-Proprieta ML21281A1382021-12-14014 December 2021 Issuance of Amendment Nos. 306 and 334 to Revise Standby Liquid Control System Boron Solution Storage Tank Volume Technical Specifications ML21155A2132021-08-26026 August 2021 Plant ML21113A0132021-05-0606 May 2021 Request for Use of a Later Edition of ASME Boiler and Pressure Vessel Code, Section XI for Repair and Replacement Activities ML21067A2242021-04-30030 April 2021 Issuance of Amendment Nos. 305 and 333 to Revise License Conditions to Adopt 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML20309A7842021-03-18018 March 2021 Issuance of Amendment Nos. 304 and 332 Revise Technical Specification 3.4.7 and 3.4.8 to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystem ML20342A3472021-03-0404 March 2021 Issuance of Amendment Nos. 303 and 331 Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control Enhancements ML21029A3352021-02-16016 February 2021 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20253A3212021-01-26026 January 2021 Issuance of Amendment Nos. 302 and 330 Revise Technical Specification 3.6.3.1 to Adopt TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 ML20310A4102020-12-18018 December 2020 Request for Alternative to Examination Category B-N-1 (VT-3) Visual Examination of Accessible Areas of the Reactor Vessel Interior ML20300A2062020-11-0909 November 2020 Duke Fleet - Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20269A3052020-09-29029 September 2020 Issuance of Amendment Nos. 301 and 329 to Revise Technical Specifications to Adopt TSTF-564 (EPID L-2020-LLA-0043) (Non-Proprietary) ML20258A2712020-09-21021 September 2020 Correction Letter to Amendment Nos. 301, 329, 307, 303, 178, 317, 296, 416, 418, 417, and 268 ML20083F9272020-08-12012 August 2020 Issuance of Amendments to Relocate the Unit/Facility/Plant Staff Qualification Requirements to the Duke Energy Quality Assurance Program Description ML20073F1862020-03-0606 March 2020 Issuance of Amendment Nos. 299 and 327 to Revise Technical Specification 5.6.5b to Allow Application of Advanced Framatome Atrium 11 Fuel Methodologies (EPID L-2018-LLA-0273) (Redacted) ML19346C7922020-02-0606 February 2020 Issuance of Amendments Nos. 298 and 326 to Modify Technical Specification to Extend Containment Leakage Test Intervals ML19316B0572020-01-0808 January 2020 Issuance of Amendment Nos. 297 and 325 to Modify Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.11 Safety Relief Valves ML19284C8332019-11-21021 November 2019 Safety Evaluation Regarding Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109 ML19281A3302019-11-21021 November 2019 Issuance of Amendment Nos. 296 and 324 to Adopt Technical Specification Task Force Traveler TSTF-269-A, Revision 2, Allow Administrative Means of Position Verification ML19268A0542019-10-31031 October 2019 Units 1 and 2 - Issuance of Amendment Nos. 295 and 323 to Revise Technical Specification 3.3.8.1, Loss of Power (LOP) Instrumentation ML19254E0762019-10-25025 October 2019 Issuance of Amendment Nos. 294 and 322 to Revise Technical Specification 3.7.4 for Control Room Air Conditioning Subsystems ML19233A0732019-09-23023 September 2019 Issuance of Amendment Nos. 293 and 321 to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML19149A4712019-09-17017 September 2019 Issuance of Amendment Nos. 292 and 320, Adopt 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML19254A6202019-09-17017 September 2019 Duke Energy Fleet (Brunswick, Catawba, Robinson, McGuire, Oconee, and Shearon Harris) - Alternative to Use Encoded Phased Array Ultrasonic Examination in Lieu of Radiography ML19058A6322019-07-0101 July 2019 Issuance of Amendments to Revise Emergency Action Level Schemes to Incorporate Clarifications Provided by Emergency Preparedness FAQs ML19128A3262019-06-20020 June 2019 Alternative to Depth Sizing Qualification Examination of Welds ML19018A2062019-05-0606 May 2019 Issuance of Amendment Nos. 290 and 318 to Revise Note on Brunswick TS 3.8.3 for One-Time Extension of Main Fuel Oil Storage Tank Completion Time ML19035A0062019-04-22022 April 2019 Issuance of Amendment Nos. 289 and 317 to Relocate the Pressure-Temperature Limits in the Technical Specifications to the Pressure-Temperature Limits Report ML18291B3222019-01-0909 January 2019 Issuance of Amendment Nos. 288 and 316 to Adopt TSTF-208, Revision 0, Extension of Time to Reach Mode 2 in LCO 3.0.3 ML18264A2602019-01-0707 January 2019 Issuance of Amendment Nos. 287 and 315 to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements ML18243A2982018-09-27027 September 2018 Issuance of Amendment to Modify DC Sources Technical Specification Surveillance Requirement 3.8.4.5 ML18172A2582018-09-18018 September 2018 Non-Proprietary, Issuance of Amendment Regarding Core Flow Operating Range Expansion (Mellla+) ML18197A4302018-08-0909 August 2018 Relief Request ISI-10 to Regarding Alternate Repair of Feedwater Nozzle Dissimilar Metal Welds ML18106B1692018-07-0606 July 2018 Issuance of Amendment Nos. 284 and 312 Regarding Request to Allow Performance-Based Fire Protection Alternative for Thermal Insulation Material ML18124A3052018-05-0909 May 2018 Alternative for ISI-09 Regarding Reactor Pressure Vessel Shell Welds Fourth Ten-Year Inservice Inspection Interval ML18122A2032018-05-0707 May 2018 Relief from the Requirements of the ASME Code, Section XI, ISI-11 Regarding System Leakage Test of Class 1 Piping ML18117A1912018-05-0404 May 2018 Proposed Alternative to Defer Inspection of Reactor Vessel Instrumentation Nozzle 2B11-RPV-N11B Until the First Period in the 5th 10-Year ISI Interval ML18039A4442018-04-13013 April 2018 Issuance of Amendments to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control Revision 2 ML17331A0862017-12-26026 December 2017 Alternative to Inservice Inspection Regarding Reactor Pressure Vessel Threads 2024-07-12
[Table view] |
Text
March 8, 2022
Mr. John A. Krakuszeski Site Vice President Brunswick Steam Electric Plant Duke Energy Progress, LLC 8470 River Rd., SE (M/C BNP001)
Southport, NC 28461
SUBJECT:
BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 - CORRECTION TO AMENDMENTS TO REVISE STANDBY LIQUID CONTROL SYSTEM BORON SOLUTION STORAGE TANK VOLUME TECHNICAL SPECIFICATIONS (EPID L-2021-LLA-0022)
Dear Mr. Krakuszeski:
On December 14, 2021 (Agencywide Documents Access and Management System Accession No. ML21281A138), the U.S. Nuclear Regulatory Commission (NRC) issued Amendment Nos. 306 and 334 to Renewed Facility Operating License Nos. DPR-71 and DPR-62 for the Brunswick Steam Electric Plant, Units 1 and 2 (Brunswick), respectively. Following issuance of these amendments, NRC identified that incorrect amendment numbers were inadvertently used.
The purpose of this letter is to correct the Amendment Nos. within the December 14, 2021, letter from 306 to 307, and 334 to 335, for Brunswick, Units 1 and 2, respectively. Enclosed, please find the corrected amendments, license pages, and safety evaluation page.
The amendments were in response to your request dated February 23, 2021 (ADAMS Accession No. ML21054A197). The amendment s revised Figure 3.1.7-1, Sodium Pentaborate Solution Volume Versus Concentration Requirements, of Technical Specification (TS) 3.1.7, Standby Liquid Control (SLC) System, to increase the minimum boron solution storage tank volume requirements.
The NRC concludes that the corrections are editorial in nature and do not change the staffs previous conclusion in the safety evaluation for these Amendments, nor do they affect the no significant hazards consideration, as published in the Federal Register on April 20, 2021 (86 FR 20529).
J. Krakuszeski - 2 -
If you have any questions regarding this matter, please contact me at (301) 415-0272 or by e-mail at Lucas.Haeg@nrc.gov.
Sincerely,
/RA/
Luke Haeg, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Docket Nos.: 50-325 and 50-324
Enclosures:
- 1. Corrected amendments
- 2. Corrected license pages
- 3. Corrected safety evaluation page
cc: Listserv DUKE ENERGY PROGRESS, LLC
DOCKET NO. 50-325
BRUNSWICK STEAM ELECTRIC PLANT, UNIT 1
AMENDMENT TO RENEWED FA CILITY OPERATING LICENSE
Amendment No. 307 Renewed License No. DPR-71
- 1. The U.S. Nuclear Regulatory Commission (the Commission) has found th at:
A. The application for amendment filed by Duke Energy Progress, LLC (the licensee), dated February 23, 2021, complies with the standa rds and requirements of the Ato mic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chap ter I;
B. The facility will operate in conformity with the application, the provision s of the Act, and the rules and regulations of the Commission;
C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the healt h and safety of the public, and (ii) that such activities will be conducted in compliance with th e Commissions regulations;
D. The issuance of this amendment will not be inimical to the common defen se and security or to the health and safety of the public; and
E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
Enclosure 1
- 2 -
- 2. Accordingly, the license is amended by changes to the Technical Specif ications, as indicated in the attachment to this license amendment; and paragraph 2.C.(2) of Renewed Facility Operating License No. DPR-71 is hereby amended to read as follo ws:
(2) Technical Specifications
The Technical Specifications contained in Appendix A, as revised through Amendment No. 307, are hereby incorporated in the license. Duke Energy Progress, LLC shall oper ate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of the date of its issuan ce and shall be implemented prior to startup from the 2022 Unit 1 refueling ou tage.
FOR THE NUCLEAR REGULATORY COMMISSION
Original signed by David J. Wrona
David J. Wrona, Chief Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachments:
Changes to the Renewed Operating License, Technical Specifications
Date of Issuance: December 14, 2021 ATTACHMENT TO LICENSE AMENDMENT NO. 307
BRUNSWICK STEAM ELECTRIC PLANT, UNIT 1
RENEWED FACILITY OPERATING LICENSE NO. DPR-71
DOCKET NO. 50-325
Replace page 6 of Renewed Facility Operating License No. DPR-71 with the attached page 6.
Replace the following page of the Appendix A Technical Specifications with the attached revised page. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove Pages Insert Pages 3.1-23 3.1-23
- 6 -
(c) Transition License Conditions
- 1. Before achieving full compliance with 10 CFR 50.48(c), as specified by 2. below, risk-informed changes to the licensees fir e protection program may not be made without prior NRC review and approval unless the change has been demonstrated to hav e no more than a minimal risk impact, as described in 2. above.
- 2. The licensee shall implement the modifications to its facility, as described in Table S-1, Plant Modifications Committed, of Duk e letter BSEP 14-0122, dated November 20, 2014, to complete the transition to full compliance with 10 CFR 50.48(c) by the startup of the second refueling outage for each unit after issuance of th e safety evaluation. The licensee shall maintain appropriate compensatory measures in place until completion of thes e modifications.
- 3. The licensee shall complete all implementation items, excep t item 9, listed in LAR Attachment S, Table S-2, Implementati on Items, of Duke letter BSEP 14-0122, dated November 20, 2014, within 180 days after NRC approval unless the 180 th day falls within an outage window; then, in that case, completion of th e implementation items, except item 9, shall occur no later than 60 days after startup from that particular outage. The licensee shall complete implementation of LAR Attachment S, Table S-2, Item 9, within 180 days after the startup of the second refueli ng outage for each unit after issuance of the safety evaluation.
C. This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; and is subject to all applicable provisions hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level The licensee is authorized to operate the facility at steady state reactor core power levels not in excess of 2923 megawatts thermal.
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 307, are hereby incorporated in the license. Duke Energy Progress, LLC shall operate the facility in accordance with the Technical Specifications.
For Surveillance Requirements (SRs) that are new in Amendment 203 to Renewed Facility Operating License DPR-71, the first performance is du e at the end of the first surveillance interval that begins at implementati on of Amendment 203. For SRs that existed prior to Amendment 203, including SRs with modified acceptance criteria and SRs whose frequency of
Renewed License No. DPR-71 Amendment No. 307 SLC System 3.1.7
11.0
10.5 (1393, 10.5)
Note: B-10 Atomic Enrichment 92%
10.0
9.5
9.0 Accep ta b l e
(1738, 8.5) 8.5 Not Acceptable
8.0 800 1200 1600 2000 2400 2800 3200
NET VOLUME OF SOLUTION IN TANK (g a llo n s )
Figure 3.1.7-1 (page 1 of 1)
Sodium Pentaborate Solution Volume Versus Concertation Requirements
Brunswick Unit 1 3.1-23 Amendment No. 307285 DUKE ENERGY PROGRESS, LLC
DOCKET NO. 50-324
BRUNSWICK STEAM ELECTRIC PLANT, UNIT 2
AMENDMENT TO RENEWED FA CILITY OPERATING LICENSE
Amendment No. 335 Renewed License No. DPR-62
- 1. The U.S. Nuclear Regulatory Commission (the Commission) has found th at:
A. The application for amendment filed by Duke Energy Progress, LLC (the licensee), dated December 14, 2021, complies with the sta ndards and requirements of the Ato mic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chap ter I;
B. The facility will operate in conformity with the application, the provision s of the Act, and the rules and regulations of the Commission;
C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the healt h and safety of the public, and (ii) that such activities will be conducted in compliance with th e Commissions regulations;
D. The issuance of this amendment will not be inimical to the common defen se and security or to the health and safety of the public; and
E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
Enclosure 2
- 2 -
- 2. Accordingly, the license is amended by changes to the Technical Specif ications, as indicated in the attachment to this license amendment; and paragraph 2.C.(2) of Renewed Facility Operating License No. DPR-62 is hereby amended to read as follo ws:
(2) Technical Specifications
The Technical Specifications contained in Appendix A, as revised through Amendment No. 335, are hereby incorporated in the license. Duke Energy Progress, LLC shall oper ate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of the date of its issuan ce and shall be implemented prior to startup from the 2023 Unit 2 refueling ou tage.
FOR THE NUCLEAR REGULATORY COMMISSION
Original signed by David J. Wrona
David J. Wrona, Chief Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachments:
Changes to the Renewed Operating License, Technical Specifications
Date of Issuance: December 14, 2021 ATTACHMENT TO LICENSE AMENDMENT NO. 335
BRUNSWICK STEAM ELECTRIC PLANT, UNIT 2
FACILITY OPERATING LICENSE NO. DPR-62
DOCKET NO. 50-324
Replace page 6 of Renewed Facility Operating License No. DPR-62 with the attached page 6.
Replace the following page of the Appendix A Technical Specifications with the attached revised page. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove Pages Insert Pages 3.1-23 3.1-23 6
(c) Transition License Conditions
- 1. Before achieving full compliance with 10 CFR 50.48(c), as specified by 2. below, risk-informed changes to the licensees fir e protection program may not be made without prior NRC review and approval unless the change has been demonstrated to hav e no more than a minimal risk impact, as described in 2. above.
- 2. The licensee shall implement the modifications to its facility, as described in Table S-1, Plant Modifications Committed, of Duk e letter BSEP 14-0122, dated November 20, 2014, to complete the transition to full compliance with 10 CFR 50.48(c) by the startup of the second refueling outage for each unit after issuance of th e safety evaluation. The licensee shall maintain appropri ate compensatory measures in place until completion of thes e modifications.
- 3. The licensee shall complete all implementation items, excep t Item 9, listed in LAR Attachment S, Table S-2, Implementati on Items, of Duke letter BSEP 14-0122, dated November 20, 2014, within 180 days after NRC approval unless the 180 th day falls within an outage window; then, in that case, completion of th e implementation items, except item 9, shall occur no later than 60 days after startup from that particular outage. The license e shall complete implementation of LAR Attachment S, Table S-2, Item 9, within 180 days after the startup of the second refueli ng outage for each unit after issuance of the safety evaluation.
C. This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter i n effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level The licensee is authorized to operate the facility at steady state reactor cor e power levels not in excess of 2923 megawatts (thermal).
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 335, are hereby incorporated in the license. Duke Energy Progress, LLC shall operate the facility in accordance with the Technical Specifications.
For Surveillance Requirements (SRs) that are new in Amendment 233 to Renewed Facility Operating License DPR-62, the first performance is du e at the end of the first surveillance interval that begins at implementati on of Amendment 233. For SRs that existed prior to Amendment 233,
Renewed License No. DPR-62 Amendment No. 335 SLC System 3.1.7
11.0
10.5 (1393, 10.5)
Note: B-10 Atomic Enrichment 92%
10.0
9.5
9.0 Accep ta b l e
(1738, 8.5) 8.5 Not Acceptable
8.0 800 1200 1600 2000 2400 2800 3200
NET VOLUME OF SOLUTION IN TANK (g a llo n s )
Figure 3.1.7-1 (page 1 of 1)
Sodium Pentaborate Solution Volume Versus Concertation Requirements
Brunswick Unit 2 3.1-23 Amendment No. 335313 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION
RELATED TO AMENDMENT NOS. 3 07 AND 335
TO RENEWED FACILITY OPERATING LICENSE NOS. DPR-71 AND DPR-62
DUKE ENERGY PROGRESS, LLC
BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2
DOCKET NOS. 50-325 AND 50-324
1.0 INTRODUCTION
By application dated February 23, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21054A197), Duke Energy Progress, LLC (Duke Energy, the licensee), submitted a license amendment request (LAR) to change the Facility Operating License Nos. DPR-71 and DPR-62 for Brunswick Steam Electric Plant, Units 1 and 2 (Brunswick). The proposed change increases the minimum boron solution storage tank volume requirements of the plant Technical Specification (TS) Figure 3.1.7-1, Sodium Pentaborate Solution Volume Versus Concentration Requirements, for the Standby Liquid Control (SLC) system.
2.0 REGULATORY EVALUATION
2.1. Proposed Change
Brunswick currently uses a sodium pentaborate (SPB) solution with boron enriched to 92 atom-percent with boron-10 (B-10) isotope. The current net volume (gallons) of solution in tank versus concentration (weight percent SPB in solut ion) limits shown in TS Figure 3.1.7-1 were established to ensure that the SLC system injects a quantity of boron which produces a concentration of 720 parts per million (ppm) equivalent of natural boron in the reactor coolant at 70°F with normal reactor vessel water level. The requirement of this figure was established when implementing the NRC-approved Maximum Extended Load Line Limit Analysis Plus (MELLLA+) for Brunswick, Issuance of Amendment Regarding Core Flow Operating Range Expansion (MELLLA+), dated September 18, 2018 (ADAMS Accession No. ML18172A258).
In order to achieve future core reload flexibility for Brunswick and to add margin to the SLC shutdown capability, the licensee plans to increase natural boron concentration from 720 ppm equivalent of natural boron to 925 ppm in the reactor coolant. As a result, the proposed change would increase the minimum boron solution storage tank volume requirements of TS Figure 3.1.7-1 by shifting the left boundary of the Acceptable region of TS Figure 3.1.7-1 to the right.
The licensee proposes that the existing minimum volume at a concentration of 10.5 weight
Enclosure 3
ML22054A215 OFFICE NRR/DORL/LPL2-2/PM NRR/DORL/LPL2-2/LA NRR/DORL/LPL2-2/BC NAME LHaeg RButler DWrona DATE 2/22/2022 2/25/2022 3/8/2022 OFFICE NRR/DORL/LPL2-2/PM NAME LHaeg DATE 3/8/2022