Text
GE Hitachi Nuclear Energy July 23, 2014 MFN 14-010 R1 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Completed Evaluation of Part 21 Potentially Reportable Condition Notification:
Unseating of Valve Spring on SSPV This letter provides information concerning an evaluation now completed by GE Hitachi Nuclear Energy (GEH) regarding the malfunction of Scram Solenoid Pilot Valves (SSPVs), which have been observed to impair control rod scram performance. As stated herein, GEH has concluded this condition is Not Reportable for two of the affected plants (Enrico Fermi 2 and Columbia Generating Station plants), but GEH does not have sufficient information to fully evaluate the safety significance of the condition for the remainder of the potentially affected plants. Given that, GEH closes this 10 CFR Part 21 evaluation with a Transfer of Information to potentially affected licensees, in accordance with the requirements of 10 CFR 21.21(b) and will communicate the determination of Not Reportable to the identified plants where sufficient information was available to make that determination.
Although the Enrico Fermi 2 and Columbia Generating Station plants are included in the attached list of U.S. plants potentially affected, inspections of all suspect SSPVs remaining at those plants indicate that no other SSPVs at those plants exhibit the condition (as informally reported to GEH),
and therefore those plants were determined to not have a reportable condition.
This letter closes the supplemental 60-Day Interim Report Notification (MFN 14-010 R0), provided on March 13, 2014, per 10 CFR 21.21(a)(2).
If you have any questions, please call me at (910) 819-4491.
Sincerely, Dale E. Porter Safety Evaluation Program Manager GE-Hitachi Nuclear Energy Americas LLC Dale E. Porter GE-Hitachi Nuclear Energy Americas LLC Safety Evaluation Program Manager 3901 Castle Hayne Rd.,
Wilmington, NC 28401 USA T 910 819-4491 Dale.Porter@GE.Com Proprietary Notice This letter transmits proprietary information in accordance with 10CFR2.390. Upon removal of Enclosure 1, the balance of this letter may be considered non-proprietary.
MFN 14-010 R1 Page 2 of 2
References:
- 1. Letter, Dale E. Porter (GEH) to Document Control Desk (NRC), Part 21 60-Day Interim Report Notification: Unseating of Valve Spring on SSPV, MFN 14-010 R0, March 31, 2014.
- 2. ASCO Valve, Inc., 60-Day Interim Report, March 11, 2014, U.S. NRC ADAMS Accession Number ML14079A026
- 3. ASCO Valve, Inc., Final Report, June 16, 2014, U.S. NRC ADAMS Accession Number ML14169A258 Attachments:
- 1. U.S. Plants Potentially Affected
Enclosures:
- 1. Description of Closure Evaluation, GEH Proprietary Information - Class II (Internal)
- 2. Description of Closure Evaluation, Non-Proprietary Information - Class I (Public)
- 3. Affidavit for Enclosure 1 cc:
J. Golla, USNRC S. S. Philpott, USNRC S. J. Pannier, USNRC A. Issa, USNRC D. C. Crawford, GEH J. F. Harrison, GEH J. G. Head, GEH J. Burke, GEH P. L. Campbell, GEH Washington PRC File PLM Spec 000N5377 R1 Document Components:
001 MFN 14-010 R1 Cover Letter.pdf 002 MFN 14-010 R1 Enclosure 1 Proprietary.pdf 003 MFN 14-010 R1 Enclosure 2 Non-Proprietary.pdf 004 MFN 14-010 R1 Enclosure 3 Affidavit.pdf
MFN 14-010 R1 Page 1 of 1 Attachment Attachment U.S. Plants Potentially Affected U.S. BWR Plants and Associated Facilities SC only TI Utility Plant Constellation Energy Nine Mile Point 1-2 X
Detroit Edison Co.
Fermi 2 X
Energy Northwest Columbia Entergy Grand Gulf Entergy River Bend Entergy FitzPatrick Entergy Pilgrim Entergy Vermont Yankee Exelon Clinton X
Exelon Dresden 2-3 Exelon LaSalle 1-2 Exelon Limerick 1-2 X
Exelon Oyster Creek X
Exelon Peach Bottom 2-3 X
Exelon Quad Cities 1-2 FirstEnergy Nuclear Operating Co.
Perry 1 Florida Power & Light Duane Arnold Nebraska Public Power District Cooper PPL Susquehanna LLC Susquehanna 1-2 Progress Energy Brunswick 1-2 PSEG Services Corp.
Hope Creek Southern Nuclear Operating Co.
Hatch 1 - 2 X
Tennessee Valley Authority Browns Ferry 1-3 Xcel Energy Monticello North East Utilities Millstone TI = Transfer of Information (10CFR 21.21(b))
SC = GEH Safety Information Communication