MONTHYEARML23201A2042023-07-28028 July 2023 Summary of Regulatory Audit in Support of Alternative Request RA-22-0308 for Inservice Inspection of the Torus Metallic Liner ML19149A2102019-07-0101 July 2019 Regulatory Audit Summary, License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Plants ML18282A2242018-11-14014 November 2018 Regulatory Audit Summary Regarding License Amendment Requests to Adopt 10 CFR 50.69 ML18068A6272018-03-22022 March 2018 Report for the Audit of Licensee Responses to Interim Staff Evaluations Open Items Related to NRC Order EA-13-109 ML17271A2482017-11-15015 November 2017 Nuclear Regulatory Commission Report for the Audit of Duke Energy Progress, LLCs Flood Hazard Reevaluation Report Submittal Related to the Near-Term Task Force Recommendation 2.1 - Flooding for Brunswick Steam Electric Plant, Units 1 and 2 ML15279A4502015-12-0909 December 2015 NRC Report for the Audit of Duke Entergy Progress, Inc. Interim Evaluation Associated with Reevaluated Seismic Hazard Implementing Near-Term Task Force Recommendation 2.1 -- Seismic for: Brunswick Steam Electric Plant, Units 1 and 2 (TACs M ML15082A1552015-03-31031 March 2015 Report for the Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML13220A0902013-11-22022 November 2013 Interim Staff Evaluation Regarding Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies ML11272A0632012-02-28028 February 2012 Audit of the Licensees Management Regulatory Commitments ML0826812572008-09-30030 September 2008 Audit of the Licensees Management of Regulatory Commitments ML0517206212005-06-21021 June 2005 Audit and Review Report for Plant Aging Management Reviews and Programs, Brunswick Steam Electric Plant, Units 1 and 2 ML0515700672005-06-0303 June 2005 Audit Report Regarding License Renewal Application for the Brunswick Steam Electric Plant Dated October 18, 2004 ML0501104452004-12-23023 December 2004 Audit Plan for License Renewal Application Aging Management Programs Aging Management Review Results - Brunswick Steam Electric Plant, Units 1 and 2, Revision 6, Dated December 23, 2004 2023-07-28
[Table view] Category:Letter
MONTHYEARIR 05000324/20240032024-11-13013 November 2024 Integrated Inspection Report 05000324/2024003 and 05000325/2024003 IR 05000324/20253012024-10-17017 October 2024 Notification of Licensed Operator Initial Examination 05000325/2025301 and 05000324/2025301 IR 05000324/20244012024-10-15015 October 2024 Security Baseline Inspection Report 05000324/2024401 and 05000325/2024401 ML24297A6262024-10-11011 October 2024 PCA Letter to NRC Brunswick Potential Tropical Storm Eight IR 05000324/20240102024-09-10010 September 2024 Focused Engineering Inspection Commercial Grade Dedication Report 05000324-2024010 and 05000325-2024010 ML24218A0862024-09-0909 September 2024 NRC to NMFS, Designation of Duke Energy Progress LLC as the Non-Federal Representative for Brunswick Steam Electric Plant, Units 1 and 2 ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24242A0322024-08-29029 August 2024 Submittal of Updated Final Safety Analysis Report (UFSAR) Revision 29, 10 CFR 54.37 Update, Technical Requirements Manuals, Technical Specification Bases, 10 CFR 50.59 and 10 CFR 72.48 Evaluation Summaries, and Commitment Change IR 05000324/20240052024-08-23023 August 2024 Updated Inspection Plan for Brunswick Steam Electric Plant, Units 1 and 2 (Report 05000324/2024005 and 05000325/2024005) IR 05000324/20240022024-08-0505 August 2024 Integrated Inspection Report 05000324/2024002 and 05000325/2024002 and 07200006/2024001 ML24206A1062024-07-30030 July 2024 2024 Brunswick Requal Inspection Corporate Notification Letter ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 IR 05000324/20244202024-07-0202 July 2024 – Security Baseline Inspection Report 05000324/2024420 and 05000325/2024420 ML24108A0702024-06-0505 June 2024 – Issuance of License Amendments to Revise the 10 CFR 50.69 Categorization Process to Reflect an Alternative Seismic Approach IR 05000324/20244022024-05-17017 May 2024 Plan Material Control and Accounting Program Inspection Report 05000324/2024402 and 05000325/2024402 - Cover Letter IR 05000324/20240012024-05-0909 May 2024 Integrated Inspection Report 05000324/2024001 and 05000325/2024001 05000325/LER-2024-002, Re Automatic Start of Emergency Diesel Generator Due to Emergency Bus De-energization2024-04-10010 April 2024 Re Automatic Start of Emergency Diesel Generator Due to Emergency Bus De-energization 05000325/LER-2024-001, Primary Containment Penetration Local Leak Rate Testing Failure2024-04-10010 April 2024 Primary Containment Penetration Local Leak Rate Testing Failure IR 05000324/20243012024-04-0303 April 2024 NRC Operator License Examination Report 05000325/2024301 and 05000324/2024301 ML24066A0132024-03-0505 March 2024 Bru 2024-002 Radiation Safety Baseline Inspection Information Request ML24026A0982024-03-0101 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0057 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000324/20230062024-02-28028 February 2024 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 – NRC Inspection Reports 05000324/2023006 and 05000325/2023006 IR 05000324/20244032024-02-14014 February 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perm Inspection 05000325/2024403; 05000324/2024403 ML24032A1392024-02-12012 February 2024 Correction of Errors within Authorized Alternative Request RA-22-0308 IR 05000324/20230042024-02-0606 February 2024 Integrated Inspection Report 05000324/2023004 and 05000325/2023004 ML24036A0962024-02-0202 February 2024 Operator Licensing Examination Approval 050003242024301 and 050003252024301 IR 05000324/20230112023-12-26026 December 2023 NRC Fire Protection Team Inspection - FPTI Report 05000324/2023011 and 05000325/2023011 IR 05000324/20234022023-12-14014 December 2023 Security Baseline Inspection Report 05000324-2023402 and 05000325-2023402 ML23297A0262023-11-27027 November 2023 – Proposed Alternatives to ASME Code Section XI Subsection IWE Requirements for Torus Metallic Liner Inspections ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000324/20230032023-11-0101 November 2023 Integrated Inspection Report 05000324/2023003 and 05000325/2023003 IR 05000324/20230102023-10-17017 October 2023 Biennial Problem Identification and Resolution Inspection Report 05000324/2023010 and 05000325/2023010 IR 05000325/20234012023-10-16016 October 2023 Security Baseline Inspection Report 05000324 and 05000325 2023401 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000324/20230052023-08-23023 August 2023 Updated Inspection Plan for Brunswick Steam Electric Plant, Units 1 and 2 (Report 05000324/2023005 and 05000325/2023005) IR 05000324/20230022023-08-0404 August 2023 Integrated Inspection Report 05000324/2023002 and 05000325/2023002 ML23201A2042023-07-28028 July 2023 Summary of Regulatory Audit in Support of Alternative Request RA-22-0308 for Inservice Inspection of the Torus Metallic Liner ML23212B2682023-07-25025 July 2023 – Notification of Licensed Operator Initial Examination 05000325/2024301 and 05000324/2024301 05000324/LER-2023-001, Two Main Steam Line Safety Relief Valves Inoperable2023-07-17017 July 2023 Two Main Steam Line Safety Relief Valves Inoperable 05000325/LER-2023-001, Loss of Redundant Power Supply Operation Causes Turbine Trip and Subsequent Reactor Scram2023-06-15015 June 2023 Loss of Redundant Power Supply Operation Causes Turbine Trip and Subsequent Reactor Scram ML23146A0012023-05-24024 May 2023 EN 56538 - Engine Systems Inc and Brunswick ML23212A9502023-05-24024 May 2023 Engine Systems, Inc., Part 21 Report Re Woodward EGB-35P Governor/Actuator with Foreign Material ML23130A3902023-05-12012 May 2023 – Regulatory Audit Plan in Support of Alternative Request RA 22-0308 for Inservice Inspection of the Torus Metallic Liner IR 05000324/20230012023-05-10010 May 2023 – Integrated Inspection Report 05000324 2023001 and 05000325 2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000324/20220042023-04-0404 April 2023 Reissue - Brunswick Steam Electric Plant - Integrated Inspection Report 05000324/2022004 and 05000325/022004 ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000324/20220062023-03-0101 March 2023 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 – NRC Inspection Reports 05000324/2022006 and 05000325/2022006 2024-09-09
[Table view] |
Text
July 28, 2023 Mr. John A. Krakuszeski Site Vice President Brunswick Steam Electric Plant Duke Energy Progress, LLC 8470 River Rd., SE (M/C BNP001)
Southport, NC 28461
SUBJECT:
BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 -
SUMMARY
OF REGULATORY AUDIT IN SUPPORT OF ALTERNATIVE REQUEST RA-22-0308 FOR INSERVICE INSPECTION OF THE TORUS METALLIC LINER (EPID L-2022-LLR-0089)
Dear Mr. Krakuszeski:
By letter dated December 15, 2022 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML22349A655), Duke Energy Progress, LLC (Duke Energy) requested an alternative (RA-22-0308) to certain requirements of the 2007 Edition through 2008 Addenda of American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, Subsection IWE to conduct alternative visual examinations of the torus metallic liner at Brunswick Steam Electric Plant, Unit Nos. 1 and 2 (Brunswick).
To support its review, the U.S. Nuclear Regulatory Commission (NRC) staff conducted a virtual regulatory audit from June 5, 2023, through June 15, 2023, to support its review of the alternative request. During the regulatory audit, the NRC staff reviewed documents and held discussions with members of Duke Energy and its representatives. The regulatory audit summary is enclosed with this letter.
J. Krakuszeski If you have any questions, please contact me at (301) 415-1383 or by email at Perry.Buckberg@nrc.gov.
Sincerely,
/RA/
Perry H. Buckberg, Senior Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-325 and 50-324
Enclosure:
Regulatory Audit Summary cc: Listserv
Enclosure REGULATORY AUDIT
SUMMARY
BY THE OFFICE OF NUCLEAR REACTOR REGULATION IN SUPPORT OF ALTERNATIVE REQUEST RR-22-0308 FOR INSERVICE INSPECTION OF THE TORUS METALLIC LINER DUKE ENERGY PROGRESS, LLC BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-325 AND 50-324
1.0 BACKGROUND
By letter dated December 15, 2022 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML22349A655), Duke Energy Progress, LLC (Duke Energy, the licensee) requested an alternative (request RA-22-0308) to certain requirements of the 2007 Edition through 2008 Addenda of American Society of Mechanical Engineers (ASME)
Boiler and Pressure Vessel Code,Section XI, Subsection IWE to conduct alternative visual examinations of the torus metallic liner at Brunswick Steam Electric Plant, Unit Nos. 1 and 2 (Brunswick).
Information that the NRC staff relies upon to make the safety determination must be submitted on the docket. However, the NRC staff may review supporting information retained as records under Title 10 of the Code of Federal Regulations (10 CFR) 50.71 and/or 10 CFR 54.37, which, although not required to be submitted as part of the licensing action, would help the NRC staff better understand the licensees submitted information. To support its review of the alternative request, the NRC staff issued a regulatory audit plan on May 12, 2023 (ML23130A390), which included audit questions to the licensee. The purpose of the audit was to review the documentation related to the subject of its application (e.g., calculations and reports) that were not submitted on the Brunswick docket, to acquire additional understanding about the alternative request, and to determine whether additional information is needed to be docketed to complete the NRC staffs safety evaluation.
2.0 AUDIT ACTIVITIES of this audit summary lists the individuals that took part in or attended the audit.
The NRC audit team held a virtual entrance meeting with the licensee on June 5, 2023, and the virtual regulatory audit was conducted from June 5, 2023, through June 15, 2023. Throughout the audit period, the NRC audit team used an internet-based portal provided by the licensee to review primarily non-docketed information related to the alternative request and technical discussions of the audit questions and responses were held according to the audit plan.
There were no open items from audit discussions and no deviations from the audit plan. A summary of non-docketed information provided by the licensee in response to the May 12, 2023, audit questions and June 5, 2023 through June 15, 2023 audit discussions is presented in of this audit summary.
3.0 RESULTS OF THE AUDIT The NRC staff will continue to review the documents which the licensee placed in the portal as the NRC staff begins drafting its safety evaluation. The NRC staff will draft a Request(s) for Additional Information if the safety evaluation will rely on information posted to the portal.
Attachments:
- 1. List of Participants
- 2. List of Documents Reviewed During Audit
List of Participants U.S. Nuclear Regulatory Commission (NRC) Audit Team Name Position Buckberg, Perry Senior Project Manager Istar, Ata Civil Engineer Tsao, John Senior Materials Engineer Lee, Brian Safety and Plant Systems Engineer Widrevitz, Dan Materials Engineer Duke Energy Team Sigmon, Chet Vaughan, Jordan Treadway, Ryan Franklin, Sean Mays, Steve Staller, Angela Tedder Jr., Rowland Miller, Ryan Goelz, John Galloway, Heather Duc, Joshua Pyne, Mark Nichols, Steven
Documents Reviewed During Audit The licensee provided responses and supporting documents (e.g., analyses, calculations, reports, drawings, and procedures) on the document portal for the NRC Audit Team to review.
Below is a summary of the documents provided.
Responses to audit questions R1 ESEB through R5 ESEB and R6 NVIB through R15 NVIB from the May 12, 2023, regulatory audit plan, with supporting documents which included:
0RIP-1009 - Torus Liner Revised Acceptance Criteria.pdf BG0249A - Design Basis Document - Torus Liner Inspections and Preservation Engineering Evaluation Report 94-0065 - Unit 2 Torus Re-coating and Corrosion Assessment Engineering Change (EC) document ECC0000420060000 o EC0000420060000 0PT-20.5.1 Mark-ups 50000 o EC0000420060000 Attachment A - PM 82-068 - Control point measurements 40000 o EC0000420060000 Attachment B -1SP-94-109 - Control point measurements 20000 o EC0000420060000 Attachment C -A Review of Trends of Corrosion Loss and Pit Depth in Long-Term Exposures 10000 o EC0000420060000 Attachment D -Metallurgy Report Maximum Pit Depth Projection for BNP U1 U2 Torus Liners 30000 Bio-Dur 561 Data Sheet NDE-NE-ALL-7402 Rev 003 Fusion Copy - Visual Examination of IWE Components OPT-20.5.1 - Primary Containment Inspection B1R21 Torus Liner Bay 1-16 Exam Report B1R21 2016 UCC Torus Exam Final Report B1R24 Torus Liner CISI AUG Exam Report B2R22 2015 Torus Visual VT-3 Exam Record B2R22 2015 UCC Torus Exam Final Report B2R25 March 2021 Torus Visual Exam Records B2R25 March 2021 UCC Torus Exam Final Report B2R26 February 2023 Torus Visual Exam Records B2R26 February 2023 UCC Project Summary R15 NVIB BNP1 Torus Exam Plan R15 NVIB BNP2 Torus Exam Plan Duke Entrance Meeting Acceptance Criteria Presentation Second and Third Interval Torus Inspection Markups Pit Depth Measurement Documentation Coating Thickness Documentation Responses to June 12 and June 13 Audit Team clarification questions
ML23201A204 NRR-106 OFFICE NRR/DORL/LPL2-2/PM NRR/DORL/LPL2-2/LA NRR/DSS/SCPB/BC NAME PBuckberg RButler BWittick DATE 7/20/2023 7/25/2023 7/25/2023 OFFICE NRR/DNRL/NVIB/BC NRR/DEX/ESEB/BC NRR/DORL/LPL2-2/BC NAME ABuford ITseng (GThomas for)
DWrona DATE 7/27/2023 7/24/2023 7/28/2023 OFFICE NRR/DORL/LPL2-2/PM NAME PBuckberg DATE 7/28/2023