IR 05000324/2022401

From kanterella
Jump to navigation Jump to search
Security Baseline Inspection Report 05000324/2022401 and 05000325/2022401
ML22075A136
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 03/16/2022
From: Jonathan Brown
Division of Reactor Safety II
To: Santaniello S
Duke Energy Progress
References
IR 2022401
Download: ML22075A136 (8)


Text

SUBJECT:

BRUNSWICK STEAM ELECTRIC PLANT - SECURITY BASELINE INSPECTION REPORT 05000324/2022401 AND 05000325/2022401

Dear Mr. Santaniello:

On February 17, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Brunswick Steam Electric Plant and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html, and at the NRC Public Document Room, in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 05000324 and 05000325 License Nos. DPR-62 and DPR-71

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000324 and 05000325

License Numbers:

DPR-62 and DPR-71

Report Numbers:

05000324/2022401 and 05000325/2022401

Enterprise Identifier:

I-2022-401-0038

Licensee:

Duke Energy Progress, LLC

Facility:

Brunswick Steam Electric Plant

Location:

Southport, NC

Inspection Dates:

January 10-January 14, 2022 (Corporate)

February 14-February 17, 2022 (On Site)

Inspectors:

J. Brown, Senior Physical Security Inspector

A. Richardson, Physical Security Inspector

Approved By:

Jannette G. Worosilo, Chief

Plant Support Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Brunswick Steam Electric Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection, unless otherwise noted. Currently approved Ips, with their attached revision histories, are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met, consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.01 - Access Authorization

The inspectors evaluated the access authorization program. The following elements were evaluated:

Access Authorization

(1) Tier I: All Requirements Tier II: (02.05 a, b, 02.07 a, b, 02.08 a, c)

Tier III: (02.09, 02.10 a-c)

71130.08 - Fitness for Duty Program

The inspectors evaluated the fitness for duty program by completing the following inspection

elements: Fitness For Duty Program

(1) Tier I: All Requirements Tier II: (02.05 a-h, 02.06 a-g, 02.07 a-e, 02.08 a, b, 02.09 a-e)

Tier III: (02.10, 02.11 a, 02.12 a, 02.14 a-c)

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On February 17, 2022, the inspectors presented the security baseline inspection results to Mr. Sam Santaniello and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

2370126

Corrective Action

Documents

2372852

21 MRO/SAE Audit

10/27/2021

Various Types of Access Authorization Records

20-Fleet-PAA-

PR-01

Nuclear Oversight - Performance Review

01/30/2020

Miscellaneous

21-Fleet-PAA-

PR-01

Nuclear Oversight - Performance Review

06/17/2021

AD-SY-ALL-0301

Nuclear Worker Unescorted Access Authorization Program

Revision 7

AD-SY-ALL-0310

Access Authorization Program

Revision 7

AD-SY-ALL-0320

Personnel Access Data System

Revision 3

AD-SY-ALL-0340

Access Authorization Training and Qualification

Revision 3

AD-SY-ALL-0350

Reviewing Official's Guidance for Access Authorization

Revision 2

Procedures

AD-SY-ALL-0370

Access Processing of Foreign Nationals

Revision 2

71130.01

Self-Assessments

20-Fleet-PAA-

Audit Report

07/09/2020

2386156

Reactor Service Performance Trend

2405833

HHS Laboratory Reporting

2408778

Administrative Error

2408781

HHS Laboratory Reporting

Corrective Action

Documents

2410415

Corrective Action

Documents

Resulting from

Inspection

2416201

Opportunity for improvement

AD-SY-ALL-0400

Fitness for Duty Program

Revision 4

AD-SY-ALL-0405

Fitness for Duty Violations

Revision 3

AD-SY-ALL-0410

Fitness for Duty Collections

Revision 4

AD-SY-ALL-0415

Fitness for Duty Blind Performance Testing Procedure

Revision 3

AD-SY-ALL-0420

Fitness for Duty Unscheduled Call Out

Revision 1

71130.08

Procedures

AD-SY-ALL-0440

Fitness for Duty Training & Qualification

Revision 2

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

AD-SY-ALL-0451

Behavior Observation Program

Revision 4

AD-SY-ALL-0460

Managing Fatigue and Work Hour Limits

Revision 5

PY-SY-ALL-0004

Duke Energy Nuclear Generation Fitness for Duty Policy

Revision 2